Technical Exhibit 4 Historical.docx

DOCX document 42 KB Posted

Attached to
ATC Mobile, AL. BOSS Facilities Maintenance Services
Solicitation number
70Z08425QAA850900
Issued by

About this file

Technical Exhibit 4 Historical is a comprehensive workload analysis document detailing maintenance service work for the United States Coast Guard Aviation Training Center in Mobile, Alabama. The document categorizes work into three levels: Level I (Standing Work), Level II (Work Orders up to $2,000), and Level III (Job Orders exceeding $2,000), with historical workload data from 2021-2023 across 12 service categories including food service, transportation, electrical, heating, water and sewage services, air conditioning, building maintenance, grounds maintenance, trash collection, and fire protection.

The historical data provides granular insights into maintenance service work, showing total work orders, work hours, and average hours per work order for each service category. In 2023, for example, the most labor-intensive categories were electrical (456 work orders, 1,315.2 work hours), building/structure maintenance (473 work orders, 1,332 work hours), and air conditioning/refrigeration (297 work orders, 1,183.4 work hours). Level III job orders, which are more complex and require specific authorization, showed varying man-hours across trades, with electricians, carpenters, and plumbers representing the most significant labor allocation in 2022 and 2023.

View the file

Other files

File Type Posted
AMENDMENT 2 List of Changes.pdf PDF
Amendment 2 70Z08425QAA850900 RFQ ATC Mobile Facilities.pdf PDF
Amendment 2 Q_A Gov Responses Protected.xlsx XLSX spreadsheet
Amendment 2 Site Visit List 70Z08425QAA850900.pdf PDF
Amendment 2 Attachment 3 Performance Assessment Questionnaire.docx DOCX document
Amendment 2 Attachment 2 Statement of Work.pdf PDF
Amendment 2 Attachment 1 Schedule of Services.xlsx XLSX spreadsheet
Amendment 1 change document ATC Mobile BOSS Facilities..pdf PDF
Amend 1 Attachment 3 Performance Assessment Questionnaire ATC Mobile BOSS..pdf PDF
Technical Exhibit 1 Blank Reserved.docx DOCX document
Attachment 3 Performance Assessment Questionnaire ATC Mobile BOSS.docx DOCX document
Technical Exhibit 9 EQUIPMENT LIST.pdf PDF
Technical Exhibit 8 Job Plans.pdf PDF
Attachment 2 SOW ATC Mobile Facilities Maintenance Final.pdf PDF
Attachment 5 DBA AL20240092.pdf PDF
Attachment 4 WD 2015_4609 REV 25 5_05_25.pdf PDF
Technical Exhibit 6 Forms.docx DOCX document
Technical Exhibit 3 Facilities and Equipment.docx DOCX document
Attachment 1 Schedule of Services.xlsx XLSX spreadsheet
70Z08425QAA850900 RFQ ATC Mobile Facilities _Final Doc.pdf PDF
Technical Exhibit 7 Map -Dwg.pdf PDF
Technical Exhibit 5 DEFINITIONS.docx DOCX document
Technical Exhibit 2 Gov Property.docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL EXHIBIT 4

Historical Workload Table of Contents

4 - 1 LEVEL I – Standing Work

4 - 2 LEVEL II - Work Orders

4 - 3 LEVEL III - Job Orders

LEVEL I (Standing Work)

This level of work is the Contractor's responsibility under the firm fixed- price portion of the contract as outlined in Paragraph 5.1.2.a. This work includes all Standing Work and Operating Services. Frequencies of tasks and volumes of work are listed in the specification and the technical exhibits referenced therein.

STANDING WORK ORDERS

Schedules, frequencies, inventories, and other workload information for maintenance and inspection Level 1 work are provided in various Subsections of Section V and Technical Exhibit 8.

Food Service Equipment Maintenance8-1
Transportation Services8-2
Electrical Maintenance8-3
Heating Maintenance8-4
Water Service and Maintenance8-5
Sewage Service and Maintenance8-6
Air Conditioning Maintenance8-7
Building/Structure Maintenance and Inspection8-8
Grounds/Surface Areas Maintenance8-9/-10 Trash Collection and Disposal8-11
Fire Protection Maintenance8-12

DETERMINATION OF WORKLOAD AMOUNTS

Determination of man-hours for the completion of specified level I work is dependent upon numerous factors to include the amount of personnel, quality of knowledge, condition of machinery, etc.Advances in productivity are the responsibility of the Contractor.

