FACILITIES OPERATIONS, MAINTENANCE, REPAIRS, AND CONSTRUCTION SERVICES FOR THE IRS FRESNO SERVICE CENTER
Solicitation number
TIRWR-10-R00009
Issued by

About this file

TECHNICAL EXHIBIT 8

View the file

Other files

File Type Posted
TIRWR10R00009-A0008[1].rtf RTF text file
TE-6_reports-august 26.pdf PDF
TIRWR10R00009[1]-revised August 24.rtf RTF text file
Davis Bacon 6-2010.pdf PDF
Fresno Wage Determination Aug25.pdf PDF
TIRWR10R00009-A0007.rtf RTF text file
Fresno Wage 6-2010.rtf RTF text file
Davis Bacon 6-2010.pdf PDF
TIRWR10R00009-A0006.pdf PDF
TIRWR10R00009-A0004.rtf RTF text file
Questions From Site Survey-August 17.rtf RTF text file
TIRWR10R00009-A3.rtf RTF text file
Corporate Experience Summary Form 2.pdf PDF
TIRWR10R00009-A0002[1].pdf PDF
site survey sign in sheet.pdf PDF
post synopsis.rtf RTF text file
TIRWR10R00009[1]-revised August 9.pdf PDF
TIRWR10R00009-A0001[1].pdf PDF
TE-12 EMS Fresno Territory.pdf PDF
Past Performance Questionnaire-Fresno.pdf PDF
TE11 Certification Test-Schedule CA October 07.pdf PDF
Fresno Wage Determination[1].pdf PDF
Contract - QASP AUGUST 2010.pdf PDF
TE-6_reports-august 2010.pdf PDF
Corporate Experience Summary Form.pdf PDF
Freseno Davis Bacon[1].pdf PDF
TE-2, New PWS-aug 10.pdf PDF
TIRWR10R00009[1].pdf PDF
post synopsis.pdf PDF
TE-3_New PWS_12_9_09.pdf PDF
TE-5 Final 3-27-09.xls XLS spreadsheet
TE-7 Government Furnished Facilities.pdf PDF
te-4_preventive_AUGUST 2010.pdf PDF
te-9_standards_and_regulations_1_14_2008.pdf PDF
HSPD_12_PIV_Procedures_Manual.pdf PDF
te-10_infrared.pdf PDF
TE-1 Facility Location Data AUGUST 2010.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IRS Building Delegations Performance Work Statement

TECHNICAL EXHIBIT TE-8

GLOSSARY OF TERMINOLOGY

DEFINITIONS.

Alteration. The work required to adjust internal space arrangements, support office relocations, or modify other physical characteristics of an existing real property facility so that it may be more effectively adapted to or utilized for its designated purpose; categorized as construction.

As-is Condition. The present state of any object at the time it is evaluated, given, received, or exchanged.

Building Operations Plan (BOP) A plan that describes how the facility will be operated to insure the mission is accomplished, energy management goals are set and achieved, equipment is inspected to validate the operational condition and status, and set procedures to respond to unusual or emergency conditions.

Certification Testing. The testing, by and independent firm, of fired and unfired pressure vessels, high voltage switch gear, grounding systems, fire detection and suppression systems, backflow preventers, all equipement deemed air polluters by SJVAPD, UST tanks and weight handling equipment to insure that established standards are met.

Component Part. Any part which is detachable or removable from the main body or main assembly of the item or system.

Construction. Construction is the addition, expansion, extension, alteration, or conversion of an existing real property facility. Includes demolition of facilities to be replaced, supporting utilities, roads, parking lot, equipment installed in and made a part of such facilities, related site preparation, excavation, filling, and landscaping, or other land improvements.

