Technical Exhibit 6 Forms.docx
DOCX document 57 KB Posted
- Solicitation number
- 70Z08425QAA850900
About this file
Technical Exhibit 6 Forms is a document containing six standardized forms and templates for contract administration and performance tracking for a U.S. Coast Guard facilities maintenance services contract. The forms include a Contract Discrepancy Report, Performance Evaluation Meeting Record, Sample Work Order, Facilities Engineering Performance Measurements Report, Generator Test Report, and Vehicle Dispatch Log. These forms are designed to systematically document work activities, track performance metrics, report maintenance actions, and maintain administrative records throughout the contract's execution.
The associated federal contract opportunity is a Service-Disabled Veteran Owned Small Business (SDVOSB) set-aside solicitation for facilities maintenance services at the U.S. Coast Guard Aviation Training Center in Mobile, AL. The contract requires comprehensive maintenance services including food service equipment, transportation, electrical systems, heating systems, water and sewage systems, air conditioning, building maintenance, grounds keeping, trash disposal, and fire protection services. Key dates include an optional site visit on 1 July 2025, questions due by 2 July 2025, and quote submissions due by 11 July 2025 at 1:00 PM ET. Quotes must be submitted via email to the Contract Specialist and Contracting Officer.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL EXHIBIT 6
Forms and Format Table of Contents
The Contractor may reproduce the Government forms identified below or may provide the information required on the Government forms in any other format acceptable to the Contracting Officer.
| FORM | REFERENCE | |
| 6 - 1 | Contract Discrepancy Report | 8.4 |
| 6 - 2 | Performance Evaluation Meeting Record | 8.5 |
| 6 - 3 | Sample Work Order | 5.1.4 |
| 6 - 4 | Facilities Engineering Performance Measures Report Format | 5.6.d |
| 6 |
| - 5 |
| Sample Generator Operating Log |
| 5.13.2.e.1 |
| 6 |
| - 6 |
| Vehicle Dispatch Log |
| 5.13.2.e |
CONTRACT DISCREPANCY REPORT
| 1. Contract Number |
| 2. Report Serial No. |
| 3. Report # this Discrepancy |
| 4. To: (Contractor and Managers Name) |
| 5. From: (Name of QAE) |
DATES
| 6. Prepared |
| Oral Notification |
| Returned by Contractor |
| Action Complete |
7. Discrepancy or Problem (Describe in detail: include reference to PMS/Directive: attach continuation sheet if needed.
8. Signature of Contracting Officer
| 9. To: (Contracting Officer) |
| From: (Contractor) |
10. Contractor response as to cause, corrective action and actions to prevent recurrence. Attach continuation sheet if needed (Cite applicable QC program procedures(s) or new QC procedures(s).)
| 11. Signature of Contractor Representative |
| Date |
12. Government Evaluation (Acceptance, rejection: Attach continuation sheet if needed)
13. Government Action (Payment deductions, cure notice, show cause, other)
14. Final Disposition
CLOSE OUT
Name – Title
Signature
Date
Contractor Notified
QAE
Contracting Officer
TE-6-1-1
PERFORMANCE EVALUATION MEETING RECORD
1. Date of Meeting:
2. Persons in Attendance (Representing)
1) 2) 3) 4) 5) 6)
3. Contract Discrepancy Reports Discussed (List):
4. Other Discrepancies, Problems or Topics Discussed (Describe in detail. Attach continuation sheet if needed)
5. Contractor Actions Required. (Attach continuation sheet if needed)
6. Government Actions Required. (Attach continuation sheet if needed)
7. Signature of Contractor’s Project Manager Date
8. Signature of Government Representative Date (Contracting Officer, COTR, or QAE)
TE-6-2-1
Sample Work Order Work Order Details // 278010
Replace approximately 40 apron lights, past the end of their service life.
| WO: |
| 278010 |
| Status: APPR |
| Priority: |
| 5 |
Parent:
Work Type: CM
Reported By:
Report Date: 8/23/2005 10:38:00 AM PM:
Phone:
| Location: |
| 26521 |
| AIRCRAFT APRON |
| Parent |
| 3765 |
| AIRCRAFT APRON |
| Unit Name: |
| CG AVIATION TRACEN MOBILE |
| Serial #: |
| Equipment: |
| 50580 |
| AIRCRAFT APRON --EQUIPMENT |
| Failure Class: |
Manufacturer:
Problem Code:
GL Account:
Supervisor:
Person Group:
Lead Person:
Lead Craft:
Crew:
| Sched Start: |
| Sched Finish: |
| Target Start: |
| Target Finish: |
| Actual Start: |
| Actual Finish: |
Work Remarks:
Workers(s) Names(s): Actuals:
Labor: Materials:
Job Plan:
*****FOR OFFICIAL USE ONLY*****NOT FOR PUBLIC DISPLAY*****FOR OFFICIAL USE ONLY*****
TE-6-3-1
FACILITIES ENGINEERING PERFORMANCE MEASUREMENT LETTER
From: (Unit Name) To: Commandant (G-SEC)
