TE11 Certification Test-Schedule CA October 07.pdf

PDF 28 KB Posted

Attached to
FACILITIES OPERATIONS, MAINTENANCE, REPAIRS, AND CONSTRUCTION SERVICES FOR THE IRS FRESNO SERVICE CENTER
Solicitation number
TIRWR-10-R00009
Issued by

About this file

TECHNICAL EXHIBIT 11

View the file

Other files

File Type Posted
TIRWR10R00009-A0008[1].rtf RTF text file
TE-6_reports-august 26.pdf PDF
TIRWR10R00009[1]-revised August 24.rtf RTF text file
Davis Bacon 6-2010.pdf PDF
Fresno Wage Determination Aug25.pdf PDF
TIRWR10R00009-A0007.rtf RTF text file
Fresno Wage 6-2010.rtf RTF text file
Davis Bacon 6-2010.pdf PDF
TIRWR10R00009-A0006.pdf PDF
TIRWR10R00009-A0004.rtf RTF text file
Questions From Site Survey-August 17.rtf RTF text file
TIRWR10R00009-A3.rtf RTF text file
Corporate Experience Summary Form 2.pdf PDF
TIRWR10R00009-A0002[1].pdf PDF
site survey sign in sheet.pdf PDF
post synopsis.rtf RTF text file
TIRWR10R00009[1]-revised August 9.pdf PDF
TIRWR10R00009-A0001[1].pdf PDF
TE-12 EMS Fresno Territory.pdf PDF
Past Performance Questionnaire-Fresno.pdf PDF
Fresno Wage Determination[1].pdf PDF
Contract - QASP AUGUST 2010.pdf PDF
TE-6_reports-august 2010.pdf PDF
Corporate Experience Summary Form.pdf PDF
Freseno Davis Bacon[1].pdf PDF
TE-2, New PWS-aug 10.pdf PDF
TIRWR10R00009[1].pdf PDF
post synopsis.pdf PDF
te_8_terminology.revised.pdf PDF
TE-3_New PWS_12_9_09.pdf PDF
TE-5 Final 3-27-09.xls XLS spreadsheet
TE-7 Government Furnished Facilities.pdf PDF
te-4_preventive_AUGUST 2010.pdf PDF
te-9_standards_and_regulations_1_14_2008.pdf PDF
HSPD_12_PIV_Procedures_Manual.pdf PDF
te-10_infrared.pdf PDF
TE-1 Facility Location Data AUGUST 2010.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Annual Certification Schedule Fresno 8/4/2010

Item # EQUIP # EQUIPMENT Description Equipment Location

IRS PM/CERT

GUIDES FREQUENCY

1 F-24-01 Fire Extinguisher, Inspection In All 5 Buildings F-24-01 M, 1Y 2 F-24-02 Fire Extinguisher, Inspection In All 5 Buildings F-24-02 M, 1Y 3 F-24-03 Fire Extinguisher, Inspection In All 5 Buildings F-24-03 M, 1Y 4 F-24-04 Fire Extinguisher, Inspection In All 5 Buildings F-24-04 M, 1Y 5 B-02A-02 Boiler (Coal, Oil, and Gas), 120 MBTU's or less Building 5 B-02A-02 Annualy, 1Y 6 B-02B-01 Boiler (Coal, Oil, and Gas), 120 to 300 MBTU's Building 5 B-02B-01 Annualy, 1Y

