Technical Evaluation Factor_ISWM.pdf

PDF 152 KB Posted

Attached to
Integrated Solid Waste Management for Hill AFB
Solicitation number
FA820126Q0026
Issued by

About this file

This is a source selection evaluation document for an Integrated Solid Waste Management (ISWM) Service Contract, completed by evaluator Anna M. Robinson under FAR 2.101 and 3.104 guidelines for source selection information.

The evaluation template addresses Volume I - Technical Acceptability across three main factors. Factor One: Technical Work Plan requires proposals to describe labor and supervision, equipment, tools, materials, vehicles, and other services necessary to meet contract requirements; outline the approach to accomplishing work including processes, schedules, inspection frequency, and refuse disposal procedures; and demonstrate adequate understanding of requirements with convincing rationale for meeting essential requirements without schedule disruption or cost increases. Factor Two: Standards requires contractors to describe capability to perform to contract standards and comply with local, state, and federal regulations as specified in the Performance Work Statement dated 5 August 2026, with emphasis on safety, sanitation, and customer service. Factor Three: Capability requires contractors to list and describe capability to provide required containers, compactors, equipment, storage, emergency services, and special event services; handle recyclable materials, perform maintenance, and provide personal protective equipment; and demonstrate adequate understanding of requirements with convincing rationale for meeting essential requirements. Each evaluation criterion is structured with separate checkboxes for Acceptable and Unacceptable determinations, with designated spaces for evaluator comments explaining the location in the proposal where criteria are addressed or identifying which FAR provisions or PWS paragraphs were not adequately addressed.

View the file

Other files

File Type Posted
Food Waste Pilot 2022.xlsx XLSX spreadsheet
Solicitation Q and A - Refuse 7 Aug 2026.pdf PDF
Compactor Use.xlsx XLSX spreadsheet
Solicitation Amendment FA820126Q00260003 SF 30.pdf PDF
Combo - Refuse 7 Aug 2026.pdf PDF
Final ISWM HillAFB PWS Refuse FY27 5 Aug 26.pdf PDF
Roll off pulls.xlsx XLSX spreadsheet
Attachment III - Addendum to FAR 52.212-1.pdf PDF
Site Visit Letter.pdf PDF
Refuse Site visit minutes.pdf PDF
WD 2015-5483 Rev 29.txt TXT text file
Solicitation Amendment FA820126Q00260002 SF 30.pdf PDF
Combo - Refuse 28 July 26.pdf PDF
Solicitation Q and A - Refuse 28 July 2026.pdf PDF
Container Condition Checklist.xlsx XLSX spreadsheet
Container Placement.xlsx XLSX spreadsheet
Solicitation Q and A - Refuse 23 July 2026.pdf PDF
Solicitation Amendment FA820126Q00260001 SF 30.pdf PDF
Combo - Refuse 14 July 26.pdf PDF
Site Visit Letter.pdf PDF
Solicitation Q and A - Refuse 14 July 2026.pdf PDF
Site Visit Registration Form.xlsx XLSX spreadsheet
Solicitation Q and A - Refuse.pdf PDF
Final ISWM HillAFB PWS Refuse FY27 23 Jun 26.pdf PDF
Solicitation - FA820126Q0026.pdf PDF
Combo - Refuse.pdf PDF
Technical Evaluation Factor_ISWM.pdf PDF
Attachment III - Addendum to FAR 52.212-1.pdf PDF
Attachment IV - Addendum to FAR 52.212-2.pdf PDF
WD 2015-5483 Rev 28.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR OFFICIAL USE ONLY

SOURCE SELECTION INFORMATION - SEE FAR 2.101 AND 3.104 for

Integrated Solid Waste Management (ISWM) Service Contract

Contractor: Name of Evaluator: Anna Robinson

Volume I - Technical Acceptability

Factor One: Technical

Sub-Factor One: Work Plan - Minimum criteria is met when the proposal included the following as required in

FAR 52.212-1 paragraph 3.2.1.1, FAR 52.212-2 paragraph 2.2.1, and the PWS dated 5 August 2026 paragraph 1, 2, 3, and 4 with all subparagraphs:

Acceptable

Unacceptable

Why: Where in the Proposal (i.e. page, paragraph, throughout, etc.)?

OR

Why Not: What part of FAR 52.212-1 - Instruction to Offeror (ITO) - Addendum, FAR 52.212-2

Evaluation - Commercial Item Evaluation Factors for Award Addendum, PWS, etc. did the proposal not fully address?

A. Describes the labor, including supervision. Describes the equipment, tools, materials, and vehicles. Describes the other equipment, items, and services it will provide to adequately meet contract requirements.

Comments:

B. Describes approach to accomplishing the work, including processes, schedules, frequency of inspections, and proper disposal of all refuse. Describes the plan to ensure the safety of Government property and personnel as well as contractor employees.

C. Indicates an adequate understanding of the requirements. Provides convincing rationale how their approach will meet all the essential requirements with little potential for schedule disruption, increased cost, or degradation of performance.

Comments:

Sub-Factor Two: Standards - Minimum criteria is met when the proposal included the following as required in

FAR 52.212-1 paragraph 3.2.1.2, FAR 52.212-2 paragraph 2.2.2, and the PWS dated 5 August 2026 paragraphs 1, 2, 3, and 4 with all subparagraphs:

OR

Why Not: What part of FAR 52.212-1 - Instruction to Offeror (ITO) - Addendum, FAR 52.212-2

Evaluation - Commercial Item Evaluation Factors for Award Addendum, PWS, etc. did the proposal not fully address?

A. Describes the capability to perform to the standards in the contract as well as local, state, and federal regulations and others as describes in the PWS paragraph 1. Has focus on safety, sanitation, and customer service.

B. Indicates an adequate understanding of the requirements. Provides convincing rationale how their approach will meet all the essential requirements with little potential for schedule disruption, increased cost, or degradation of performance.

Comments:

Sub-Factor Three: Capability - Minimum criteria is met when the proposal included the following as required in

FAR 52.212-1 paragraph 3.2.1.3, FAR 52.212-2 paragraph 2.2.3, and the PWS dated 5 August 2026 paragraphs 1, 2, 3, and 4 with all subparagraphs:

OR

Why Not: What part of FAR 52.212-1 - Instruction to Offeror (ITO) - Addendum, FAR 52.212-2

Evaluation - Commercial Item Evaluation Factors for Award Addendum, PWS, etc. did the proposal not fully address?

A. Lists and describes its capability to provide: all required types of containers, compactors, or other equipment; storage;

emergency services; and special events.

Comments:

B. Lists and describes its capability to: handle recyclable materials; perform maintenance; and provide personal protective equipment (PPE) to adequately service the installations.

Comments:

C. Indicates an adequate understanding of the requirements. Provides convincing rationale how their approach will meet all the essential requirements with little potential for schedule disruption, increased cost, or degradation of performance.

Evaluator Signature: Anna M. Robinson Acceptable Unacceptable Comments in general: