TE_15_QASP_102016.doc

DOC document 116 KB Posted

Attached to
QUESTIONS AND ANSWERS Federal contract opportunity
Solicitation number
TIRNO15R00046
Issued by
Department of the Treasury Internal Revenue Service

About this file

QASP

View the file

Other files for this federal contract opportunity

Other files attached to QUESTIONS AND ANSWERS, newest first.
File Type Posted
Technical_Evaluation_Criteria_122016.doc DOC document
TIRNO15R00046-A0002.zip ZIP file
TE-10_Infrared_Testing_Requirements_120216.doc DOC document
Elevator_PM.pdf PDF
Combined_Q__A_Final_112016.docx DOCX document
REVISED_EVALUATION_FACTORS_122016.docx DOCX document
WALK_THRU_SIGN_IN.11162016.pdf PDF
TIRNO15R00046-A0001.zip ZIP file
PAST_PERFORMANCE_ATTACHMENT_3c_ECC.docx DOCX document
CBA_Union_Contract.pdf PDF
Revised_Evaluation_Criteria_O M_DC_112016.zip ZIP file
TE_17_QASP_Checksheet_Guides_102016.doc DOC document
TE_7_GFI_GFM_GFE.doc DOC document
TE_12_Cert_requirements.xlsx XLSX spreadsheet
TE_1_Facility_Location_Data.doc DOC document
TE_9_Regulations_and_References.doc DOC document
TE_11_CMMS_PM_IDIQ_Flow_Chart.pdf PDF
TE_14a_Biopref_FAR_reporting.pdf PDF
TE_10_Infrared_Testing_Requirements.doc DOC document
TE_4_IRS_Preventive_guide_cards.doc DOC document
TE_8_Terminology.doc DOC document
TE-18_Landscape_Task_Quality_Requirements.docx DOCX document
TIRNO-15-R-00046.zip ZIP file
TE_2_Facility_equipment_and_components.docx DOCX document
TE_5_Equipment_PM_ListR.pdf PDF
TE_14_Annual_Designated_Biobased_Prod_list.doc DOC document
TE_6_Reports.doc DOC document
TE_16_QASP_Checksheets_102016.doc DOC document
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QASP (TE-15)

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

For

Operation and Maintenance Services

At Internal Revenue Service 1111 Constitution Ave., NW

Washington, DC 20224 Table of Contents

31.

QASP & CONTRACT ADMINISTRATION DUTIES AND RESPONSIBILITIES

52.

QUALITY ASSURANCE SURVEILLANCE PLAN

83.

SURVEILLANCE INSPECTION METHODS

144.

CHOOSING SURVEILANCE INSPECTION METHODS

155.

ACCEPTABLE QUALITY LEVEL

166.

EVALUATION PROCEDURES

177.

QASP REPORTS AND CONTRACT PAYMENT DEDUCTIONS

198.

NON-CONFORMING SERVICES AND SUPPLIES AND REWORK PROCESS

1. QASP & CONTRACT ADMINISTRATION DUTIES AND RESPONSIBILITIES

Background and Purpose

This QASP is designed to be in accordance with the FAR subparts 37.6 and 46.4. Briefly, Quality Assurance (QA) is a program undertaken by the Government to provide some measure of the quality of goods and services purchased from a Service Provider (SP). To accomplish this, the Government must develop and implement a system that will ensure the quantity and quality of the goods and services received comply with the requirements of the contract. This QASP is designed to assist the Contracting Officer’s Representatives (COR) and Mechanical Work Inspectors (MWI’s) or other users in conducting the Government’s QA program. Lastly, the QASP was established to ensure consistency in contract administration of the Operation and Maintenance contract at the Internal Revenue Service, 1111 Constitution Ave., NW; Washington, DC 20224.

1. Contracting Officer (CO) The Contracting Officer (CO) has the authority to administer all aspects of the contract. The Contracting Officer will delegate many aspects of the day-to-day contract administration duties to the COR and MWI’s. However, certain contractual actions such as the negotiation and issuance of contract modifications, resolution of Contractor claims and disputes, issuance of Contractor nonconforming supplies or services, reports, issuance of cure notices, issuance of show-cause letters, termination of the contract, contract deductions, and contract close-out will be retained by the Contracting Officer.

2. Contracting Officer's Representative (COR)

a. The COR serves as the local day to day onsite manager of the overall contract administration effort for the contract. The COR represents the Contracting Officer and functions as the Contractor's primary point of contact for the overall contract effort. The COR oversees the overall contract administration effort. If additional services are necessary, the COR will prepare, review, and/or oversee the preparation of a Statement of Work (SOW) and Independent Government Estimate (IGE) that will be used by the CO to solicit a proposal from the Contractor. The COR may assist the CO in negotiations with the Contractor. The COR is responsible for ensuring all contract interpretations are consistent with the Contracting Officer’s interpretation prior to advising the Contractor. The CO makes the final determination on all disputes in contract interpretations.

b. The COR reviews the monthly contract progress reports provided by the Contractor and determines rating levels of the Contractor performance for the overall contract effort. The COR also recommends the appropriate payment to the CO based on the recommendation from the evaluation of the Contractor’s overall performance each month. The Contracting Officer determines the final payments authorized to the Contractor for each fixed-price monthly payment based on his/her final QASP report determination and other relevant contract considerations.

c. Maintain a complete Contract File Management Plan (CFMP).

