Technical Exhibit 3 Facilities and Equipment.docx

DOCX document 172 KB Posted

Attached to
ATC Mobile, AL. BOSS Facilities Maintenance Services
Solicitation number
70Z08425QAA850900
Issued by

About this file

Technical Exhibit 3 is a comprehensive facilities and equipment maintenance inventory for the United States Coast Guard Aviation Training Center in Mobile, Alabama. The document details extensive maintenance requirements across multiple categories including food service equipment, motor vehicles, electrical systems, heating plants, water and sewage systems, air conditioning, buildings and structures, grounds, surfaced areas, fire suppression systems, medical equipment, and storage batteries. The inventory encompasses 63 buildings and structures totaling over 400,000 square feet, numerous vehicle and mobile equipment assets, complex electrical and mechanical systems, and approximately 180 acres of grounds, with specific maintenance responsibilities for each category.

The maintenance contract is structured as a Service-Disabled Veteran Owned Small Business (SDVOSB) Set-Aside, with a solicitation number of 70Z08425QAA850900. Key dates include an optional site visit on 1 July 2025, a question submission deadline of 2 July 2025, and quote submission due by 1:00 PM ET on 11 July 2025. Quotes are to be submitted via email to the Contract Specialist Ryan Difernando and Contracting Officer Luis Torres from the Department of Homeland Security US Coast Guard. The contractor will be responsible for maintaining all listed equipment and facilities in accordance with manufacturer recommendations, national codes, and federal, state, and local laws.

View the file

Other files

File Type Posted
Amendment 2 Site Visit List 70Z08425QAA850900.pdf PDF
Amendment 2 Attachment 3 Performance Assessment Questionnaire.docx DOCX document
Amendment 2 Attachment 2 Statement of Work.pdf PDF
Amendment 2 Attachment 1 Schedule of Services.xlsx XLSX spreadsheet
AMENDMENT 2 List of Changes.pdf PDF
Amendment 2 70Z08425QAA850900 RFQ ATC Mobile Facilities.pdf PDF
Amendment 2 Q_A Gov Responses Protected.xlsx XLSX spreadsheet
Amendment 1 change document ATC Mobile BOSS Facilities..pdf PDF
Amend 1 Attachment 3 Performance Assessment Questionnaire ATC Mobile BOSS..pdf PDF
Technical Exhibit 6 Forms.docx DOCX document
Attachment 1 Schedule of Services.xlsx XLSX spreadsheet
70Z08425QAA850900 RFQ ATC Mobile Facilities _Final Doc.pdf PDF
Technical Exhibit 9 EQUIPMENT LIST.pdf PDF
Technical Exhibit 8 Job Plans.pdf PDF
Attachment 2 SOW ATC Mobile Facilities Maintenance Final.pdf PDF
Attachment 5 DBA AL20240092.pdf PDF
Attachment 4 WD 2015_4609 REV 25 5_05_25.pdf PDF
Technical Exhibit 7 Map -Dwg.pdf PDF
Technical Exhibit 5 DEFINITIONS.docx DOCX document
Technical Exhibit 2 Gov Property.docx DOCX document
Technical Exhibit 4 Historical.docx DOCX document
Technical Exhibit 1 Blank Reserved.docx DOCX document
Attachment 3 Performance Assessment Questionnaire ATC Mobile BOSS.docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL EXHIBIT 3

Description of Facilities and Equipment to be Maintained Table of Contents

The Contractor shall maintain and repair all Government owned facilities and equipment on the Aviation Training Center. The list of facilities and equipment herein is not all-inclusive, but the list is reflective of the level of effort required in this contract. Generally, only major items have been listed; most sub-components, sub-assemblies, and accessories have not been listed, but they must be maintained.

3A Food Service Equipment

3BMotor Vehicles and Mobile Equipment 3CElectrical Systems (Major)
3DHeating Plants and Systems 3EWater Systems
3FSewage Systems
3GAir Conditioning and Refrigeration Systems 3HBuildings and Structures
3IGrounds Maintenance Inventory
3JSurfaced Areas (Including Exterior Signs) 3KFire Alarm and Fire Suppression Systems 3LMedical/Dental Equipment
3MOther Equipment 3NStorage Batteries

3A. FOOD SERVICE EQUIPMENT: The Contractor shall maintain the following food service equipment, or their replacements, in accordance with the requirements of Paragraph 5.0 of the Performance Work Statement (PWS).

DINING FACILITY

CONDITION

ITEM DESCRIPTIONQUANTITYCODE
DISHWASHER15
FOOD MIXER LARGE14
FOOD MIXER SMALL14
MEAT SLICER14
VEGETABLE CHOPPER14
MEAT TENDERIZER14
MICROWAVE OVEN34
GARBAGE DISPOSAL36
STEAMER15
TILTING SKILLET14
KETTLE (STEAM)34
DEEP FAT FRYER24
GRIDDLE14
CHARBROILER14
SOUP WARMER14
PLATE WARMER34
VEGETABLE STEAMER14
OVEN CONVECTION24
STOVE14
COFFEE MAKER14
ICE CREAM MAKER14
TWIN JET SPRAY JUICE DISPENSER14
SODA FOUNTAIN14
BAND SAW14
ICE DISPENSER (JUICE)14
ICED TEA DISPENSER14
CASH REGISTER (CASIO)14
FOOD WARMER24
REFRIG PASSTHROUGH14
THERMULATOR PASSTHROUGH14
REFRIG COUNTER34
REFRIG DESSERT14
BUFFET UNIT24
TOASTER14
COMPRESSORS34
CHILL BOX24
FREEZER14
ICE MACHINE14
EXHAUST SYSTEM24
GAYLORD HOOD VENTILATOR SYSTEM24
ICE CREAM FREEZER14
CreCor Proofer – Food Warmer14
Manitowoc - Oven14

TE 3 – 3A – 1

GATOR CLUB
BEVERAGE COOLER (TRUE SUPERIOR)1
BEER COOLER TWO KEG2
4
ICE MACHINE (MANITOWAC SERIES 600)1
4
MICROWAVE OVEN (LITTON)1
6
REFRIG/FREEZER UNIT (McCALL)1
4
BEER COOLER (TRUE SUPERIOR)1
4
OVEN (STAR FRANK)1
5
COFFEE MAKER (SILEX)1
4
BEER COOLER (BEVERAGE AIR)1
5
HOT DOG COOKER1
4
HOBART DISWASHER1
4
Turbo Air (Model # TBB4SG-N) 1
1