Subj: FY-XX FACILITIES ENGINEERING PERFORMANCE MEASUREMENTS
Ref: (a) Civil Engineering Manual, COMDTINST MI 1000.11 A
1. Per reference (a), the following Facility Engineering performance measurement data is provided for fiscal year XXXX.
2. Unit Staffing and Facilities:
A. Attach copy of organization chart for the Facilities Engineering Division.
B. Total Building Square Footage (SF) as maintained by Facility Engineering and as listed in CEDS at end of fiscal year.
C. Total Plant Replacement Value (PRV), as listed in CEDS at end of the fiscal year.
D. List of all OPFACs (shore and afloat) for which you are funded to provide FE maintenance responsibility.
3. Key Performance Measures:
A. Non-Recurring Maintenance Rate = A (1)/ PRV
(1) Total AFC43 obligated at facilities under FE maintenance responsibility = _ This includes all AFC43 funds obligated at your facility including funds obligated by servicing CEUs or FDCC. Also includes AFC-43 funds obligated for design and construction support. This does not include in-house (Coast Guard) salary and overhead costs.
B. Recurring Maintenance Rate = B(1)/PRV
(1) AFC30 maintenance obligations and associated salaries = . This includes staff (WG/GS/Mil) salary costs computed from Standard Personnel Costs (SPC). Includes all AFC30 material costs and maintenance contract costs.
Maintenance is NOT: Janitorial. Pest Control, Fuel Ops, Crane Ops, Window Cleaning, Security, Fire Fighting, Snow Removal, Refuse Removal, Recycling, Enviro/HazWaste Management, Water Sewer Ops, Vehicles, Telephone Services. and other comparable operating costs.
TE-6-4-1
C. Preventative Maintenance Rate = C(1)/C(2)
(1) Total Hours of PMS Completed =
(2) Total Hours of PMS in Annual PMS Cycle = PMS requirements are non-standardized, count those entered in FEDS CMMS or similar system. Includes all PMS (daily, weekly, monthly, quarterly, annual. etc.)
D. Family Housing Maintenance Rate = D(1)+D(2)
(1) Annual AFC30 maintenance obligations = Includes maintenance salaries, materials, and contracts for family housing units and for infrastructure required primarily to support family housing. Excludes utility and housing administration costs.
(2) Annual AFC43 contract and material obligations =
Includes contract and material costs for family housing units and infrastructure required primarily to support family housing.
(3) Number of Family Housing Units =
E. Maintenance Priority Distribution = E(1)/E(2)
(1) Total number of Work Orders completed within each Work Order priority category during the FY =
(2) Total number of Work Orders completed during FY =
Note: Provide a definition for each work order category. Data shall be provided for each Work Order category.
F. Responsiveness Rate = F(1)/ F(2)
(1) Total number of Work Orders completed on-time (as defined within each priority category) within each Work Order priority category =
(2) Total number of Work Orders completed during FY, within each Work Order priority category =
Note: Data shall be provided for each work order category
G. Energy Consumption Rate = BTU/SF
BTU = Consumption reported in Quarterly Energy Reports.
H. Recapitalization Rate = [ H(l) + H(2) ] / PRV
(1) Rebuilding (R) portion of AC&I projects awarded for your facility during the past year, as taken from PPRA estimates =
(2) Rebuilding (R) AFC43 projects awarded for your facility during the past year, as taken from CEDS =
I. Human Recapitalization Rate = I(1)/# of FE Billets
TE-6-4-
(1) Includes professional training hours for all FE employees, including GS. WG, Military = hrs
Note: Does not include mandatory unit training (example: CDAR, Ethics, Human Relations, etc.), nor OJT.
J. Remarks or Comments
Prepared by: Phone Number
GENERATOR TEST REPORT
Engine Number
Check Prior to Running
Check Under Load Condition Monthly
| Oil Level |
| Paint Cond. |
| Batt. Level |
| Batt. Cond. |
| Oil Leaks |
| Water Leaks |
| Eng. RPM |
| Oil Pres. |
| Oil Temp. |
| Water Temp. |
| Gen. Amps |
| Gen. Volts |
| Eng. Hours |
Date
TE 6- 5 - 1
Note:
Ensure all areas affected by Generator Testing/Power Loss are notified prior to and after testing. Ensure all equipment is reset after Generator is on line and after Generator is secured.
Comments: (List items that are not otherwise addressed) Performed
By:
Date:
Reviewed
By:
Date:
Department of Transportation U.S. Coast Guard CG-5367A
MOTOR VEHICLE DISPATCH LOG
| Vehicle Tag# |
| Destination |
| Purpose |
| Date and Time Out |
| Mileage Out |
| Date and Time In |
| Mileage In |
| Operator’s Name & Signature |
| Office Symbol |
| Office Phone |
TE 6- 6 - 1