3. Mechanical Work Inspectors (MWI’s)

a. The MWI’s play a key role in quality performance and surveillance. They serve as the primary reviewer and examiner of work performed by the Contractor. Their reports and inspections are critical to the success of the Operations and Maintenance Contract. The COR relies on the performance of the MWI’s to ensure the Contractor is providing quality services and materials and is meeting contract requirements. The MWI’s perform most of the actual day-to-day contract surveillance and inspections, and accurately reports the findings to the COR (in verbal and written format) for inclusion into the monthly QASP report to be furnished to the CO. Some of the key quality assurance surveillance duties of MWI’s include:

1. Perform inspections of operations and maintenance type activities and additional services work as required by this QASP. Make recommendations to the COR for acceptance of contract work deliverables and contract administration actions such as contract deductions, issuance of nonconforming supplies or services notices and/or or letters of commendation. These recommendations may be forwarded by the COR for documentation and discussions with the CO so action can be taken with the Contractor.

2. Assist the COR in identifying necessary technical changes to the contract, preparing SOW’s and IGE’s, preparing quality assurance reports, documenting Contractor performance, maintaining day-to-day inspection work files (CFMP), and bringing any significant contract issues to the attention of the COR.

3. The MWI’s have no authority to direct or allow the Contractor to deviate from contract requirements or to issue modifications directly to any of the Contractor’s personnel. All necessary contract changes that the MWI deems necessary will be coordinated and approved by the COR and CO in advance. The CO will approve and issue all official contract modifications deemed appropriate in coordination with the COR.

4. Building Manager

a. The Building Manager is responsible for the overall Building Delegation Program at each site. The Building Manager is the primary customer and recipient of the services performed under this contract.

b. The Building Manager is the official supervisor of record for the COR and MWI’s at each site. The COR will be the official Point of Contact (POC) for communications with the Contractor Project Manager and other Contractor personnel. The Building Manager can coordinate with the COR and CO to resolve contractual issues that cannot be resolved with the Contractor.

5. Customers

Customers are the recipients of services furnished by the Contractor.

2. QUALITY ASSURANCE SURVEILLANCE PLAN

1. This Quality Assurance Surveillance Plan (QASP) has been developed for the Operations and Maintenance Contract at the Internal Revenue Service, 1111 Constitution Ave., NW; Washington, DC 20224. . The QASP is a contractual management tool that is used to ensure that the supplies and services acquired conform to the contract requirements and the contract’s quality and quantity requirements in a uniform basis. The major categories of services to be performed are:

a) Phase-In (one time 60 day period of performance)

b) Facility Operations

c) Water Treatment

d) Service Calls

e) Preventive Maintenance

f) Additional Services (IDIQ)

2. This QASP comprehensively defines procedures to be followed by the Government to ensure achievement of required performance standards. The Government monitors work performance through the COR and MWI’s for the overall contract effort. The QASP comprehensively guides the activities of the COR and MWI’s.

3. A QASP Inspection Guide and Check Sheets have been developed for each major contract requirement identified above. The Contractor is obligated by the contract to perform all of the services as described in the PWS to an Acceptable Quality Level (AQL) as described in the checksheets.

4. The Contractor is directly responsible to the Contracting Officer and performs contract work under the direction of the Contracting Officer. However, the Contracting Officer (CO) has delegated the day-to-day technical oversight and administration of the contract to the COR and MWI’s. The COR will be the Government CO’s on-site representative for this contract and will be the CO’s main representative for the overall contract effort and for contract issues covering the Internal Revenue Service, 1111 Constitution Ave., NW; Washington, DC 20224. .

5. The Contractor will receive technical guidance from and report technical issues to the COR and MWI’s. The COR will delegate specific contract inspections and contract administration documentation responsibilities to the MWI. The MWI’s will perform surveillance activities including inspections, checks, and other methods determined to ensure quality performance and products are delivered by the Contractor in accordance with the contract and/or QASP. The COR will provide oversight of contract activities. Inspections and checks performed by the MWI’s will assist the COR in identifying the performance rating achieved by the Contractor for each major contract requirement identified in the QASP Checksheets.

6. The COR will base the rating (Pass/Fail) on whether the performance has reached the Acceptable Quality Level (AQL) outlined on each Checksheet and is considered as passing or whether the performance is less than the required AQL due to poor performance, non performance, or non conforming supplies or services which may result in an overall rating of failed for the entire Checksheet or a single Checksheet element.

7. These results will be reported by the COR in writing to the CO on a monthly basis and may be reported to the Contractor local project manager when deemed appropriate. The COR will document all performance issues in accordance with the QASP, QASP Checksheets, and QASP Inspection Guides on a monthly basis. This will include but is not limited to issuing a rework through the CMMS for corrective action to be taken by the Contractor when an inspection reveals a non performance issue. The Contractor shall re-perform work that has been performed in an unacceptable manner provided that time allows it to be done before the end of the month or the frequency is due again (if a daily/twice a day/etc. requirement fails inspection it is recorded as a failure since the requirement will be due again so soon that there isn’t sufficient time for a rework). If the Contractor re-performs the work in a satisfactory manner before the end of the month or its next frequency cycle (if it’s due again before the end of that month) it will not be recorded as a performance issue on the QASP Checksheet (see the QASP checksheets for specific information on the allowable re-work timeframes before a failure is recorded on the QASP). However, if it is not satisfactorily completed by the end of the month and is still considered a non performance issue the Contractor is still expected to perform the task in a satisfactory manner even though it was recorded on the monthly QASP Checksheet as a failure. Failure to correct the non performance issue could result in the IRS having another Contractor perform the services and deducting the associated cost from the Contractor’s monthly invoice as well as the deduction that’s taken on the monthly QASP for the performance issue. The MWI’s will make the COR aware of all noted nonconforming supplies or services as soon as practical after an inspection has been completed.

8. If a checksheet has an element that the Contractor is not required to perform that month it shall be marked as N/A and the weight associated with that element will be evenly distributed over the remaining elements on that checksheet.

9. Failure of the contractor to provide deliverables that pertain to a checksheet element shall result in the failure of any checksheet element that relies on that data to be evaluated. Failure will continue for each month that the deliverable is not provided (ex. no specific BOP provided or only an incomplete one provided will result in checksheet # 6, element #1 failing).

10. The QASP monthly report relies on several contractors supplied monthly reports to effectively evaluate their performance. Failure of the contractor to timely provide these reports shall result in checksheet elements that rely on these reports as being recorded as failed for the month.

11. In summary the QASP:

a. Documents the means and methods by which the Government intends to implement Quality Assurance (QA) for a contract.

b. Provides the COR and MWI’s with:

(1). A systematic plan for surveillance of the Contractor’s work.

(2). The methods for collecting information necessary to evaluate the Contractor's performance and justify contract administration actions such as final acceptance of contract work performed or rejection of work performed resulting from nonconformance and/or unsatisfactory performance.

(3). A basis for documenting the official contract files concerning the Contractor's performance and quality of the work.

3. SURVEILLANCE INSPECTION METHODS

There are five surveillance methods that can be used to evaluate the contract work: Planned Sampling Inspection, 100% Inspection, Customer Complaints, Unscheduled Inspections, and Random Sampling Inspections.

1. Planned Sampling Inspections

Planned sampling is based on evaluating a portion of the work as the basis for appraising the Contractor’s performance. Samples are selected based on a subjective rationale with the sample size being arbitrarily determined by the COR. Planned sampling is useful when population sizes are not large enough or homogeneous enough to make random sampling practical.

a. Sample Size The COR and/or MWI’s must follow the documented criteria to be used for sample selection as outlined in the QASP Inspection Guide Checksheet. The documentation should include: rationale for selection of specific work occurrences, sample size requirements, and impact on services that receive little or no evaluation.

b. Planned Sampling Analysis of Results

At the end of the monthly rating period, the COR will summarize the surveillance data and compute the Acceptable Quality Level (AQL) rating for each Checksheet.

c. To determine an AQL percentage rating (1). Determine how many times the service is expected to be provided during the surveillance period (population).

(2). Determine what the maximum number of nonconforming services or supplies for the given requirement for the period the Government should tolerate (number of accepted nonconforming services or supplies).

(3). Subtract the number of accepted nonconforming services or supplies from the population to determine the number of required services that should be performed satisfactorily (acceptable services).

(4). Then divide the number of acceptable services by the population to determine the AQL.

(5). All of the above data shall be documented on the Inspection Checksheets, in the Rating Comments Section. Statistical data supporting all Inspection Checksheet elements rated as failed shall be included in the COR Monthly QASP Report.

AQL =

Total Number of Observed Approved Service Occurrences/ Sample

d. Population

(1). The AQL for a specific Checksheet is identified on each Checksheet in a percentage. To determine if a Checksheet is rated as passing or failing, each of the Checksheet elements in the Checksheet has been given a weight factor in percent of the overall Checksheet.

(2). For each Checksheet element that passes, the full percentage for that element is added to all other passing elements for that Checksheet to produce a total quality level rating in percentage for each Checksheet (if a Checksheet element is failed, zero percentage points are added to the overall Checksheet rating).