OFFICERS CLUB BEER COOLER ONE KEG W/REEFER (PERLIK) 1

MICROWAVE OVEN (AMANA TOUCHMATIC)1
6
ICE MACHINE (MANITOWAC SERIES 400)1
6
REFRIG/FREEZER COOLER (DELFIELD)1
4
FREEZER (NORTHLAKE)1
5

HANGAR 1

ICE
MACHINE
(SCOTSMAN)
1
4
ICE
MACHINE
(HOSHIZAKI)
1
4
ICE
MACHINE
(HOSHIZAKI)
1
4

GULF STRIKE TEAM

ICE MACHINE (MANITOWAC) 1 4

FACILITIES

ICE MACHINE (SCOTSMAN) 1 4

MEDICAL

ICE MACHINE (ICE-O-MATIC) 1 4

MORALE

ICE
MACHINE
(ICE-O-MATIC)
1
4
ICE
MACHINE
(ICE-O-MATIC)
1
4

TE 3 – 3A - 2

3B. MOTOR VEHICLES AND MOBILE EQUIPMENT: The Contractor shall maintain the following vehicles and equipment, or their replacements, in accordance with the requirements of Paragraph 5.0 of the PWS. Government furnished vehicles and equipment (not listed here and/or found in TE2) are the responsibility of the Contractor under the provisions of Paragraph 10.0 of the PWS.

GSA RENTAL VEHICLES

DESCRIPTIONCAPACITYCONDITION
SEDAN4EXCELLENT
SEDAN4EXCELLENT
VAN (7 PSGR)7EXCELLENT
VAN (7 PSGR)7EXCELLENT
VAN (7 PSGR)7EXCELLENT
VAN (15 PSGR)15EXCELLENT
PICKUP (RANGER)2EXCELLENT
PICKUP (F450)4EXCELLENT
PICKUP (F250)4EXCELLENT

COAST GUARD OWNED VEHICLES

SEDAN (EV)EXCELLENT
PICK-UP TRUCK, DODGE (gas)FAIR
FRONT OFFICE (CO’s cart) (EV)GOOD
C5I (open cab) (gas)GOOD
FACENG (4-seat Gray) (diesel)GOOD
FACENG (2-seat Gray) (diesel)GOOD
FACENG (2-seat Red) (gas)GOOD
FACENG (2-seat Green) (EV)GOOD
HAZMAT Micro Truck (gas)FAIR
MEDICAL (EV)EXCELLENT

COAST GUARD OWNED EQUIPMENT

DUMP TRAILER4FPFB10213G070706GOOD
PORTABLE HVAC TRAILER4PCU216229100033GOOD
PORTABLE HVAC TRAILER4PCU216091000032GOOD
PORTABLE HVAC TRAILER1738GOOD
FLAT BED TRAILER4PCU2162991000031GOOD ENCLOSED TRAILER HAULER4FPFB0817PG002714GOOD
ENCLOSED STAGE TRANSPORT HAULEREXCELLENT
REFUELING TRAILERGOOD
KOHLER, 60KW GENERATOR #1EXCELLENT
KOHLER, 60KW GENERATOR #2EXCELLENT
TOYOTA FORKLIFT, CGES (propane)EXCELLENT
TOYOTA FORKLIFT, FTS (propane)EXCELLENT
BACKHOEEXCELLENT
BACKHOE ATTACHMENTS (1-ft and 2-ft bucket)EXCELLENT
FORKLIFT ATTACHEMENT (man lift cage)EXCELLENT
WELDER UNIT, MILLER ALLEXCELLENT
PRESSURE WASHERS (4)EXCELLENT
CARPET STEAMEREXCELLENT

TE 3 – 3B - 1

3C. ELECTRICAL SYSTEMS (MAJOR):The Contractor shall maintain the following major electrical systems, or their replacements, in accordance with the requirements of
Paragraph 5.0 of

LOCATION(BLDG #)

the PWS.

HIGH VOLTAGE SYSTEMS EQUIPMENT

EQUIPMENT TYPE (NUMBER) DESCRIPTION

Basewide
Underground Duct-Bank
Primary (12470V)
02
Transformer, RTE Corp
75 KVA
03
Transformer, Cooper
25 KVA
04
Transformer, Cooper
150 KV
05
Transformer, Vantran Electric
1500 KVA
05
Transformer(3), RTE Corp.
10 KVA
05
Transformer(6), Challenger
45 KVA
05
Transformer(2), Square D
45 KVA
05
Transformer(3), Challenger
30 KVA
05
Transformer(2), Challenger
150 KVA
05
Transformer(2), Challenger
15 KVA
05
Transformer, Challenger
75 KVA
05
Transformer, General Electric
5 KVA
05
Transformer,MAGNETEK
30 KVA
06
Transformer, Cooper
75 KVA
10
Transformer
225 KVA
13
Transformer, Cooper
25 KVA
18
Transformer, Siemens (2)
75 KVA
18
Transformer, Siemens
500 KVA
24
Transformer, Westinghouse
300 KVA
25
Transformer, FPE
750 KVA
32
Transformer, Sorgel Electric
1000 KVA
32
Transformer, General Electric
112.5 KVA
32
Transformer, General Electric
300 KVA
32
Transformer, Siemens
300 KVA
32
Square D Panelboard
600 AMPS/13.8KV
36
Transformer, Square D
750 KVA
36
Transformer(2), Square D
75 KVA
36
Transformer(2), Square D
15 KVA
36
Transformer, ITE
15 KVA
36
Transformer, Square D
30 KVA
36
Transformer, Siemens
30 KVA
42
Transformer, Cooper
150 KV
43
Transformer, Cooper
75 KVA
50
Transformer, Square D
225 KVA
55
Transformer, Square D
113 KVA
55
Transformer, Cooper
75 KVA
62
Transformer
750 KVA, 12470/480Y/277
63
Transformer
500 KVA

EMERGENCY GENERATORS

05
Cummins NT855GC2 Generator
200
KW
13
Kohler Generator
15
KW
24
Kohler Generator
35
KW
25
Kohler Generator
35
KW
33
Kohler Generator
135
KW
36
Onan 175 DGFB Generator
175
KW
51
Kohler Generator
100
KW
55
Kohler Generator
15
KW
04
Kohler 30RZ6
30
KW

