Attachment 1 Schedule of Services.xlsx
XLSX spreadsheet 60 KB Posted
- Solicitation number
- 70Z08425QAA850900
About this file
This document is a detailed Schedule of Services for a Base Year and four Option Years of Facilities Maintenance Services for the U.S. Coast Guard Aviation Training Center in Mobile, Alabama. The solicitation is a Service-Disabled Veteran Owned Small Business (SDVOSB) Set-Aside for comprehensive facility maintenance covering food service equipment, transportation services, electrical systems, heating systems, water distribution, sewage systems, air conditioning, building maintenance, grounds keeping, surfaced area maintenance, trash disposal, and fire protection services.
Key dates include a optional site visit on 1 July 2025, question submissions due by 2 July 2025, and quote submissions due by 11 July 2025 at 1:00 PM ET. The contract period spans from 1 September 2025 to 31 August 2030, with a base year and four option years. The document includes detailed labor categories and estimated hours for both construction wage rate requirements and service contract labor standards, with pricing to be determined. Quotes should be submitted via email to the Contract Specialist Ryan Difernando and Contracting Officer Luis Torres from the Department of Homeland Security U.S. Coast Guard.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base
| BASE YEAR: 1 SEPTEMBER 2025 - 31 AUGUST 2026 | |||||||
| CLIN | SLIN | Shedule of Supplies/Serivces | Qty | Unit | Unit Price | Total Amount | |
| 0001 | BOSS Facilities Maintenance Services at USCG ATC Mobile Recurring Services | 0 | EA | ||||
| 0001AA | Level I Work for Maintenance and Repair of Food Service Equipment. | 12 | MO | $0.00 | |||
| 0001AB | Level II Work for Maintenance and Repair of Food Service Equipment. | 12 | MO | $0.00 | |||
| 0001AC | Level I Work for Transportation Operation and Maintenance Services. | 12 | MO | $0.00 | |||
| 0001AD | Level II Work for Transportation Operation and Maintenance Services. | 12 | MO | $0.00 | |||
| 0001AE | Level I Work for Operation, Maintenance and Repair of Electrical Systems. | 12 | MO | $0.00 | |||
| 0001AF | Level II Work for Operation, Maintenance and Repair of Electrical Systems. | 12 | MO | $0.00 | |||
| 0001AG | Level I Work for Operation, Maintenance and Repair of Heating Systems. | 12 | MO | $0.00 | |||
| 0001AH | Level II Work for Operation, Maintenance and Repair of Heating Systems. | 12 | MO | $0.00 | |||
| 0001AJ | Level I Work for Operation, Maintenance and Repair of Water Distribution Systems. | 12 | MO | $0.00 | |||
| 0001AK | Level II Work for Operation, Maintenance and Repair of Water Distribution Systems. | 12 | MO | $0.00 | |||
| 0001AL | Level I Work for Operation, Maintenance and Repair of Sewage Systems | 12 | MO | $0.00 | |||
| 0001AM | Level II Work for Operation, Maintenance and Repair of Sewage Systems | 12 | MO | $0.00 | |||
| 0001AN | Level I Work for Operation, Maintenance and Repair of Air Conditioning and Refrigeration Systems. | 12 | MO | $0.00 | |||
| 0001AP | Level II Work for Operation, Maintenance and Repair of Air Conditioning and Refrigeration Systems. | 12 | MO | $0.00 | |||
| 0001AQ | Level I Work for Maintenance and Repair of Buildings and Structures. | 12 | MO | $0.00 | |||
| 0001AR | Level II Work for Maintenance and Repair of Buildings and Structures. | 12 | MO | $0.00 | |||
| 0001AS | Level I Work for Grounds Maintenance | ||||||
| Services | 12 | MO | $0.00 | ||||
| 0001AT | Level II Work for Grounds Maintenance Services | 12 | MO | $0.00 | |||
| 0001AU | Level I Work for Surfaced Areas | ||||||
| Maintenance | 12 | MO | $0.00 | ||||
| 0001AV | Level II Work for Surfaced Areas Maintenance | 12 | MO | $0.00 | |||
| 0001AW | Level I Work for Trash Collection and | ||||||
| Disposal | 12 | MO | $0.00 | ||||
| 0001AX | Level I Work for Fire Protection Systems Maintenance and Fire Prevention Services. | 12 | MO | $0.00 | |||
| 0001AY | Level II Work for Fire Protection Systems Maintenance and Fire Prevention Services. | 12 | MO | $0.00 | |||
| 0001AZ | Reports, Meetings and Written | ||||||
| Deliverables. | 12 | EA | $0.00 | ||||
| TOTAL FOR CLIN 00001: | $0.00 |
0002 Non-Recurring Services LEVEL II (Not to exceed $2,000.00) REQUIREMENTS WORK: The labor hours indicated are anticipated yearly requirements based on past usage. They are set forth solely for evaluation purposes only and should not be construed in any way as being a firm commitment on the part of the Government. These items will be awarded under the “Ordering,” “Task Order Limitations,” and “Requirements” clauses listed herein. To calculate the price for this line item:
LOADED COMPOSITE LABOR RATES: The composite labor rate for each job category shall consist of direct wages, health and welfare benefits, FICA, FUTA, and other fringe benefits as listed in the applicable wage determination/decision incorporated as Attachments 2 and 3, operational and material overhead, general and administrative and profit. It shall also include all costs associated with the Contractor’s use of government furnished property and equipment. All labor rates offered below will be subject to adjustment upon receipt and incorporation of a revised wage determination/decision
| LOADED COMPOSITE LABOR RATES FOR TASK ORDERS SUBJECT TO CONSTRUCTION WAGE RATE REQUIREMENTS: | |||||||
| SLIN | Labor Category | Estimated Annual Hours | x | Composite | |||
| x Labor Rate | = Total | ||||||
| 0002AA | Electrician Leader | 75 | $0.00 | ||||
| 0002AB | Electrician | 50 | $0.00 | ||||
| 0002AC | Plumber | 50 | $0.00 | ||||
| 0002AD | A/C Mechanic Leader | 80 | $0.00 | ||||
| 0002AE | A/C Mechanic | 40 | $0.00 | ||||
| 0002AF | Mason | 5 | $0.00 | ||||
| 0002AG | Carpenter | 200 | $0.00 | ||||
| 0002AH | Carpenter Worker | 600 | $0.00 | ||||
| 0002AJ | Painter | 200 | $0.00 | ||||
