Technical Exhibit B - Sample JA.docx

DOCX document 29 KB Posted

Attached to
Range Operations at Fort Hood, Texas Federal contract opportunity
Solicitation number
W91151-22-R-0001
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood

About this file

This document is a sample justification and approval form for a federal contract with sole source procurement. The form provides details for a range operations contract at Fort Hood, Texas to be awarded non-competitively. It lists the contracting agency as the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Hood. The justification cites authority under FAR 13.106-1(b)(1) to procure follow-on services from the original source, as using any other provider would substantially duplicate costs without expected cost recovery through competition. The representative and contracting officer must both sign off on the justification and approval before a sole source award can be made.

View the file

Other files for this federal contract opportunity

Other files attached to Range Operations at Fort Hood, Texas, newest first.
File Type Posted
Attachment 11 - Battery Shop Tasks and Workload.xlsx XLSX spreadsheet
Attachment 07 - Range Utilization Data.xlsx XLSX spreadsheet
Attachment 06 - DS-GS Workload.xlsx XLSX spreadsheet
Attachment 20 - Relevant Contracts.doc DOC document
Attachment 17 - DD-Form-254_Contract Security Classification Specification.pdf PDF
Technical Exhibit H - Pricing Spreadsheets - Rev2.xls XLS spreadsheet
Attachment 19 - Performance Requirements Summary (PRS).xlsx XLSX spreadsheet
Attachment 13 - Target Fabrication and Workload.xlsx XLSX spreadsheet
Attachment 08 - Request for Training Resources.pdf PDF
Attachment 05 - Telephone Network.xlsx XLSX spreadsheet
Attachment 03 - Minimum Safety Briefing.xlsx XLSX spreadsheet
Attachment 02 - Detailed Range Maps.pdf PDF
Technical Exhibit F - Sample Invoice Cover Sheet.docx DOCX document
Technical Exhibit C - DD Form 250 Material Inspection and Receiving Report.pdf PDF
Attachment 22 - WD 2015-5237 Rev 16 dated 21Jul2021.pdf PDF
Attachment 21 - Past Performance Questionnaire.docx DOCX document
Attachment 15 - Electrical and Mechanical Maintenance and Workload.xlsx XLSX spreadsheet
Attachment 14 - Vehicle Maintenance Welding Target Devices.xlsx XLSX spreadsheet
Attachment 10 - Fiber Copper Combination and RF breakdown.xlsx XLSX spreadsheet
Attachment 09 - UTF 92050 Room Map.pptx PPTX presentation
Attachment 01 - Detailed Range Listing - Rev.xlsx XLSX spreadsheet
RFP for release_22-R-0001_as of 6Oct2021.pdf PDF
Technical Exhibit A - Reports.xlsx XLSX spreadsheet
Technical Exhibit G - CAP Purchase Request.pdf PDF
Technical Exhibit E - Supplemental_Reports_Monthly Central Issue Point Usage Report.xlsx XLSX spreadsheet
Technical Exhibit D - Request for Maintenance_Repair of GFP.docx DOCX document
Attachment 23 - Construction Related Repairs and Maintenance Historical Data.xlsx XLSX spreadsheet
Attachment 18 - Annual Line Stopper Tasks and Workload.xlsx XLSX spreadsheet
Attachment 16 - Generator and Small Engine Maintenance Workload.xlsx XLSX spreadsheet
Attachment 12 - Central Issue Point Tasks and Workload.xlsx XLSX spreadsheet
Attachment 04 - Government Furnished Property.xlsx XLSX spreadsheet
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Exhibit B – Sample Justification & Approval (J&A)

1. Contractor Name:

2. Description of Action/Request:

3. Description of Supplies/Services:

4. Authority Cited: (Identify the statutory authority, FAR title and FAR citation permitting other than full and open competition. These include Simplified Procedures for Certain Commercial Items, 41 U.S.C 1901 (or 41 U.S.C. 1903 for Special Emergency Procurement) as implemented by FAR Subpart 13.5:

· Unusual and compelling urgency

· Exclusive licensing agreements

· Industrial mobilization

· Other: FAR 13.106-1(b)(1)(i), Brand name only available from manufacturer. (if applicable)

5. Reason for Authority Cited/Justification for Repairs or Maintenance IAW FAR 13.106 1(B)(1), Required for purchases below the simplified acquisition threshold (if applicable.)

· Services can only be provided from the original source as this is a follow-on requirement for the continued provision of highly specialized services

· Award to any other source would result in substantial duplication of cost to the Government that is not expected to be recovered through competition.

· Supplies/services are needed immediately to satisfy mission requirements.

6. Efforts to Obtain Competition: (State what steps will be taken to increase competition before subsequent acquisition of supplies and services is required).

7. Actions to Increase Competition:

8. Market Research: Describe the extent of the market research conducted to identify all qualified sources and the results thereof. Market Research is defined as “those attempts you made to ascertain whether other qualified sources exist.” Research of the marketplace may consist of written, telephonic or internet inquiries.”

9. InterestedSources: __________________________________________________________________________________________________________________________________________________________________

10. Other Facts:

11. Technical Certification: I certify that the supporting data under my cognizance which are included in the justification are accurate and complete to the best of my knowledge and belief.

Name: ___________________________Signature: ______________________________
Title: ____________________________Date: _______________________________

12. Requirements Certification: I certify that the supporting data under my cognizance which are included in the justification are accurate and complete to the best of my knowledge and belief.

Name: ___________________________Signature: ______________________________
Title: ____________________________Date: _______________________________

13. Fair and Reasonable Cost Determination: I hereby determine that the anticipated cost or price to the Government for this contract action will be fair and reasonable.

This determination will be made using the following:

· Price Analysis:

· Cost Analysis:

· IGCE:

· Audit (type):

· Other:

As a part of this basis, certified cost or pricing data is / is not required because the item (s) and/or service (s) being acquired are considered commercial.

(IAW FAR 15.403.1(a) Prohibition of obtaining certified cost and pricing data shall not be obtained for acquisitions at or below the simplified acquisition threshold.)

Name: _________________________Signature: ______________________________
Title: __________________________Date: _______________________________

14. Contracting Officers Representative

I validate that these repairs are necessary.

Name: _________________________________Signature: ______________________________
Title: Contracting Officer’s RepresentativeDate: _______________________________

15. Contracting Officer

APPROVED / DISAPPROVED

Name: _________________________________Signature: ______________________________
Title: Contracting OfficerDate: _______________________________
Name: __________________________________Signature: ______________________________
Title: ___________________________________Date: _______________________________

File details come from the government source that posted it. Updated .