About this file

TECHNICAL EXHIBIT 10

View the file

Other files

File Type Posted
TIRWR10R00009-A0008[1].rtf RTF text file
TE-6_reports-august 26.pdf PDF
TIRWR10R00009[1]-revised August 24.rtf RTF text file
Davis Bacon 6-2010.pdf PDF
Fresno Wage Determination Aug25.pdf PDF
TIRWR10R00009-A0007.rtf RTF text file
Fresno Wage 6-2010.rtf RTF text file
Davis Bacon 6-2010.pdf PDF
TIRWR10R00009-A0006.pdf PDF
TIRWR10R00009-A0004.rtf RTF text file
Questions From Site Survey-August 17.rtf RTF text file
TIRWR10R00009-A3.rtf RTF text file
Corporate Experience Summary Form 2.pdf PDF
TIRWR10R00009-A0002[1].pdf PDF
site survey sign in sheet.pdf PDF
post synopsis.rtf RTF text file
TIRWR10R00009[1]-revised August 9.pdf PDF
TIRWR10R00009-A0001[1].pdf PDF
TE-12 EMS Fresno Territory.pdf PDF
Past Performance Questionnaire-Fresno.pdf PDF
TE11 Certification Test-Schedule CA October 07.pdf PDF
Fresno Wage Determination[1].pdf PDF
Contract - QASP AUGUST 2010.pdf PDF
TE-6_reports-august 2010.pdf PDF
Corporate Experience Summary Form.pdf PDF
Freseno Davis Bacon[1].pdf PDF
TE-2, New PWS-aug 10.pdf PDF
TIRWR10R00009[1].pdf PDF
post synopsis.pdf PDF
te_8_terminology.revised.pdf PDF
TE-3_New PWS_12_9_09.pdf PDF
TE-5 Final 3-27-09.xls XLS spreadsheet
TE-7 Government Furnished Facilities.pdf PDF
te-4_preventive_AUGUST 2010.pdf PDF
te-9_standards_and_regulations_1_14_2008.pdf PDF
HSPD_12_PIV_Procedures_Manual.pdf PDF
TE-1 Facility Location Data AUGUST 2010.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IRS Building Delegations Performance Work Statement

TECHNICAL EXHIBIT TE -10

Infrared Testing Requirements

IRS PM

CHECK DESCRIPTION FREQUENCY

E-26 Molded Case Breakers Less than 600 Volts and Greater than 400 amps

One time in three years

E-28 Motor Starters Less Than 100 Hp One time in three years

E-30A Switchboards, Medium Voltage, (per cubicle) One time in three years

E-30B Switchboards Low Voltage, (per cubicle), One time in three years

E-37C Bus Duct, Low Voltage, & Connectors Copper - Per disconnect One time in three years

E-37D Bus Duct, Low Voltage, & Connectors Copper - Per 10 foot bus duct section

One time in three years

E-36 Automatic Transfer Switch One time in three years

E-33A High Voltage Network and, Power Type Transformer Dry Type Transformer - - Power Type Annual

E-33B High Voltage Network and, Power Type Transformer Dry Type Transformer - - Network Type Annual

E-34A Disconnects or Isolating Switch, Per Switch, Under 200 amps >600 VOLTS Annual

E-34B Disconnect or isolating switch, low voltage (fused/non- fused, 200 amps and up) - - 200 To 500 Amps Annual

E-34C Disconnect or isolating switch, low voltage (fused/non- fused, 200 amps and up) - - Over 500 Amps Annual

E-37A Bus Duct, Low Voltage, & Connectors Aluminum - Per disconnect Annual

E-37B Bus Duct, Low Voltage, & Connectors Aluminum - Per 10 foot bus duct section

Annual

E-37AA

Bus Duct, Metal Enclosed, & Connectors Aluminum: - Per disconnect

Annual

E37BB Bus Duct, Metal Enclosed, & Connectors Aluminum: - Per 10 foot bus duct section Annual

E-37CC Bus Duct, Metal Enclosed, & Connectors Aluminum: - Outdoors: Per disconnect Annual

E-37DD Bus Duct, Metal Enclosed, & Connectors Aluminum: - Outdoors: Per 10 foot bus duct section Annual

E-59 Uninterruptible Power System, Static Annual

E-35A Motor Control Center (MCC), under 100 hp - - 5 or fewer starters Annual

E-35B Motor Control Center (MCC), under 100 hp - - Each additional motor starter Annual

E-58 Power Distribution Unit Annual