| 0002AK | Alarm Technician (Electronic) | 20 | $0.00 | ||||
| 0002AL | Fire Suppression (Mechanical) | 20 | $0.00 | ||||
| 0002AM | Roofer | 50 | $0.00 | ||||
| 0002AN | Equipment Operator | 200 | $0.00 | ||||
| TOTAL CONSTRUCTION WAGE RATE REQUIREMENTS LABOR COSTS (SUM OF ITEMS | |||||||
| 00002AA-00002AN): | $0.00 |
| LOADED COMPOSITE LABOR RATES FOR TASK ORDERS SUBJECT TO SERVICE CONTRACT LABOR STANDARDS | |||||||
| SLIN | Labor Category | Estimated Annual Hours | x | Composite | |||
| x Labor Rate | = Total | ||||||
| 0002AP | Helper | 120 | $0.00 | ||||
| 0002AQ | Electrician Leader | 100 | $0.00 | ||||
| 0002AR | Electrician | 80 | $0.00 | ||||
| 0002AS | Plumber | 75 | $0.00 | ||||
| 0002AT | A/C Mechanic Leader | 80 | $0.00 | ||||
| 0002AU | A/C Mechanic | 40 | $0.00 | ||||
| 0002AV | Carpenter | 100 | $0.00 | ||||
| 0002AW | Carpenter Worker | 300 | $0.00 | ||||
| 0002AX | Painter | 75 | $0.00 | ||||
| 0002AY | Heavy Equipment Mechanic | 25 | $0.00 | ||||
| 0002AZ | Vehicle Mechanic | 20 | $0.00 | ||||
| 0002BB | Alarm Tech | 20 | $0.00 | ||||
| 0002BA | Fire Suppression Tech | 20 | $0.00 | ||||
| 0002BC | Gardener | 40 | $0.00 | ||||
| 0002BD | Roofer | 20 | $0.00 | ||||
| 0002BE | Equipment Operator | 250 | $0.00 | ||||
| TOTAL SERVICE CONTRACT LABOR STANDARDS LABOR COSTS | |||||||
| (SUM OF ITEMS 00002AP-00002BE): | $0.00 | ||||||
| TOTAL PRICE FOR CLIN 00002: |
0003 Non-Recurring Services LEVEL III (Over $2,000.00 under $100,000.00) REQUIREMENTS WORK: The labor hours indicated are anticipated yearly requirements based on past usage. They are set forth solely for evaluation purposes only and should not be construed in any way as being a firm commitment on the part of the Government. These items will be awarded under the “Ordering,” “Task Order Limitations,” and “Requirements” clauses listed herein. To calculate the price for this line item:
LOADED COMPOSITE LABOR RATES: The composite labor rate for each job category shall consist of direct wages, health and welfare benefits, FICA, FUTA, and other fringe benefits as listed in the applicable wage determination/decision incorporated as Attachments 2 and 3, operational and material overhead, general and administrative and profit. It shall also include all costs associated with the Contractor’s use of government furnished property and equipment. All labor rates offered below will be subject to adjustment upon receipt and incorporation of a revised wage determination/decision
| LOADED COMPOSITE LABOR RATES FOR TASK ORDERS SUBJECT TO CONSTRUCTION WAGE RATE REQUIREMENTS: | |||||||
| SLIN | Labor Category | Estimated Annual Hours | x | Burden | |||
| x Labor Rate | = Total | ||||||
| 0003AA | Electrician Leader | 900 | $0.00 | ||||
| 0003AB | Electrician | 360 | $0.00 | ||||
| 0003AC | Plumber | 720 | $0.00 | ||||
| 0003AD | HVAC Mechanic Leader | 720 | $0.00 | ||||
| 0003AE | HVAC Mechanic Leader | 480 | $0.00 | ||||
| 0003AF | Mason | 120 | $0.00 | ||||
| 0003AG | Carpenter | 900 | $0.00 | ||||
| 0003AH | Carpenter Worker | 480 | $0.00 | ||||
| 0003AJ | Painter | 900 | $0.00 | ||||
| 0003AK | Alarm Technician (Electronic) | 120 | $0.00 | ||||
| 0003AL | Fire Suppression (Mechanical) | 120 | $0.00 | ||||
| 0003AM | Roofer | 120 | $0.00 | ||||
| 0003AN | Equipment Operator | 240 | $0.00 | ||||
| TOTAL CONSTRUCTION WAGE RATE REQUIREMENTS LABOR COSTS (SUM OF ITEMS | |||||||
| 00003AA-00003AN): | $0.00 |
| LOADED COMPOSITE LABOR RATES FOR TASK ORDERS SUBJECT TO SERVICE CONTRACT LABOR STANDARDS | |||||||
| SLIN | Labor Category | Estimated Annual Hours | x | Burden | |||
| x Labor Rate | = Total | ||||||
| 0003AP | Helper | 720 | $0.00 | ||||
| 0003AQ | Electrician Leader | 900 | $0.00 | ||||
| 0003AR | Electrician | 360 | $0.00 | ||||
| 0003AS | Plumber | 720 | $0.00 | ||||
| 0003AT | HVAC Mechanic Leader | 720 | $0.00 | ||||
| 0003AU | HVAC Mechanic Leader | 720 | $0.00 | ||||
| 0003AV | Carpenter | 900 | $0.00 | ||||
| 0003AW | Carpenter Worker | 480 | $0.00 | ||||
| 0003AX | Painter | 480 | $0.00 | ||||
| 0003AY | Heavy Equipment Mechanic | 120 | $0.00 | ||||
| 0003AZ | Vehicle Mechanic | 120 | $0.00 | ||||
| 0003BA | Alarm Tech | 120 | $0.00 | ||||
| 0003BB | Fire Suppression Tech | 120 | $0.00 | ||||
| 0003BC | Roofer | 120 | $0.00 | ||||
| 0003BD | Equipment Operator | 240 | $0.00 | ||||
| TOTAL SERVICE CONTRACT LABOR STANDARDS LABOR COSTS | |||||||
| (SUM OF ITEMS 00003AP-00003BD): | $0.00 | ||||||
| TOTAL PRICE FOR CLIN 00003: | |||||||
| TOTAL PRICE FOR BASE YEAR 00001-00003( RECURRING AND NON-RECURRING SERVICES): | ____________________ |
Option Period 1
| OPTION YEAR ONE: 1 SEPTEMBER 2026 - 31 AUGUST 2027 | |||||||
| CLIN | SLIN | Shedule of Supplies/Serivces | Qty | Unit | Unit Price | Total Amount | |
| 1001 | BOSS Facilities Maintenance Services at USCG ATC Mobile Recurring Services | 0 | EA | ||||
| 1001AA | Level I Work for Maintenance and Repair of Food Service Equipment. | 12 | MO | $0.00 | |||
| 1001AB | Level II Work for Maintenance and Repair of Food Service Equipment. | 12 | MO | $0.00 | |||
| 1001AC | Level I Work for Transportation Operation and Maintenance Services. | 12 | MO | $0.00 | |||
| 1001AD | Level II Work for Transportation Operation and Maintenance Services. | 12 | MO | $0.00 | |||
| 1001AE | Level I Work for Operation, Maintenance and Repair of Electrical Systems. | 12 | MO | $0.00 | |||
| 1001AF | Level II Work for Operation, Maintenance and Repair of Electrical Systems. | 12 | MO | $0.00 | |||
| 1001AG | Level I Work for Operation, Maintenance and Repair of Heating Systems. | 12 | MO | $0.00 | |||
| 1001AH | Level II Work for Operation, Maintenance and Repair of Heating Systems. | 12 | MO | $0.00 | |||
| 1001AJ | Level I Work for Operation, Maintenance and Repair of Water Distribution Systems. | 12 | MO | $0.00 | |||
