Technical Exhibit H - Pricing Spreadsheets - Rev2.xls
XLS spreadsheet 237 KB Posted
- Attached to
- Range Operations at Fort Hood, Texas Federal contract opportunity
- Solicitation number
- W91151-22-R-0001
About this file
This document contains a pricing template for a federal contract solicitation for range operations at Fort Hood, Texas. The solicitation number is W91151-22-R-0001 and is being issued by the Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood. The template provides pricing tables to be filled in by offerors for the base period of performance as well as four option periods. Pricing is to be provided for labor, contractor-acquired property, and other direct costs for both prime contractor and subcontractor personnel. Instructions are included on how to populate the tables with labor category names and pricing details using full-time, part-time, and full-time equivalent designations along with hourly salary information. Formulas are pre-populated but offerors are responsible for ensuring accuracy. Supporting documentation requirements are identified for overhead, G&A, SUTA, and other rates. A pricing narrative must also be provided with the completed templates.
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY
| PHASE-IN | $0.00 |
| BASE PERIOD | $490,000.00 |
| OPTION 1 | $490,000.00 |
| OPTION 2 | $490,000.00 |
| OPTION 3 | $490,000.00 |
| OPTION 4 | $490,000.00 |
| PHASE-OUT | $0.00 |
| TOTAL | $2,450,000.00 |
PHASE-IN
| PHASE-IN | |||||||||||||||||||
| FT/ | NO. | AVAIL | NET PROD | HR SALARY | TOTAL | H&W | FICA | FUTA | SUTA | WCI | WCI | WCI | TOTAL FRINGE | SUBTOTAL | G&A | TOTAL | PROFIT | GRAND | |
| LABOR CATEGORY | PT | EMP. | HOURS | HOURS | RATE | WAGES | $ 4.23 | 7.65% | 0.60% | 0.00% | CODE | RATE | AMOUNT | BURDEN | COST | 0.00% | COST | 0.00% | TOTAL |
| 2080 | 1,856 | $ 7,000 | $ 9,000 | PER $100 | |||||||||||||||
| RANGE OPERATIONS W91151-22-R-0001 | |||||||||||||||||||
| CLIN 0006: PHASE-IN | |||||||||||||||||||
| EXEMPT (PRIME): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SUB-TOTAL EXEMPT (PRIME) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| NON-EXEMPT (PRIME): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SUB-TOTAL NON-EXEMPT (PRIME) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| EXEMPT (SUBCONTRACTOR): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SUB-TOTAL EXEMPT (SUBCONTRACTOR) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| NON-EXEMPT (SUBCONTRACTOR): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SUB-TOTAL NON-EXEMPT (SUBCONTRACTOR) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| CLIN 0006 AMOUNT | 0.00 | 0.00 | 0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Monthly Cost | $0.00 | ||||||||||||||||||
| Fill in yellow boxes. |
BASE PERIOD
| BASE PERIOD | |||||||||||||||||||
| FT/ | NO. | AVAIL | NET PROD | HR SALARY | TOTAL | H&W | FICA | FUTA | SUTA | WCI | WCI | WCI | TOTAL FRINGE | SUBTOTAL | G&A | TOTAL | PROFIT | GRAND | |
| LABOR CATEGORY | PT | EMP. | HOURS | HOURS | RATE | WAGES | $ 4.23 | 7.65% | 0.60% | 0.00% | CODE | RATE | AMOUNT | BURDEN | COST | 0.00% | COST | 0.00% | TOTAL |
| 2080 | 1,856 | $ 7,000 | $ 9,000 | PER $100 | |||||||||||||||
| RANGE OPERATIONS W91151-22-R-0001 | |||||||||||||||||||
| CLIN 0001: RANGE OPERATIONS (FFP) | |||||||||||||||||||
| EXEMPT (PRIME): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SUB-TOTAL EXEMPT (PRIME) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| NON-EXEMPT (PRIME): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SUB-TOTAL NON-EXEMPT (PRIME) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| EXEMPT (SUBCONTRACTOR): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SUB-TOTAL EXEMPT (SUBCONTRACTOR) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| NON-EXEMPT (SUBCONTRACTOR): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SUB-TOTAL NON-EXEMPT (SUBCONTRACTOR) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| CLIN 0001 AMOUNT | 0.00 | 0.00 | 0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Monthly Cost | $0.00 | ||||||||||||||||||
| CLIN 0002: CONTRACTOR ACQUIRED PROPERTY (CAP) (Cost) | $303,000.00 | ||||||||||||||||||
| Material Handling Fee (To be filled out by offeror) | 0% | $0.00 | |||||||||||||||||
