SolicitationW9115122Q0001 HVAC Chemical Service.pdf
PDF 896 KB Posted
- Solicitation number
- W9115122Q0001
About this file
This document is an amendment to a solicitation for Heating, Ventilation, Air Conditioning (HVAC) Chemical water treatment services at Fort Hood, Texas. The Mission and Installation Contracting Command (MICC) - Fort Hood is seeking these services through a firm fixed price contract for a base year plus four option years. The requirement is 100% set aside for small businesses with a NAICS code of 325998 and size standard of 500 employees. Interested parties must register in the System for Award Management and Online Representations and Certifications Application to be eligible for award. The point of contacts are provided. The period of performance is projected to commence on January 1, 2022. The amendment provides additional details on the solicitation number, requirement description, and instructions for accessing technical exhibits and attachments through the Federal Search of Contract Opportunities website. The quote due date is November 17, 2021.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W9115122Q0001 18-Oct-2021
b. TELEPHONE NUMBER
(254) 287-4103
8. OFFER DUE DATE/LOCAL TIME
01:00 PM 17 Nov 2021
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W911519. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
MARK GREEN
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
MICC - FORT HOOD_6
MISSION CONTRACTING OFFICE (MCO)
36000 DARNALL LOOP, ROOM 1300B
FORT HOOD TX 76544-5025
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE W45NQ9 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
W0VC ENGR R U ACT
W0VC ENGR R U ACT
4408 BLDG 4408 78TH ST AT SANTA FE
IMWE HOD PWB SUPPLY
FORT HOOD TX 76544-5027
TEL: 254-287-9254 FAX:
254-288-3617FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
NAICS:
325998
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF102
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W9115122Q0001
Section SF 30 - BLOCK 14 CONTINUATION PAGE
SOLICIATION CONTRACT NOTE
In accordance with Federal Acquisition Regulation (FAR) 52.232-18 Availability of Funds and AFARS 5132.702 Contract Funding Policy, funds are not presently available for this acquisition. No contract award will be made until appropriated funds are made available.
Section SF 1449 - CONTINUATION SHEET
ADDENDUM FAR 52.212-1
ADDENDUM TO 52.212-1-INSTRUCTIONS TO OFFERORS
Instructions to Offerors---Commercial items
VOLUME -1 GENERAL: The following paragraphs below have either been amended or deleted from the basic provision FAR 52.212-1:
North American Industry Classification System (NAICS) code and small business size standard:
The NAICS code is 325998 and the Size standards in number of employees is 500. The NAICS code shall be on the Offerors System for Award Management profile https://www.sam.gov before the quote can be accepted.
Period for acceptance of offers. The offeror agrees to hold the prices in its offer firm for 120 calendar days from the date specified for receipt of offers, unless another time period is specified in an addendum to the solicitation.
Site Visit. An organized site visit has been scheduled for 25 October 2021 at 10:00 a.m. CDT. The Government will conduct a site visit at BLDG 39043, Fort Hood, Texas. No question will be allowed or addressed during the Site visit. Offeror’s must submit notification email no later than 22 October 2021, 4:30P.M. CDT to the Contracting Specialist Mark C. Green at email: mark.c.green.civ@army.mil and the Contracting Officer and Mrs.
Madge Lewis at email: madge.a.lewis2.civ@army.mil with the names and position titles of representatives attending the site visit. Offeror’s should reach out to the Fort Hood Visitor's Center Information, Marvin Leath Visitor's Welcome Center Hours of Operation: 5:00 a.m. - 9:00 p.m. daily. Marvin Leath Visitors Center is located just off Interstate 14 (U.S. Hwy. 190) on T.J Mills Blvd Building 69012, adjacent to Fort Hood Main Gate. The Visitor Center provides visitor access passes for non-DoD ID card holders, AIE registration services, and Fort Hood firearms registration services. You can always get more information by calling the Marvin Leath visitor center at
(254) 287-9909.
Request for Information (RFI): Technical questions are not official unless received in written format. If offerors have any questions concerning this solicitation, offerors must submit questions in the form of an RFI via email to Mark C. Green at email: mark.c.green.civ@army.mil and Mrs. Madge Lewis at email: madge.a.lewis2.civ@army.mil by 01 November 2021, 4:30 P.M. CDT, to reasonably expect a response from the Government on or about 04 November 2021.
The Contract Specialist and the Contracting Officer is the offeror’s only authorized source of information on questions related to this solicitation. The Contract Specialist for this requirement is Mark C. Green at email:
mark.c.green.civ@army.mil. The Contracting Officer is Mrs. Madge Lewis, her email address is madge.a.lewis2.civ@army.mil.
A quote shall be submitted prior to the closing date specified in block 8 of the SF1449 by ( 17 November 2021 at 01:00 PM CDT). Quotation shall be submitted by email to the contract specialist Mark C. Green at mark.c.green.civ@army.mil and the contracting Officer, Mrs. Madge Lewis at madge.a.lewis2.civ@army.mil, the email file size shall not exceed 10 Megabyte (MB).
