Attachment 13 - Target Fabrication and Workload.xlsx

XLSX spreadsheet 11 KB Posted

Attached to
Range Operations at Fort Hood, Texas Federal contract opportunity
Solicitation number
W91151-22-R-0001
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood

About this file

This document contains an attachment providing target fabrication workload details for a federal contract opportunity for range operations at Fort Hood, Texas. The attachment lists various types of targets to be fabricated annually for 2018 through 2019, including screening panels, KD panels, boresight panels, ammunition tables, barriers, vehicle fronts and flanks for tanks, armored personnel carriers, technical vehicles and trucks. It notes that supplies and materials for target fabrication are not covered under the supply contract line item and associated labor costs for fabrication, issue and turn in are borne by the contract. The federal contract opportunity is a solicitation issued by the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Hood for range operations, including the target fabrication workload outlined in the attachment.

View the file

Other files for this federal contract opportunity

Other files attached to Range Operations at Fort Hood, Texas, newest first.
File Type Posted
Attachment 11 - Battery Shop Tasks and Workload.xlsx XLSX spreadsheet
Attachment 07 - Range Utilization Data.xlsx XLSX spreadsheet
Attachment 06 - DS-GS Workload.xlsx XLSX spreadsheet
Attachment 20 - Relevant Contracts.doc DOC document
Attachment 17 - DD-Form-254_Contract Security Classification Specification.pdf PDF
Technical Exhibit F - Sample Invoice Cover Sheet.docx DOCX document
Technical Exhibit C - DD Form 250 Material Inspection and Receiving Report.pdf PDF
Attachment 22 - WD 2015-5237 Rev 16 dated 21Jul2021.pdf PDF
Attachment 21 - Past Performance Questionnaire.docx DOCX document
Attachment 15 - Electrical and Mechanical Maintenance and Workload.xlsx XLSX spreadsheet
Attachment 14 - Vehicle Maintenance Welding Target Devices.xlsx XLSX spreadsheet
Attachment 10 - Fiber Copper Combination and RF breakdown.xlsx XLSX spreadsheet
Attachment 09 - UTF 92050 Room Map.pptx PPTX presentation
Attachment 01 - Detailed Range Listing - Rev.xlsx XLSX spreadsheet
RFP for release_22-R-0001_as of 6Oct2021.pdf PDF
Technical Exhibit A - Reports.xlsx XLSX spreadsheet
Technical Exhibit H - Pricing Spreadsheets - Rev2.xls XLS spreadsheet
Attachment 19 - Performance Requirements Summary (PRS).xlsx XLSX spreadsheet
Attachment 08 - Request for Training Resources.pdf PDF
Attachment 05 - Telephone Network.xlsx XLSX spreadsheet
Attachment 03 - Minimum Safety Briefing.xlsx XLSX spreadsheet
Attachment 02 - Detailed Range Maps.pdf PDF
Technical Exhibit G - CAP Purchase Request.pdf PDF
Technical Exhibit E - Supplemental_Reports_Monthly Central Issue Point Usage Report.xlsx XLSX spreadsheet
Technical Exhibit D - Request for Maintenance_Repair of GFP.docx DOCX document
Technical Exhibit B - Sample JA.docx DOCX document
Attachment 23 - Construction Related Repairs and Maintenance Historical Data.xlsx XLSX spreadsheet
Attachment 18 - Annual Line Stopper Tasks and Workload.xlsx XLSX spreadsheet
Attachment 16 - Generator and Small Engine Maintenance Workload.xlsx XLSX spreadsheet
Attachment 12 - Central Issue Point Tasks and Workload.xlsx XLSX spreadsheet
Attachment 04 - Government Furnished Property.xlsx XLSX spreadsheet
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attach 13 Target Fabrication

Note supplies and material are not a part of the supply CLIN and the cost burden is not borne by the Contract.

The associated labor cost is borne by the contract for fabrication, issue and turn in.

Additionally note that the only information available to the Government about the amount of time to fabricate and the cost of that labor is proprietary to previous contractor's methods and means.

Annual Workload
TargetCY 18CY 19
10'X10' SCREENING PANEL10878
3' X 5' SCREENING PANEL CLOTH010
3' X 5' SCREENING PANEL WOOD276295
6' X 6' KD PANEL6030
6'X6' BORESIGHT PANEL2716
6'X6' Z PANEL1322
AMMO TABLE22
BARRIER 3.5'X4'10
BATTERY BOX200
BMP FLANK6934
BMP FRONTAL426339
BOOT 1"X4"330506
BOOT 4"X4"010
BRDM FLANK60
BRDM FRONTAL165145
BUNKER010
KD FRAME3070
T-72 FLANK4751
T-72 FRONTAL225260
TECH-TRUCK FLANK2613
TECH-TRUCK FRONTAL14540
TGT REF PT200
TROOP 3 MAN2014
TROOP 4 MAN4453
TRUCK FLANK4255
TRUCK FRONTAL601531
U-SHAPE FRAME 24" LEG920860
U-SHAPE FRAME 36" LEG160
V-NOTCH STAKE200220
WINDOW2832

Attachment 13 Target Fabrication and Workload

&P of &N

File details come from the government source that posted it. Updated .