| CLIN 0002 ESTIMATED COST | $303,000.00 | ||||||||||||||||||
| CLIN 0003: RANGE OPERATIONS - LRC FUNDED (FFP) | |||||||||||||||||||
| EXEMPT (PRIME): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SUB-TOTAL EXEMPT (PRIME) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| NON-EXEMPT (PRIME): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SUB-TOTAL NON-EXEMPT (PRIME) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| EXEMPT (SUBCONTRACTOR): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SUB-TOTAL EXEMPT (SUBCONTRACTOR) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| NON-EXEMPT (SUBCONTRACTOR): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SUB-TOTAL NON-EXEMPT (SUBCONTRACTOR) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| CLIN 0003 AMOUNT | 0.00 | 0.00 | 0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Monthly Cost | $0.00 | ||||||||||||||||||
| CLIN 0004: CONTRACTOR ACQUIRED PROPERTY (CAP) - LRC FUNDED (Cost) | $187,000.00 | ||||||||||||||||||
| Material Handling Fee (To be filled out by offeror) | 0% | $0.00 | |||||||||||||||||
| CLIN 0004 ESTIMATED COST | $187,000.00 | ||||||||||||||||||
| CLIN 0005: SERVICE CONTRACT REPORTING (SCR) (FFP) | |||||||||||||||||||
| EXEMPT (PRIME): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| CLIN 0005 TOTAL | 0.00 | 0.00 | 0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| TOTAL - BASE PERIOD | 0.00 | 0.00 | 0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $490,000.00 | ||||
| Fill in yellow boxes. |
OPTION 1
| OPTION 1 | |||||||||||||||||||
| FT/ | NO. | AVAIL | NET PROD | HR SALARY | TOTAL | H&W | FICA | FUTA | SUTA | WCI | WCI | WCI | TOTAL FRINGE | SUBTOTAL | G&A | TOTAL | PROFIT | GRAND | |
| LABOR CATEGORY | PT | EMP. | HOURS | HOURS | RATE | WAGES | $ 4.23 | 7.65% | 0.60% | 0.00% | CODE | RATE | AMOUNT | BURDEN | COST | 0.00% | COST | 0.00% | TOTAL |
| 2080 | 1,856 | $ 7,000 | $ 9,000 | PER $100 | |||||||||||||||
| RANGE OPERATIONS W91151-22-R-0001 | |||||||||||||||||||
| CLIN 1001: RANGE OPERATIONS (FFP) | |||||||||||||||||||
| EXEMPT (PRIME): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SUB-TOTAL EXEMPT (PRIME) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| NON-EXEMPT (PRIME): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SUB-TOTAL NON-EXEMPT (PRIME) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| EXEMPT (SUBCONTRACTOR): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SUB-TOTAL EXEMPT (SUBCONTRACTOR) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| NON-EXEMPT (SUBCONTRACTOR): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SUB-TOTAL NON-EXEMPT (SUBCONTRACTOR) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| CLIN 1001 AMOUNT | 0.00 | 0.00 | 0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Monthly Cost | $0.00 | ||||||||||||||||||
| CLIN 1002: CONTRACTOR ACQUIRED PROPERTY (CAP) (Cost) | $303,000.00 | ||||||||||||||||||
| Material Handling Fee (To be filled out by offeror) | 0% | $0.00 | |||||||||||||||||
| CLIN 1002 ESTIMATED COST | $303,000.00 | ||||||||||||||||||
| CLIN 1003: RANGE OPERATIONS - LRC FUNDED (FFP) | |||||||||||||||||||
| EXEMPT (PRIME): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SUB-TOTAL EXEMPT (PRIME) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| NON-EXEMPT (PRIME): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SUB-TOTAL NON-EXEMPT (PRIME) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| EXEMPT (SUBCONTRACTOR): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SUB-TOTAL EXEMPT (SUBCONTRACTOR) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| NON-EXEMPT (SUBCONTRACTOR): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SUB-TOTAL NON-EXEMPT (SUBCONTRACTOR) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| CLIN 1003 AMOUNT | 0.00 | 0.00 | 0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Monthly Cost | $0.00 | ||||||||||||||||||
| CLIN 1004: CONTRACTOR ACQUIRED PROPERTY (CAP) - LRC FUNDED (Cost) | $187,000.00 | ||||||||||||||||||
| Material Handling Fee (To be filled out by offeror) | 0% | $0.00 | |||||||||||||||||
| CLIN 1004 ESTIMATED COST | $187,000.00 | ||||||||||||||||||
| CLIN 1005: SERVICE CONTRACT REPORTING (SCR) (FFP) | |||||||||||||||||||