(3). If the total percentage for a given Checksheet meets or exceeds the AQL for that particular Checksheet, the Checksheet is rated as passing for the overall Checksheet rating and the Checksheet receives a rating of the maximum AQL points for that particular Checksheet and/or CLIN/sub-CLIN item.

e. Criteria for Use (1). Consider for medium populations where 100% inspection is too costly or manpower is inadequate.

(2). Can be used for unscheduled services, if the work can be inspected at a later time after performance.

(3). Consider for requirements whose importance does not justify the cost of 100% inspection.

(4). If used consistently, it will provide adequate trends in overall Contractor performance.

(5). Use where the requirement is critical enough not to rely on the Validated Customer Complaint method.

2. 100% Inspection

100% Inspection is an evaluation method that requires complete 100% inspection of a major contract requirement as shown in the QASP. The AQL analysis for 100% inspection will be based on 100 % inspection of all work associated with the requirement and the AQL established in the QASP Inspection Guide and /or Checksheets. The analysis requires the summarization of all surveillance data and the computation of the AQL. The AQL is computed by the same method as in the planned sampling.

a. Criteria for Use (1). Use when the service population is small.

(2). Apply to critical services with major mission impact, where inspection of each and every occurrence is important.

(3). Use when it is important to have a precise measurement of the Contractor’s level of performance.

(4). Not well suited for large populations.

b. To determine an AQL percentage rating (1). Determine how many times the service is expected to be provided during the surveillance period (population).

(2). Determine what the maximum number of nonconforming services or supplies for the given requirement for the period the Government should tolerate (number of accepted nonconforming services or supplies).

(3). Subtract the number of accepted nonconforming services or supplies from the population to determine the number of required services that should be performed satisfactorily (acceptable services).

(4). Then divide the number of acceptable services by the population to determine the AQL.

(5). All of the above data shall be documented on the Inspection Checksheets, in the Rating Comments Section. Statistical data supporting all Inspection Checksheet elements rated as failed shall be included in the COR Monthly QASP Report.

AQL =

Total Number of Observed Approved Service Occurrences/ Sample

3. Unscheduled Inspections

a. They’re usually opportunities for inspections that may be able to be carried out in an effective manner in conjunction with scheduled inspections of other contract requirements or in an impromptu fashion on the way to or from another commitment. Analysis of Unscheduled Inspection results requires the summarization of surveillance data and the computation of the AQL. The AQL is computed by the same method as in the planned sampling.

b. For example, a MWI may be performing a random inspection of an air handler in a mechanical room. Incidental to that inspection, he/she may notice that the belt is flapping loose on a toilet exhaust fan in the mechanical room and therefore fails to meet specific standards. This constitutes an unscheduled inspection. Decisions on what to inspect are usually arbitrary; they are made simply “because you are there”. Unscheduled Inspections will be used were the requirement is not critical and therefore does not require a planned inspection approach. In some cases, a requirement with few work occurrences and few locations can be inspected by Unscheduled Inspection, but only if it is a relatively non-critical requirement and does not require inspection immediately upon completion.

c. Unscheduled inspections may also be used to further identify how far ranging problems may be which has been previously identified using planned sampling, or customer complaints. When a problem is identified in the performance of a requirement, additional unscheduled inspections may be performed to identify if the problem exists in more than the one location previously inspected and will provide additional information to the COR and Contracting Officer in instituting contract administrative actions. All items of work that are found to be unsatisfactory by the MWI’s will be identified to the COR and could result in a service call being issued, a rework order being generated, or turned over to the Contracting Officer for action.

a. Criteria for Use (1). Use for low priority requirements.

(2). Use to supplement other inspection methods to further identify the scope and causes of problems with provided services.

4. Validated Customer Complaints

Customer Complaints constitutes a surveillance method based on customer awareness, timeliness in completing customer service calls, and customer satisfaction ratings. Customers notify the ERC and/or COR and/or MWI’s when there is a case of perceived poor performance, untimely performance, or non-performance. Upon notification, the COR and/or MWI’s investigate the report and, if valid, document the performance problem, thereby validating the complaint.

a. Criteria for Use Use this method where the customer:

(1). Is the direct recipient of the service and is aware of service levels required.

b. Documenting Customer Complaints

Normally customer complaints are received from the ERC or directly from the customer to the COR and/or MWI’s. If the complaint is from the ERC in a service call ticket format the Contractor shall address the issue by opening a new ticket if one does not already exist for the performance issue in the CMMS. If a ticket already exists in the system, the Contractor will notify the COR and wait for instruction as to how to address the performance issue (the COR may need to validate the complaint before giving direction to the Contractor). Subsequently, those customer complaints that are received by the COR or MWI will be documented by the MWI in the CMMS as a re-work order if the ticket has already been closed by the contractor, or a request (by email) for the Contractor to generate a service call ticket will be made if it is a new performance issue. The following information should be recorded on the work order that is associated with the customer complaint in the CMMS database:

(1). Date and time of complaint

(2). Source of complaint ‑ organization and/or individual and location (3). Nature of complaint (narrative description)

(4). Contract reference of complaint related services

(5). Valid complaint (Yes or No) (Validation)

(6). Date and time Contractor is informed of complaint

(7). Action taken by Contractor and date ticket is closed (8). Signature of the person (MWI) validating the Complaint

c. Customer Complaint Validation

(1). Only validated complaints are allowable as described above. In order to validate a customer complaint, the COR and/or the MWI must physically review the performance in reference against the standard in the Contract. The complaint is validated only if the performance standard was not met.