THE OFFEROR SHALL ENSURE THAT THE QUOTE CONTAINS ALL THE COMPLETED
DOCUMENTS LISTED BELOW:
1. Completed and signed SF1449 ( Pg.1) coversheet, and all solicitation amendments.
a. Completed Schedule (Supplies or Services and Prices) for all Item Numbers indicated on the SF 1449.
Offeror shall apply pricing for each line items for the base year and including four (4) one (1) year option period(s) in their entirety. Offeror shall submit a price for each CLIN (0001 to 4004) with total amount. The offerors prices shall be provided in increments of whole numbers with total amount. Failure to provide pricing for each CLIN on this RFQ shall render their offer as deficient and may not be considered for award.
b. Completed FAR Provision 52.212-3 (Offeror Representations and Certifications Application (ORCA) –
Commercial Items), or a statement from the offeror that the ORCA was completed in the System for Award Management (SAM) web-site at https://www.sam.gov.
c. The Solicitation can be accessed through the website at beta SAM https://sam.gov/content/opportunities.
Offeror’s quotation submission package shall not exceed 10 Megabytes (MB)
VOLUME- 2 PRICE:
Award will be made to the offerors whose quote(s) represents the lowest priced technically acceptable quotes that is responsible and technically acceptable in accordance with the terms and condition of the solicitation. The Contract Line Item Number (CLIN) Schedule shall be submitted fully completed and error free. Provide unit price, CLIN total amount and the proposed estimated contract total amount. The offeror’s prices shall be provided in increments of whole numbers.
VOLUME -3 TECHNICAL APPROACH:
Prepare the Technical Approach in a form consistent with the Performance Work Statement (PWS) and the evaluation criteria for award set forth in FAR 52.212-2 of this solicitation. The section shall be prepared in an orderly format and in sufficient detail to enable the Government to make a thorough evaluation of the offeror’s technical competence and ability to comply with the contract task requirements specified in the PWS Part Five (5) specific tasks. Failure to provide a completed offer shall render your quote as deficient and may not be considered and may not form the basis for award.
See below table A-1 to show rating and description of how capabilities will be evaluated.
Table A-1 TECHNICAL APPROACH: ACCEPTABLE / UNACCEPTABLE RATINGS
Rating Description
Acceptable Quotation clearly meets the minimum requirements of the solicitation
Unacceptable Quotation does not meeting the minimum requirements of the solicitation
Key Personnel:
Submit resumes, certificate and other relevant training documents of the Offeror’s qualified personnel. The (Program Manager, Quality Control Manager, and Lead Technician each shall meet the minimum of ten (10) year experience in HVAC Chemical Field In Accordance With (IAW) the P.W.S. The lead technician shall be certified and licensed to perform all work on all manufacturer’s equipment listed in Attachment 4- HVAC System Inventory and Attachment 5- System manufactures in this solicitation. It is the offerors’ responsibility to ensure that all documents and any other information relevant to the quotation are received by the contracting office prior to closing date and time of this solicitation. The Request for Quotation requirements are considered material to the needs of the Government, and a Quotation that fails to conform to such material terms may not be considered and may not form the basis for award.
a. Prepare the Technical Approach in a form consistent with the Performance Work Statement (PWS) and the evaluation criteria for award set forth in FAR 52.212-2 of this solicitation. The section shall be prepared in an orderly format and in sufficient detail to enable the Government to make a thorough evaluation of the offeror’s technical competence and ability to comply with the contract task requirements specified in the PWS section five (5) specific task. The offeror shall address as specifically as possible the actual methodology you would use for accomplishing the PWS tasks
b. All Key personnel shall demonstrate a minimum of ten (10) years of experience in the HVAC Chemical Water Treatment industry. This evaluation factor measures experience successful future performance.
c. The Technical Approach will receive one of the adjectival ratings defined below. The ratings will be used to determine an overall rating for the technical approach. Any technical approach that meets the minimum requirement of the solicitation will result in a rating of acceptable. Any Technical Approach that receives an unacceptable rating will result in an overall unacceptable rating for the Technical capability and may not be eligible for contract award.
VOLUME- 4 PAST PERFORMANCE:
Request offerors to submit a list of two (2) to three (3) Government and non-Government contract references (including contract number, type, and dollar value; place of performance; date of award; whether performance is on-going or completed; extent of subcontracting; and the names, phone numbers, and e-mail addresses of at least two points of contacts for each contract) The Past Performance evaluation will assess the offeror’s probability of meeting the solicitation’s requirements as indicated by that offeror’s record of past performance. The offeror’s Past Performance is assessed to evaluate aspects of the offeror’s recent past performance and focusing on performance that is relevant to the services being procured under this solicitation. The Government will obtain Past performance information from any other sources available to the Government, to include, but not limited to, the Past Performance Information Retrieval System (PPIRS), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), or other databases; interviews with Program Managers, Contracting Officers, and the Defense Contract Management Agency. Those offerors proof of success completion of all relevant work as outlined in this solicitation shall be forward to Contract Specialist, Mark Green, via email (mark.c.green.civ@army.mil) and Contracting Officer Madge (Angie) Lewis via email madge.a.lewis2.civ@army.mil. Those offerors proof of success completion of all relevant work as outlined in this solicitation will not to exceed three (3) pages.
a. Recency Assessment – To be recent, the effort must be ongoing or must have been Performed during the last three (3) years from the date of the issuance of this solicitation.
b. Relevancy Assessment – To be relevant, the effort must be of similar nature of work, size, and complexity.