TE 3 – 3C - 1

EMERGENCY GENERATOR CONT’D

25
Kohler 200 RZG
200
KW
62
Olympian
200
KW
02
Kohler
100
KW
63
Seimans
150
KW
32
Kohler Generator FTS
200
KW

OTHER ELECTRICAL SYSTEMS/COMPONENTS

QUANTITY

EQUIPMENT TYPE
DESCRIPTION
86
Panelboards
Up to 150 Amps, 120/208V
45
Panelboards
200 to 250 Amps,120/208V
16
Panelboards
250 Amps & above,120/208V
18
Panelboards
Up to 300 Amps, 277/480V
17
Panelboards
300 Amps & above, 277/480V
130
Safety/Disconnect Switch
Up to 100 Amps, 208/240V
30
Safety/Disconnect Switch
100 Amps & above, 208/240V
25
Safety/Disconnect Switch
Up to 100 Amps, 277/480V
15
Safety/Disconnect Switch
100 Amps & above, 277/480V
9
Emerg Pwr Load Xfer Switch
Up to 1000 Amps, 120/208V
2
Emerg Pwr Load Xfer Switch
Up to 1000 Amps, 277/480V
10
Explosion Proof Switches
Up to 100 Amps, 120/208V
4
Mercury Vapor Lights
250 Watts
43
Mercury Vapor Lights
175 Watts
38
Metal Halide Lights
1000 Watts
275
High Pressure Sodium Lights
400 Watts
4
Mercury Vapor Lights
50 Watts
14
High Pressure Sodium Lights
150 Watts
9
Bollard Lights
70 Watt
8
Intrusion Alarm Systems
1
Main Gate Radionics Security

Receiver

6
Hangar Power Reels
120 Volts, Single-Phase
12
Hangar Power Reels
208 Volts, 3-Phase
2
Hangar Power Reels
480 Volts, 3-Phase
75
Exit Light fixtures/Emergency

lights

3
Solar Lights
S04 Parking Lot
28
Solar Lights
Fence-line
4
Solar Lights
Vehicle Storage Area
3
Street Lights
Walter’s Park
9
Above Ground Junction Boxes
2
Above Ground Switches
1
DC Rectifier for Ramp Lights
4
GSA Vehicle Charging Stations
14
Hangar Power Reels
18
Streetlights
1
Main Gate Receiver Computer/Software
2
Hangar DC Power Reels
300
LED light fixtures
Various Locations
200(approx)
Motion detectors
Various Locations

TE 3 – 3C - 2

OTHER ELECTRICAL SYSTEMS/COMPONENTS cont’d

QUANTITY

EQUIPMENT TYPE
DESCRIPTION
05
Hangar Gas Heaters (12)
200,000 BTUs (ea)
62(MPA)
Hangar Gas Heaters (12)
200,000 BTUs (ea)
62(MPA)
Boiler and Tank-A.O.Smith LW-1000

Boiler and TJV 250 Tank 1,000,000 BTUs

62(MPA)
Boiler – A.O. Smith BTR 200
199,000 BTUs
29
Water to Water Heat Pump
165,000 BTUs
63
Carrier heat pump
60 Tons
63
Boiler Rheen
500,000 BTUs

3D. HEATING PLANTS AND SYSTEMS: The Contractor shall maintain the following heating plants and systems or their replacements, in accordance with the requirements of Paragraph 5.0 of the PWS.

LOCATION

(BLDG #) EQUIPMENT TYPE (NUMBER) DESCRIPTION

03
National Gas Heater Unit (2)
24,000 BTU(ea)
04
Dayton Gas Fired Furnace
82,500 BTU
04
Peerless Gas Heater Unit
80,000 BTU
05
Teledyne Laars Hot Water Boiler
987,500 BTU
05
Teledyne Laars Hot Water Boiler
858,000 BTU
06
Carrier Gas Furnace(3)
91,000 BTU(ea)
10
Bryant Gas Furnace
100,000 BTU
10
Bryant Gas Furnace
125,000 BTU
10
Gordon Ray Infared Heaters (3)
100,000 BTU(ea)
13
Heat Pump (Amana)
14,000 BTU
16
Bryant Electric Furnace (1)
10 KW
16
American Standard Furnace (3)
100,000 BTU (ea)
18
Sterling Gas Furnace(5)
250,000 BTU (ea)
18
HASTINGS GAS HEATER
1,270,000 BTU
21
RUUD Electric Heater(3)
45 KW
22
Carrier Furnace (3)
75,000 BTU(ea)
22
Bryant Electric Furnace
90,000 BTU
24
Teledyne Laars H/W Boiler
396,000 BTU/hr
24
Rudd Commercial Water Heater
156,000 BTU
25
Weil McLain Steam Boiler
2,114,900 BTU
25
Hurst Steam Boiler
2,000,000 BTU
25
Des Champs Labs Inc Air Handler
228,928 BTU/hr

Precision Boiler Heat Exchangers(2) Lochinvar Model CPN 1802 1,200,000 BTU (ea)

1,800,000 BTU

32
Weil McLain Hot Water Boiler
3,950 BTU
32
Ruud Hot Water Heater
40,000 BTU/hr
32
Contempo, Electric (2)
50,400 BTU/hr
33
Bryant Gas Heater Unit (3)
40,000 BTU/hr
35
Auto Hobby Shop
50,000 BTU
36
Carrier Heatpump
36,000 BTU
42
Amana Heatpump
18,000 BTU
50
Rite Hot Water Boiler
200,000 BTU
51
Raypack Hot Water Boiler
200,000 BTU
51
Modine Gas Heaters (6)
80,850 BTU (ea)
62
NEC T2A Convection Heater Exp Proof
26,000 BTU
62
NEC T3B Fan Forced Heater
3.3 KW
63
York Heatpump
2 Ton

TE 3 – 3D - 1

OTHER HEATING SYSTEMS/COMPONENTS

QUANTITYEQUIPMENT TYPE
43Heat Pumps
NumerousValves, pumps, heat exchangers, expansion tanks, condensate tanks, steam traps, thermostats, controls, fans, air handling units, etc.
26Electric and gas hot water heaters ranging in size from 6 gallon capacity to 100 gallons.
1Gas Heater/Boiler for Pool Water
1Boiler Wilks Hall
24
Dental Dehumifiers (4)
Mod1133560

Solar Wash Rack System (includes on demand heaters) RS Means PM Attached

2.5 gal – 5 gal on demand water heaters (S10, S25, and S16)

TE 3 – 3D - 2

3E. WATER SYSTEMS: The Contractor shall maintain the following water systems, or their replacements, in accordance with the requirements of Paragraph 5.0 of the PWS.