(2). If the contract standard was met, then the MWI will discuss the complaint with the customer and the standards of performance that are expected and the complaint will not be counted as a non-conforming service or supply in evaluating the performance of the Contractor.

5. Random Sampling Inspections

a. Random Sampling shall be used when some part but not all of the Contractor’s performance is to be evaluated. The method of random inspections is defined for each Checksheet task on each Checksheet Inspection Guide.

b. The Random Sampling level of inspection may be normal, reduced, or tightened. These levels only pertain to Random Sampling and may be adjusted by the COR based on the Contractor’s performance. All changes in the number of Random Samples analyzed for Checksheet Tasks will be documented by issuance of revised Inspection Guides addressing the new sample size to be implemented.

4. CHOOSING SURVEILANCE INSPECTION METHODS

The Government reserves the right to use any of the above-defined surveillance inspection methods as it deems appropriate: Planned Sampling Inspections, Unscheduled Inspections, Validated Customer Complaints, 100% Inspections, or Random Sampling Inspections. These methods are selected based on several factors including population size, relative work importance, and service times.

5. ACCEPTABLE QUALITY LEVEL

1. The AQL is the level of performance of the contract requirement the contractor shall perform for the particular contract requirement to be considered acceptable and rated as passed as defined in the QASP Checksheets and Inspection Guides. The AQL is shown in the performance criteria section of the QASP Inspection Guide and on each Checksheet. For each Checksheet requirement, the AQL serves as a benchmark to evaluate the Contractors performance as it applies to that particular requirement. The COR should be notified in all cases where the AQL is not met for a particular Checksheet item.

2. The unit of measure for an AQL for a given Checksheet element may be stated either as a percent or as an absolute number of items per time period. The specific AQL is identified for each requirement in the QASP inspection guide and/or checksheets. All of the above-outlined surveillance methods may be applied to determine the AQL.

3. The AQL may trigger payment deductions to be determined by the Contracting Officer, and in certain cases, negotiations with the Contractor. In addition, the AQL is also the threshold below which other contract actions will be taken (cure notices, show cause letters, termination, etc. as deemed appropriate by the Contracting Officer). In short, it is a Government QA tool to determine when performance is acceptable and when performance needs improvement and/or further contract administrative actions.

4. How to determine an AQL percentage rating

(a) Determine how many times the service is expected to be provided during the surveillance period (population).

(b) Determine what the maximum number of nonconforming services or supplies for the given requirement for the period the Government should tolerate (number of accepted nonconforming services or supplies).

(c) Subtract the number of accepted nonconforming services or supplies from the population to determine the number of required services that should be performed satisfactorily (acceptable services).

(d) Then divide the number of acceptable services by the population to determine the AQL.

(e) All of the above data shall be documented on the Inspection Checksheets, in the Rating Comments Section.

(f) The AQL for a specific Checksheet is identified on each Checksheet as a percentage. To determine if a Checksheet is rated as “PASS”, each of the individual elements in the Checksheet is weighted in a percentage. For each Check sheet element passed, the percentage score for each Checksheet element is added together to produce a total overall percentage rating for each Checksheet. If the total percentage for each Checksheet meets or exceeds the AQL for that particular Checksheet, the Checksheet is rated as passed.

AQL =

Total Number of Observed Approved Service Occurrences/ Sample

6. EVALUATION PROCEDURES

1. The QASP Inspection Guide provides the details of how the COR or MWI’s will conduct inspections. This includes but not limited to the following:

a) Requirement Number

b) Population

c) Task or Contract Reference

d) Surveillance/Inspection Procedures

e) AQL Performance Criteria

2. The level of inspection details must be adequate to allow the MWI’s to employ the same method of surveillance, apply the same performance evaluation criteria, and produce the required level of documentation to justify a fare and reasonable performance rating (pass/fail and AQL percentage) associated with all five (5) checksheets (6 checksheets during phase-in). The COR and MWI’s will interpret and administer all contract surveillance in strict accordance with the approved QASP inspection guide.

3. For the purpose of completed service call and preventive maintenance work orders for the month, the following criteria will apply:

(a) The completion date as assigned by the contractor in the CMMS will determine the month in which the evaluation will take place on the work order.

(b) If a deferral is granted for any SC or PM work order, the new due date is what will be used by the COR and/or MWI to determine timeliness.