See below table A-2 to show rating and description of how Past Performance will be evaluated.
TABLE A-2 PAST PERFORMANCE ACCEPTABLE / UNACCEPTABLE RATINGS
Rating Description
Acceptable
Based on the vendor’s performance record for the last three (3) years, the Government has a reasonable expectation that the vendor will successfully perform the required effort, or the vendor’s performance record is unknown.
Unacceptable
Based on the Vendor’s performance record for the last three (3) years, the Government has no reasonable expectation that the vendor will be able to successfully perform the required effort.
Neutral If the offeror has no relevant past performance, the Offerors Quote will be rated as “Neutral”.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 12 Months Hot Water Boiler Loop
FFP
The Contractor shall provide personnel, management, equipment, tools, supplies, and transportation to perform heating, ventilation, and air conditioning chemical water treatment service to the standards and specifications IAW the PWS.Section
5.0 thru 5.14.
FOB: Destination
PSC CD: J045
NET AMT
0002 12 Months Chill Water Loop
FFP
The Contractor shall provide personnel, management, equipment, tools, supplies, and transportation to perform heating, ventilation, and air conditioning chemical water treatment service to the standards and specifications IAW the PWS.Section
5.0 thru 5.14.
0003 12 Months Cooling Towers Loop
FFP
The Contractor shall provide personnel, management, equipment, tools, supplies, and transportation to perform heating, ventilation, and air conditioning chemical water treatment service to the standards and specifications IAW the PWS.Section
5.0 thru 5.14.
0004 1 Job Make-up Chemicals
FFP
Description of Services/Introduction: The contractor shall furnish all materials required to perform all work as set forth in PWS. Para 3.4. The Contractor shall price each component as listed on Technical Exhibit -F. Pricing shall reflect the total cost for chemical and parts for a period of 12 months.
0005 1 Job Freeze Protection
FFP
The contractor shall provide personnel, management, equipment, tools, supplies, and transportation to perform heating, ventilation, and air conditioning chemical water treatment service IAW PWS 5.3.3.5. Services shall be performed during November thru March.
1001 12 Months OPTION Hot Water Boiler Loop
FFP
The Contractor shall provide personnel, management, equipment, tools, supplies, and transportation to perform heating, ventilation, and air conditioning chemical water treatment service to the standards and specifications IAW the PWS.Section
5.0 thru 5.14.
1002 12 Months OPTION Chill Water Loop
FFP
The Contractor shall provide personnel, management, equipment, tools, supplies, and transportation to perform heating, ventilation, and air conditioning chemical water treatment service to the standards and specifications IAW the PWS.Section
5.0 thru 5.14.
1003 12 Months OPTION Cooling Towers Loop
FFP
The Contractor shall provide personnel, management, equipment, tools, supplies, and transportation to perform heating, ventilation, and air conditioning chemical water treatment service to the standards and specifications IAW the PWS.Section
5.0 thru 5.14.
1004 1 Job OPTION Make-up Chemicals
FFP
Description of Services/Introduction: The contractor shall furnish all materials required to perform all work as set forth in PWS. Para 3.4. The Contractor shall price each component as listed on Technical Exhibit -F. Pricing shall reflect the total cost for chemical and parts for a period of 12 months.
1005 1 Job OPTION Freeze Protection
FFP
The contractor shall provide personnel, management, equipment, tools, supplies, and transportation to perform heating, ventilation, and air conditioning chemical water treatment service IAW PWS 5.3.3.5. Services shall be performed during November thru March.
2001 12 Months OPTION Hot Water Boiler Loop
FFP
The Contractor shall provide personnel, management, equipment, tools, supplies, and transportation to perform heating, ventilation, and air conditioning chemical water treatment service to the standards and specifications IAW the PWS.Section
5.0 thru 5.14.
2002 12 Months OPTION Chill Water Loop
FFP
The Contractor shall provide personnel, management, equipment, tools, supplies, and transportation to perform heating, ventilation, and air conditioning chemical water treatment service to the standards and specifications IAW the PWS.Section
5.0 thru 5.14.
2003 12 Months OPTION Cooling Towers Loop
FFP
The Contractor shall provide personnel, management, equipment, tools, supplies, and transportation to perform heating, ventilation, and air conditioning chemical water treatment service to the standards and specifications IAW the PWS.Section
5.0 thru 5.14.
2004 1 Job OPTION Make-up Chemicals
FFP
Description of Services/Introduction: The contractor shall furnish all materials required to perform all work as set forth in PWS. Para 3.4. The Contractor shall price each component as listed on Technical Exhibit -F. Pricing shall reflect the total cost for chemical and parts for a period of 12 months.
2005 1 Job OPTION Freeze Protection
FFP
The contractor shall provide personnel, management, equipment, tools, supplies, and transportation to perform heating, ventilation, and air conditioning chemical water treatment service IAW PWS 5.3.3.5. Services shall be performed during November thru March.
3001 12 Months OPTION Hot Water Boiler Loop
FFP
The Contractor shall provide personnel, management, equipment, tools, supplies, and transportation to perform heating, ventilation, and air conditioning chemical water treatment service to the standards and specifications IAW the PWS.Section
5.0 thru 5.14.
3002 12 Months OPTION Chill Water Loop
FFP
The Contractor shall provide personnel, management, equipment, tools, supplies, and transportation to perform heating, ventilation, and air conditioning chemical water treatment service to the standards and specifications IAW the PWS.Section
5.0 thru 5.14.
3003 12 Months OPTION Cooling Towers Loop
FFP
The Contractor shall provide personnel, management, equipment, tools, supplies, and transportation to perform heating, ventilation, and air conditioning chemical water treatment service to the standards and specifications IAW the PWS.Section
5.0 thru 5.14.
3004 1 Job OPTION Make-up Chemicals
FFP
Description of Services/Introduction: The contractor shall furnish all materials required to perform all work as set forth in PWS. Para 3.4. The Contractor shall price each component as listed on Technical Exhibit -F. Pricing shall reflect the total cost for chemical and parts for a period of 12 months.
3005 1 Job OPTION Freeze Protection
FFP
The contractor shall provide personnel, management, equipment, tools, supplies, and transportation to perform heating, ventilation, and air conditioning chemical water treatment service IAW PWS 5.3.3.5. Services shall be performed during November thru March.
4001 12 Months OPTION Hot Water Boiler Loop
FFP
The Contractor shall provide personnel, management, equipment, tools, supplies, and transportation to perform heating, ventilation, and air conditioning chemical water treatment service to the standards and specifications IAW the PWS.Section
5.0 thru 5.14.
4002 12 Months OPTION Chill Water Loop
FFP
Description of Services/Introduction: The Contractor shall provide personnel, management, equipment, tools, parts, supplies, and transportation to perform heating, ventilation, and air conditioning chemical water treatment service at Fort Hood, Texas. The Contractor shall perform to the standards and specifications IAW the PWS.Section 5.0 thru 5.14.
4003 12 Months OPTION Cooling Towers Loop
FFP
The Contractor shall provide personnel, management, equipment, tools, supplies, and transportation to perform heating, ventilation, and air conditioning chemical water treatment service to the standards and specifications IAW the PWS.Section
5.0 thru 5.14.
4004 1 Job OPTION Make-up Chemicals
FFP
Description of Services/Introduction: The contractor shall furnish all materials required to perform all work as set forth in PWS. Para 3.4. The Contractor shall price each component as listed on Technical Exhibit -F. Pricing shall reflect the total cost for chemical and parts for a period of 12 months.
4005 1 Job OPTION Freeze Protection
FFP
The contractor shall provide personnel, management, equipment, tools, supplies, and transportation to perform heating, ventilation, and air conditioning chemical water treatment service IAW PWS 5.3.3.5. Services shall be performed during November thru March.
PERFORMANCE WORK STATEMENT
Performance Work Statement HVAC Chemical Water Treatment Service
Fort Hood, Texas 05 October 2021
TABLE OF CONTENTS
PART 1- GENERAL INFORMATION
1. GENERAL
1.1. Description of Services/Introduction
1.2. Background
1.3. Objectives
1.4. Scope
1.5. General Information
1.6. Security Requirements
1.7. Disclosure of Information
1.8. Key Control
1.9. Access to Secure Areas
1.10. Area Check-Out
1.11. Safety Standards
1.12. Safety Plan
1.13. Accident Reporting
1.14. Safety Measures
1.15. Stop Work
1.16. Interface with Government Operations
1.17. Damage Reports
1.18. Energy Conservation
1.19. Fraud, Waste, and Abuse
1.20. Recycling
1.21. Fire Protection
1.22. Smoking
1.23. Property Guidelines
1.24. Environmental Requirements
1.25. Materials
1.26. Key Personnel
1.27. Post Award Conference/Periodic Progress Meetings
1.28. Identification of Contractor Employees
1.29. Duty Assignment
1.30. Vehicle Registration
1.31. Files
1.32. Modifications to Technical Exhibits and Attachments
1.33. Emergency Response
1.34. Antiterrorism Training
1.35. I-Watch Training
1.36. OPSEC Training
PART 2 – DEFINITIONS & ACRONYMS
2. Definitions and Acronyms
2.1. Definitions
2.2. Acronyms
PART 3 – GOVERNMENT OWNED PROPERTY, EQUIPMENT AND SERVICES
3. Government Owned Items and Services
3.1. Government Owned Keys to Mechanical Room
3.2. Building Chemical Treatment Equipment
3.3. Contractor Yard
PART 4 - CONTRACTOR FURNISHED ITEMS AND SERVICES
4. Contractor Furnished Items and Responsibilities
4.1. General
4.2. Parts and Materials
4.3. Exception to New Parts Requirements
4.4. Hot Work
4.5. Chemicals
4.6. Testing Equipment
4.7. COR Testing Equipment
4.8. Chemical Treatment Service (CTS) Equipment and Peripheral Items
4.9. Repair Parts