FACILITIES

NO. SHORT TITLE SIZE

4 Water Well 4"

9 Deluge Water Tank 350,000 gallons

25 Potable Water Well/Lawn Sprinklers 4"

25
Geothermal GHP Wells Open System (7)
62
Geothermal GHP Wells Closed System (100)

WATER MAINS

DESCRIPTION
LOCATION/QUANTITY
SIZE

Potable Water and Fire Protection Water Mains NEW TOTAL 13920 LF of Underground cast iron/asbestos cement

4" to 12"

Main Corporation Valves
NEW TOTAL 68
6" to 12"

PUMPS

DESCRIPTION

LOCATION/QUANTITY
SIZE/CAPACITY

Electric Driven Pump

Bldg. 4
3 HP
Diesel Engine Driven
Pumps
(4ea.)
Bldg. 3
2000 GPM(ea)

Barracks Well Pump

Bldg. 25
5 HP

Pool Cooler Pump

Bldg. S29

Jockey Pump (2)
03
Geothermal Well Pumps (3)
25

STORM WATER LIFT PUMPS POND WELL PUMP

POND FOUNTAIN

FTS STORAGE BLDG WELL PUMP

LSI Lift station

POND/1 POND/1 BLDG 32/1

BLDG 42/1

FIRE PROTECTION SYSTEMS

DESCRIPTION LOCATION/QUANTITY

Fire Hydrants27
Deluge SystemBldg. 4, 5, 18
Wet Sprinkler SystemsBldgs. 4, 5, 18, 25, 36, 50, 51

TE 3 – 3E- 1

FIRE PROTECTION SYSTEMS CONT’D

DESCRIPTION LOCATION/QUANTITY

Dry Sprinkler SystemsBldgs. 36, 05
AFFF Monitor System
05

High Expansion Foam (HEF)System

FM-200

Wilks Hall

EMERGENCY LIGHTING

DESCRIPTION Size

Meet NPFA 101 article 7.9.3.1 Monthly test for 30 seconds

WATER FILTERS

QUANTITY LOCATION

Approx. 40 Washracks, Athletic Courts, Bldg 05, 10, 24, 25, S62, S64, S16, S40, S51 S35, S43, Various locations.

GROUNDS SPRINKLER SYSTEMS (installed)

LAND PARCEL
BLDG. AREA
L.FT. OF PIPE
1
S16
350
4
S36
300
12
S50
275
6
S32
1000
2
S25
2000
11
S10
600
8
S18
800
6
S06
200
10
S04
100
2
S33
250
6
S32
150
25A
S62
3000

TE 3 – 3E- 2

3F. SEWAGE SYSTEMS: The Contractor shall maintain the following sewage systems, or their replacements, in accordance with the requirements of Paragraph 5.0 of the PWS.

DESCRIPTION QUANTITY/LOCATION SIZE

NEW TOTALS

Sewer Lines
9,470 LF
3"
to
8"
Storm Drain Lines
21,616 LF
up
to
48"
Sewage Manholes
34 EA
Storm Drain Manholes
11 EA
Catch Basins
66 EA
Sewage Lift Stations
Bldg 02, 12,
13,
33
STORM DRAIN LIFT STATIONS
BLDG S25 (4
EA)

TE 3 – 3F- 1

3G. AIR CONDITIONING AND REFRIGERATION SYSTEMS:The Contractor shall
maintain the following air conditioning and refrigeration systems, or their replacements, in accordance with the requirement of Paragraph 5.0 of the PWS. (NOTE:All refrigeration units are listed here for convenience; some are also listed in Technical Exhibit 3A.)

LOCATION EQUIPMENT TYPE (NUMBER) DESCRIPTION

Bldg
5 - Hangar 1
Ice Maker (1)
Bldg
62- Hangar 2
Ice Maker (1)
Bldg
10 – Facilities
Ice Maker (1)
Bldg
24-Medical
Ice Maker (1)
Bldg
43-Motorcycle/car-wash
Ice Maker (2)
Bldg
25 - Dining Facility
Freezers (1)

Walk-in

Refrigerators (2)

Walk-in

Refrigerators (5)

Counter/Dessert

Refrigerators (1)

Pass through

Ice Makers (2)

Bldg
25 - O'CLUB
Refrigerator/Freezer
(1)
Portable Reach-in

Ice Machine (1)

Beer Coolers (1)

Bldg
25 - Gator Club
Refrigerator/Freezer
(1)
Reach-in

Ice Machine (1)

Beer Coolers (5)

Bldg
51 - Strike Team
Ice Maker (1)

AIR CONDITIONING PLANTS

LOCATION (BLDG.) TONNAGE

02
- Fuel Farm Office
3
1/2
Tons
04
- Supply Building
38
1/2
Tons
05
- Hangar
125
Tons
06
- Fitness Facility
29
Tons
10
- Facilities Engineering
Main
25
Tons
13
- Gate House
2
Ton
16
- Administration Building
12
1/2
Tons
17
- Aircraft Washstand
2
Tons
18
- Composite Repair Shop
20
Tons
20
– Beauty/Barber Shop
3
Tons
21
- Racquetball Court
11
Tons
22
- Facilities Engineering
Shops
18
1/2
Tons
24
- Medical/Dental
59
Tons
25
- BEQ/BOQ/MESS Facility
95
Tons
25
– BEQ/BOQ/MESS Facility Make-up
Air system
60
Tons
28
– Pool Bath House
15
Tons
32
- Erickson Hall/Flight Training
Systems
150
Tons
33
- IRM/Credit Union
28
Tons
34
- Service Station
2
1/2
Tons
35
- Auto Hobby Shop
2
1/2
Tons
36
- Pharmacy
3
Tons

42 - GSE Shed 11 ½ Tons

TE 3 – 3G- 1

AIR CONDITIONING PLANTS CONT’D

LOCATION (BLDG.) TONNAGE

50 - Gulf Strike Team Admin.
26
Tons
51 - Gulf Strike Team Shops
25
Tons
55 - Avionics Shop
15
Tons
52 – GST HAZMAT Storage Shed
2 ½
Tons
58 – GST Storage Warehouse
2
Tons
62 - Hangar 2
90
Tons
63 - Wilks Hall
60
Tons

