TE_8_Terminology.doc
DOC document 54 KB Posted
- Attached to
- QUESTIONS AND ANSWERS Federal contract opportunity
- Solicitation number
- TIRNO15R00046
About this file
TERMINOLOGY
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IRS Building Delegations
Performance Work Statement
TECHNICAL EXHIBIT TE-8
GLOSSARY OF TERMINOLOGY
DEFINITIONS.
Alteration. The work required to adjust internal space arrangements, support office relocations, or modify other physical characteristics of an existing real property facility so that it may be more effectively adapted to or utilized for its designated purpose; categorized as construction.
As-is Condition. The present state of any object at the time it is evaluated, given, received, or exchanged.
Building Operations Plan (BOP) A plan that describes how the facility will be operated to insure the mission is accomplished, energy management goals are set and achieved, equipment is inspected to validate the operational condition and status, and set procedures to respond to unusual or emergency conditions.
Certification Testing. The testing, by and independent firm, of fired and unfired pressure vessels, high voltage switch gear, grounding systems, fire detection and suppression systems, backflow preventers, and weight handling equipment to insure that established standards are met.
Component Part. Any part which is detachable or removable from the main body or main assembly of the item or system.
Construction. Construction is the addition, expansion, extension, alteration, or conversion of an existing real property facility. Includes demolition of facilities to be replaced, supporting utilities, roads, parking lot, equipment installed in and made a part of such facilities, related site preparation, excavation, filling, and landscaping, or other land improvements.
Contract Discrepancy Report (CDR). A report sent by the Government to the Service Provider that the Service Provider is required to complete if any element of performance under this contract is unsatisfactory based on the Acceptable Quality Level (AQL) identified in the Performance Requirements Summary (PRS). The CDR requires the Service Provider to explain to the Contracting Officer, in writing within 1 workday, why performance is unsatisfactory, how performance shall be returned to satisfactory levels, and how recurrence of the problem shall be prevented in the future.
Deficiency. An existing condition identified during the Phase-In inspection which costs $500 or more in labor and materials to correct.
Existing Condition. A need for repair that exists prior to the start of full contract services and may be identified during the phase-in inspection.
Facility Operations. The recurring day-to-day work to keep equipment and systems in operation, preserve its useful life, or restore it to operation such that it may be utilized for its designated purpose. The intent of operation, maintenance, repair and inspection is to minimize malfunction and deterioration of equipment, ensure efficient operation, and provide an overall balance of acceptable levels of reliability at the lowest life cycle cost. Tasks include but are not limited to startup and shutdown, inspection, cleaning, lubrication, adjustment, calibration, belt and filter changes, and water treatment for all steam, condensate return, hot water, chilled water, condenser water, and process water systems.
Federal Holidays. IRS business operations will be closed on Federal holidays except for essential personnel. Holidays, which fall on Saturdays, are observed on the Friday immediately before the holiday. However, when the holiday falls on a Sunday, the subsequent Monday is observed as the holiday. Federal holidays in each calendar year are identified as follows:
a) New Year’s Day, January 1
b) Martin Luther King’s Birthday, the third Monday in January
c) President’s Day, the third Monday in February
d) Memorial Day, the last Monday in May
e) Independence Day, July 4
f) Labor Day, the first Monday in September
g) Columbus Day, the second Monday in October
h) Veteran’s Day, November 11
i) Thanksgiving Day, the fourth Thursday in November
j) Christmas Day, December 25
Imminent Danger. A condition that immediately threatens the loss of life or serious injury or illness of an employee.
Inactive Equipment. Equipment not currently in use that may be placed back in service during the contract performance period.
Performance Requirements Summary (PRS). A tabular summary of contract requirements itemized by work requirements, standards of performance, and acceptable quality level (AQL) that is used by the Government to assess monthly Service Provider performance. It is the primary basis for deducting for partially performed, unsatisfactorily performed, and non-performed work. The PRS is located in Attachment J-E1.
Periodic Inspection. This method, sometimes called “planned sampling,” consists of the evaluation of tasks selected on other than a 100 percent or random basis. It may be appropriate for tasks that occur infrequently, and where 100 percent inspection is neither required nor practicable. A predetermined plan for inspecting part of the work is established using subjective judgment and analysis of agency resources to decide what work to inspect and how frequently to inspect it.
Preventive Maintenance (PM). PM consists primarily of inspection, cleaning, lubrication, adjustment, calibration, corrosion control, touch-up painting, and minor part and component replacement (e.g. filters, belts, hoses, fluids, hardware, etc.) as required to increase the reliability of equipment by minimizing malfunction, breakdown, and deterioration of equipment; and the identifying of any repairs required to bring the equipment up to the manufacturer’s operating standards.