Contract Discrepancy Report (CDR). A report sent by the Government to the Service Provider that the Service Provider is required to complete if any element of performance under this contract is unsatisfactory based on the Acceptable Quality Level (AQL) identified in the Performance Requirements Summary (PRS). The CDR requires the Service Provider to explain to the Contracting Officer, in writing within 1 workday, why performance is unsatisfactory, how performance shall be returned to satisfactory levels, and how recurrence of the problem shall be prevented in the future.

Deficiency. An existing condition identified during the Phase-In inspection which costs $500 or more in labor and materials to correct.

Existing Condition. A need for repair that exists prior to the start of full contract services and may be identified during the phase-in inspection.

Facility Operations. The recurring day-to-day work to keep equipment and systems in operation, preserve its useful life, or restore it to operation such that it may be utilized for its designated purpose. The intent of operation, maintenance, repair and inspection is to minimize malfunction and deterioration of equipment, ensure efficient operation, and provide an overall balance of acceptable levels of reliability at the lowest life cycle cost. Tasks include but are not limited to startup and shutdown, inspection, cleaning, lubrication, adjustment, calibration, belt and filter changes, and water treatment for all steam, condensate return, hot water, chilled water, condenser water, and process water systems.

Federal Holidays. IRS business operations will be closed on Federal holidays except for essential personnel. Holidays, which fall on Saturdays, are observed on the Friday immediately before the holiday. However, when the holiday falls on a Sunday, the subsequent Monday is observed as the holiday. Federal holidays in each calendar year are identified as follows:

a) New Year’s Day, January 1

b) Martin Luther King’s Birthday, the third Monday in January

c) President’s Day, the third Monday in February

d) Memorial Day, the last Monday in May

e) Independence Day, July 4

f) Labor Day, the first Monday in September

g) Columbus Day, the second Monday in October

h) Veteran’s Day, November 11

i) Thanksgiving Day, the fourth Thursday in November

j) Christmas Day, December 25

Imminent Danger. A condition that immediately threatens the loss of life or serious injury or illness of an employee.

Inactive Equipment. Equipment not currently in use that may be placed back in service during the contract performance period.

Performance Requirements Summary (PRS). A tabular summary of contract requirements itemized by work requirements, standards of performance, and acceptable quality level (AQL) that is used by the Government to assess monthly Service Provider performance. It is the primary basis for deducting for partially performed, unsatisfactorily performed, and non-performed work. The PRS is located in Attachment J-E1.

Periodic Inspection. This method, sometimes called “planned sampling,” consists of the evaluation of tasks selected on other than a 100 percent or random basis. It may be appropriate for tasks that occur infrequently, and where 100 percent inspection is neither required nor practicable. A predetermined plan for inspecting part of the work is established using subjective judgment and analysis of agency resources to decide what work to inspect and how frequently to inspect it.

Preventive Maintenance (PM). PM consists primarily of inspection, cleaning, lubrication, adjustment, calibration, corrosion control, touch-up painting, and minor part and component replacement (e.g. filters, belts, hoses, fluids, hardware, etc.) as required to increase the reliability of equipment by minimizing malfunction, breakdown, and deterioration of equipment; and the identifying of any repairs required to bring the equipment up to the manufacturer’s operating standards.

Preventive Maintenance (PM) Frequency. PM shall be performed at the following frequencies.

Weekly. To be acceptable, weekly tasks must be satisfactorily accomplished 52 times during the contract year. Work must be in accordance with the approved schedule.

Failure to perform 52 monthly PM actions during the contract year or failure to meet the scheduling criteria will cause deductions to be taken in accordance with Section E.

Monthly. To be acceptable, monthly tasks must be satisfactorily accomplished 12 times during the contract year. Work must be in accordance with the approved schedule.

Failure to perform 12 monthly PM actions during the contract year or failure to meet the scheduling criteria will cause deductions to be taken in accordance with Section E.

Quarterly. To be acceptable, quarterly tasks must be satisfactorily accomplished four times during the contract year. Work must be in accordance with the approved schedule. Failure to perform four quarterly tasks during the contract year or failure to meet the scheduling criteria will cause deductions to be taken in accordance with Section E.