(c) PM that is completed late will not have the original maintenance scheduled changed to reflect a new due date based on the late completion date of the PM.

(d) A single non performance or performance issue can result in a failure on more than one checksheet element (ex. No date/time stamp entered on a work order could result in failure of a timely checksheet element and a proper documentation element).

4. The following outlines the timeframe for completion of the QASP and any resulting deductions:

(a) The contractors reports are due to the COR by the 7th of the month following the QASP evaluation month (ex – June reports are due by July 7th)

(b) The QASP summary report and backing documentation is due to the CO by the 17th of the month.

(c) The CO will review and provide the Project Manager a copy of the report by the 22rd.

(d) The Project Manager has 5 work days to review and provide any written report if they dispute any/all parts of the report.

(e) The CO will make a final determination and inform the Contractor and COR of the appropriate voucher amount that can be submitted for payment by the first day of the following month.

(f) If a deduction is necessary it will be taken from the following month’s payment (June’s deduction would be taken from July’s payment). Deductions will always be taken in arrears, therefore the last month’s payment shall be held until all deductions have been calculated and applied.

7. QASP REPORTS AND CONTRACT PAYMENT DEDUCTIONS

1. Deductions, while related to the Quality Assurance Surveillance Plan (QASP) evaluation, are a separate and distinct contract administrative action. Deductions from the contract will be based upon the COR’s analysis and the MWI’s inspections which will document nonconforming services or supplies in the Monthly QASP Summary Report regardless of the inspection method executed.

2. Nonconforming supplies or services are recorded for each work occurrence that either is not performed or is performed unsatisfactorily and is incorporated into the COR Monthly QASP Summary Report and documented in the COR’s contract file. For all methods of surveillance, deductions for only the inspected/observed and documented nonconforming services or supplies are appropriate. Simply stated, the Government should not pay for a product or service not received, or received in an unsatisfactory condition. However, appropriate specific inspection and performance documentation of each nonconforming supply or service must be captured before deductions are executed.

3. The major categories of services to be evaluated in the Monthly QASP Report are as follows:

a) Phase – In (Checksheet #6) AQL = 95%

b) Facility Operations (Check Sheets #1) AQL=95%

c) Water Treatment (Check Sheet #2) AQL=95%

d) Service Calls (Check Sheet #3) AQL=95%

e) Preventive Maintenance (Check Sheet #4) AQL=95%

f) Additional Services (IDIQ) (Check Sheet #5) AQL=95%

3. Deductions will be taken from each monthly payment by the Monthly QASP Summary Report when a monthly Checksheet AQL drops below 95% for any checksheet. The checksheet AQL is comprised of the total weight earned for each element on the checksheet. If the element passes, the total weight for that element is earned. If the element fails, no weight is earned. Total Monthly payment deductions are based on the overall checksheet rating for each of the five (5) checksheets and depending on how contract payment is made. If contract payment is made based on one monthly payment, (A) below will apply. If payment is broken out by Contract Line Item Numbers (CLIN’s), (B) below will apply.

A. All the deduction percentages from each checksheet are added up to form one combined monthly deduction. Below is the checksheet deductions based on the rating earned:

Checksheet Rating of:

95% - 100% = no deduction

85% - 94% = 2% deduction

75% - 84% = 4% deduction

65% - 74% = 6% deduction

45% - 64% = 10% deduction

0% - 44% = 20% deduction For example, if three checksheets have scores below the AQL it would work like this:

Checksheet #1’s score is 78% which calls for a 4% deduction, Checksheet #3’s score is 87%, which calls for a 2% deduction, and

Checksheet #4’s score is 61%, which calls for a 10% deduction.

The total deduction from the monthly payment would be 16%.

B. If the contract monthly payments are broken out by Contract Line Item Numbers (CLIN’s), the checksheets will be associated to a specific CLIN and the recommended deduction amounts from each checksheet will be taken from that CLIN.

For example, if checksheet #1 and #5 are associated with the same CLIN and checksheet #3 is associated with a different CLIN and have deduction recommendations it would work like this:

Checksheet #1’s score is 85% which calls for a 2% deduction, Checksheet #3’s score is 87%, which calls for a 2% deduction, and

Checksheet #5’s score is 66%, which calls for a 6% deduction.

The deduction from the CLIN for checksheets #1 & #5 would be 8% while the deduction associated with Checksheet #3 would be 2% from that CLIN.

PHASE-IN Checksheet: Initially the Phase-In checksheet will only apply during that period of the contract and any deductions will be taken from the contractors cost for the phase-in period. Deductions for the phase-in checksheet will be calculated as described below:

Checksheet Rating of:

95% - 100% = no deduction

85% - 94% = 4% deduction

75% - 84% = 10% deduction

65% - 74% = 20% deduction

45% - 64% = 30% deduction

0% - 44% = 50% deduction HOWEVER, should the contractor fail to provide the phase-in deliverables/submittals/personnel during the phase-in period the checksheet shall continue to be used until all the deliverables/submittals/personnel have been provided. The Phase-In checksheet deduction percentages at the start of the contract will be applied as those above in #4 and will be taken from the contract monthly payment.