4.10. Material Safety Data Sheets
4.11. Vehicle Identification
4.12. Permits
4.13. Cellular Telephone Equipment and Services
4.14. Employee Identification Badges
4.15. Property Guidelines
PART 5 – SPECIFIC TASKS
5. Specific Tasks
5.1. Water Analysis
5.2. Descaling System
5.3. Chemical Treatment
5.4. HVAC Chemical Water Treatment Equipment Maintenance
5.5. Parts & Equipment
5.6. Warranted Equipment
5.7. Coordination System Shutdown
5.8. Report and Checklist
5.9. Other Specifications
5.10. Warranty Equipment
5.11. Contract Data Requirements
5.12. Wide Area Work Flow (WAWF)
5.13. Coordination with Other Fort Hood Organizations
5.14. Work Schedules
PART 6 – PERFORMANCE REQUIREMENTS SUMMARY (PRS) MATRIX
6.1 Quality Assurance
6.2 Quality Control Plan (QCP)
6.3 Non Conformance Report (NCR)
PART 7 – APPLICABLE PUBLICATIONS
7.0 Applicable Document
7.1 Document
7.2 Location of Publications and Forms
7.3 Publications
PART 8- DELIVERABLES
PART 9- TECHNICAL EXHIBITS/ATTACHMENTS
PART 1 GENERAL INFORMATION
1. General: This is a non-personal services contract to provide Heating, Ventilation, Air Conditioning (HVAC) Chemical Water Treatment Services. The Government will not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1 Description of Services/Introduction: The Contractor shall provide personnel, management, equipment, tools, supplies, and transportation to perform heating, ventilation, and air conditioning chemical water treatment service at Fort Hood, Texas. The Contractor shall perform to the standards and specifications in this PWS.
1.2 Background: This contract encompasses HVAC systems located on Fort Hood, Texas.
1.3 Objectives: The objective for performance under this contract is to provide HVAC Chemicals according to equipment manufactures recommendations.
1.4 Scope: The Contractor shall provide personnel, management, equipment, tools, supplies, materials, transportation and any other items or services not Government furnished necessary to perform heating, ventilation, and air conditioning chemical water treatment service at Fort Hood, Texas. The Contractor shall perform to the standards and specifications in this PWS.
1.4.1 Standard hours of Operation: The Contractor shall perform the services required under this contract during Normal Hours of Operation, 0730 to 1630; normal duty days or workdays shall be Mondays through Fridays, excluding federal holidays. Work outside these normal hours may be necessary to fulfill the requirements of the contract.
1.4.2 Other Than Standard Hours of Operation: The Contractor shall not work outside the standard hours of operation unless notified to Contractor Officer Representative (COR) and a written authorization from the
Contracting officer is provided in advance. Deviation from these standard hours of operation may potentially be allowable for service under this contract, especially if doing so is in the Government's best interest or weather has impacted the Contractor's ability to execute work during standard hours of operation. All deviations from standard hours of operation should be documented and a record maintained by the Contractor, which shall be provided to the Contractor Officer Representative and Contracting Officer within 24 hours of request. No overtime is permitted under this contract. The Contractor shall manage/schedule personnel resources appropriately to preclude the need for overtime while still fulfilling all contractual requirements. Working outside the standard hours of operation shall be at no additional cost to the Government.
1.4.3 Federal Holidays. The Contractor is not required to perform service on Federal holidays.
1.4.4 Installation Closures: When an unforeseen installation closure occurs on a regularly scheduled day of work, the Contractor shall:
Reschedule the work to be performed the following day unless the following day is a Saturday, Sunday, a legal federal holiday, and when routine work is not scheduled for that day; or reschedule the work on any day mutually satisfactory 24 hours after installation closure to the COR.
1.4.5 Inclement Weather Delay: If the Contractor determines unsafe weather conditions for continued operations, then the Contractor shall notify the KO/COR if inclement weather suspends operations within 2 hours.
Contractor shall follow installation closure (1.4.4 to reschedule operations. The Contractor shall resume operations with KO/COR approval.
1.5 General Information:
1.5.1 Contractor Deliverables: Contract requirements for data submissions are detailed in Part 8 – Deliverables.
1.5.2 Place of Performance: The work to be performed under this contract shall be performed at Fort Hood, Texas which consists of the main cantonment, West Fort Hood and North Fort Hood areas. Fort Hood is located approximately 60 miles north of Austin and 50 miles south of Waco, Texas. The main cantonment area is approximately 20 miles west of interstate Highway 35 at Belton, Texas, and adjacent to Killeen, Texas. West Fort Hood is immediately adjacent to the main cantonment and North Fort Hood is approximately 25 miles north of the main cantonment. Maps of the (Attachment 1) Fort Hood main cantonment, (Attachment 3) West Fort Hood and (Attachment 2) North Fort Hood are provided as an attachment.