7 T-01-01 Tank, Water (All Types) Boiler Rooom

Building 5 T-01-01 Every 3

Years, 3Y

8 T-01-02 Tank, Water (All Types) Boiler Rooom

Building 5 T-01-02 Every 3

Years, 3Y

9 T-01-04 Tank, Water (All Types) Boiler Rooom

Building 5 T-01-04 Every 3

Years, 3Y 10 V-09-01 Backflow Preventer Up to 1½ inches Boiler Rm, Bldg 5 V-09-01 Annualy, 1Y 11 V-09-06 Backflow Preventer Up to 1½ inches Boiler Rm, Bldg 5 V-09-06 Annualy, 1Y 12 V-09-05 Backflow Preventer 2 to 3 inches Main Tower V-09-05 Annualy, 1Y 13 V-09-08 Backflow Preventer 2 to 3 inches PH 2, Bldg 2 V-09-08 Annualy, 1Y 14 V-09-09 Backflow Preventer 2 to 3 inches Main Tower V-09-09 Annualy, 1Y 15 V-09-02 Backflow Preventer 4 to 6 inches Landscape V-09-02 Annualy, 1Y 16 V-09-03 Backflow Preventer 4 to 6 inches O/S Lane Ent. V-09-03 Annualy, 1Y

17 V-09-07 Backflow Preventer 4 to 6 inches O/S Lane Ent. V-09-07

Valve, Backflow Preventer

18 T-04 Underground Storage Tanks (UST) Building 5 T-04 Every 3

Years, 3Y

19 T-03-01 Tanks, Fuel Oil Storage Building 5 T-03-01 Every 3

Years, 3Y

20 T-03-02 Tanks, Fuel Oil Storage Building 5 T-03-02 Every 3

Years, 3Y

22 E-28 Motor Starters Less Than 100 Hp Boiler Rm, Bldg 5 E-28 One time in three years

29 E-30A-01 Switchboards, Medium Voltage, (per cubicle) PH 1, Bldg 1 E-30A-01 One time in three years

30 E-30A-02 Switchboards Low Voltage , (per cubicle), PH 2, Bldg 2 E-30A-02 One time in three years

31 E-30A-03 Switchboards Low Voltage , (per cubicle), PH 2, Bldg 2 E-30A-03 One time in three years

32 E-30A-04 Switchboards Low Voltage , (per cubicle), PH 2, Bldg 2 E-30A-04 One time in three years

33 E-30A-05 Switchboards Low Voltage , (per cubicle), PH 2, Bldg 2 E-30A-05 One time in three years

34 E-30A-06 Switchboards Low Voltage , (per cubicle), PH 3, Bldg 3 E-30A-06 One time in three years

Technical Exhibit TE #11 Certification Testing Requirements

TE6(21) Certification Test-Schedule NewPage 1

IRS PM/CERT

GUIDES FREQUENCY

Certification Testing Requirements

35 E-30A-07 Switchboards Low Voltage , (per cubicle), PH 3, Bldg 3 E-30A-07 One time in three years

36 E-30A-08 Switchboards Low Voltage , (per cubicle), Elect Vault, Bldg 4 E-30A-08 One time in three years

37 E-30A-09 Switchboards Low Voltage , (per cubicle), Main Vault, Bldg 5 E-30A-09 One time in three years

38 E-30A-10 Switchboards Low Voltage , (per cubicle), Main Vault, Bldg 5 E-30A-10 One time in three years

39 E-30A-11 Switchboards Low Voltage , (per cubicle), Main Vault, Bldg 5 E-30A-11 One time in three years

40 E-30A-12 Switchboards Low Voltage , (per cubicle), Main Vault, Bldg 5 E-30A-12 One time in three years

41 E-30A-13 Switchboards Low Voltage , (per cubicle), Main Vault, Bldg 5 E-30A-13 One time in three years

42 E-30A-14 Switchboards Low Voltage , (per cubicle), Main Vault, Bldg 5 E-30A-14 One time in three years

43 E-30A-15 Switchboards Low Voltage , (per cubicle), Main Vault, Bldg 5 E-30A-15 One time in three years

44 E-30A-16 Switchboards Low Voltage , (per cubicle), Main Vault, Bldg 5 E-30A-16 One time in three years

45 E-36-01 Automatic Transfer Switch Main Vault, Bldg 5 E-36-01 One time in three years

