(TE 11) Deliverables Schedule.pdf

PDF 159 KB Posted

Attached to
Fort Bliss Solid Waste Management (SWM) Refuse and Recycling Services
Solicitation number
W911SG25RA009
Issued by

About this file

The document is a comprehensive Deliverables Schedule for a Fort Bliss Solid Waste Management (SWM) Refuse and Recycling Services contract. The schedule details 28 specific deliverables that the contractor must submit throughout the contract period, ranging from initial transition plans to ongoing monthly and quarterly reports. Key deliverables include a Transition Phase In/Phase Out Plan, Recycle/Refuse Collection Schedule, Employee Training & Certifications, Safety Plan, Hazardous Spill Plan, Quality Control Plan, Monthly Summary Reports, and Regulatory Agency Inspection Reports.

The deliverables have specific requirements for frequency (ranging from within hours of an event to annually), format (primarily electronic copies in MS Word, Excel, or PDF), and distribution (typically to the Contracting Officer or designated Government representative). Most documents must be submitted electronically, with some requiring coordination with the Contracting Officer's Representative (COR). The schedule covers critical aspects of waste management services, including container inventories, recycling characterization studies, weekly skip reports, and annual service contract reporting, demonstrating a comprehensive approach to monitoring and managing solid waste and recycling operations at Fort Bliss.

View the file

Other files

File Type Posted
D- SWM - PWS - DRAFT-.pdf PDF
Fort_Bliss_SWM_Refuse_Recycling_Services_Draft_RFP_Feedback_Form.xlsx XLSX spreadsheet
(TE 06) Government Furnished Facilities.pdf PDF
(TE 16) DPW Dumpster Request Form.pdf PDF
(TE 17) Contractor Badge Request Form.xlsx XLSX spreadsheet
(TE 18) TCEQ Form20429 NOI to Operate Citizens Collection Station.pdf PDF
D- SWM - PWS - DRAFT.pdf PDF
(TE 03) Fort Bliss Spill Prevention Control and Countermeasures Plan.pdf PDF
(TE 09) Collection Station Laydown Areas.pdf PDF
(TE 01) Installation Mapping.pdf PDF
(TE 10) List of Current Refuse and Recycle Service Locations.xlsx XLSX spreadsheet
(TE 14) Container Standoff and Separation Distances.pdf PDF
(TE 08) Marathon Operation Service and Installation Manual.pdf PDF
(TE 04 ) Fort Bliss Mission Essential Functions (MEF).pdf PDF
(TE 13) Recycle Characterization Study.xlsx XLSX spreadsheet
(TE 19) Enterprise Municipal SWM Services Performance Tasks Frequency Standards.xlsx XLSX spreadsheet
(TE 07) GFE Inventory and Current Condition.xlsx XLSX spreadsheet
(TE 05) Performance Requirements Summary (PRS).pdf PDF
(TE 15) Sample Container Labels.pdf PDF
(TE 02) Fort Bliss Hazardous Waste Management Plan.pdf PDF
Draft RFP Solicitation - W911SG25RA009.pdf PDF
(TE 12) Average Pick-ups Per Container Size.xlsx XLSX spreadsheet
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Deliverable Frequency # of Copies Medium/Format Distribution

A001 (PWS, para 1.5) Transition Phase In/Phase Out Plan

Within thirty (30) business days after contract award

One (1) Electronic Copy

MS Word or .PDF

KO or designated Government representative/CO R

A002 (PWS para. 1.8 and 5.2.2) Recycle/Refuse Collection Schedule.

Contractor shall provide schedule routes by building and/or container number and the day of the week sequence of collections.

Schedule shall cover a 12-month period.

Not later than (NLT) ten (10) days prior to contract performance start date and every subsequent option period.

Changes to the schedule shall be submitted to the KO NLT ten

(10) working days prior to the proposed implementation date of any change.

One (1) electronic copy

MS Word or Excel KO or designated Government representative/CO R

A003 (PWS, Para 1.8) Employee Training & Certifications

Within 30 days of contract award.

One (1) Electronic representative/CO R

A004 (PWS, para 1.8) Post Award Conference Performance Evaluation Meeting Minutes

Within five (5) business after the meeting

One (1) representative/CO R

A005 (PWS, para 1.10) Key Personnel - Resumes and organization chart.

Initial: within 30 days of contract award.

Updates: All QCP updates shall be accepted by the

KO

One (1) Electronic representative/CO R

A006 Initial: Verbal report within one (1) hour of

Typed original plus one

ENG Form 3394 United States Army Corps of Engineers

(PWS, para 1.11) Accident Report each such occurrence Updates:

Written report within five (5) business days of occurrence

(1) copy of ENG Form

Accident Investigation Report (or equivalent reporting form) representative/CO R

A007 (PWS, para.

1.12) Safety Plan

Within 10 days of contract award.