The tables on the following pages are based upon a 100% sample of Work Orders during Fiscal Years 2011 - 2013.The workload data sample was taken from the Government managed work order database, with man-hours and materials provided as feedback from the current maintenance/support services contractor.The tables
The work orders issued in the past were based on specifications that were not exactly the same as these.Some of the parameters differentiating between

TE 4 – 2 - 1

Standing Work and Service Work have changed. Additionally, the threshold between Level II and Level III work has changed.

LEVEL II (WORK ORDERS)

This level of work is the Contractor's responsibility under the firm fixed- price portion of the contract. Level II work includes all Service Tickets, i.e., jobs that do not exceed $2000 of direct labor and materials per job, as described in Paragraph 5.1.2.b.

Many of the work orders used for the figures below included more than one task or work item (e.g., the work items to replace a broken window, repair the window frame, and paint the frame could all be on one work order).

Figures stated below are based on averages and will fluctuate each year. Some Work Orders were also modified on the job to include small work items discovered while accomplishing the originally assigned work, which may not reflect the service hours provided by a different craft (e.g., lubricating the window latch could be added to the example above).

Line Item & Description
2021
2022
2023

Total Work Orders

Total Work Hours Average Hours Per Work Order

Total Work Orders

Total Work Hours Average Hours per Work Order

Total Work Orders

Total Work Hours Average Hours per Work Order

1 Food Service
200
230
2.5
32
63
2.1
17
97
5.7
2 Transportation
32
106.2
3.1
51
101
2.1
26
44.4
1.7
3 Electrical
243
803.2
3.3
442
1389.5
3.2
456
1315.2
2.9
4 Heating
111
372.5
3.4
100
250
2.5
31
44.35
1.4
5 Water Service
202
721.3
3.6
206
715
3.5
194
803.2
4.1
6 Sewage Service
100
104
1.9
116
103.5
.9
138
103.9
0.8
7 A/C & Refrig.
215
975.2
4.2
244
1129
4.6
297
1183.4
4.0
8 Bldg. Structure
494
1205.5
2.4
495
1386.5
2.8
473
1332
2.8
9 Grounds Maint
23
78.3
3.4
35
65.3
1.9
17
87
5.1
10 Surfaced Areas
9
24.2
2.7
5
18
3.6
3
5
1.7
11 Trash Collect
3
2
0.6
1
2.2
2.2
2
2
1
12 Fire Protect.
83
100.3
6.0
49
31
0.7
10
13.3
1.33
Totals
1715
4722.7
3.09
1776
5254
2.50
1664
5030.75
2.70

LEVEL III (JOB ORDERS)

This level of work is covered under the requirements portion of the contract and will only be accomplished by the Contractor when ordered by the Contracting Officer on an approved Job Order, as specified in Paragraph 5.1.4.b. Level III work includes all Job Orders, i.e., jobs that exceed the limits of Level II, as described in Paragraph 5.1.2.c. There are approximately 50 Job Orders per year. The following breakdown is reflective of work hours expended completing Level III job orders during FY 2013 and 2014, respectively. Since most job orders involve multiple trades, the breakdown is given by trade as opposed to line-item number. These are given as historical data only. The actual amount of man-hours expended on Level III job orders could vary significantly from year to year and does not include management and oversight mark-up for subcontractors.

Trade

Electrician/Electrical Worker Man-hours

1414.0 Man-hours

830.0

HVAC Mechanic/HVAC Worker
336.0
633.0
Carpenter/Carpenter Worker
5156.0
374.0
Plumber/Plumber Worker
870.0
1126.0
Maintenance Trade Helper
84.0
204.0
Equipment Operator
0.0
0.0
Grounds Laborer
32.0
606.0
Vehicle Mechanic
0.0
0.0
Painter
0.0
112.0

TE 4 – 3 - 1

File details come from the government source that posted it. Updated .