Should additional government QA inspections be required due to the Contractor’s performance in providing nonconforming services, supplies and/or do to the rework process, the Government reserves the right to reduce the monthly contract payment by the actual cost to the Government to re-inspect contract work that has been inspected and found to be NONCONFORMING SERVICES AND SUPPLIES.

5. If a trend is observed by the COR of poor overall performance, or poor performance in a specific QASP Checksheet/element, the COR will notify the Contracting Officer and/or the Contractor’s Project Manager of the findings to resolve the performance issue promptly.

6. COR Monthly QASP Summary Report

a. The overall Monthly QASP Summary Report will be generated by the COR from data extracted from the MWI’s monthly inspection report(s) and CMMS reports and will be furnished to the Contracting Officer each month. This report will also be the basis for determining the Contractor’s deductions and performance rating. The COR will review all of the data provided in the MWI’s monthly inspection report(s) and CMMS reports and ensure that all reports reflect consistent and accurate evaluations for the appropriate Checksheet elements with adequate documentation to support the resulting AQL rating for each Checksheet.

b. Should errors be discovered by the COR in the Monthly MWI inspection report(s) and/or the CMMS reports, the COR shall request that the individual reports be modified to ensure the accuracy in rating Checksheet elements.

c. Monthly contract payment deductions will be taken for any Checksheet AQL ratings less than the AQL identified with each of the associated checksheets. Each rating lower than the AQL percentage required by a given Checksheet will reduce the monthly contract payment amount.

d. Subsequently, the COR’s Monthly QASP Summary Report (with the supporting MWI and CMMS reports and documentation enclosed) will be provided to the Contracting Officer (CO) for his/her review and approval. After reviewing and approving the contents of the report, the CO will formally issue the report to the Contractor for comment.

e. The Contractor’s Project Manager will have 5 work days to respond to the findings of the Monthly QASP Summary Report. If the Contractor agrees with the report, the Contractor may generate a voucher for the amount identified by the Contracting Officer in the final QASP report issued to the Contractor for the previous month’s services per Section G.3 of the contract.

f. If the Contractor disputes the finding in the report, the Contractor’s Project Manager shall provide a written response documenting the rationale for disputing each of the nonconforming services or supplies cited in the report. After taking into consideration the findings identified in the Monthly QASP Summary Report and any relevant and timely Contractor performance documentation provided by the Contractor’s Project Manager, the CO will make a final determination and inform the Contractor and COR of the appropriate voucher amount that can be submitted for payment.

g. If the Contractor and CO are still not in agreement on the appropriate voucher amount, the Contractor shall issue a voucher as directed by the Contracting Officer and may seek additional payment via the disputes clause in the contract.

8. NON-CONFORMING SERVICES AND SUPPLIES AND REWORK PROCESS

1. This section is included in the QASP to provide guidance and information to the Contractor, COR and MWI personnel regarding this process-- if it becomes necessary to implement it. The FAR clause has been adapted to provide instruction to the government personnel. In part, the FAR states:

FAR 46.407 -- Nonconforming Supplies or Services

(a) The contracting officer will reject supplies or services not conforming in all respects to contract requirements (see 46.102). In those instances where deviation from this policy is found to be in the Government’s interest, such supplies or services may be accepted only as authorized in this section.

(b) The contracting officer will give the contractor an opportunity to correct or replace nonconforming supplies or services when this can be accomplished within the required delivery schedule. Unless the contract specifies otherwise (as may be the case in some cost-reimbursement contracts), correction or replacement must be without additional cost to the Government. Subparagraph (e)(2) of the clause at 52.246-2, Inspection of Supplies -- Fixed-Price, reserves to the Government the right to charge the Contractor the cost of Government re-inspection and retests because of prior rejection.

(c)

(1) In situations not covered by paragraph (b) of this section, the contracting officer will ordinarily reject supplies or services when the non-conformance is critical or major or the supplies or services are otherwise incomplete. However, there may be circumstances (e.g., reasons of economy or urgency) when the contracting officer determines acceptance or conditional acceptance of supplies or services is in the best interest of the Government. The contracting officer must make this determination, based upon:

(i) Advice of the technical activity that the item is safe to use, and will perform its intended purpose;

(ii) Information regarding the nature and extent of the non-conformance or otherwise incomplete supplies or services;

(iii) A request from the Contractor for acceptance of the nonconforming or otherwise incomplete supplies or services (if feasible);

(iv) A recommendation for acceptance, conditional acceptance, or rejection, with supporting rationale; and

(v) The contract adjustment considered appropriate, including any adjustment offered by the Contractor.”

