Table_of_Contents_-_Distribution.pdf

PDF 138 KB Posted

Attached to
Flooring Job Order Contracts (JOC 2712 and 2713) - Class C15 License
Solicitation number
2027-RFP-00201
Issued by
San Mateo County, California

About this file

This file is a Table of Contents for a Construction Task Catalog for flooring work prepared by The Gordian Group, Inc. for San Mateo County in California, copyrighted 2026. The document serves as the pricing and specification framework for Flooring Job Order Contracts (JOC 2712 and 2713) requiring a Class C15 License. The catalog comprehensively organizes flooring-related construction tasks across multiple divisions, including General Requirements, Existing Conditions, Concrete, Openings, and Finishes. The Finishes division encompasses the primary flooring categories such as flooring treatment, masonry flooring, wood flooring, resilient flooring, terrazzo flooring, fluid-applied flooring, and carpeting, along with related work such as wall finishes, acoustic treatment, and painting and coating. The table of contents indicates this is a detailed specification document with numerous subsections and line items organized by MasterFormat divisions and sections, which contractors would use to price individual job orders as directed by the Director of Public Works or designee. Proposals were due December 10, 2026, with up to two contractors to be awarded contracts with a maximum aggregate fiscal obligation of $2.0 million each over a one-year term, with separate job orders issued by Notice to Proceed as warranted.

This Construction Task Catalog represents the pricing mechanism for the JOC System, wherein contractors submit bids based on unit prices and multipliers applied to the standardized tasks contained in this document. The apparent lowest, responsive, and responsible bidder is selected for each contract but is excluded from consideration for successive contracts, ensuring rotation among qualified contractors. No incumbent contractor is identified in the solicitation materials. The document does not explicitly state pricing terms, set-asides, or funding sources within the table of contents itself, as these details are contained in separate solicitation documents referenced in the contract opportunity, including bid bond templates, payment and performance bond requirements, sample agreements, general conditions, Project Labor Agreement documents, and Equal Opportunity Employment program requirements.

View the file

Other files

File Type Posted
Flooring_Job_Order_Contracts_(JOC_2712_and_2713)_-_Class_C15_License.pdf PDF
Construction_Task_Catalog®_-_Distribution.pdf PDF
Technical_Specifications_-_Distribution.pdf PDF
Using_The_Construction_Task_Catalog®_-_Distribution.pdf PDF
_I_Equal_Benefits_Compliance_Ordinance.pdf PDF
_K_Contractor_Employee_Jury_Service_Ordinance_No.4324_Chapter_2.85.pdf PDF
Contractor's_Declaration_Form_JOC_2712_and_2713_-_Flooring.pdf PDF
JOC_2027_Sample_Agreement.pdf PDF
San_Mateo_County_PLA_(executed)_2025.pdf PDF
Bid_Bond_JOC_2712_and_2713_-_Flooring.pdf PDF
Anti-Trust_Laws_Questionnaire_JOC_2712_and_2713_-_Flooring.pdf PDF
JOC_2027_Contract_Documents_General_Conditions_Special_Provisions_final.pdf PDF
PLA_Resolution.pdf PDF
_L_Recycling_and_Diversion_of_Debris_from_Construction_and_Demolition_Ordinance_No._4099_Chapter_4.105.pdf PDF
Payment_and_Performance_Bonds_Sample.pdf PDF
EEO_Questionnaire_for_JOC_2712_and_2713_-_Flooring.pdf PDF
_O_JOC_System_License_and_Fee_Agreement_Sample.pdf PDF
_G_EEO_Certification_of_Compliance.pdf PDF
JOC_2027_Bid_Form_final.xlsx XLSX spreadsheet
EEO_Contractor_Report_Form_JOC_2712_and_2713_-_Flooring.pdf PDF
Standard_Contract_Template_-_Under_$200K_DRAFT.docx DOCX document
_D_EEO_Program_Supplemental_General_Conditions.pdf PDF
Standard_Contract_Template_-_Over_$200K_DRAFT.docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table of Contents

2026 copyright © 2026 The Gordian Group, Inc.