1.6 Security Requirements: Contractor personnel and any representative of the Contractor entering Fort Hood, Texas, shall abide by all security regulations and shall be subject to security checks. Contractor personnel and property shall be subject to search and seizure upon entering the confines of Fort Hood, Texas, while on Fort Hood, Texas, and upon leaving the confines of Fort Hood, Texas. The Contractor shall be responsible for assuring all Contractor personnel authorized to perform work under this contract obtain installation access as required as required by DOD Directive 4630.5. Government furnished identification shall be returned to the Government when the employee no longer performs work for the Contractor under this contract.
1.6.1 Physical Security: The Contractor shall comply with FH Regulation 190-3, Fort Hood Physical security Regulation, and be responsible for security of all facilities, materials and equipment utilized during the performance period. In case of forced entry or theft, the Contractor shall notify the Department of Emergency Services (DES) immediately and cooperate in the investigation. The Contractor shall maintain a physical security checklist or log (e.g., Standard Form (SF) 701, Activity Security Checklist), which will be forwarded to the KO/COR, NLT the tenth (10th) of each month, following the month of surveillance. The Contractor shall secure Government facilities, equipment, and materials at the close of each work period. The Contractor shall develop and administer a Physical Security Plan (PSP) and maintain an effective physical security program to ensure the security of the physical infrastructure at Fort Hood is secure before, during and after maintenance is performed.
The finalized PSP will be due to the KO/COR within ten (10) days after award of the contract. The KO/COR may notify the Contractor of required modifications to the plan during the period of performance. The Contractor shall make the required modifications within five (5) working days after notification, and submit the modified PSP to the KO/COR for approval. The Contractor may recommend modifications to the PSP. Such recommendations shall be submitted to the KO/COR for approval no later than five (5) working days prior to requested effective date of the change. The KO/COR may find the PSP to be “unacceptable" and notify the Contractor; whenever the Contractor's procedures do not comply with the requirements of the contract. The Contractor shall revise the PSP within five (5) working days.
1.7 Disclosure of Information: Performance under this contract may require the Contractor to access data and information proprietary to a Government agency, another Contractor, or of such nature that its dissemination or use other than as specified in this work statement would be adverse to the interests of the Government or others.
Neither the Contractor, nor Contractor personnel, shall divulge nor release data nor information developed or obtained under performance of this work statement, except as authorized, in writing, by the Contracting Officer.
The Contractor shall not use, disclose, or reproduce proprietary data which bears a restrictive legend, other than as specified in this work statement.
Disclosure of information regarding operations and services of the activity to persons not entitled to receive it, or failure to safeguard any classified information that may come to the Contractor (or any persons under the Contractor's control) in connection with work under this work statement, may subject the Contractor, Contractor's agent, or employees to criminal liability under Title 18, Sections 793 and 798 of the United States Code. Neither the Contractor, nor the Contractor's employees, shall disclose or cause to be disseminated, any information concerning the operations of the activity that could result in, or increase the likelihood of, the possibility of ab reach of the activities' security or interrupt the continuity of its operation. The Contractor shall direct to the Contracting Officer or designated representative all inquiries, comments, or complaints arising from matters observed, experienced, or learned as a result of, or in connection with the performance of this contract, the resolution of which may require the dissemination of official information. Inquiries received by the Contractor for work performed under this contract shall be referred to the Government for evaluation under the Freedom of Information Act of 1975, Public Law 93- 502, 5 U.S. C., and Section 552. The determination of whether records will be released will remain with the Government. The Contractor shall be responsible for search and submission of records upon request by the Government. The Contractor shall not release any information (including photographs, files, public announcements, statements, denials, or confirmations) on any part of the subject matter of this contract or any phase of any program hereunder without the prior written approval of the Contracting Officer. All documentation showing individuals' names or other personal information will be controlled and protected. The provisions of the Privacy Act of 1974, Public Law 93-579, 5 U.S.C., Section 552a, shall apply.
1.8 Key Control: The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE:
All references to keys include key cards. No keys issued to the Contractor by the Government will be duplicated.
The Contractor shall develop procedures covering key control that shall be included in the Key Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall report any occurrences of lost or duplicate keys/key cards to the Contracting Officer representative within 1 hour.
1.8.1 In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re- keying. When the replacement of locks or rekeying is performed by the Government, the total cost of rekeying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor.
1.8.2 The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor's employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer.
1.9 Access to Secure Areas. Contractor employees identified on the Contractor's employee roster, wearing identification badges, and complying with local security procedures will be allowed access to facilities. The
Contractor shall not release any information (including photographs, files, public announcements, statements, denials, or confirmations) on any part of the subject matter of this contract or any phase of any program hereunder without the prior written approval of the Contracting Officer. All documentation showing individuals' names or other personal information will be controlled and protected. The provisions of the Privacy Act of 1974, Public Law 93-579, 5 U.S.C., Section 552a, shall apply.
1.10 Area Check-Out. Upon completion of their duties, personnel shall turn off all lights and lock doors in the mechanical rooms. Contractor personnel shall not tamper with or adjust any cooling or heating devices such as thermostats.