2. The COR must furnish this data to the contracting officer in writing, except that in urgent cases it may be furnished orally and later confirmed in writing. Before making a decision to accept, the Contracting Officer must obtain the concurrence of the activity responsible for the technical requirements of the contract and, where health factors are involved, of the responsible health official of the agency concerned.

3. If the non-conformance is minor, the COR may make recommendations to the CO who will make the final determination whether or not to accept or reject the work.

4. The COR will assist the Contracting Officer in discouraging the repeated tender of nonconforming supplies or services, including those with only minor non-conformances, by appropriate action, such as rejection and documenting the Contractor’s performance record.

5. When supplies or services are accepted with critical or major non-conformances as authorized in paragraph (c) of this section, the Contracting Officer may modify the contract to provide for an equitable price deduction or other consideration. In the case of conditional acceptance, amounts withheld from payments generally should be at least sufficient to cover the estimated cost and related profit to correct nonconforming supplies or services and complete unfinished work.

6. The COR must document in the contract file the basis for the amounts withheld. This data will be provided to the Contracting Officer by the COR. For services, the Contracting Officer can consider identifying the value of the individual work requirements or tasks (subdivisions) that may be subject to price or fee deduction. This value may be used to determine an equitable adjustment for nonconforming services.

7. However, when supplies or services involving minor non-conformance are accepted, the contract need not be modified unless it appears that the savings to the Contractor in fabricating the nonconforming supplies or performing the nonconforming services will exceed the cost to the Government of processing the modification.

8. Notices of rejection of work will be done in the CMMS using the re-work process with the rationale for rejection of work documented on the re-work request. The notification shall be furnished promptly to the Contractor. Promptness in giving this notice is essential because, if timely nature of rejection is not furnished, acceptance may in certain cases be implied as a matter of law and untimely notification may preclude the Contractor from re-performing a given service. The following notification timeframes shall be followed by the IRS COR’s and MWI’s:

a) PM tickets: “within 5 work days after input of the completed work order into the CMMS by the contractor."

b) Service Call tickets: “within 2 work days after input of the completed work order into the CMMS by the contractor."

c) IDIQ final inspections: “within 5 work days after receipt of the contractors email notice of work being completed.”

9. Rework Process

a) The preferred way to resolve known non-conforming services or quality supplies/materials is to request performance (if unperformed initially), or re-work (if performed unsatisfactorily).

b) The primary mission of the Government’s inspection is not to deny payment to a Contractor but to receive the desired services in a quality and timely manner. A requirement with timeliness as a performance requirement may not be reworked if time doesn’t allow for it. For example, if a twice a day task is not successfully completed the first time there may not be substantial time for the Contractor to re-work the task before it is due to be performed again, therefore no credit can be given for that non conformance work being performed.

c) On a case-by-case basis, the COR may agree to allow deferments for up to a maximum of 15 calendar days for service calls and 30 calendar days for preventive maintenance tasks not performed and or needing to be reworked due to non-conforming substandard performance of the services performed if time allows before the next performance of the task is required (see the PWS for specific information on deferrals).

10. Deductions for Rework by Others

In the event “rework” services are accomplished by other than the Contractor, deductions may be made in accordance with the termination clause and the following procedures:

FAR 49.402-6, REPURCHASE AGAINST CONTRACTOR’S ACCOUNT

a) When the supplies or services are still required after termination, the contracting officer shall repurchase the same or similar supplies or services against the Contractor’s account as soon as practicable. The contracting officer shall repurchase at as reasonable a price as practicable, considering the quality and delivery requirements. The contracting officer may repurchase a quantity in excess of the undelivered quantity terminated for default when the excess quantity is needed, but excess cost may not be charged against the defaulting Contractor for more than the undelivered quantity terminated for default (including variations in quantity permitted by the terminated contract). Generally, the contracting officer will make a decision whether or not to repurchase before issuing the termination notice.

(b) If the repurchase is for a quantity not over the undelivered quantity terminated for default, the Default clause authorizes the contracting officer to use any terms and acquisition method deemed appropriate for the repurchase. However, the contracting officer shall obtain competition to the maximum extent practicable for the repurchase. The contracting officer shall cite the Default clause as the authority. If the repurchase is for a quantity over the undelivered quantity terminated for default, the contracting officer shall treat the entire quantity as a new acquisition.

(c) If repurchase is made at a price over the price of the supplies or services terminated, the contracting officer shall, after completion and final payment of the repurchase contract, make written demand on the Contractor for the total amount of the excess, giving consideration to any increases or decreases in other costs such as transportation, discounts, etc. If the Contractor fails to make payment, the contracting officer shall follow the procedures in Subpart 32.6 for collecting contract debts due the Government.

(d) If rework inspections are required and performed by the Government COR or MWI’s due to poor or incomplete work performance, the Government may effect a deduction in the monthly contract payment equal to the actual cost to the Government to perform each additional inspection and all associated administrative costs.