OTHER EQUIPMENT

Refrigerators - Domestic Type
127
Refrigerators - Industrial Type
15
Industrial Freezers
10
Air Handling Units
9
Cooling Towers
5
Water Coolers (Water Fountains)
76
Exhaust Fans
88
Drier
1
Ice Machines
7
Beer Coolers
5
Air Filters (Throw away)
3000
Circulating Pumps
8
Condensing Units
25
Hydraulic Oil Cooler Units
2
Refrigerated Air Dryer
5
DOOR BLOWER (GATE HOUSE)
1
Energy Management Control Systems
11
Overhead Hangar Bay Fans
14
McQuay Inter-air Cooler Water Chiller
1
Carrier AHU
4
GreenHeck Fresh Air Machine
1
Emerson Network Power Liberty
3
AO Smith Vent Fan1/3 HP
1

TE 3 – 3G- 2

3H. BUILDINGS AND STRUCTURES: The following buildings, structures, system components, and installed equipment, or their replacements shall be maintained in accordance with the requirements of Paragraph 5.0 of the PWS. Government furnished facilities (although included in the list below) are the responsibility of the Contractor under the provisions of Paragraph 10.0 of the PWS.

FACILITIES

BLDG.CONSTRUCTION
NO.SHORT TITLESIZETYPE
01 Fuel Pump Shed*3821 sfSteel
02 Fuel Farm Office725 sfConcrete Block 03 Deluge Pump House 1,462 sfConcrete Block 04 Supply26,615 sfConcrete Block
05 Hangar81,666 sfMetal/Concrete Block 06 Fitness Center/Lockers 6,222 sfConcrete Block/Brick 07 Well Pump House312 sfConcrete Block
09 Deluge Water Tank 350,000 galMetal
10 FACENGDIV Bldg.**5595 sfConcrete Block
11 Sewage Lift Station 186 sfConcrete Block
12 Walter’s Park Strge/Restroom 437 sfBrick
13 Gate House256 sfMasonry
14 FACENGDIV Open Storage 3,500 sfMetal
15 Ammo Storage Magazine 207 sfConcrete
16 Administration4,489 sfConcrete Block
17 Washstand Storage194 sfConcrete Block
18 Composite Repair Shop*** 6,380 sfConcrete Block/Brick
19 Storage Magazine140 sfConcrete
20 Barber/Beauty Shop800 sfWood
21 Racquetball Court 2,184 sfWood
22 Facilities Eng. Shops 3,580 sfMetal
23 Facilities Eng. Storage 6,000 sfMetal
24 Medical/Dental Clinic 12,000 sfConcrete Block
25 BEQ/B0Q/Galley81,000 sfConcrete Block
28 Pool Bath House2,466 sfConcrete Block
29 Pool Storage104 sfWood
30 Pool Equipment233 sfConcrete Block
32 Erickson Hall20,700 sfConcr. Blk, Brick, Metal
33 IRM/Credit Union4,835 sfConcrete Block
34 Service Station1,015 sfConcrete Block
35 Auto Hobby Shop5,899 sfMetal
36 Exchange/Grocery 46,909 sfMetal
40 Walter’s Park Pavilion 2,500 sfMetal
41 Pool Pavilion1,500 sfMetal
42 GSE Equipment Shed 4,000 sfMetal
43 Motorcycle/Car Wash 877 sfConcrete Block/Wood
45 Lawn Equipment Shed 300 sfConcrete Block
48 GST Storage Shed9,576 sfMetal
49
Fuel Truck Parking
Shed
1,620
sf
Metal
50
GST Administration
6,325
sf
Metal/Brick
51
GST Warehouse**
22,571
sf
Metal/Brick

TE 3 – 3H- 1

52
GST HAZMAT Storage
333
sf
Block
53
MWR Storage
2,000
sf
Metal
55
Avionics
5,856
sf
Concrete Block
56
Helo Gear Storage
112
sf
Concrete Block
57
Falcon Wash-rack Bldg.
80
sf
Concrete Block
58
GST Storage Building
5,757
sf
Metal
59
Smoking Shelter (Hangar)
150
sf
Wood

Buildings and Structures cont’d

60
Armory and ARMAGs
1000 sf
Metal/Concrete
61
HAZMAT Storage Shed
5,600 sf
Metal
62
Hangar 2
101,523
Metal/Brick
63
Wilks Hall
13,611 sf
Metal/Brick
64
FTS Storage shed
900 sf
Metal
67
Motorcycle parking sheds
(total 03)
Metal

Load Bearing Structures

TypeQTYLocation
Lofts and storage
14
Various (S04,S05,S06,S10, S18A/B,S22/A,S23,S24,S25,S32,S35,S44,S46, S48,S50,S51,S52,S53,S55,S59,S61,S62/A

S63,S64,S65)

Elevators
3
CGES, Barracks, Hangar 2

Pressure vessel’s

FALL ARREST SYSTEM

22 air
Various locations, compressed air tanks,

boilers, etc.

Hangar 2, S62

Load Bearing Structures to be inspected Per COMDTINST M11000.11

Weight Handling Equipment

Location
Description
Serial Number
Gulf Strike Team Welding Shop
1 Ton Air Hoist, model 11588121
92-01-69

Facilities Engineering Garage

3 Ton Chain Fall
595

Hangar 1

Hangar 1 Hydraulic Motor Lift, model EL 01 Engine Hoist (2013) 0102T00078

Erickson Hall MH65 Highbay
DC-PRO lift
321786

Erickson Hall HH60 Highbay

LM010.11045TS
G0509721

Wilks Hall HC 144 High Bay

2000 lb Lift
7195514
Hangar 2, 114 shop
Hyster Forklift
G006v04576D

Supply/AMO

1.Yale Electric Forklift, 2.Mitsubishi 25 Forklift A824N07386W A17B-04570

Facilities Engineering
Toyota Forklift
135751
Gulf Strike Team
1.Hyundai Forklift

2.Kalmar

HHKHFU34CK0000054

F40200496

GSE
1.Tailift

2.Clark

TA10407

CMP230G-d6326873KF

TE 3 – 3H- 2

52 GST HAZMAT Storage 333 sf Block

MWR Storage

2,000 sf

Metal

55
Avionics
5,856
sf
Concrete Block
56
Helo Gear Storage
112
sf
Concrete Block
57
Falcon Wash-rack Bldg.
80
sf
Concrete Block
58
GST Storage Building
5,757
sf
Metal
59
Smoking Shelter (Hangar)
150
sf
Wood

Buildings and Structures cont’d

60
Armory and ARMAGs
1000 sf
Metal/Concrete
61
HAZMAT Storage Shed
5,600 sf
Metal
62
Hangar 2
101,523
Metal/Brick
63
Wilks Hall
13,611 sf
Metal/Brick
64
FTS Storage shed
900 sf
Metal
67
Motorcycle parking sheds
(total 03)
Metal

Load Bearing Structures

TypeQTYLocation
Lofts and storage
14
Various (S04,S05,S06,S10, S18A/B,S22/A,S23,S24,S25,S32,S35,S44,S46, S48,S50,S51,S52,S53,S55,S58,S59,S61,S62/A

S63,S64,S65)

Pressure vessel’s

FALL ARREST SYSTEM

22 air
Various locations, compressed air tanks,

boilers, etc.