| 1001AK | Level II Work for Operation, Maintenance and Repair of Water Distribution Systems. | 12 | MO | $0.00 | |||
| 1001AL | Level I Work for Operation, Maintenance and Repair of Sewage Systems | 12 | MO | $0.00 | |||
| 1001AM | Level II Work for Operation, Maintenance and Repair of Sewage Systems | 12 | MO | $0.00 | |||
| 1001AN | Level I Work for Operation, Maintenance and Repair of Air Conditioning and Refrigeration Systems. | 12 | MO | $0.00 | |||
| 1001AP | Level II Work for Operation, Maintenance and Repair of Air Conditioning and Refrigeration Systems. | 12 | MO | $0.00 | |||
| 1001AQ | Level I Work for Maintenance and Repair of Buildings and Structures. | 12 | MO | $0.00 | |||
| 1001AR | Level II Work for Maintenance and Repair of Buildings and Structures. | 12 | MO | $0.00 | |||
| 1001AS | Level I Work for Grounds Maintenance | ||||||
| Services | 12 | MO | $0.00 | ||||
| 1001AT | Level II Work for Grounds Maintenance Services | 12 | MO | $0.00 | |||
| 1001AU | Level I Work for Surfaced Areas | ||||||
| Maintenance | 12 | MO | $0.00 | ||||
| 1001AV | Level II Work for Surfaced Areas Maintenance | 12 | MO | $0.00 | |||
| 1001AW | Level I Work for Trash Collection and | ||||||
| Disposal | 12 | MO | $0.00 | ||||
| 1001AX | Level I Work for Fire Protection Systems Maintenance and Fire Prevention Services. | 12 | MO | $0.00 | |||
| 1001AY | Level II Work for Fire Protection Systems Maintenance and Fire Prevention Services. | 12 | MO | $0.00 | |||
| 1001AZ | Reports, Meetings and Written | ||||||
| Deliverables. | 12 | EA | $0.00 | ||||
| TOTAL FOR CLIN 1001: | $0.00 |
1002 Non-Recurring Services LEVEL II (Not to exceed $2,000.00) REQUIREMENTS WORK: The labor hours indicated are anticipated yearly requirements based on past usage. They are set forth solely for evaluation purposes only and should not be construed in any way as being a firm commitment on the part of the Government. These items will be awarded under the “Ordering,” “Task Order Limitations,” and “Requirements” clauses listed herein. To calculate the price for this line item:
LOADED COMPOSITE LABOR RATES: The composite labor rate for each job category shall consist of direct wages, health and welfare benefits, FICA, FUTA, and other fringe benefits as listed in the applicable wage determination/decision incorporated as Attachments 2 and 3, operational and material overhead, general and administrative and profit. It shall also include all costs associated with the Contractor’s use of government furnished property and equipment. All labor rates offered below will be subject to adjustment upon receipt and incorporation of a revised wage determination/decision
| LOADED COMPOSITE LABOR RATES FOR TASK ORDERS SUBJECT TO CONSTRUCTION WAGE RATE REQUIREMENTS: | |||||||
| SLIN | Labor Category | Estimated Annual Hours | x | Composite | |||
| x Labor Rate | = Total | ||||||
| 1002AA | Electrician Leader | 75 | $0.00 | ||||
| 1002AB | Electrician | 50 | $0.00 | ||||
| 1002AC | Plumber | 50 | $0.00 | ||||
| 1002AD | A/C Mechanic Leader | 80 | $0.00 | ||||
| 1002AE | A/C Mechanic | 40 | $0.00 | ||||
| 1002AF | Mason | 5 | $0.00 | ||||
| 1002AG | Carpenter | 200 | $0.00 | ||||
| 1002AH | Carpenter Worker | 600 | $0.00 | ||||
| 1002AJ | Painter | 200 | $0.00 | ||||
| 1002AK | Alarm Technician (Electronic) | 20 | $0.00 | ||||
| 1002AL | Fire Suppression (Mechanical) | 20 | $0.00 | ||||
| 1002AM | Roofer | 50 | $0.00 | ||||
| 1002AN | Equipment Operator | 200 | $0.00 | ||||
| TOTAL CONSTRUCTION WAGE RATE REQUIREMENTS LABOR COSTS (SUM OF ITEMS | |||||||
| 1002AA-1002AN): | $0.00 |
| LOADED COMPOSITE LABOR RATES FOR TASK ORDERS SUBJECT TO SERVICE CONTRACT LABOR STANDARDS | |||||||
| SLIN | Labor Category | Estimated Annual Hours | x | Composite | |||
| x Labor Rate | = Total | ||||||
| 1002AP | Helper | 120 | $0.00 | ||||
| 1002AQ | Electrician Leader | 100 | $0.00 | ||||
| 1002AR | Electrician | 80 | $0.00 | ||||
| 1002AS | Plumber | 75 | $0.00 | ||||
| 1002AT | A/C Mechanic Leader | 80 | $0.00 | ||||
| 1002AU | A/C Mechanic | 40 | $0.00 | ||||
| 1002AV | Carpenter | 100 | $0.00 | ||||
| 1002AW | Carpenter Worker | 300 | $0.00 | ||||
| 1002AX | Painter | 75 | $0.00 | ||||
| 1002AY | Heavy Equipment Mechanic | 25 | $0.00 | ||||
| 1002AZ | Vehicle Mechanic | 20 | $0.00 | ||||
| 1002BB | Alarm Tech | 20 | $0.00 | ||||
| 1002BA | Fire Suppression Tech | 20 | $0.00 | ||||
| 1002BC | Gardener | 40 | $0.00 | ||||
| 1002BD | Roofer | 20 | $0.00 | ||||
| 1002BE | Equipment Operator | 250 | $0.00 | ||||
| TOTAL SERVICE CONTRACT LABOR STANDARDS LABOR COSTS | |||||||
| (SUM OF ITEMS 1002AP-1002BE): | $0.00 | ||||||
| TOTAL PRICE FOR CLIN 1002: |
1003 Non-Recurring Services LEVEL III (Over $2,000.00 under $100,000.00) REQUIREMENTS WORK: The labor hours indicated are anticipated yearly requirements based on past usage. They are set forth solely for evaluation purposes only and should not be construed in any way as being a firm commitment on the part of the Government. These items will be awarded under the “Ordering,” “Task Order Limitations,” and “Requirements” clauses listed herein. To calculate the price for this line item:
LOADED COMPOSITE LABOR RATES: The composite labor rate for each job category shall consist of direct wages, health and welfare benefits, FICA, FUTA, and other fringe benefits as listed in the applicable wage determination/decision incorporated as Attachments 2 and 3, operational and material overhead, general and administrative and profit. It shall also include all costs associated with the Contractor’s use of government furnished property and equipment. All labor rates offered below will be subject to adjustment upon receipt and incorporation of a revised wage determination/decision
| LOADED COMPOSITE LABOR RATES FOR TASK ORDERS SUBJECT TO CONSTRUCTION WAGE RATE REQUIREMENTS: | |||||||
| SLIN | Labor Category | Estimated Annual Hours | x | Burden | |||
