TECHNICAL QUESTIONNAIRE.docx

DOCX document 19 KB Posted

Attached to
F103--Water Treatment Services at James J. Peters VA Medical Center and Northport VA Medical Center
Solicitation number
36C24223Q0147
Issued by

View the file

Other files

File Type Posted
36C24223Q0147 0005.docx DOCX document
36C24223Q0147 0004.docx DOCX document
SOW Water Treatment NP BX Rev2.docx DOCX document
36C24223Q0147 0003.docx DOCX document
James J Peters VAMC Responses 2.docx DOCX document
Northport Responses.docx DOCX document
SOW Water Treatment NP BX Rev1.docx DOCX document
James J. Peters Responses.docx DOCX document
36C24223Q0147 0002.docx DOCX document
Site Visit Info.docx DOCX document
36C24223Q0147 0001.docx DOCX document
Wage Determination.pdf PDF
G 2021.02.22 Standard Document - Cooling Tower Water Systems.pdf PDF
E a - VHA Directive 1810 - Boiler and Boiler Plant Operations _ 2018-09-11.pdf PDF
PAST PERFORMANCE QUESTIONNAIRE.docx DOCX document
LIMITATIONS ON SUBCONTRACTING CERTIFICATION.docx DOCX document
F Cooling Tower Pages from Directive 1061 D 2021-02-16.pdf PDF
QASP Northport VA MC.pdf PDF
Wage Determination 2015-4157 Rev.20.pdf PDF
36C24223Q0147 BX and NP.pdf PDF
ATTACHMENT D Northport VAMC.docx DOCX document
QASP James J Peters VAMC.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Questionnaire Solicitation: 36C24223Q0147 Firm’s SAM Unique Entity Identifier: _________________________ Instructions: The offeror shall describe in its technical questionnaire how it plans to meet the requirement in the Performance Work Statement (PWS). The offeror shall provide details of specific methods, techniques, and solutions for completing the requirement, including areas such as technical approach, technical expertise (including experience and qualifications), and overall benefit to the Government. This questionnaire is limited to five (5) pages, not counting the required supervisor training certificate(s). Font is Times New Roman, size 11, with Moderate margins (1” Top and Bottom, 0.75” Left and Right). Anything submitted beyond the fifth page of this questionnaire will not be considered. Do not change the font and margins to fit more text.

1. Describe your company’s ability and professionalism to perform the services as described in the Performance Work Statement (PWS).

2. Describe how your firm intends to provide services on a scheduled basis.

3. Identify the feasibility in which your firm can begin performance and a phase-in plan with timelines.

4. Describe the proposed Supervisor’s water treatment experience on healthcare settings and level of training. Provide copies of certification of formal training.

5. Describe your firm’s quality control plan in ensuring its ability to consistently meet PWS requirements at acceptable quality levels.

File details come from the government source that posted it. Updated .