This document contains a federal contract solicitation and related technical exhibit deliverables. The solicitation is for heating, ventilation, and air conditioning chemical water treatment services at Fort Hood, Texas. The requirement will be procured as a firm fixed price contract for a base year plus four option years. The contract is set aside entirely for small businesses with a NAICS code of 325998 and size standard of 500 employees. Quotes are due by November 17, 2021 and period of performance is expected to begin on January 1, 2022. The solicitation number is W91151-22-Q-0001 and will be posted on SAM.gov. The technical exhibit outlines 38 required deliverables and reporting timelines for items like safety plans, training certificates, status reports, and chemical analysis. The points of contact listed are the contracting officer and contract specialist.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Technical Exhibit- D
Deliverables
A001 Accident requiring emergency medical treatment shall be reported No later than two (2) hours after the incident and a written report shall be submitted within one working day of Occurrence.
1 Electronic Copy
Email or Telephone for the two hour report time and written report shall be electronic.
COR/ACOR
(PWS, para. 1.13)
Accident Requiring Emergency
Medical Treatment
A002 Initial: within 30 days of contract award Updates: All QCP updates shall be accepted by the KO
1 Electronic
MS Word KO/KS
(PWS, para. 6.2) Copy
Quality Control Plan
A003
Submit resumes, certification, licensure, and organization chart (to include contact info) for initial and replacements. 10 working days after contract start date and updated 1 day after changes.
1 Electronic
MS Word KO
(PWS, para. 1.26) Key Copy
Personnel – Provide name of
Program Manager
A004
Submit NLT the 10th of each month following the month of surveillance
1 Electronic Copy Army Standard Form (SF) 701 Activity Security Checklist
COR/ACOR
(PWS, para. 1.6.1) Physical Security
Checklist or Log
A005
Immediately report any occurrences within 1 hour.
1 Electronic Copy
Immediate personal Contact by Phone call followed up by written Correspondence
COR/ACOR
(PWS para. 1.8), Key Control
A006
Certificates filed within twenty four (24) hours prior to employees commencing performance.
1 Copy of Certificate
Electronic COR/ACOR (PWS, para1.34, 1.35, 1.37) Training Completion Certificates
A007
Review and Acceptance:
During phase in and within 10 days of commencement of work
1 Electronic Copy
Email COR/ACOR
(PWS, para. 1.12) Revisions: five (5) calendar days prior to effective date of change
Safety Plan
A008
Annual, upon completion of the basic year and each option year
1 Electronic Copy
MS Word Report IAW requirements at: FAR 52.223-9
COR/ACOR (PWS, para. 1.20) Recycled or Recovered
Certification and
Products Report and Estimate of
Certification Percentage of Recovered
Material Content for EPA Designated Items
A009 (PWS, para. 1.25) all Safety Data Sheets (SDS for approval on materials
Five (5) days before delivery of the Hazardous material
1 Electronic .PDF
COR/ACOR
Copy of each sheet See FAR
52.223-3
Hazardous
Material
Identification and
Material Safety
Data
A010 Verbal report 4 hours after occurrence and a written report one day after occurrence
1 Electronic
.PDF with digital signature
COR/ACOR
(PWS, para. 1.17) Damage Report
Copy
A011 Contact by written notification
1 Electronic Copy Coordinate with
COR
KO (PWS, para. 5.9.5) within one (1) hour of occurrence
Spill Plan
A012
Within 5 working days of contract start date, insurance coverage presented upon application of vehicle registration
1 Electronic
By making application
Vehicle
(PWS, para. 1.30) Copy Registration
Contractor Vehicles Section of the
Registration. Contractor
Provost
Vehicle Marshal’s
Identification (PWS para
Office and
1.30.2) COR/ACOR
A013 (PWS, para 1.6.1) Physical Security Plan
10 days after award of the contract.
1 Electronic Electronic KO
Copy
A014 (PWS, para 1.8)
5 working days after award of the contract
1 Electronic
Electronic COR Key Control/Key Control Copy
Plan
A015 (PWS, para 5.8.2) Monthly Status Report
5 working days prior to the start of each month
1 Electronic Electronic COR
Copy
A016 (PWS para 5.8) QC Report monthly roll up report, 5 working days after the start of each month
1 Electronic Copy Excel Spread sheet COR
A017 (PWS, para 1.34)
Shall complete AT Level 1 awareness training within 30 calendar days after contract award date or date of incorporation of this requirement into the contract, whichever is applicable.
1 Electronic Electronic KO/COR
Antiterrorism Training Copy
A018 30 calendar days after contract award, and within 30 calendar days of new employees hire date.
1 Electronic
Electronic KO/COR
(PWS, para 1.35) iWatch Copy
Training
A019
Level 1 OPSEC Conduct training within 30 calendar days of employees reporting for work.
1 Electronic Electronic KO
(PWS, para 1.37) OPSEC Copy
Training
A020
Weekly report. Monday morning before 9:00 am.
1 Electronic Copy Electronic COR CTS water chemical level test and analysis report (PWS, PARA 5.3.3)
A021 Environmental Energy
10 Days after the contract start date
1 Electronic Copy Electronic COR Monitor and Recycle Monitor
(PWS para 1.24)
A022 Environmental 30 days after contract start Date
1 Electronic
Electronic COR Management System (EMS) Copy
(PWS para 1.24.1)
A023 Quality Control Manager (PWS para 1.26.5)
10 Days after contract award
1 Electronic Copy Electronic COR
A024 Personnel List (PWS para 1.26.7)
Pre‐list prepare on or before Contract Start date, 24 hours after changes.
1 electronic copy Electronic COR
A025 Pre-screen candidates using E-Verify Program NLT 3 business days after initial contract award 1 electronic copy Electronic COR
(PWS para 1.36)
A026 COR Testing Two test kits every year, with additional kits upon request
Material COR COR Equipment (PWS para
4.7)
A027 CTS Schedule (PWS para 5.8.4)
NLT 10 working days after contract start date and NLT 30 days prior to the first day of each option period.
1 electronic Copy Electronic COR
A028 CTS Report (PWS para 5.8.13)
NLT 5 working Days after the start of each month
1 electronic Copy Electronic COR
A029 Scale in Boilers (PWS para 5.2.5)
One week after request of 1 Electronic
Electronic COR Government Copy
A030 Descaling (PWS para One week after mechanical failure of equipment
1 Electronic Electronic COR
5.2.2 Copy
A031 Permits (PWS para During solicitation
1 Electronic Copy all permits in PWS para Electronic COR
4.12) 4.12
A032 Inclement Weather Delay (PWS para 1.4.5)
If inclement weather suspends operations within 2 hours of operations. The contracting officer representative will provide resume to work to contractor.
1 Electronic Electronic COR/ KO
Copy(email)
A033 Other than written authorization from the Contracting officer is provided
1 Electronic
Electronic COR/ KO Standard Hours of 24 hours prior to start of work
Copy
Operations. (PWS para
1.4.2)
A034 Initial Water Analysis 30 Days after the contract award date.
1 Electronic Electronic COR
(PWS 5.1) Copy
A035 Chemicals (PWS 4.5) 30 Days after the contract award date
1 Electronic Electronic COR
Copy
A036 Hot Work (PWS 4.4) Before hot work is performed
1 electronic Electronic COR
Copy
A037 Productive time and material cost tracker. PWS 5.0
NLT the 10th of every month 1 Electronic Copy Electronic COR
A038 Exception to new part requirements (PWS 4.3)
Before purchase of new part 1 electronic copy Electronic COR