County of San Mateo, Flooring Page TOC - 1

00 Using The Construction Task Catalog® 1

01 General Requirements 1 01 10 Summary

01 11 Summary Of Work 01 20 Price and Payment Procedures

01 22 Unit Prices 01 30 Administrative Requirements

01 31 Project Management and Coordination 01 35 Special Procedures

01 50 Temporary Facilities and Controls 01 51 Temporary Utilities 01 52 Construction Facilities 01 54 Construction Aids 01 56 Temporary Barriers and Enclosures 01 58 Project Identification

01 60 Product Requirements 01 66 Product Storage and Handling Requirements

01 70 Execution and Closeout Requirements 01 71 Examination and Preparation 01 74 Cleaning and Waste Management

02 Existing Conditions 1 02 30 Subsurface Investigation

02 32 Geotechnical Investigations 02 40 Demolition and Structure Moving

02 41 Demolition 02 42 Removal and Salvage of Construction Materials 02 43 Structure Moving

02 60 Contaminated Site Material Removal 02 61 Removal and Disposal of Contaminated Soils

02 80 Facility Remediation 02 81 Transportation and Disposal of Hazardous Materials 02 82 Asbestos Remediation 02 83 Lead Remediation 02 84 Polychlorinated Biphenyl Remediation 02 87 Bio-Hazard Material Remediation 02 89 Hazmat Ancillary Tasks and Support

02 90 Disaster Recovery 02 90 50 Cleaning and Disaster Cleanup 02 90 55 Emergency Clean-up

03 Concrete 1 03 01 Maintenance of Concrete

03 01 30 Maintenance of Cast-In-Place Concrete 03 05 Common Work Results For Concrete

03 05 13 Concrete Admixtures 03 10 Concrete Forming and Accessories

03 11 Concrete Forming 03 15 Concrete Accessories

03 20 Concrete Reinforcing 03 21 Reinforcement Bars 03 22 Fabric and Grid Reinforcing

03 30 Cast-In-Place Concrete 03 30 53 Miscellaneous Cast-in-Place Concrete 03 31 Structural Concrete 03 35 Concrete Finishing 03 37 Specialty Placed Concrete 03 39 Concrete Curing

03 40 Precast Concrete 03 41 Precast Structural Concrete 03 48 Precast Concrete Specialties

03 50 Cast Decks and Underlayment

Table of Contents copyright © 2026 The Gordian Group, Inc. 2026 Page TOC - 2 County of San Mateo, Flooring

03 51 Cast Roof Decks 03 53 Concrete Topping 03 54 Cast Underlayment

03 60 Grouting 03 61 Cementitious Grouting 03 62 Non-Shrink Grouting 03 63 Epoxy Grouting 03 64 Injection Grouting

08 Openings 1 08 05 Common Work Results for Openings

08 05 13 Door Options and Modifications

09 Finishes 1 09 01 Maintenance of Finishes

09 01 20 Maintenance of Plaster and Gypsum Board 09 01 30 Maintenance of Tiling 09 01 50 Maintenance of Ceilings 09 01 60 Maintenance of Flooring 09 01 80 Maintenance of Acoustic Treatment 09 01 90 Maintenance of Painting and Coating

09 05 Common Work Results for Finishes 09 05 61 Common Work Results for Flooring Preparation 09 05 71 Acoustic Underlayment

09 20 Plaster and Gypsum Board 09 22 Supports for Plaster and Gypsum Board 09 23 Gypsum Plastering 09 24 Cement Plastering 09 28 Backing Boards and Underlayments 09 29 Gypsum Board

09 30 Tiling 09 30 13 Ceramic Tiling 09 30 16 Quarry Tiling 09 30 33 Stone Tiling 09 31 Thin-Set Tiling 09 32 Mortar-Bed Tiling 09 34 Waterproofing-Membrane Tiling 09 35 Chemical-Resistant Tiling 09 39 Tiling Transitions

09 50 Ceilings 09 51 Acoustical Ceilings 09 53 Acoustical Ceiling Suspension Assemblies 09 54 Specialty Ceilings 09 57 Special Function Ceilings

09 60 Flooring 09 61 Flooring Treatment 09 63 Masonry Flooring 09 64 Wood Flooring 09 65 Resilient Flooring 09 66 Terrazzo Flooring 09 67 Fluid-Applied Flooring 09 68 Carpeting 09 69 Access Flooring

09 70 Wall Finishes 09 72 Wall Coverings 09 73 Wall Carpeting 09 74 Flexible Wood Sheets 09 77 Special Wall Surfacing

09 80 Acoustic Treatment 09 81 Acoustic Insulation 09 84 Acoustic Room Components

09 90 Painting and Coating 09 91 Painting 09 93 Staining and Transparent Finishing 09 96 High-Performance Coatings 09 97 Special Coatings

Table of Contents

File details come from the government source that posted it. Updated .