Hangar 2, S62

Load Bearing Structures to be inspected Per COMDTINST M11000.11

Weight Handling Equipment

Location
Component
Type
Manufacturer
Model #
Serial #
Capacity

Outside Ground Support Equip Shop Car lift

Hoist
Electric
Unknown
AB-1271-A
583
25000 LBS
Gulf Strike Team 12.5 Ton TRDG
Hoist
Electric
Yale
BEW15X22 CB16D4
BD2367 15B
12.5
Bridge
Top Running Double Girder
DeShazo
--
2939
12.5
Bridge
Top Running Double Girder
DeShazo
--
2939
12.5
Runway
Top-Running
--
--
--
--
Pendant / Remote
Pendant PB
Not Found
NA
NA
--
Trolley
Electric
Yale
NA
NA
12.5
Gulf Strike Team Weld Shop 1 Ton Air Hoist
Trolley
Push
Acco Wright
80
1610020
2
Monorail
Structural Beam
--
--
--
NA
Hoist
Air
Budgit
11588121
92-01-

1TON

TE 3-3H-2Gulf Strike Team MK Shop 1 Ton Air Hoist Monorail Structural Beam

1 TON

Hoist
Air
Dayton
4ZW59
042026
1 TON
Trolley
Push
Dayton
--
--
1 TON
Hanger 1 65 Gantry
Bridge
Gantry
Spanmaster
--
9911013
2 TON
Pendant / Remote
Pendant PB
Telemecanique
NA
NA
--
Hoist
Electric
Kone
XN162000 22M16T2A
E060616 7
2 TON
Trolley
Electric
Kone
X22909
1138248
2 TON
Hanger 1HH65 Engine Shop
Bridge
Under Running Single Girder
NA
--
NA
1000 LBS
Hoist
Hand Chain
Budgit
8302
10-98
1000 LBS
Trolley
Hand Geared
Budgit
504552-1
NA
2000 LBS

Spanco Gantry 2on Harrington

Trolley
Electric
Harrington
MR020L
0002800

2 TON

Hoist
Electric
Harrington
MR-2. NER020C
0014141

2 TON

Bridge
Gantry
Spanco
--
--
2T
Hanger 2 Airframe Shop
Monorail
Structural Beam
--
--
--
5000 LBS
Hoist
Electric
Stahl
ST 2010

8/2 2/1

3303798
4000 LBS
Trolley
Electric
Stahl
FU-A 14 43
3303798
4000 LBS
Pendant / Remote
Pendant PB
Other
STH 1202-

60 047- 5-1

Hanger 2 Engine Prop Shop
Pendant / Remote
Pendant PB
Other
STH 1202-

60 947- 5-1

Monorail
Structural Beam
--
--
--
5000 LBS
Hoist
Electric
Stahl
ST 2010

8/2 2/1

3303799
4000LBS
Trolley
Electric
Stahl
FU-A 14 43
3303799
4000 LBS
Hanger 2 60's Shop
Pendant / Remote
Pendant PB
Other
STH 1202-

60 947- 5-1

Monorail
Structural Beam
--
--
--
2500 LBS
Trolley
Electric
Stahl
FU-A 14 43
3106356
2000 LBS
Hoist
Electric
Stahl
ST 1005 8

2/1

3106356
2000 LBS
Hanger 2 West Bay Overhead
Runway
Under-Running
--
--
--
--
Bridge
Under Running
DeShazo
--
234
4000 LBS
Hoist
Electric
Stahl
SH3005-20 4/1 L3
1905836
4000 LBS
Pendant / Remote
Pendant PB
Telemecanique
XAC-A
08H7
--
Cont’d
Trolley
Electric
Stahl
SF 17 113
1905836
4000 LBS
Hanger 2 East Overhead Crane
Runway
Under-Running
--
--
--
--
Bridge
Under Running Single Girder
DeShazo
--
234

23 -

4000 LBS

Trolley
Electric
Stahl
SF 17 113
1905835
4000 LBS
Pendant / Remote
Pendant PB
Telemecanique
XAC-A
0BH7
--
Hoist
Electric
Stahl
SH3005-20 4/1 L3
1905835
4000 LBS
Hobby Shop Bend Pak-Prolift 12,000
Hoist
Electric
Unknown
AB-1466
4517
6 TON
Hobby Shop Dannmar 10,000
Hoist
Electric
Unknown
D-10ACX
1989
5 TON
Hobby Shop Pro Lift 7000 Lbs
Hoist
Electric
Unknown
S203T*312
G390
3.5 TON
Facilities Shop Car Lift
Hoist
Electric
Uknown
NA
773-65
7840 LBS.
Erikson Hall MH 65 Highbay
Runway
Under-Running
--
--
--
--
Bridge
Under Running Single Girder
Gorbel
--
NA
1000 LBS
Hoist
Electric
Demag
DC-PRO 1
321786
1000 LBS
Trolley
Push
Demag
NA
NA
1000 LBS
Pendant / Remote
Pendant PB
Demag
NA
NA
--
Hoist
Electric
Harrington

1 TON

Erickson HallGorbel Suspended 1t
Bridge
Under Running Single Girder
Gorbel
--
--
2200 LBS
Hoist
Electric
Demag
--
--
2200LBS
Pendant /
Pendant PB
Demag
--
--
--
Trolley
Electric
Gorbel
--
--
1T
Wilks Hall HC 144 High Bay
Runway
Top-Running
--
--
--
--
Bridge
Top Running Single Girder
Not Found
--
NA
2000 LBS
Hoist
Electric
Demag
--
7195514
1 TON
Trolley
Electric
Demag
NA
NA
1 TON
Wilks Hall HC 144 High Bay CONT’D
Pendant /
Pendant PB
Demag
NA
NA
--
Facility Engineering Chain Fall
Hoist
Hand Chain
Yale
NA
595
3 TON
Trolley
Hand Geared
Yale
NA
NA
3 TON
Fuel Farm Safety Winch
Jib Crane
Foundation
Unknown
AK207
--
300 LBS
Hoist
Other
Unknown
AK207
NA
300 LBS
Hobby Shop Challenger Lift
Hoist
Electric
Unknown
4P12EFX
1205000

0000793

6 TON

3I. GROUND MAINTENANCE INVENTORY: The Contractor shall maintain the following grounds-cover, trees, shrubs, and flower beds in accordance with the requirements of Paragraph 5.0 of the PWS.