1.11 Safety Standards: The Contractor and his employees shall comply with accepted industry safety standards and applicable safety precautions and guidelines contained in these publications at all times while performing work under this contract:
• AR-385-1-1 Safety and Health Requirements; • ANSVASME A17.4 Guide for Emergency Personnel
• U.S. Army Corps of Engineers Manual:
• Safety and Health Occupational Safety and Health Standards (General Industry)
• National Electric Code, National Fire Protection Association
• Department of Labor, Occupational Safety and Health Act
• Army Safety Program
• 40 CFR 61National Emission Standards for Hazardous Air Pollutants (NESHAPS)
• Texas Water Code Section 26.121 Unauthorized Discharges Prohibited
• Texas Civil Statutes: Article 8861Air Conditioning and Refrigeration Contractor License
• Texas Boiler Law: Chapter 755 Health and Safety Code
• Title 30 chapter 315: Pretreatment Regulations for Existing and New Sources of Pollution
1.12 Safety Plan: The Contractor shall develop and implement a safety program for its Employees. The Contractor shall submit the Safety Plan to the COR/KO for review and acceptance within ten (10) days of commencement of work. Revisions shall be submitted five (5) calendar days prior to the effective date of change.
1.13 Accident Reporting: The Contractor shall comply with all OSHA reporting requirements and AR 385-40, Accident Reporting and Records, for record keeping and reporting of all accidents resulting in death, injury, occupational disease, or adverse environmental impact. The Contractor shall provide a verbal report(s) to the Contracting Officer or designated representative within two hours of each such occurrence, whenever an accident involving personal injury occurs. A written accident report(s) shall be delivered to the Contracting Officer or designated representative within one work day of occurrence.
1.14 Safety Measures: Workers shall be trained in appropriate safety measures.
1.14.1 Safety: The Contractor shall safeguard and maintain all Government and Contractor property, as well as provide for the safety and well-being of personnel employed under this contract. The Contractor shall comply with AR 385-10, The Army Safety Program.
1.14.2 Occupational Safety and Health: The Contractor shall comply with the Occupational Safety and Health Administration (OSHA) standards. The Contractor shall comply with all applicable Federal, State, and local laws, regulations, and directives.
1.14.3 Safety Measures and Protective Equipment: The Contractor shall provide all personal protective equipment in accordance with Federal Law and the aforementioned paragraphs of section 2.5.3. Safety. Workers shall be trained in appropriate safety measures and shall not place materials, machines, or other equipment in traffic lanes or other locations that could create safety hazards. The Contractor shall maintain a safe job site, clean and free of all foreign debris during and upon completion of work. The Contractor shall remove unserviceable parts and components from Government property, unless otherwise directed by the KO/COR. The Contractor shall be responsible for the enforcement of all safety requirements for any work performed under the contract. If the
Contractor fails or refuses to comply with safety or environmental requirements, the KO/COR may issue an order stopping all part of the work in accordance with the Stop work Clause of this contract.
1.15 Stop Work: The Contractor shall be responsible for the enforcement of all safety requirements for any work performed under the contract. If the Contractor fails or refuses to promptly comply with safety or environmental requirements, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective actions have been taken. No part of the time lost, due to any such stop order, shall be made the subject of a claim for extension of time or for excess costs or damages to the Contractor.
1.16 Interface with Government Operation: Performance of work by Contractor personnel under the terms of this contract shall not interfere with regularly schedule Government operational activities.
1.17 Damage Reports: In all instances where Government property or equipment is damaged by the Contractor, the Contractor shall provide a verbal report to the COR within four working hours of the occurrence. A written damage report shall be delivered to the COR within one working day of the occurrence, explaining the circumstances of the accident and the extent of damage. The Contractor shall bear all costs of repairing or replacing damaged property.
1.18 Energy Conservation: The Contractor shall observe energy conservation policies established by Fort Hood and published in FH Reg. 420-9, Energy Efficiency Program. Contractor personnel shall practice utilities conservation and shall operate under conditions that preclude waste of Government furnished utilities.
1.19 Fraud, Waste, and Abuse: The Contractor shall be responsible for maintaining proper conduct and good discipline within Contractor occupied work area(s). Contractor personnel shall be encouraged to be alert to and report suspected situations of fraud, waste, and abuse, or other intentionally dishonest conduct against the Government observed during or in the performance of this contract.
1.20 Recycling: The Contractor shall observe recycle program policies established by Fort Hood and published in FH Reg. 420-6, Recycle Program.
1.21 Fire Protection: The Contractor shall comply with AR 420-90, Fire Protection, and FH 420-1, Fire Regulation, for fire protection and fire prevention.
1.22 Smoking: The Contractor shall comply with AR 600-63, Army Health Promotion, which establishes uniform policies governing the use of tobacco products in Government facilities and on Fort Hood.
1.23 Property Guidelines: Contractor's property shall be equipped with protective and safety features, in good repair, and clean in appearance. The Contracting Officer or designated representative has the right to require the Contractor to remove Contractor furnished property from the installation that is inoperable or unserviceable for any reason.
