Technical Evaluation Factor_ISWM.pdf

PDF 155 KB Posted

Attached to
Integrated Solid Waste Management for Hill AFB
Solicitation number
FA820126Q0026
Issued by

About this file

This is a Source Selection Information document—specifically a technical evaluation form for an Integrated Solid Waste Management (ISWM) Service Contract. The document is a blank template for evaluating contractor proposals against established minimum criteria across three technical sub-factors.

The evaluation form assesses proposals on three primary technical sub-factors: Work Plan, Standards, and Capability. The Work Plan sub-factor requires contractors to describe labor and supervision, equipment and materials, work accomplishment approach, inspection schedules, refuse disposal procedures, and safety protocols for government property and personnel. The Standards sub-factor evaluates the contractor's capability to perform to contract standards, local, state, and federal regulations, with emphasis on safety, sanitation, and customer service. The Capability sub-factor assesses the contractor's ability to provide required containers, compactors, equipment, storage, emergency services, special events management, recyclable materials handling, maintenance, and personal protective equipment (PPE). Each sub-factor contains evaluation criteria marked as either "Acceptable" or "Unacceptable," with space for evaluator comments explaining the rationale and proposal location references. The evaluator, Anna M. Robinson, must sign the completed form and provide general comments. The document references FAR clauses 52.212-1 and 52.212-2 for commercial item evaluation factors and a Performance Work Statement dated 4 June 2026 as the basis for evaluation criteria.

View the file

Other files

File Type Posted
Food Waste Pilot 2022.xlsx XLSX spreadsheet
Combo - Refuse 7 Aug 2026.pdf PDF
Solicitation Q and A - Refuse 7 Aug 2026.pdf PDF
Compactor Use.xlsx XLSX spreadsheet
Solicitation Amendment FA820126Q00260003 SF 30.pdf PDF
Final ISWM HillAFB PWS Refuse FY27 5 Aug 26.pdf PDF
Roll off pulls.xlsx XLSX spreadsheet
Technical Evaluation Factor_ISWM.pdf PDF
Attachment III - Addendum to FAR 52.212-1.pdf PDF
Site Visit Letter.pdf PDF
Refuse Site visit minutes.pdf PDF
WD 2015-5483 Rev 29.txt TXT text file
Solicitation Amendment FA820126Q00260002 SF 30.pdf PDF
Combo - Refuse 28 July 26.pdf PDF
Solicitation Q and A - Refuse 28 July 2026.pdf PDF
Container Condition Checklist.xlsx XLSX spreadsheet
Container Placement.xlsx XLSX spreadsheet
Solicitation Q and A - Refuse 23 July 2026.pdf PDF
Solicitation Q and A - Refuse 14 July 2026.pdf PDF
Solicitation Amendment FA820126Q00260001 SF 30.pdf PDF
Combo - Refuse 14 July 26.pdf PDF
Site Visit Letter.pdf PDF
Site Visit Registration Form.xlsx XLSX spreadsheet
Solicitation Q and A - Refuse.pdf PDF
Final ISWM HillAFB PWS Refuse FY27 23 Jun 26.pdf PDF
Solicitation - FA820126Q0026.pdf PDF
Combo - Refuse.pdf PDF
Attachment III - Addendum to FAR 52.212-1.pdf PDF
Attachment IV - Addendum to FAR 52.212-2.pdf PDF
WD 2015-5483 Rev 28.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR OFFICIAL USE ONLY

SOURCE SELECTION INFORMATION - SEE FAR 2.101 AND 3.104 for

Integrated Solid Waste Management (ISWM) Service Contract

Contractor: Name of Evaluator: Anna Robinson

Volume I - Technical Acceptability

Factor One: Technical Sub-Factor One: Work Plan - Minimum criteria is met when the proposal included the following as required in FAR 52.212-1 paragraph 3.2.1.1, FAR 52.212-2 paragraph 2.2.1, and the PWS dated 4 June 2026 paragraph 1, 2, 3, and 4 with all subparagraphs:

Acceptable

Unacceptable

Why: Where in the Proposal (i.e. page, paragraph, throughout, etc.)?

OR

Why Not: What part of FAR 52.212-1 - Instruction to Offeror (ITO) - Addendum, FAR 52.212-2 Evaluation - Commercial Item Evaluation Factors for Award Addendum, PWS, etc. did the proposal not fully address?

A. Describes the labor, including supervision. Describes the equipment, tools, materials, and vehicles. Describes the other equipment, items, and services it will provide to adequately meet contract requirements.

Comments:

B. Describes approach to accomplishing the work, including processes, schedules, frequency of inspections, and proper disposal of all refuse. Describes the plan to ensure the safety of Government property and personnel as well as contractor employees.

C. Indicates an adequate understanding of the requirements. Provides convincing rationale how their approach will meet all the essential requirements with little potential for schedule disruption, increased cost, or degradation of performance.

Comments:

Sub-Factor Two: Standards - Minimum criteria is met when the proposal included the following as required in FAR 52.212-1 paragraph 3.2.1.2, FAR 52.212-2 paragraph 2.2.2, and the PWS dated 4 June 2026 paragraphs 1, 2, 3, and 4 with all subparagraphs:

OR

Why Not: What part of FAR 52.212-1 - Instruction to Offeror (ITO) - Addendum, FAR 52.212-2 Evaluation - Commercial Item Evaluation Factors for Award Addendum, PWS, etc. did the proposal not fully address?

A. Describes the capability to perform to the standards in the contract as well as local, state, and federal regulations and others as describes in the PWS paragraph 1. Has focus on safety, sanitation, and customer service.

B. Indicates an adequate understanding of the requirements. Provides convincing rationale how their approach will meet all the essential requirements with little potential for schedule disruption, increased cost, or degradation of performance.

Comments:

Sub-Factor Three: Capability - Minimum criteria is met when the proposal included the following as required in FAR 52.212-1 paragraph 3.2.1.3, FAR 52.212-2 paragraph 2.2.3, and the PWS dated 4 June 2026 paragraphs 1, 2, 3, and 4 with all subparagraphs:

OR

Why Not: What part of FAR 52.212-1 - Instruction to Offeror (ITO) - Addendum, FAR 52.212-2 Evaluation - Commercial Item Evaluation Factors for Award Addendum, PWS, etc. did the proposal not fully address?

A. Lists and describes its capability to provide: all required types of containers, compactors, or other equipment; storage;

emergency services; and special events.

Comments:

B. Lists and describes its capability to: handle recyclable materials; perform maintenance; and provide personal protective equipment (PPE) to adequately service the installations.

Comments:

C. Indicates an adequate understanding of the requirements. Provides convincing rationale how their approach will meet all the essential requirements with little potential for schedule disruption, increased cost, or degradation of performance.

Evaluator Signature: Anna M. Robinson Acceptable Unacceptable Comments in general:

FOR OFFICIAL USE ONLY

SOURCE SELECTION INFORMATION – SEE FAR 2.101 AND 3.104

PERSONAL PROTECTIVE CLOTHING

File details come from the government source that posted it. Updated .