GROUND COVER

PARCELPARCELAPPROXIMATE
NUMBERIDENTIFICATIONACREAGE
1 Main Gate, Administration and Medical Buildings3.27
2 Barracks, Credit Union and Family Programs2.97
3 Pool, Tennis, Racquetball Courts1.98
4 Grocery Annex/Exchange and Service Station2.63
5 Greathouse Drive2.09
6 Erickson Hall, Fitness Center, Avionics2.74
7 Hangar (South Side)1.02
8 Hangar (North Side)1.56
9 Supply Bldg.1.16
10 Deluge Pump Bldg1.80
11 Facilities Engineering and Auto Hobby Shop2.07
12 Gulf Strike Team0.55
13 Walters Park9.57
21 Field (West of Main Gate)5.42
22 Field (East of Main Gate)7.42
23 Field (Along property Line and Fuel Farm)18.03
24 Field (East of Airport Ramp)24.63
25 Field (West of Airport Ramp)16.92
25aADM Stewart Park1.01
26 Fence line along Tanner Williams Road4.15
27 Field (West of Airport Ramp)6.08
28 Field (Behind IRM)6.00
31Fitness Trails(includes Jog/Bike/Run)2.80
35Wooded Areas72.05
25Hangar 23.0
63Wilks Hall1.5
25Sports Field2

TREES AND SHRUBS

PARCELNUMBER OFNUMBER OF
NUMBER
TREES

SHRUBS

1
20
2
63
3
14
4
65
5
48
6
42
7
0
8
15
9
30
10
8
11
12
12
30
13
80
21
59

TE 3 – 3I- 1

TREES AND SHRUBS CONT’D

PARCEL NUMBER
NUMBER TREES
OF
NUMBER OF SHRUBS
22
8
23
3
24
3
25
272
26
3
25a
30
25c
8
28
4

FLOWER BEDS

LOCATION
SIZE
Main Gate
90
sf
Trees at Greathouse & Mariner
128
sf
Fitness Center Planter
50
sf
Erickson Hall Planter
283
sf
Gulf Strike Team Planter
21
sf
Facility Engineering Planter
27
sf
Wilks Hall Planter
50
sf
CG Exchange/Service Station
1500
sf
Hangar 1 Plant Beds
100
sf
Barracks
125
sf
Falcon Static Display
100
sf
Tree beds
200
sf
Memorial/Monument
100
sf

SHRUB BEDS

LOCATION SIZE

Admin Building
3350
sf
Barracks
4000
sf
Pool Bathhouse
1000
sf
FTS/Avionics
3000
sf
Gulf Strike Team
4000
sf
Facility Engineering
150
sf
Hangar
500
sf
Main Gate
1035
sf
Supply/Compdiv building
2000
sf
Medical
1000
sf
Erickson Hall/Fitness Center
200
sf
CG Exchange/Service Station
150
sf
Front Parade Field/Static Display
100
sf
IRM/Credit Union
100
sf

TE 3 – 3I- 2

3J. SURFACED AREAS (INCLUDING EXTERIOR SIGNS): The Contractor shall maintain the following surfaced areas and exterior signs in accordance with the requirements of Paragraph 5.0 of the PWS.

ATC MOBILE SURFACED AREAS

ITEM DESCRIPTION QUANTITY UNIT

Concrete Roadways 193,218 SF

Concrete Sidewalks 76,700 LF

Concrete Curbs* 19,760 LF

Asphalt Roads 246,036 SF

Asphalt Parking Lots 436,573 SF

Concrete Aircraft Apron** 878,930 SF

Vehicle Storage Area*** (Gravel) 16,900 SF

Facilities Storage Area (Gravel) 2,000 SF

*Includes Hazmat Containment
**Includes Talon Grid pad, extreme South corner of Apron

*** Includes DRMO scrap metal storage area

EXTERIOR SIGN INVENTORY

QUANTITY

TRAFFIC SIGNS - Stop, Yield, One Way, Do Not Enter, Includes Digital signage etc. 44 PARKING SIGNS - No Parking, Tow Zone, Reserved,

Includes Digital signage etc.32
SAFETY SIGNS -Utility Instructions, Fire Exits, Safety,
Caution, High Voltage, etc.104
BUILDING SIGNS - Titles, Directories, Bldg. Numbers, Office Hours, Delivery Instructions, etc.93
STREET NAME SIGNS5
RUNNING TRAIL SIGNS15

TE 3 – 3J- 1

3K. FIRE ALARM AND FIRE SUPPRESSION SYSTEMS: The Contractor shall maintain the following Fire Alarm and Fire Suppression Systems, or their replacements, in accordance with the requirements of Paragraph 5.0 of the PWS.

SPRINKLER SYSTEMS

BLDG. NUMBER TYPE OF SYSTEM CONDITION

04
Wet

Good

05
Deluge
and
Wet
Good
18
Wet

Good

25
Wet

Excellent

50
Wet

Good

51
Wet

Good

36
Wet

Good

36
Dry

Good

03
Wet

Excellent

62
Wet

Excellent

FIXED FIRE EXTINGUISHER SYSTEM

BLDG. NUMBER

TYPE OF SYSTEM

Ansul R-102 Agent

CONDITION

Good

32
Fenwall Halon 1301
Good
32
FM-200
Good
55
Ansul Halon 1301
Good
61
Ansul PCI-50 Agent
Good
62
Ansul PCI-50 Agent
Good
05
AFFF
Excellent
62
High Expansion Foam (HEF)
Excellent

AFFF Hose Reel 3M NOVEC 1230 Fire Protection Fluid Excellent Excellent

FIRE ALARM DETECTION SYSTEMS

BLDG. NUMBER
SYSTEM MANUFACTURER

MODEL

04
Edwards
05
Radionics
13
Radionics Receiver
16
Simplex
24
Radionics
25
Edwards

EST2

32
Cererus Pyrotronics

MXL-IQ

32
Fenwall

Halon

32
Kidde-Fenwal

Gemini

32
Pyrotronics

CP-30

33
Radionics
36
Simplex

TE 3 – 3K- 1

FIRE ALARM DETECTION SYSTEMS CONT’D

BLDG. NUMBER SYSTEM MANUFACTURER MODEL

36
Radionics
8112
50
Simplex
2001
51
Simplex
2001
55
Ansul
Autopulse
3000

Notifier General Fire Alarm System Simplex

PORTABLE FIRE EXTINGUISHERS

TYPE QUANTITY SIZE

Carbon
Dioxide
(CO2)
6

50 LB

PKP

150 LB

Cleanguard920 LB
Cleanguard
2
5 LB
ABC
234
10 LB
K-Guard
26 GL

TE 3 – 3K- 2

3L. MEDICAL EQUIPMENT: The contractor shall service and repair the following equipment, or their replacements, in accordance with the requirements of Paragraph

5.0 of the PWS.

ITEM DESCRIPTION QUANTITY

Exam Table, Midmark6
Exam Table, Ritter3
Exam Table, electrical1
Exam Table, traction2
Lights, surgical3
Sanitizer, Dental2
Sterilizer, Dry Clave Heat, Dental2
Viewer, Xray, fluorescent10
Screen, Standing, Xray1
Ice Machine1
Refrigerator5
Hydrocullator1
Water Distiller1

TE 3 – 3L- 1

3M. OTHER EQUIPMENT: The contractor shall service and repair the following equipment, or their replacements, in accordance with the requirements of Paragraph

5.0 of the PWS.

INVENTORY OF AIR COMPRESSORS

Number Make and Model Number MAWP

05
ELGI

Model EN22-175

175
PSI
10
Bell and Gossett
200
PSI
18
Ingersoll-Rand Model SSR-HP100
125
PSI
22
Saylor-Beall Model 703
200
PSI
24
Ingersoll-Rand Model 234
200
PSI
25
Johnson Controls
165
PSI
34
Curtis Man
200
PSI
35
LeRoi

Ser# 89415

200
PSI
42
Saylor-Beall
200
PSI
51
Saylor-Beall
200
PSI
57
Curtis Model E-57
200
PSI
62
Air Compressor-Champion RCS60
125 PSI
62
Air Compressor-Champion RCS60
125 PSI
62
Refrigerated Compressed Air Dryer-Zeks

500 NEC

500SCFM

51
Air Compressor will be replaced

INVENTORY OF AIR HOSE REELS

NUMBER LOCATION RETRACTION

02
HELO WASH RACK
SPRING
06
HANGAR BAY
AIR MOTOR
04
METAL SHOP
SPRING
01
FALCON WASH RACK
SPRING
03
FALCON SHOP
SPRING
62
Air Hose Reels (38)
Spring
62
Air Hose Reels (7)
Electric

TE 3 – 3M -1

INVENTORY OF WATER HOSE REELS

NUMBER LOCATION RETRACTION

02
HELO WASH RACK BODY WASH
MANUAL
02
HELO WASH RACK ENGINE WASH
SPRING
02
HELO WASH RACK SOAPER/FOAM TANK
SPRING
02
FALCON WASH RACK ENGINE WASH
SPRING
01
FALCON WASH RACK SOAPER/FOAM TANK
SPRING
01
FALCON WASH RACK BODY WASH
MANUAL
02
FALCON WASH RACK ENGINE WASH
SPRING
62
Water Hose Reels (3)
Pneumatic

TE 3 – 3M- 2

3N. STORAGE BATTERIES: The Contractor shall maintain all batteries in accordance with Paragraph 5.0 of the PWS.

TYPE

8D-1000

QUANTITY

DESCRIPTION

DELUGE PUMPS

LOCATION/BLDG

S03

BATT-5R

Recharge

Ni-MH

2
Maintenance Control Active Shooter Kit
S10

12V N.C.

2
GULF STRIKE TEAM ALARM
S50, S51

12V N.C.

8
HANGAR ALARMS
S05

BATT-5R

Recharge

Ni-MH

2
COMMCEN(ODO)-Active

Shooter Kit

SO5

12V N.C.

2
SUPPLY ALARM
S04

BATT-5R

Recharge

Ni-MH

2
Front Gate-Active Shooter Kit
S13

12V N.C.

2
MEDICAL ALARM
S24

12V N.C.

2
ADMIN ALARM
S16

12V N.C.

6
BEQ/BOQ ALARMS
S25

BATT-5R

Recharge

Ni-MH

2
JOOD-Active Shooter Kit
S25

12V N.C.

6
FTS ALARMS
S32

12V N.C.

6
AVIONICS ALARMS
S55

12V

1
WEAPONS INTRUSION SYS
S55

12V N.C.

2
COMPOSITE SHOP ALARM
S18

12V N.C.

10
CGES ALARMS
S36

BATT-5R

Recharge

Ni-MH

2
Maintenance Control Active Shooter Kit
S62

12V

8D

EMPIRE PORTABLE GENERATOR SET #1

12V
4D
1
EMPIRE PORTABLE GENERATOR SET #2
12V
4D
1
EMPIRE PORTABLE GENERATOR SET #3

6V HD 6 ELECTRIC CUSHMANS

TE 3 – 3N- 1

CONT’D

TYPE QUANTITY DESCRIPTION LOCATION/BLDG

GROUP 24 12V 31 GENERATORS FOR MAIN GATE, MEDICAL, BEQ/BOQ, AVIONICS, IRM/CREDIT UNION, CARTS, TRACTORS, & DOT VEHICLES, Wilks Hall.

12V N.C.APPROX. 60EMERGENCY LIGHTS
6V N.C.(SOME CONTAIN TWO BATTERIES
4V N.C.AND OTHERS ONE)

ASSORTMENT

OF BATTERIES APPROX. 95 EXIT LIGHTS

Note: N.C. denotes nickel cadmium.

TE 3 – 3N- 2

File details come from the government source that posted it. Updated .