46 E-33-01 High Voltage Network and, Power Type Transformer Dry Type Transformer - - Power Type PH 1, Bldg 1 E-33A Annual 47 E-33-02 High Voltage Network and, Power Type Transformer Dry Type Transformer - - Power Type PH 2, Bldg 2 E-33A Annual 48 E-33-03 High Voltage Network and, Power Type Transformer Dry Type Transformer - - Power Type PH 2, Bldg 2 E-33A Annual 49 E-33-04 High Voltage Network and, Power Type Transformer Dry Type Transformer - - Power Type PH 2, Bldg 2 E-33A Annual 50 E-33-05 High Voltage Network and, Power Type Transformer Dry Type Transformer - - Power Type PH 2, Bldg 2 E-33A Annual 51 E-33-06 High Voltage Network and, Power Type Transformer Dry Type Transformer - - Power Type PH 2, Bldg 2 E-33A Annual 52 E-33-07 High Voltage Network and, Power Type Transformer Dry Type Transformer - - Power Type PH 2, Bldg 2 E-33A Annual 53 E-33-08 High Voltage Network and, Power Type Transformer Dry Type Transformer - - Power Type PH 3, Bldg 3 E-33A Annual 54 E-33-09 High Voltage Network and, Power Type Transformer Dry Type Transformer - - Power Type PH 3, Bldg 3 E-33A Annual 55 E-33-10 High Voltage Network and, Power Type Transformer Dry Type Transformer - - Power Type PH 4, Bldg 4 E-33A Annual

56 E-33-11 High Voltage Network and, Power Type Transformer Dry Type Transformer - - Power Type Electrical Vault, Bldg 4 E-33A Annual

57 E-33-12 High Voltage Network and, Power Type Transformer Dry Type Transformer - - Power Type Electrical Vault, Bldg 4 E-33A Annual

58 E-33-13 High Voltage Network and, Power Type Transformer Dry Type Transformer - - Power Type Main Vault, Bldg 5 E-33A Annual

59 E-33-14 High Voltage Network and, Power Type Transformer Dry Type Transformer - - Power Type Main Vault, Bldg 5 E-33A Annual

60 E-33-15 High Voltage Network and, Power Type Transformer Dry Type Transformer - - Power Type Main Vault, Bldg 5 E-33A Annual 61 E-34-01 Disconnects or Isolating Switch, Per Switch, Under 200 amps >600 VOLTS PH 2, Bldg 2 E-34A Annual 62 E-34-02 Disconnects or Isolating Switch, Per Switch, Under 200 amps >600 VOLTS PH 2, Bldg 2 E-34A Annual 63 E-34-03 Disconnects or Isolating Switch, Per Switch, Under 200 amps >600 VOLTS PH 2, Bldg 2 E-34A Annual

TE6(21) Certification Test-Schedule NewPage 2

IRS PM/CERT

GUIDES FREQUENCY

Certification Testing Requirements

64 E-34-04 Disconnects or Isolating Switch, Per Switch, Under 200 amps >600 VOLTS PH 2, Bldg 2 E-34A Annual 65 E-34-05 Disconnects or Isolating Switch, Per Switch, Under 200 amps >600 VOLTS PH 2, Bldg 2 E-34A Annual 66 E-34-06 Disconnects or Isolating Switch, Per Switch, Under 200 amps >600 VOLTS PH 2, Bldg 2 E-34A Annual 67 E-34-07 Disconnects or Isolating Switch, Per Switch, Under 200 amps >600 VOLTS PH 2, Bldg 2 E-34A Annual 68 E-34-08 Disconnects or Isolating Switch, Per Switch, Under 200 amps >600 VOLTS PH 3, Bldg 3 E-34A Annual 69 E-34-09 Disconnects or Isolating Switch, Per Switch, Under 200 amps >600 VOLTS PH 3, Bldg 3 E-34A Annual 70 E-34-10 Disconnects or Isolating Switch, Per Switch, Under 200 amps >600 VOLTS PH 4, Bldg 4 E-34A Annual