| x Labor Rate | = Total | ||||||
| 1003AA | Electrician Leader | 900 | $0.00 | ||||
| 1003AB | Electrician | 360 | $0.00 | ||||
| 1003AC | Plumber | 720 | $0.00 | ||||
| 1003AD | HVAC Mechanic Leader | 720 | $0.00 | ||||
| 1003AE | HVAC Mechanic Leader | 480 | $0.00 | ||||
| 1003AF | Mason | 120 | $0.00 | ||||
| 1003AG | Carpenter | 900 | $0.00 | ||||
| 1003AH | Carpenter Worker | 480 | $0.00 | ||||
| 1003AJ | Painter | 900 | $0.00 | ||||
| 1003AK | Alarm Technician (Electronic) | 120 | $0.00 | ||||
| 1003AL | Fire Suppression (Mechanical) | 120 | $0.00 | ||||
| 1003AM | Roofer | 120 | $0.00 | ||||
| 1003AN | Equipment Operator | 240 | $0.00 | ||||
| TOTAL CONSTRUCTION WAGE RATE REQUIREMENTS LABOR COSTS (SUM OF ITEMS | |||||||
| 1003AA-1003AN): | $0.00 |
| LOADED COMPOSITE LABOR RATES FOR TASK ORDERS SUBJECT TO SERVICE CONTRACT LABOR STANDARDS | |||||||
| SLIN | Labor Category | Estimated Annual Hours | x | Burden | |||
| x Labor Rate | = Total | ||||||
| 1003AP | Helper | 720 | $0.00 | ||||
| 1003AQ | Electrician Leader | 900 | $0.00 | ||||
| 1003AR | Electrician | 360 | $0.00 | ||||
| 1003AS | Plumber | 720 | $0.00 | ||||
| 1003AT | HVAC Mechanic Leader | 720 | $0.00 | ||||
| 1003AU | HVAC Mechanic Leader | 720 | $0.00 | ||||
| 1003AV | Carpenter | 900 | $0.00 | ||||
| 1003AW | Carpenter Worker | 480 | $0.00 | ||||
| 1003AX | Painter | 480 | $0.00 | ||||
| 1003AY | Heavy Equipment Mechanic | 120 | $0.00 | ||||
| 1003AZ | Vehicle Mechanic | 120 | $0.00 | ||||
| 1003BA | Alarm Tech | 120 | $0.00 | ||||
| 1003BB | Fire Suppression Tech | 120 | $0.00 | ||||
| 1003BC | Roofer | 120 | $0.00 | ||||
| 1003BD | Equipment Operator | 240 | $0.00 | ||||
| TOTAL SERVICE CONTRACT LABOR STANDARDS LABOR COSTS | |||||||
| (SUM OF ITEMS 1003AP-1003BD): | $0.00 | ||||||
| TOTAL PRICE FOR CLIN 1003: | |||||||
| TOTAL PRICE FOR OPTION YEAR ONE 1001-1003( RECURRING AND NON-RECURRING SERVICES): | ____________________ |
Option Period 2
| OPTION YEAR TWO:1 SEPTEMBER 2027 - 31 AUGUST 2028 | |||||||
| CLIN | SLIN | Shedule of Supplies/Serivces | Qty | Unit | Unit Price | Total Amount | |
| 2001 | BOSS Facilities Maintenance Services at USCG ATC Mobile Recurring Services | 0 | EA | ||||
| 2001AA | Level I Work for Maintenance and Repair of Food Service Equipment. | 12 | MO | $0.00 | |||
| 2001AB | Level II Work for Maintenance and Repair of Food Service Equipment. | 12 | MO | $0.00 | |||
| 2001AC | Level I Work for Transportation Operation and Maintenance Services. | 12 | MO | $0.00 | |||
| 2001AD | Level II Work for Transportation Operation and Maintenance Services. | 12 | MO | $0.00 | |||
| 2001AE | Level I Work for Operation, Maintenance and Repair of Electrical Systems. | 12 | MO | $0.00 | |||
| 2001AF | Level II Work for Operation, Maintenance and Repair of Electrical Systems. | 12 | MO | $0.00 | |||
| 2001AG | Level I Work for Operation, Maintenance and Repair of Heating Systems. | 12 | MO | $0.00 | |||
| 2001AH | Level II Work for Operation, Maintenance and Repair of Heating Systems. | 12 | MO | $0.00 | |||
| 2001AJ | Level I Work for Operation, Maintenance and Repair of Water Distribution Systems. | 12 | MO | $0.00 | |||
| 2001AK | Level II Work for Operation, Maintenance and Repair of Water Distribution Systems. | 12 | MO | $0.00 | |||
| 2001AL | Level I Work for Operation, Maintenance and Repair of Sewage Systems | 12 | MO | $0.00 | |||
| 2001AM | Level II Work for Operation, Maintenance and Repair of Sewage Systems | 12 | MO | $0.00 | |||
| 2001AN | Level I Work for Operation, Maintenance and Repair of Air Conditioning and Refrigeration Systems. | 12 | MO | $0.00 | |||
| 2001AP | Level II Work for Operation, Maintenance and Repair of Air Conditioning and Refrigeration Systems. | 12 | MO | $0.00 | |||
| 2001AQ | Level I Work for Maintenance and Repair of Buildings and Structures. | 12 | MO | $0.00 | |||
| 2001AR | Level II Work for Maintenance and Repair of Buildings and Structures. | 12 | MO | $0.00 | |||
| 2001AS | Level I Work for Grounds Maintenance | ||||||
| Services | 12 | MO | $0.00 | ||||
| 2001AT | Level II Work for Grounds Maintenance Services | 12 | MO | $0.00 | |||
| 2001AU | Level I Work for Surfaced Areas | ||||||
| Maintenance | 12 | MO | $0.00 | ||||
| 2001AV | Level II Work for Surfaced Areas Maintenance | 12 | MO | $0.00 | |||
| 2001AW | Level I Work for Trash Collection and | ||||||
| Disposal | 12 | MO | $0.00 | ||||
| 2001AX | Level I Work for Fire Protection Systems Maintenance and Fire Prevention Services. | 12 | MO | $0.00 | |||
| 2001AY | Level II Work for Fire Protection Systems Maintenance and Fire Prevention Services. | 12 | MO | $0.00 | |||
| 2001AZ | Reports, Meetings and Written | ||||||
| Deliverables. | 12 | EA | $0.00 | ||||
| TOTAL FOR CLIN 2001: | $0.00 |
2002 Non-Recurring Services LEVEL II (Not to exceed $2,000.00) REQUIREMENTS WORK: The labor hours indicated are anticipated yearly requirements based on past usage. They are set forth solely for evaluation purposes only and should not be construed in any way as being a firm commitment on the part of the Government. These items will be awarded under the “Ordering,” “Task Order Limitations,” and “Requirements” clauses listed herein. To calculate the price for this line item:
LOADED COMPOSITE LABOR RATES: The composite labor rate for each job category shall consist of direct wages, health and welfare benefits, FICA, FUTA, and other fringe benefits as listed in the applicable wage determination/decision incorporated as Attachments 2 and 3, operational and material overhead, general and administrative and profit. It shall also include all costs associated with the Contractor’s use of government furnished property and equipment. All labor rates offered below will be subject to adjustment upon receipt and incorporation of a revised wage determination/decision