Semi-Annual. To be acceptable, semi-annual tasks must be satisfactorily accomplished two times during the contract year. Work must be in accordance with the approved schedule. Failure to perform two semi-annual tasks during the contract year or failure to meet the scheduling criteria will cause deductions to be taken in accordance with Section

E.

Annual. To be acceptable, annual tasks must be satisfactorily accomplished one time during the contract year. Work must be in accordance with the approved schedule.

Failure to perform one annual task during the contract year or failure to meet the scheduling criteria will cause deductions to be taken in accordance with Section E.

Greater than Annual. To be acceptable, all greater than annual tasks must be satisfactorily accomplished during the base year unless justified to and approved by the

COTR.

Annual PM Schedule: COTR Approved PM schedule shall include the following elements:

1. Equipment ID

2. Equipment description

3. Frequencies for all equipment identified in TE-5

4. Last performance date

5. Fixed scheduled dates

New Project Work. Additional IDIQ tasks/Services ordered by the Government to support miscellaneous customer services, building repairs, and minor construction and improvements. It is also sometimes referred to as “New Work.”

Quality Assurance (QA) Program. A program implemented by the Government to evaluate the output quality and responsiveness of the Service Provider to ensure that the Government receives the services for which public funds are expended. It is emphasized that the Government's quality assurance program is not a substitute for the quality control program implemented and administered by the Service Provider.

Quality Control Program (QCP). A method used by the Service Provider to evaluate the output quality and responsiveness of services rendered verses specific requirements of this contract. It includes but is not limited to routine inspections performed and documented by supervisory personnel to ensure the control of the quality of goods and services provided to the Government.

Response Time. The time allowed the Service Provider after initial notification of a work requirement to be physically on the premises at the work site with appropriate tools, equipment, and materials ready to perform the work required. Response times are designated in the appropriate paragraphs of this specification.

R.S. Means. A job estimating system commonly used by the construction industry developed by R.S. Means Company, Inc., which is also used by the Government for estimating cost and data for all phases of construction, maintenance, and repair cost determination.

ACRONYMS.

ACRONYM DEFINITION

A/C Air Conditioning

ACM Asbestos Containing Material

AHU Air Handling Unit

APM Asbestos Program Manager

BDS Building Delegations Section

BOP Building Operations Plan

CMMS Computerized Maintenance Management System

CO Contracting Officer

COTR Contracting Officer’s Technical Representative

D.C. Direct Current

EPA Environmental Protection Agency

ERC Employee’s Resource Center

G & A General and Administrative

GSA General Services Administration

HQ Headquarters IRS, located in Washington, DC

HVAC Heating, Ventilation, and Air Conditioning

IAW In Accordance With

ID Identification

IDIQ Indefinite Delivery Indefinite Quantity

IRS Internal Revenue Service

LO/TO Lock Out/Tag Out

MCC Motorized Control Center

MCE Maintenance Control Equipment

MEO Most Efficient Organization

MG Motor Generator

MSDS Material Safety Data Sheet

OSH Occupational Safety and Health

OSHA Occupational Safety and Health Agency

PDU Power Distribution Unit

PM Preventive Maintenance

PMNo PM Checklist Number

POC Point of Contact

PPE Personal Protection Equipment

PWS Performance Work Statement

QC Quality Control

QCP Quality Control Program

RCM Refrigeration Compliance Manager

RUPS Rotating Uninterrupted Power Supply

UPS Uninterrupted Power Supply

Periodic Inspection. This method, sometimes called “planned sampling,” consists of the evaluation of tasks selected on other than a 100 percent or random basis. It may be appropriate for tasks that occur infrequently, and where 100 percent inspection is neither required nor practicable. A predetermined plan for inspecting part of the work is established using subjective judgment and analysis of agency resources to decide what work to inspect and how frequently to inspect it.