71 E-34-11 Disconnects or Isolating Switch, Per Switch, Under 200 amps >600 VOLTS Main Vault, Bldg 5 E-34A Annual

72 E-34-12 Disconnects or Isolating Switch, Per Switch, Under 200 amps >600 VOLTS Main Vault, Bldg 5 E-34A Annual 73 E-34-13 Disconnects or Isolating Switch, Per Switch, Under 200 amps >600 VOLTS PH 2, Bldg 2 E-34A Annual 74 E-34-14 Disconnects or Isolating Switch, Per Switch, Under 200 amps >600 VOLTS PH 2, Bldg 2 E-34A Annual 75 E-34-15 Disconnects or Isolating Switch, Per Switch, Under 200 amps >600 VOLTS Bldg 4 E-34A Annual 76 E-34-16 Disconnects or Isolating Switch, Per Switch, Under 200 amps >600 VOLTS Bldg 4 E-34A Annual 77 E-59-03 Uninterruptible Power System, Static (=or < 250 KVA) LIEBERT PH 4, Bldg 4 E-59-03 Annual 78 E-59-06 Uninterruptible Power System, Static (=or < 250 KVA) LIEBERT RPS, Bldg 1 E-59-06 Annual 79 E-59-01 Uninterruptible Power System, Static (> 250 KVA) LIEBERT PH 2, Bldg 2 E-59-01 Annual 80 E-35-01 Motor Control Center (MCC), , under 100 hp - - 5 or fewer starters PH 1, Bldg 1 E-35A Annual 81 E-35-02 Motor Control Center (MCC), , under 100 hp - - 5 or fewer starters PH 2, Bldg 2 E-35A Annual 82 E-35-03 Motor Control Center (MCC), , under 100 hp - - 5 or fewer starters PH 2, Bldg 2 E-35A Annual 83 E-35-04 Motor Control Center (MCC), , under 100 hp - - 5 or fewer starters PH 2, Bldg 2 E-35A Annual 84 E-35-05 Motor Control Center (MCC), , under 100 hp - - 5 or fewer starters PH 2, Bldg 2 E-35A Annual 85 E-35-06 Motor Control Center (MCC), , under 100 hp - - 5 or fewer starters PH 2, Bldg 2 E-35A Annual 86 E-35-07 Motor Control Center (MCC), , under 100 hp - - 5 or fewer starters PH 3, Bldg 3 E-35A Annual 87 E-35-08 Motor Control Center (MCC), , under 100 hp - - 5 or fewer starters PH 3, Bldg 3 E-35A Annual 88 E-35-09 Motor Control Center (MCC), , under 100 hp - - 5 or fewer starters PH 4, Bldg 4 E-35A Annual 89 E-35-10 Motor Control Center (MCC), , under 100 hp - - 5 or fewer starters Boiler Rm, Bldg 5 E-35A Annual 90 E-35-11 Motor Control Center (MCC), , under 100 hp - - 5 or fewer starters Boiler Rm, Bldg 5 E-35A Annual 91 E-35-12 Motor Control Center (MCC), , under 100 hp - - 5 or fewer starters Boiler Rm, Bldg 5 E-35A Annual 92 E-35-13 Motor Control Center (MCC), , under 100 hp - - 5 or fewer starters PH 5, Bldg 5 E-35A Annual

93 E-58-01 Power Distribution Unit Comp Rm 1, Bldg 2 E-58 Annual

94 E-58-02 Power Distribution Unit Comp Rm 1, Bldg 2 E-58 Annual

96 E-58-08 Power Distribution Unit Comp Rm 1, Bldg 2 E-58 Annual

99 E-58-14 Power Distribution Unit RPS, Bldg 1 E-58 Annual

TE6(21) Certification Test-Schedule NewPage 3

IRS PM/CERT

GUIDES FREQUENCY

Certification Testing Requirements

TE6(21) Certification Test-Schedule NewPage 4

IRS PM/CERT

GUIDES FREQUENCY

Certification Testing Requirements

TE6(21) Certification Test-Schedule NewPage 5

IRS PM/CERT

GUIDES FREQUENCY

Certification Testing Requirements

TE6(21) Certification Test-Schedule NewPage 6

IRS PM/CERT

GUIDES FREQUENCY

Certification Testing Requirements

TE6(21) Certification Test-Schedule NewPage 7

Work Order # Description Equipment ID # Completion Date

Fresno
Fresno Repairs