| LOADED COMPOSITE LABOR RATES FOR TASK ORDERS SUBJECT TO CONSTRUCTION WAGE RATE REQUIREMENTS: | |||||||
| SLIN | Labor Category | Estimated Annual Hours | x | Composite | |||
| x Labor Rate | = Total | ||||||
| 2002AA | Electrician Leader | 75 | $0.00 | ||||
| 2002AB | Electrician | 50 | $0.00 | ||||
| 2002AC | Plumber | 50 | $0.00 | ||||
| 2002AD | A/C Mechanic Leader | 80 | $0.00 | ||||
| 2002AE | A/C Mechanic | 40 | $0.00 | ||||
| 2002AF | Mason | 5 | $0.00 | ||||
| 2002AG | Carpenter | 200 | $0.00 | ||||
| 2002AH | Carpenter Worker | 600 | $0.00 | ||||
| 2002AJ | Painter | 200 | $0.00 | ||||
| 2002AK | Alarm Technician (Electronic) | 20 | $0.00 | ||||
| 2002AL | Fire Suppression (Mechanical) | 20 | $0.00 | ||||
| 2002AM | Roofer | 50 | $0.00 | ||||
| 2002AN | Equipment Operator | 200 | $0.00 | ||||
| TOTAL CONSTRUCTION WAGE RATE REQUIREMENTS LABOR COSTS (SUM OF ITEMS | |||||||
| 2002AA-2002AN): | $0.00 |
| LOADED COMPOSITE LABOR RATES FOR TASK ORDERS SUBJECT TO SERVICE CONTRACT LABOR STANDARDS | |||||||
| SLIN | Labor Category | Estimated Annual Hours | x | Composite | |||
| x Labor Rate | = Total | ||||||
| 2002AP | Helper | 120 | $0.00 | ||||
| 2002AQ | Electrician Leader | 100 | $0.00 | ||||
| 2002AR | Electrician | 80 | $0.00 | ||||
| 2002AS | Plumber | 75 | $0.00 | ||||
| 2002AT | A/C Mechanic Leader | 80 | $0.00 | ||||
| 2002AU | A/C Mechanic | 40 | $0.00 | ||||
| 2002AV | Carpenter | 100 | $0.00 | ||||
| 2002AW | Carpenter Worker | 300 | $0.00 | ||||
| 2002AX | Painter | 75 | $0.00 | ||||
| 2002AY | Heavy Equipment Mechanic | 25 | $0.00 | ||||
| 2002AZ | Vehicle Mechanic | 20 | $0.00 | ||||
| 2002BB | Alarm Tech | 20 | $0.00 | ||||
| 2002BA | Fire Suppression Tech | 20 | $0.00 | ||||
| 2002BC | Gardener | 40 | $0.00 | ||||
| 2002BD | Roofer | 20 | $0.00 | ||||
| 2002BE | Equipment Operator | 250 | $0.00 | ||||
| TOTAL SERVICE CONTRACT LABOR STANDARDS LABOR COSTS | |||||||
| (SUM OF ITEMS 2002AP-2002BE): | $0.00 | ||||||
| TOTAL PRICE FOR CLIN 2002: |
2003 Non-Recurring Services LEVEL III (Over $2,000.00 under $100,000.00) REQUIREMENTS WORK: The labor hours indicated are anticipated yearly requirements based on past usage. They are set forth solely for evaluation purposes only and should not be construed in any way as being a firm commitment on the part of the Government. These items will be awarded under the “Ordering,” “Task Order Limitations,” and “Requirements” clauses listed herein. To calculate the price for this line item:
LOADED COMPOSITE LABOR RATES: The composite labor rate for each job category shall consist of direct wages, health and welfare benefits, FICA, FUTA, and other fringe benefits as listed in the applicable wage determination/decision incorporated as Attachments 2 and 3, operational and material overhead, general and administrative and profit. It shall also include all costs associated with the Contractor’s use of government furnished property and equipment. All labor rates offered below will be subject to adjustment upon receipt and incorporation of a revised wage determination/decision
| LOADED COMPOSITE LABOR RATES FOR TASK ORDERS SUBJECT TO CONSTRUCTION WAGE RATE REQUIREMENTS: | |||||||
| SLIN | Labor Category | Estimated Annual Hours | x | Burden | |||
| x Labor Rate | = Total | ||||||
| 2003AA | Electrician Leader | 900 | $0.00 | ||||
| 2003AB | Electrician | 360 | $0.00 | ||||
| 2003AC | Plumber | 720 | $0.00 | ||||
| 2003AD | HVAC Mechanic Leader | 720 | $0.00 | ||||
| 2003AE | HVAC Mechanic Leader | 480 | $0.00 | ||||
| 2003AF | Mason | 120 | $0.00 | ||||
| 2003AG | Carpenter | 900 | $0.00 | ||||
| 2003AH | Carpenter Worker | 480 | $0.00 | ||||
| 2003AJ | Painter | 900 | $0.00 | ||||
| 2003AK | Alarm Technician (Electronic) | 120 | $0.00 | ||||
| 2003AL | Fire Suppression (Mechanical) | 120 | $0.00 | ||||
| 2003AM | Roofer | 120 | $0.00 | ||||
| 2003AN | Equipment Operator | 240 | $0.00 | ||||
| TOTAL CONSTRUCTION WAGE RATE REQUIREMENTS LABOR COSTS (SUM OF ITEMS | |||||||
| 2003AA-2003AN): | $0.00 |
| LOADED COMPOSITE LABOR RATES FOR TASK ORDERS SUBJECT TO SERVICE CONTRACT LABOR STANDARDS | |||||||
| SLIN | Labor Category | Estimated Annual Hours | x | Burden | |||
| x Labor Rate | = Total | ||||||
| 2003AP | Helper | 720 | $0.00 | ||||
| 2003AQ | Electrician Leader | 900 | $0.00 | ||||
| 2003AR | Electrician | 360 | $0.00 | ||||
| 2003AS | Plumber | 720 | $0.00 | ||||
| 2003AT | HVAC Mechanic Leader | 720 | $0.00 | ||||
| 2003AU | HVAC Mechanic Leader | 720 | $0.00 | ||||
| 2003AV | Carpenter | 900 | $0.00 | ||||
| 2003AW | Carpenter Worker | 480 | $0.00 | ||||
| 2003AX | Painter | 480 | $0.00 | ||||
| 2003AY | Heavy Equipment Mechanic | 120 | $0.00 | ||||
| 2003AZ | Vehicle Mechanic | 120 | $0.00 | ||||
| 2003BA | Alarm Tech | 120 | $0.00 | ||||
| 2003BB | Fire Suppression Tech | 120 | $0.00 | ||||
| 2003BC | Roofer | 120 | $0.00 | ||||
| 2003BD | Equipment Operator | 240 | $0.00 | ||||
| TOTAL SERVICE CONTRACT LABOR STANDARDS LABOR COSTS | |||||||
| (SUM OF ITEMS 2003AP-2003BD): | $0.00 | ||||||
| TOTAL PRICE FOR CLIN 2003: | |||||||
| TOTAL PRICE FOR OPITON YEAR TWO 2001-2003( RECURRING AND NON-RECURRING SERVICES): | ____________________ |
Option Period 3
| OPTION YEAR THREE: 1 SEPTEMBER 2028 - 31 AUGUST 2029 | |||||||
| CLIN | SLIN | Shedule of Supplies/Serivces | Qty | Unit | Unit Price | Total Amount | |
| 3001 | BOSS Facilities Maintenance Services at USCG ATC Mobile Recurring Services | 0 | EA | ||||
| 3001AA | Level I Work for Maintenance and Repair of Food Service Equipment. | 12 | MO | $0.00 | |||
| 3001AB | Level II Work for Maintenance and Repair of Food Service Equipment. | 12 | MO | $0.00 | |||
| 3001AC | Level I Work for Transportation Operation and Maintenance Services. | 12 | MO | $0.00 | |||
| 3001AD | Level II Work for Transportation Operation and Maintenance Services. | 12 | MO | $0.00 | |||