Preventive Maintenance (PM) Frequency.
PM shall be performed at the following frequencies.
Weekly.
To be acceptable, weekly tasks must be satisfactorily accomplished 52 times during the contract year. Work must be in accordance with the approved schedule. Failure to perform 52 monthly PM actions during the contract year or failure to meet the scheduling criteria will cause deductions to be taken in accordance with Section E.
Monthly.
To be acceptable, monthly tasks must be satisfactorily accomplished 12 times during the contract year. Work must be in accordance with the approved schedule. Failure to perform 12 monthly PM actions during the contract year or failure to meet the scheduling criteria will cause deductions to be taken in accordance with Section E.
Quarterly.
To be acceptable, quarterly tasks must be satisfactorily accomplished four times during the contract year. Work must be in accordance with the approved schedule. Failure to perform four quarterly tasks during the contract year or failure to meet the scheduling criteria will cause deductions to be taken in accordance with Section E.
Semi-Annual.
To be acceptable, semi-annual tasks must be satisfactorily accomplished two times during the contract year. Work must be in accordance with the approved schedule. Failure to perform two semi-annual tasks during the contract year or failure to meet the scheduling criteria will cause deductions to be taken in accordance with Section E.
Annual.
To be acceptable, annual tasks must be satisfactorily accomplished one time during the contract year. Work must be in accordance with the approved schedule. Failure to perform one annual task during the contract year or failure to meet the scheduling criteria will cause deductions to be taken in accordance with Section E.
Greater than Annual.
To be acceptable, all greater than annual tasks must be satisfactorily accomplished during the base year unless justified to and approved by the COTR.
Project Support Work. Additional IDIQ tasks/Services ordered by the Government to support miscellaneous customer services, building repairs, and minor construction and improvements. It is also sometimes referred to as “New Work.”
Quality Assurance (QA) Program. A program implemented by the Government to evaluate the output quality and responsiveness of the Service Provider to ensure that the Government receives the services for which public funds are expended. It is emphasized that the Government's quality assurance program is not a substitute for the quality control program implemented and administered by the Service Provider.
Quality Control Program (QCP). A method used by the Service Provider to evaluate the output quality and responsiveness of services rendered verses specific requirements of this contract. It includes but is not limited to routine inspections performed and documented by supervisory personnel to ensure the control of the quality of goods and services provided to the Government.
Response Time. The time allowed the Service Provider after initial notification of a work requirement to be physically on the premises at the work site with appropriate tools, equipment, and materials ready to perform the work required. Response times are designated in the appropriate paragraphs of this specification.
R.S. Means. A job estimating system commonly used by the construction industry developed by R.S. Means Company, Inc., which is also used by the Government for estimating cost and data for all phases of construction, maintenance, and repair cost determination.
ACRONYMS.
| ACRONYM |
| DEFINITION |
| A/C |
| Air Conditioning |
| ACM |
| Asbestos Containing Material |
| AHU |
| Air Handling Unit |
| APM |
| Asbestos Program Manager |
| BDS |
| Building Delegations Section |
| BOP |
| Building Operations Plan |
| CMMS |
| Computerized Maintenance Management System |
| CO |
| Contracting Officer |
| COTR |
| Contracting Officer’s Technical Representative |
| D.C. |
| Direct Current |
| EPA |
| Environmental Protection Agency |
| ERC |
| Employee’s Resource Center |
| G & A |
| General and Administrative |
| GSA |
| General Services Administration |
| HQ |
| Headquarters IRS, located in Washington, DC |
| HVAC |
| Heating, Ventilation, and Air Conditioning |
| IAW |
| In Accordance With |
| ID |
| Identification |
| IDIQ |
| Indefinite Delivery Indefinite Quantity |
| IRS |
| Internal Revenue Service |
| LO/TO |
| Lock Out/Tag Out |
| MCC |
| Motorized Control Center |
| MCE |
| Maintenance Control Equipment |
| MEO |
| Most Efficient Organization |
| MG |
| Motor Generator |
| MSDS |
| Material Safety Data Sheet |
| OSH |
| Occupational Safety and Health |
| OSHA |
| Occupational Safety and Health Agency |
| PDU |
| Power Distribution Unit |
| PM |
| Preventive Maintenance |
| PMNo |
| PM Checklist Number |
| POC |
| Point of Contact |
| PPE |
| Personal Protection Equipment |
| PWS |
| Performance Work Statement |
| QC |
| Quality Control |
| QCP |
| Quality Control Program |
| RCM |
| Refrigeration Compliance Manager |
| RUPS |
| Rotating Uninterrupted Power Supply |
| UPS |
| Uninterrupted Power Supply |
File details come from the government source that posted it. Updated .