One (1) Electronic Copy and 1 printed copy representative/CO R

A008 (PWS, para 1.12) Hazardous Spill Plan

Within 30 days of contract award.

One (1)

Coordinate with

COR

KO or designated Government representative/CO R

A009

(PWS,

Para.1.13.1) Labor Dispute Contingency Plan

Within 30 days after contract award.

One (1) Electronic Copy

Coordinate with

COR

KO or designated Government representative/CO R

A010 (PWS, para 1.15) Quality Control Plan

Initial: within 30 days after contract award.

Updates: All QCP updates shall be accepted by the

KO

One (1) Electronic representative/CO R

A011 (PWS, para.

1.17) Operational Work Order Completion (OWO) Report

Within four hours after scheduling the

OWO

One (1) Electronic Copy

E-mail MS Word and/or Excel file

COR/ACOR and the DPW Service Order Desk (SOD)

A012 (PWS, para 1.18) Preventive Maintenance Plan / Preventive Maintenance Scheduler

Initial: Within 30 days after contract award.

Updates:

Monthly

One (1)

MS Word and/or Excel

KO or designated Government representative/CO R

A013 (PWS, Para.

3.1.1) Government

On or before the contract start date

One (1) Electronic Copy

All inventory listings will utilize DA Form 2062, Hand

KO or designated Government representative/CO R

Furnished Equipment Joint Inventory

Receipt/Annex Number, to record inventory data.

A014 (PWS, Para.

3.1.2) Utilization of Government-furnished Facilities Plan

Within (30) days of after contract award.

One (1) Electronic Copy

Coordinate with

COR

KO or designated Government representative/CO R

A015 (Overarching PWS, para 3.1.4) Damage/Acciden t Report

Verbal within four (4) hours of occurrence;

Written report within one (1) working day of occurrence

One (1) Electronic Copy

.PDF with digital signature

KO or designated Government representative/CO R

A016 (PWS, para. 3.2) Container Inventory

Initial: Within thirty (30) days of the start of each contract year Updates: Semi-annually

One (1) Electronic Copy

Coordinate with

COR

representative/CO R

A018 (PWS, para 5.2.3) Recycling Invoice

By the 10th calendar day of each month

One (1) electronic copy

MS Word or Excel KO or designated Government representative/CO R

A019 (PWS, para 5.2.3) Submit plan for Conducting recycling characterization study.

Within 30 days after contract award.

representative/CO R

A020

(PWS,

para.5.2.3) Perform recycling characterization study.

Initial: Within 60 days after contract award.

Updates:

Annually representative/CO R

A021 (PWS, para 5.2.3) Contractor shall mail or hand deliver to the COR a rebate

By the 15th calendar day of the following month

Money orders or company check or cashier’s check is

Deliver or mail checks to:

IMBL-PWE, Bld 622 Taylor Rd, Rm 109, Ft. Bliss, TX 79916

KO or designated Government check for the sale proceeds of collected and processed Recyclable Materials.

acceptable No cash.

A022 (PWS, para.

5.2.4 & 5.2.9) Container Condition Report

Evaluate condition monthly and provide information Quarterly

One (1) Electronic Copy

MS Word and/or Excel

KO or designated Government representative/CO R

A023 (PWS, para.

5.2.4) Container cleaning Schedule

NLT ten (10) calendar days after contract award.

One (1) Electronic Copy

MS Word and/or Excel

KO or designated Government representative/CO R

A024 (PWS, para.

5.2.9) Contractor shall submit Monthly Summary reports including: Dates, total number of pickups per container type (Front end Loader, Roll-Off) in both cantonment and ranges; monthly weight summary for EACH container (tonnage of refuse/recyclable material collected);

weight % of capacity when containers picked up;

weight tickets and Landfill fees;

identify the alternative waste streams, organics, and

Within five (5) calendar days of the following month.

One (1) electronic copy

MS Word or Excel (Government may provide sample of existing spreadsheets)

KO or designated Government percent refuse and recyclable.

A025 (PWS, para.

5.2.9) Weekly Skip Reports

Within (one) 1 hour after identifying the non-collected container

One (1) Electronic Copy

E-mail MS Word and/or Excel file

COR/ACOR and the DPW Service Order Desk (SOD)

A026 (PWS,

para. 5.2.9) Regulatory Agency Inspections

Immediately after any inspection visit by representative(s ) of any regulatory agency

One (1) Electronic Copy

Voice or text message followed up with e-mail and subsequent written report (MS Word or

PDF)

representative/CO R

A027 (PWS, para.

5.2.9) Service Contract Reporting

Annually NLT October 31, or

IAW

requirements at SAM.gov, per Policy Alert #20-

Online Entry

Via website IAW requirements at http://www.SAM.gov l

COR/ACOR

A028 (PWS, para. 3.4) Collection Stations

Within five (5) calendar days of the following month.

One (1) Electronic Copy

MS Word, Excel, or

PDF

COR/ACOR