| 3001AE | Level I Work for Operation, Maintenance and Repair of Electrical Systems. | 12 | MO | $0.00 | |||
| 3001AF | Level II Work for Operation, Maintenance and Repair of Electrical Systems. | 12 | MO | $0.00 | |||
| 3001AG | Level I Work for Operation, Maintenance and Repair of Heating Systems. | 12 | MO | $0.00 | |||
| 3001AH | Level II Work for Operation, Maintenance and Repair of Heating Systems. | 12 | MO | $0.00 | |||
| 3001AJ | Level I Work for Operation, Maintenance and Repair of Water Distribution Systems. | 12 | MO | $0.00 | |||
| 3001AK | Level II Work for Operation, Maintenance and Repair of Water Distribution Systems. | 12 | MO | $0.00 | |||
| 3001AL | Level I Work for Operation, Maintenance and Repair of Sewage Systems | 12 | MO | $0.00 | |||
| 3001AM | Level II Work for Operation, Maintenance and Repair of Sewage Systems | 12 | MO | $0.00 | |||
| 3001AN | Level I Work for Operation, Maintenance and Repair of Air Conditioning and Refrigeration Systems. | 12 | MO | $0.00 | |||
| 3001AP | Level II Work for Operation, Maintenance and Repair of Air Conditioning and Refrigeration Systems. | 12 | MO | $0.00 | |||
| 3001AQ | Level I Work for Maintenance and Repair of Buildings and Structures. | 12 | MO | $0.00 | |||
| 3001AR | Level II Work for Maintenance and Repair of Buildings and Structures. | 12 | MO | $0.00 | |||
| 3001AS | Level I Work for Grounds Maintenance | ||||||
| Services | 12 | MO | $0.00 | ||||
| 3001AT | Level II Work for Grounds Maintenance Services | 12 | MO | $0.00 | |||
| 3001AU | Level I Work for Surfaced Areas | ||||||
| Maintenance | 12 | MO | $0.00 | ||||
| 3001AV | Level II Work for Surfaced Areas Maintenance | 12 | MO | $0.00 | |||
| 3001AW | Level I Work for Trash Collection and | ||||||
| Disposal | 12 | MO | $0.00 | ||||
| 3001AX | Level I Work for Fire Protection Systems Maintenance and Fire Prevention Services. | 12 | MO | $0.00 | |||
| 3001AY | Level II Work for Fire Protection Systems Maintenance and Fire Prevention Services. | 12 | MO | $0.00 | |||
| 3001AZ | Reports, Meetings and Written | ||||||
| Deliverables. | 12 | EA | $0.00 | ||||
| TOTAL FOR CLIN 3001: | $0.00 |
3002 Non-Recurring Services LEVEL II (Not to exceed $2,000.00) REQUIREMENTS WORK: The labor hours indicated are anticipated yearly requirements based on past usage. They are set forth solely for evaluation purposes only and should not be construed in any way as being a firm commitment on the part of the Government. These items will be awarded under the “Ordering,” “Task Order Limitations,” and “Requirements” clauses listed herein. To calculate the price for this line item:
LOADED COMPOSITE LABOR RATES: The composite labor rate for each job category shall consist of direct wages, health and welfare benefits, FICA, FUTA, and other fringe benefits as listed in the applicable wage determination/decision incorporated as Attachments 2 and 3, operational and material overhead, general and administrative and profit. It shall also include all costs associated with the Contractor’s use of government furnished property and equipment. All labor rates offered below will be subject to adjustment upon receipt and incorporation of a revised wage determination/decision
| LOADED COMPOSITE LABOR RATES FOR TASK ORDERS SUBJECT TO CONSTRUCTION WAGE RATE REQUIREMENTS: | |||||||
| SLIN | Labor Category | Estimated Annual Hours | x | Composite | |||
| x Labor Rate | = Total | ||||||
| 3002AA | Electrician Leader | 75 | $0.00 | ||||
| 3002AB | Electrician | 50 | $0.00 | ||||
| 3002AC | Plumber | 50 | $0.00 | ||||
| 3002AD | A/C Mechanic Leader | 80 | $0.00 | ||||
| 3002AE | A/C Mechanic | 40 | $0.00 | ||||
| 3002AF | Mason | 5 | $0.00 | ||||
| 3002AG | Carpenter | 200 | $0.00 | ||||
| 3002AH | Carpenter Worker | 600 | $0.00 | ||||
| 3002AJ | Painter | 200 | $0.00 | ||||
| 3002AK | Alarm Technician (Electronic) | 20 | $0.00 | ||||
| 3002AL | Fire Suppression (Mechanical) | 20 | $0.00 | ||||
| 3002AM | Roofer | 50 | $0.00 | ||||
| 3002AN | Equipment Operator | 200 | $0.00 | ||||
| TOTAL CONSTRUCTION WAGE RATE REQUIREMENTS LABOR COSTS (SUM OF ITEMS | |||||||
| 3002AA-3002AN): | $0.00 |
| LOADED COMPOSITE LABOR RATES FOR TASK ORDERS SUBJECT TO SERVICE CONTRACT LABOR STANDARDS | |||||||
| SLIN | Labor Category | Estimated Annual Hours | x | Composite | |||
| x Labor Rate | = Total | ||||||
| 3002AP | Helper | 120 | $0.00 | ||||
| 3002AQ | Electrician Leader | 100 | $0.00 | ||||
| 3002AR | Electrician | 80 | $0.00 | ||||
| 3002AS | Plumber | 75 | $0.00 | ||||
| 3002AT | A/C Mechanic Leader | 80 | $0.00 | ||||
| 3002AU | A/C Mechanic | 40 | $0.00 | ||||
| 3002AV | Carpenter | 100 | $0.00 | ||||
| 3002AW | Carpenter Worker | 300 | $0.00 | ||||
| 3002AX | Painter | 75 | $0.00 | ||||
| 3002AY | Heavy Equipment Mechanic | 25 | $0.00 | ||||
| 3002AZ | Vehicle Mechanic | 20 | $0.00 | ||||
| 3002BB | Alarm Tech | 20 | $0.00 | ||||
| 3002BA | Fire Suppression Tech | 20 | $0.00 | ||||
| 3002BC | Gardener | 40 | $0.00 | ||||
| 3002BD | Roofer | 20 | $0.00 | ||||
| 3002BE | Equipment Operator | 250 | $0.00 | ||||
| TOTAL SERVICE CONTRACT LABOR STANDARDS LABOR COSTS | |||||||
| (SUM OF ITEMS 3002AP-3002BE): | $0.00 | ||||||
| TOTAL PRICE FOR CLIN 3002: |
3003 Non-Recurring Services LEVEL III (Over $2,000.00 under $100,000.00) REQUIREMENTS WORK: The labor hours indicated are anticipated yearly requirements based on past usage. They are set forth solely for evaluation purposes only and should not be construed in any way as being a firm commitment on the part of the Government. These items will be awarded under the “Ordering,” “Task Order Limitations,” and “Requirements” clauses listed herein. To calculate the price for this line item:
LOADED COMPOSITE LABOR RATES: The composite labor rate for each job category shall consist of direct wages, health and welfare benefits, FICA, FUTA, and other fringe benefits as listed in the applicable wage determination/decision incorporated as Attachments 2 and 3, operational and material overhead, general and administrative and profit. It shall also include all costs associated with the Contractor’s use of government furnished property and equipment. All labor rates offered below will be subject to adjustment upon receipt and incorporation of a revised wage determination/decision
| LOADED COMPOSITE LABOR RATES FOR TASK ORDERS SUBJECT TO CONSTRUCTION WAGE RATE REQUIREMENTS: | |||||||
| SLIN | Labor Category | Estimated Annual Hours | x | Burden | |||
| x Labor Rate | = Total | ||||||
| 3003AA | Electrician Leader | 900 | $0.00 | ||||
| 3003AB | Electrician | 360 | $0.00 | ||||
| 3003AC | Plumber | 720 | $0.00 | ||||
| 3003AD | HVAC Mechanic Leader | 720 | $0.00 | ||||
| 3003AE | HVAC Mechanic Leader | 480 | $0.00 | ||||
| 3003AF | Mason | 120 | $0.00 | ||||
| 3003AG | Carpenter | 900 | $0.00 | ||||
| 3003AH | Carpenter Worker | 480 | $0.00 | ||||
| 3003AJ | Painter | 900 | $0.00 | ||||
| 3003AK | Alarm Technician (Electronic) | 120 | $0.00 | ||||
| 3003AL | Fire Suppression (Mechanical) | 120 | $0.00 | ||||
| 3003AM | Roofer | 120 | $0.00 | ||||
| 3003AN | Equipment Operator | 240 | $0.00 | ||||
| TOTAL CONSTRUCTION WAGE RATE REQUIREMENTS LABOR COSTS (SUM OF ITEMS | |||||||
| 3003AA-3003AN): | $0.00 |
| LOADED COMPOSITE LABOR RATES FOR TASK ORDERS SUBJECT TO SERVICE CONTRACT LABOR STANDARDS | |||||||
| SLIN | Labor Category | Estimated Annual Hours | x | Burden | |||
| x Labor Rate | = Total | ||||||
| 3003AP | Helper | 720 | $0.00 | ||||
| 3003AQ | Electrician Leader | 900 | $0.00 | ||||
| 3003AR | Electrician | 360 | $0.00 | ||||
| 3003AS | Plumber | 720 | $0.00 | ||||
| 3003AT | HVAC Mechanic Leader | 720 | $0.00 | ||||
| 3003AU | HVAC Mechanic Leader | 720 | $0.00 | ||||
| 3003AV | Carpenter | 900 | $0.00 | ||||
| 3003AW | Carpenter Worker | 480 | $0.00 | ||||
| 3003AX | Painter | 480 | $0.00 | ||||
| 3003AY | Heavy Equipment Mechanic | 120 | $0.00 | ||||
| 3003AZ | Vehicle Mechanic | 120 | $0.00 | ||||
| 3003BA | Alarm Tech | 120 | $0.00 | ||||
| 3003BB | Fire Suppression Tech | 120 | $0.00 | ||||
| 3003BC | Roofer | 120 | $0.00 | ||||
| 3003BD | Equipment Operator | 240 | $0.00 | ||||
| TOTAL SERVICE CONTRACT LABOR STANDARDS LABOR COSTS | |||||||
| (SUM OF ITEMS3003AP-3003BD): | $0.00 | ||||||
| TOTAL PRICE FOR CLIN 3003: | |||||||
| TOTAL PRICE FOR BASE YEAR 00001-00003( RECURRING AND NON-RECURRING SERVICES): | ____________________ |
Option Period 4
| OPTION YEAR FOUR: 1 SEPTEMBER 2029 - 31 AUGUST 2030 | |||||||
| CLIN | SLIN | Shedule of Supplies/Serivces | Qty | Unit | Unit Price | Total Amount | |
| 4001 | BOSS Facilities Maintenance Services at USCG ATC Mobile Recurring Services | 0 | EA | ||||
| 4001AA | Level I Work for Maintenance and Repair of Food Service Equipment. | 12 | MO | $0.00 | |||
| 4001AB | Level II Work for Maintenance and Repair of Food Service Equipment. | 12 | MO | $0.00 | |||
| 4001AC | Level I Work for Transportation Operation and Maintenance Services. | 12 | MO | $0.00 | |||
| 4001AD | Level II Work for Transportation Operation and Maintenance Services. | 12 | MO | $0.00 | |||
| 4001AE | Level I Work for Operation, Maintenance and Repair of Electrical Systems. | 12 | MO | $0.00 | |||
| 4001AF | Level II Work for Operation, Maintenance and Repair of Electrical Systems. | 12 | MO | $0.00 | |||
| 4001AG | Level I Work for Operation, Maintenance and Repair of Heating Systems. | 12 | MO | $0.00 | |||
| 4001AH | Level II Work for Operation, Maintenance and Repair of Heating Systems. | 12 | MO | $0.00 | |||
| 4001AJ | Level I Work for Operation, Maintenance and Repair of Water Distribution Systems. | 12 | MO | $0.00 | |||
| 4001AK | Level II Work for Operation, Maintenance and Repair of Water Distribution Systems. | 12 | MO | $0.00 | |||
| 4001AL | Level I Work for Operation, Maintenance and Repair of Sewage Systems | 12 | MO | $0.00 | |||
| 4001AM | Level II Work for Operation, Maintenance and Repair of Sewage Systems | 12 | MO | $0.00 | |||
| 4001AN | Level I Work for Operation, Maintenance and Repair of Air Conditioning and Refrigeration Systems. | 12 | MO | $0.00 | |||
| 4001AP | Level II Work for Operation, Maintenance and Repair of Air Conditioning and Refrigeration Systems. | 12 | MO | $0.00 | |||
| 4001AQ | Level I Work for Maintenance and Repair of Buildings and Structures. | 12 | MO | $0.00 | |||
| 4001AR | Level II Work for Maintenance and Repair of Buildings and Structures. | 12 | MO | $0.00 | |||
| 4001AS | Level I Work for Grounds Maintenance | ||||||
| Services | 12 | MO | $0.00 | ||||
| 4001AT | Level II Work for Grounds Maintenance Services | 12 | MO | $0.00 | |||
| 4001AU | Level I Work for Surfaced Areas | ||||||
| Maintenance | 12 | MO | $0.00 | ||||
| 4001AV | Level II Work for Surfaced Areas Maintenance | 12 | MO | $0.00 | |||
| 4001AW | Level I Work for Trash Collection and | ||||||
| Disposal | 12 | MO | $0.00 | ||||
| 4001AX | Level I Work for Fire Protection Systems Maintenance and Fire Prevention Services. | 12 | MO | $0.00 | |||
| 4001AY | Level II Work for Fire Protection Systems Maintenance and Fire Prevention Services. | 12 | MO | $0.00 | |||
| 4001AZ | Reports, Meetings and Written | ||||||
| Deliverables. | 12 | EA | $0.00 | ||||
| TOTAL FOR CLIN 4001: | $0.00 |
4002 Non-Recurring Services LEVEL II (Not to exceed $2,000.00) REQUIREMENTS WORK: The labor hours indicated are anticipated yearly requirements based on past usage. They are set forth solely for evaluation purposes only and should not be construed in any way as being a firm commitment on the part of the Government. These items will be awarded under the “Ordering,” “Task Order Limitations,” and “Requirements” clauses listed herein. To calculate the price for this line item:
LOADED COMPOSITE LABOR RATES: The composite labor rate for each job category shall consist of direct wages, health and welfare benefits, FICA, FUTA, and other fringe benefits as listed in the applicable wage determination/decision incorporated as Attachments 2 and 3, operational and material overhead, general and administrative and profit. It shall also include all costs associated with the Contractor’s use of government furnished property and equipment. All labor rates offered below will be subject to adjustment upon receipt and incorporation of a revised wage determination/decision
| LOADED COMPOSITE LABOR RATES FOR TASK ORDERS SUBJECT TO CONSTRUCTION WAGE RATE REQUIREMENTS: | |||||||
| SLIN | Labor Category | Estimated Annual Hours | x | Composite | |||
| x Labor Rate | = Total | ||||||
| 4002AA | Electrician Leader | 75 | $0.00 | ||||
| 4002AB | Electrician | 50 | $0.00 | ||||
| 4002AC | Plumber | 50 | $0.00 | ||||
| 4002AD | A/C Mechanic Leader | 80 | $0.00 | ||||
| 4002AE | A/C Mechanic | 40 | $0.00 | ||||
| 4002AF | Mason | 5 | $0.00 | ||||
| 4002AG | Carpenter | 200 | $0.00 | ||||
| 4002AH | Carpenter Worker | 600 | $0.00 | ||||
| 4002AJ | Painter | 200 | $0.00 | ||||
| 4002AK | Alarm Technician (Electronic) | 20 | $0.00 | ||||
| 4002AL | Fire Suppression (Mechanical) | 20 | $0.00 | ||||
| 4002AM | Roofer | 50 | $0.00 | ||||
| 4002AN | Equipment Operator | 200 | $0.00 | ||||
| TOTAL CONSTRUCTION WAGE RATE REQUIREMENTS LABOR COSTS (SUM OF ITEMS | |||||||
| 4002AA-4002AN): | $0.00 |
| LOADED COMPOSITE LABOR RATES FOR TASK ORDERS SUBJECT TO SERVICE CONTRACT LABOR STANDARDS | |||||||
| SLIN | Labor Category | Estimated Annual Hours | x | Composite | |||
| x Labor Rate | = Total | ||||||
| 4002AP | Helper | 120 | $0.00 | ||||
| 4002AQ | Electrician Leader | 100 | $0.00 | ||||
| 4002AR | Electrician | 80 | $0.00 | ||||
| 4002AS | Plumber | 75 | $0.00 | ||||
| 4002AT | A/C Mechanic Leader | 80 | $0.00 | ||||
| 4002AU | A/C Mechanic | 40 | $0.00 | ||||
| 4002AV | Carpenter | 100 | $0.00 | ||||
| 4002AW | Carpenter Worker | 300 | $0.00 | ||||
| 4002AX | Painter | 75 | $0.00 | ||||
| 4002AY | Heavy Equipment Mechanic | 25 | $0.00 | ||||
| 4002AZ | Vehicle Mechanic | 20 | $0.00 | ||||
| 4002BB | Alarm Tech | 20 | $0.00 | ||||
| 4002BA | Fire Suppression Tech | 20 | $0.00 | ||||
| 4002BC | Gardener | 40 | $0.00 | ||||
| 4002BD | Roofer | 20 | $0.00 | ||||
| 4002BE | Equipment Operator | 250 | $0.00 | ||||
| TOTAL SERVICE CONTRACT LABOR STANDARDS LABOR COSTS | |||||||
| (SUM OF ITEMS 4002AP-4002BE): | $0.00 | ||||||
| TOTAL PRICE FOR CLIN 4002: |
4003 Non-Recurring Services LEVEL III (Over $2,000.00 under $100,000.00) REQUIREMENTS WORK: The labor hours indicated are anticipated yearly requirements based on past usage. They are set forth solely for evaluation purposes only and should not be construed in any way as being a firm commitment on the part of the Government. These items will be awarded under the “Ordering,” “Task Order Limitations,” and “Requirements” clauses listed herein. To calculate the price for this line item:
LOADED COMPOSITE LABOR RATES: The composite labor rate for each job category shall consist of direct wages, health and welfare benefits, FICA, FUTA, and other fringe benefits as listed in the applicable wage determination/decision incorporated as Attachments 2 and 3, operational and material overhead, general and administrative and profit. It shall also include all costs associated with the Contractor’s use of government furnished property and equipment. All labor rates offered below will be subject to adjustment upon receipt and incorporation of a revised wage determination/decision
| LOADED COMPOSITE LABOR RATES FOR TASK ORDERS SUBJECT TO CONSTRUCTION WAGE RATE REQUIREMENTS: | |||||||
| SLIN | Labor Category | Estimated Annual Hours | x | Burden | |||
| x Labor Rate | = Total | ||||||
| 4003AA | Electrician Leader | 900 | $0.00 | ||||
| 4003AB | Electrician | 360 | $0.00 | ||||
| 4003AC | Plumber | 720 | $0.00 | ||||
| 4003AD | HVAC Mechanic Leader | 720 | $0.00 | ||||
| 4003AE | HVAC Mechanic Leader | 480 | $0.00 | ||||
| 4003AF | Mason | 120 | $0.00 | ||||
| 4003AG | Carpenter | 900 | $0.00 | ||||
| 4003AH | Carpenter Worker | 480 | $0.00 | ||||
| 4003AJ | Painter | 900 | $0.00 | ||||
| 4003AK | Alarm Technician (Electronic) | 120 | $0.00 | ||||
| 4003AL | Fire Suppression (Mechanical) | 120 | $0.00 | ||||
| 4003AM | Roofer | 120 | $0.00 | ||||
| 4003AN | Equipment Operator | 240 | $0.00 | ||||
| TOTAL CONSTRUCTION WAGE RATE REQUIREMENTS LABOR COSTS (SUM OF ITEMS | |||||||
| 4003AA-4003AN): | $0.00 |
| LOADED COMPOSITE LABOR RATES FOR TASK ORDERS SUBJECT TO SERVICE CONTRACT LABOR STANDARDS | |||||||
| SLIN | Labor Category | Estimated Annual Hours | x | Burden | |||
| x Labor Rate | = Total | ||||||
| 4003AP | Helper | 720 | $0.00 | ||||
| 4003AQ | Electrician Leader | 900 | $0.00 | ||||
| 4003AR | Electrician | 360 | $0.00 | ||||
| 4003AS | Plumber | 720 | $0.00 | ||||
| 4003AT | HVAC Mechanic Leader | 720 | $0.00 | ||||
| 4003AU | HVAC Mechanic Leader | 720 | $0.00 | ||||
| 4003AV | Carpenter | 900 | $0.00 | ||||
| 4003AW | Carpenter Worker | 480 | $0.00 | ||||
| 4003AX | Painter | 480 | $0.00 | ||||
| 4003AY | Heavy Equipment Mechanic | 120 | $0.00 | ||||
| 4003AZ | Vehicle Mechanic | 120 | $0.00 | ||||
| 4003BA | Alarm Tech | 120 | $0.00 | ||||
| 4003BB | Fire Suppression Tech | 120 | $0.00 | ||||
| 4003BC | Roofer | 120 | $0.00 | ||||
| 4003BD | Equipment Operator | 240 | $0.00 | ||||
| TOTAL SERVICE CONTRACT LABOR STANDARDS LABOR COSTS | |||||||
| (SUM OF ITEMS 4003AP-4003BD): | $0.00 | ||||||
| TOTAL PRICE FOR CLIN 4003: | |||||||
| TOTAL PRICE FOR BASE YEAR 4001-4003( RECURRING AND NON-RECURRING SERVICES): | ____________________ |
TOTAL 5-YEAR CONTRACT AMOUNT:
File details come from the government source that posted it. Updated .