| EXEMPT (PRIME): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| CLIN 1005 TOTAL | 0.00 | 0.00 | 0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| TOTAL - OPTION 1 | 0.00 | 0.00 | 0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $490,000.00 | ||||
| Fill in yellow boxes. |
OPTION 2
| OPTION 2 | |||||||||||||||||||
| FT/ | NO. | AVAIL | NET PROD | HR SALARY | TOTAL | H&W | FICA | FUTA | SUTA | WCI | WCI | WCI | TOTAL FRINGE | SUBTOTAL | G&A | TOTAL | PROFIT | GRAND | |
| LABOR CATEGORY | PT | EMP. | HOURS | HOURS | RATE | WAGES | $ 4.23 | 7.65% | 0.60% | 0.00% | CODE | RATE | AMOUNT | BURDEN | COST | 0.00% | COST | 0.00% | TOTAL |
| 2080 | 1,856 | $ 7,000 | $ 9,000 | PER $100 | |||||||||||||||
| RANGE OPERATIONS W91151-22-R-0001 | |||||||||||||||||||
| CLIN 2001: RANGE OPERATIONS (FFP) | |||||||||||||||||||
| EXEMPT (PRIME): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SUB-TOTAL EXEMPT (PRIME) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| NON-EXEMPT (PRIME): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SUB-TOTAL NON-EXEMPT (PRIME) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| EXEMPT (SUBCONTRACTOR): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SUB-TOTAL EXEMPT (SUBCONTRACTOR) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| NON-EXEMPT (SUBCONTRACTOR): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SUB-TOTAL NON-EXEMPT (SUBCONTRACTOR) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| CLIN 2001 AMOUNT | 0.00 | 0.00 | 0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Monthly Cost | $0.00 | ||||||||||||||||||
| CLIN 2002: CONTRACTOR ACQUIRED PROPERTY (CAP) (Cost) | $303,000.00 | ||||||||||||||||||
| Material Handling Fee (To be filled out by offeror) | 0% | $0.00 | |||||||||||||||||
| CLIN 2002 ESTIMATED COST | $303,000.00 | ||||||||||||||||||
| CLIN 2003: RANGE OPERATIONS - LRC FUNDED (FFP) | |||||||||||||||||||
| EXEMPT (PRIME): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SUB-TOTAL EXEMPT (PRIME) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| NON-EXEMPT (PRIME): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SUB-TOTAL NON-EXEMPT (PRIME) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| EXEMPT (SUBCONTRACTOR): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SUB-TOTAL EXEMPT (SUBCONTRACTOR) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| NON-EXEMPT (SUBCONTRACTOR): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SUB-TOTAL NON-EXEMPT (SUBCONTRACTOR) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| CLIN 2003 AMOUNT | 0.00 | 0.00 | 0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Monthly Cost | $0.00 | ||||||||||||||||||
| CLIN 2004: CONTRACTOR ACQUIRED PROPERTY (CAP) - LRC FUNDED (Cost) | $187,000.00 | ||||||||||||||||||
| Material Handling Fee (To be filled out by offeror) | 0% | $0.00 | |||||||||||||||||
| CLIN 2004 ESTIMATED COST | $187,000.00 | ||||||||||||||||||
| CLIN 2005: SERVICE CONTRACT REPORTING (SCR) (FFP) | |||||||||||||||||||
| EXEMPT (PRIME): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| CLIN 2005 TOTAL | 0.00 | 0.00 | 0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| TOTAL - OPTION 2 | 0.00 | 0.00 | 0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $490,000.00 | ||||
| Fill in yellow boxes. |
OPTION 3
| OPTION 3 | |||||||||||||||||||
| FT/ | NO. | AVAIL | NET PROD | HR SALARY | TOTAL | H&W | FICA | FUTA | SUTA | WCI | WCI | WCI | TOTAL FRINGE | SUBTOTAL | G&A | TOTAL | PROFIT | GRAND | |
| LABOR CATEGORY | PT | EMP. | HOURS | HOURS | RATE | WAGES | $ 4.23 | 7.65% | 0.60% | 0.00% | CODE | RATE | AMOUNT | BURDEN | COST | 0.00% | COST | 0.00% | TOTAL |
| 2080 | 1,856 | $ 7,000 | $ 9,000 | PER $100 | |||||||||||||||
| RANGE OPERATIONS W91151-22-R-0001 | |||||||||||||||||||
| CLIN 3001: RANGE OPERATIONS (FFP) | |||||||||||||||||||
| EXEMPT (PRIME): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SUB-TOTAL EXEMPT (PRIME) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| NON-EXEMPT (PRIME): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SUB-TOTAL NON-EXEMPT (PRIME) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| EXEMPT (SUBCONTRACTOR): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SUB-TOTAL EXEMPT (SUBCONTRACTOR) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| NON-EXEMPT (SUBCONTRACTOR): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SUB-TOTAL NON-EXEMPT (SUBCONTRACTOR) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| CLIN 3001 AMOUNT | 0.00 | 0.00 | 0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Monthly Cost | $0.00 | ||||||||||||||||||
| CLIN 3002: CONTRACTOR ACQUIRED PROPERTY (CAP) (Cost) | $303,000.00 | ||||||||||||||||||
| Material Handling Fee (To be filled out by offeror) | 0% | $0.00 | |||||||||||||||||
| CLIN 3002 ESTIMATED COST | $303,000.00 | ||||||||||||||||||
| CLIN 3003: RANGE OPERATIONS - LRC FUNDED (FFP) | |||||||||||||||||||
| EXEMPT (PRIME): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SUB-TOTAL EXEMPT (PRIME) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| NON-EXEMPT (PRIME): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SUB-TOTAL NON-EXEMPT (PRIME) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| EXEMPT (SUBCONTRACTOR): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SUB-TOTAL EXEMPT (SUBCONTRACTOR) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| NON-EXEMPT (SUBCONTRACTOR): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SUB-TOTAL NON-EXEMPT (SUBCONTRACTOR) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| CLIN 3003 AMOUNT | 0.00 | 0.00 | 0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Monthly Cost | $0.00 | ||||||||||||||||||
| CLIN 3004: CONTRACTOR ACQUIRED PROPERTY (CAP) - LRC FUNDED (Cost) | $187,000.00 | ||||||||||||||||||
| Material Handling Fee (To be filled out by offeror) | 0% | $0.00 | |||||||||||||||||
| CLIN 3004 ESTIMATED COST | $187,000.00 | ||||||||||||||||||
| CLIN 3005: SERVICE CONTRACT REPORTING (SCR) (FFP) | |||||||||||||||||||
| EXEMPT (PRIME): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| CLIN 3005 TOTAL | 0.00 | 0.00 | 0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| TOTAL - OPTION 3 | 0.00 | 0.00 | 0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $490,000.00 | ||||
| Fill in yellow boxes. |
OPTION 4
| OPTION 4 | |||||||||||||||||||
| FT/ | NO. | AVAIL | NET PROD | HR SALARY | TOTAL | H&W | FICA | FUTA | SUTA | WCI | WCI | WCI | TOTAL FRINGE | SUBTOTAL | G&A | TOTAL | PROFIT | GRAND | |
| LABOR CATEGORY | PT | EMP. | HOURS | HOURS | RATE | WAGES | $ 4.23 | 7.65% | 0.60% | 0.00% | CODE | RATE | AMOUNT | BURDEN | COST | 0.00% | COST | 0.00% | TOTAL |
| 2080 | 1,856 | $ 7,000 | $ 9,000 | PER $100 | |||||||||||||||
| RANGE OPERATIONS W91151-22-R-0001 | |||||||||||||||||||
| CLIN 4001: RANGE OPERATIONS (FFP) | |||||||||||||||||||
| EXEMPT (PRIME): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SUB-TOTAL EXEMPT (PRIME) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| NON-EXEMPT (PRIME): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SUB-TOTAL NON-EXEMPT (PRIME) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| EXEMPT (SUBCONTRACTOR): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SUB-TOTAL EXEMPT (SUBCONTRACTOR) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| NON-EXEMPT (SUBCONTRACTOR): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SUB-TOTAL NON-EXEMPT (SUBCONTRACTOR) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| CLIN 4001 AMOUNT | 0.00 | 0.00 | 0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Monthly Cost | $0.00 | ||||||||||||||||||
| CLIN 4002: CONTRACTOR ACQUIRED PROPERTY (CAP) (Cost) | $303,000.00 | ||||||||||||||||||
| Material Handling Fee (To be filled out by offeror) | 0% | $0.00 | |||||||||||||||||
| CLIN 4002 ESTIMATED COST | $303,000.00 | ||||||||||||||||||
| CLIN 4003: RANGE OPERATIONS - LRC FUNDED (FFP) | |||||||||||||||||||
| EXEMPT (PRIME): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SUB-TOTAL EXEMPT (PRIME) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| NON-EXEMPT (PRIME): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SUB-TOTAL NON-EXEMPT (PRIME) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| EXEMPT (SUBCONTRACTOR): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SUB-TOTAL EXEMPT (SUBCONTRACTOR) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| NON-EXEMPT (SUBCONTRACTOR): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SUB-TOTAL NON-EXEMPT (SUBCONTRACTOR) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| CLIN 4003 AMOUNT | 0.00 | 0.00 | 0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Monthly Cost | $0.00 | ||||||||||||||||||
| CLIN 4004: CONTRACTOR ACQUIRED PROPERTY (CAP) - LRC FUNDED (Cost) | $187,000.00 | ||||||||||||||||||
| Material Handling Fee (To be filled out by offeror) | 0% | $0.00 | |||||||||||||||||
| CLIN 4004 ESTIMATED COST | $187,000.00 | ||||||||||||||||||
| CLIN 4005: SERVICE CONTRACT REPORTING (SCR) (FFP) | |||||||||||||||||||
| EXEMPT (PRIME): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| CLIN 4005 TOTAL | 0.00 | 0.00 | 0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| TOTAL - OPTION 4 | 0.00 | 0.00 | 0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $490,000.00 | ||||
| Fill in yellow boxes. |
PHASE-OUT
| PHASE-OUT | |||||||||||||||||||
| FT/ | NO. | AVAIL | NET PROD | HR SALARY | TOTAL | H&W | FICA | FUTA | SUTA | WCI | WCI | WCI | TOTAL FRINGE | SUBTOTAL | G&A | TOTAL | PROFIT | GRAND | |
| LABOR CATEGORY | PT | EMP. | HOURS | HOURS | RATE | WAGES | $ 4.23 | 7.65% | 0.60% | 0.00% | CODE | RATE | AMOUNT | BURDEN | COST | 0.00% | COST | 0.00% | TOTAL |
| 2080 | 1,856 | $ 7,000 | $ 9,000 | PER $100 | |||||||||||||||
| RANGE OPERATIONS W91151-22-R-0001 | |||||||||||||||||||
| CLIN 4007: PHASE-OUT | |||||||||||||||||||
| EXEMPT (PRIME): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SUB-TOTAL EXEMPT (PRIME) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| NON-EXEMPT (PRIME): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SUB-TOTAL NON-EXEMPT (PRIME) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| EXEMPT (SUBCONTRACTOR): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SUB-TOTAL EXEMPT (SUBCONTRACTOR) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| NON-EXEMPT (SUBCONTRACTOR): | |||||||||||||||||||
| Labor Category #1 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #2 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Labor Category #3 | FT | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| SUB-TOTAL NON-EXEMPT (SUBCONTRACTOR) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||
| CLIN 4007 AMOUNT | 0.00 | 0.00 | 0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Monthly Cost | $0.00 | ||||||||||||||||||
| Fill in yellow boxes. |
INSTRUCTIONS
| (1) Offeror shall replace Labor Category #1, #2 and so forth with the labor category being proposed in column A. |
| (2) Offeror shall indicate FT for full time employee, FTE for full time equivalent or PT for part time employee in column B |
| (3) Available hours are all hours including holidays, vacation and sick hours. |
| (4) Net productive hours are the available hours less any holiday, vacation, and sick hours allowed by the offeror. |
| (5) SUTA rate shown in column K on this spreadsheet is for sample spreadsheet estimating purposes only. It is each individual offeror's responsibility to apply its own percentage rate for SUTA. |
| (6) SUTA and Workers' Compensation (WC) certificates shall be provided to support the SUTA & WC rates proposed on this spreadsheet. Also, the General Liability certificate shall be provided if General Liability is proposed separate from G&A. |
| (7) If an offeror has an overhead rate it may insert the necessary columns to calculate the overhead. However, a narrative shall be provided to support the proposed overhead rate. |
| (8) G&A rate shown in column Q on this spreadsheet is for estimating purposes only. It is each individual offeror's responsibility to apply its own percentage rate for G&A. |
| (9) Profit rate shown in column S on this spreadsheet is for estimating purposes only. It is each individual offeror's responsibility to apply its own percentage rate for profit. |
| (10) Although formulas are provided in the spreadsheet cells it is the responsibility of the offeror to make sure all formulas are correct. |
| (11) Spreadsheets shall be completed for each option period. |
| (12) A pricing narrative shall accompany the spreadsheets. |
| (13) Any labor costs provided by a sub-contractor shall be proposed in detail on the spreadsheet just as the prime contractor would. This means that the sub-contractor shall fill in columns A through T. |
File details come from the government source that posted it. Updated .