1.24 Environmental Requirements: The Contractor shall comply with all federal, state, and local environmental protection laws, regulations, and standards referenced in FH Regulation 200-1, Environment and Natural Resources. The Contractor shall comply with all other contract requirements for clean air, clean water, and toxic substances control (TSCA), pollution control, and resource conservation and recovery (RCRA). The Contractor shall designate an Energy Conservation Monitor and a Recycling Monitor in writing to the Contracting Officer.
The Contractor shall provide who the Energy Conservation and Recycling Monitor will be ten (10) days after the contract start date. All environmental protection matters or questions shall be coordinated with the Contracting Officer and the Directorate of Public Works (DPW) Environmental Division.
1.24.1 Environmental Management System (EMS): Fort Hood has implemented an EMS to proactively deal with the environmental impacts of its processes, activities, and services. Fort Hood offers EMS General Awareness Training in the form of a 12 minute video available at https://lmp.hood.army.mil. The Contractor shall ensure that employees, and subcontractors hired receive EMS General Awareness Training. The Contractor shall also ensure that all goods and services used under this contract do not deviate from the installation Environmental Policy, objectives and targets of the EMS. The Contractor shall maintain a record of the training, and submit a roster to the Contracting Officer or designated representative. This training shall be completed within 30 days after contract start date.
1.25 Materials: Hazardous materials are forbidden for use on Fort Hood. All materials must be approved by the DPW Environmental Division at building 4622, prior to use. All materials (grease, oil, lubricants, etc.) utilized on this contract shall contain a Safety Data Sheet (SDS). An approval request for each material proposed for use shall be submitted to the COR five days before delivery of material and utilizing the
"HAZARDOUS MATERIAL AUTHORIZATION REQUEST" form.
1.26 Special Qualification:
1.26.1 Contractor Personnel: The Contractor shall provide work force possessing the skills, knowledge, and training to satisfactorily perform the services required by this contract. Personnel performing work under this contract shall remain employees of the Contractor and will not be considered employees of the Government. The Contractor shall not employ any person who is an employee of the United States Government or the Department of Defense, either military or civilian, if such employment would create a conflict of interest or be contrary to the policies contained in Department of Defense (DOD) Joint Ethics Regulation (JER), DOD 5500.7-R. The Contracting Officer may require the Contractor to remove from the job site any employee working under this contract for reason of misconduct, security, or found to be under the influence of alcohol, drugs, or other incapacitating agent. Contractor employees shall be subject to dismissal from the premises upon determination by the Contracting Officer that such action is necessary in the interests of the Government. In accordance with Department of Defense (DOD) Joint Ethics Regulation (JER), DOD 5500.7-R and 18 U.S.C. 1382 (1972), the installation commander has the authority to bar individuals from the installation. The removal from the jobsite or dismissal from the premises shall not relieve the Contractor of the requirement to provide sufficient personnel to perform the services as required by this performance work statement. Contractor personnel shall not wear any part of a military uniform while performing contract duties, nor clothing such as exercise suits, shorts, tank tops, or t-shirts. There shall be no objectionable messages or phrases on the clothing.
1.26.2 Key Personnel: Contractors shall submit resumes, certificate and other relevant training documents of qualified key personnel. The Lead Technician, Project Manager and Quality Control Manager Personnel each shall possess at a minimum of ten (10) years’ work experience in the HVAC Chemical field. The lead technician shall be certified and licensed to perform all work on all manufactures listed in Attachment 4- HVAC System Inventory and Attachment 5- System manufactures. All other Technician must have a minimum of Five (5) years’ experience working on automated chemical treatment systems, including controls, sensors, valves, and chemical treatment of the boiler/chiller systems. Experience includes, but is not limited to, boiler and chiller loops, cooling towers, condenser loops, and daily/monthly/annual operations.
1.26.3 Lead Technician/Contract Representative: The Contractor shall designate a Lead Technician to the Government for performance of all work under this contract. The Lead Technician shall be the point of contact with the Government all work. The Lead Technician shall be available 0730 to 1630 Monday through Friday except Federal holidays or when the Government facility is closed. The lead technician shall possess a minimum of ten
(10) years’ experience of HVAC chemical treatment.
1.26.4 Alternate Lead Technician: The Contractor shall designate an alternate who shall be authorized to act on behalf during absents of the lead technician and submit to contracting officer.
1.26.5 Management Contact Information: The Contractor shall provide the name, address, work assignments, and telephone number(s) for the Lead Technician, alternate, management, quality control, and supervisory personnel to the Contracting Officer ten days after contract award and for any changes. The Contractor shall verbally notify the Contracting Officer of changes of personnel as they occur and provide written changes not later than twenty four (24) hours after effective date of the change. The Contractor shall provide cellular communication for the Lead Technician, Alternate Lead Technician, Quality Control, and Supervisory personnel.
1.26.6 Quality Control Manager. The Contractor shall provide the name and telephone number of the Quality Control Manager ten (10) calendar days after contract award. The Contractor shall submit to the Contracting Officer and COR on a company letter head the Quality Control Manager appointment.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .