TE-C PRS.pdf

PDF 127 KB Posted

Attached to
Amendment -0003 HVAC Chemical Water Treatment Service
Solicitation number
W9115122Q0001
Issued by

About this file

This document contains a federal contract opportunity solicitation and related technical performance requirements summary. The Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood is soliciting proposals for a firm fixed price contract to provide Heating, Ventilation, Air Conditioning (HVAC) Chemical water treatment services at Fort Hood, Texas. The requirement includes a one year base period and four one-year option periods. The North American Industry Classification System (NAICS) code for this 100% small business set aside is 325998. Interested parties must register in the System for Award Management and Online Representations and Certifications Application to be eligible for award. The performance work statement and technical exhibits describe the service requirements. Proposals are due by November 17, 2021 and contract performance is expected to begin on January 1, 2022.

View the file

Other files

File Type Posted
W9115122Q0001_HVAC Chemical_Site Visit sign-in Sheet.pdf PDF
Amendment 0003 W9115122Q0001 HVAC Chemicals.pdf PDF
Govt Response to RFI from Industry W9115122Q0001 HVAC Chemical Svc_09Nov2021.pdf PDF
Govt Response to RFI from Industry W9115122Q0001 HVAC Chemical Svc.pdf PDF
Attachment 8- Other Components_Revised _04Nov2021.xlsx XLSX spreadsheet
TE -A PWS Chemical Water Service_Revised 04Nov21.pdf PDF
TE- F Make-up Chemicals_revised_04Nov2021.xlsx XLSX spreadsheet
Attachment 4- HVAC System Inventory_Revised_04Nov21.xlsx XLSX spreadsheet
Amendment-0002 W9115122Q0001.pdf PDF
Attachment-11 HVAC Chemical Site Visit Slide.pptx PPTX presentation
Amendment-0001 W9115122Q0001.pdf PDF
Attachment 1- Fort Hood Main Cantonment Map.pdf PDF
TE-F Make-up Chemicals.xlsx XLSX spreadsheet
TE-A PWS HVAC Chemical Water.pdf PDF
Attachment 3- West Fort Hood Cantonment Map.pdf PDF
SolicitationW9115122Q0001 HVAC Chemical Service.pdf PDF
Attachment 10- Contractor Yard Site Map.pdf PDF
TE-E Surveillance Checklist.xlsx XLSX spreadsheet
TE-G Utilities Sales Agreement.pdf PDF
Attachment 2- North Fort Hood Cantonment Map.pdf PDF
TE-H Glycol Chill Water Loops.pdf PDF
TE-D Joint Inspection.pdf PDF
Attachment 5- System Manufactures.xlsx XLSX spreadsheet
Attachment 7- Water quality report.pdf PDF
Attachment 9- Wage Determination 2015-5237 _21JUL21.pdf PDF
TE-B Deliverables.pdf PDF
Attachment 6- Green Chemical.docx DOCX document
Attachment 4- HVAC System Inventory_14Oct20.xlsx XLSX spreadsheet
Attachment 8- Other Components.xlsx XLSX spreadsheet
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Exhibit- C PRS

6.0 Performance Requirements Summary (PRS) Matrix.

Performance Requirements Summary (PRS) Table. The PRS that follows provides the following information.

1. Performance Objective. Brief description of the standards for the respective “Required Service”.

2. Performance Standard. Contains the standards that each contract requirement shall meet or exceed.

3.Performance Threshold (AQL) The minimum allowable deviation from perfect performance. This quantity is found by multiplying the number of services provided by the designated AQL percentage. Rejections exceeding this quantity may result in payment deduction. Amount of deviation from 100% compliance that is acceptable.

4. Method of Surveillance. Sets forth the primary surveillance methods that the Government will use to evaluate the Contractor’s performance in meeting the contract requirements. Definition of the lot used as the basis for surveillance or for payment computation purposes is also included in this column.

Performance Objective

PERFORMANCE

STANDARD

Performance Threshold AQL

METHOD OF

SURVEILLANCE

Data Requirements and Coordination

TE- C,D, E. PWS, 1.13,

1.17, 1.28, Part 5 of PWS

Contract Data submission and Coordination requirements shall be performed in accordance with PWS.

96% Deviation Random Sampling, 100% Inspection, Customer Input, Periodic Inspection

Boiler water Loops of Hot Water boilers Analysis and Treatment PWS Part 5 Specific Task, Technical exhibits, and Attachments

All required service is performed IAW the approved schedule, Attachments, Technical Exhibits and PWS.

96% Deviation Random Sampling, 100% Inspection, Customer Input, Periodic Inspection

Chiller Water Loop Analysis and Treatment PWS Part 5 Specific Task, Technical exhibits, and Attachments

All required service is performed within the specified time requirements, Attachments, Technical Exhibits and PWS.

96% Deviation Random Sampling, 100% Inspection, Customer Input, Periodic Inspection

Cooling Tower Analysis and Treatment PWS Part 5 Specific Task, Technical exhibits, and Attachments

Contractor shall perform work in accordance with the specified time requirements, Attachments, Technical Exhibits and PWS.

96% Deviation Random Sampling, 100% Inspection, Customer Input, Periodic Inspection

Note: Government surveillance of contractor performance is not limited to the Performance Objectives as outlined in this PRS. The government reserves the right to conduct compliance surveillance of any contractual

File details come from the government source that posted it. Updated .