Construction_Task_Catalog®_-_Distribution.pdf

PDF 4 MB Posted

Attached to
Flooring Job Order Contracts (JOC 2712 and 2713) - Class C15 License
Solicitation number
2027-RFP-00201
Issued by
San Mateo County, California

About this file

Construction Task Catalog Summary

This document is a Construction Task Catalog (CTC) for Flooring Job Order Contracts developed by The Gordian Group, Inc. for the County of San Mateo, California, and published in September 2026. The CTC provides pre-priced unit tasks organized by CSI MasterFormat divisions 01-09 and establishes the pricing framework for flooring-related construction work including general requirements, demolition, concrete, openings, and finishes (plaster, gypsum board, tiling, ceilings, flooring, wall finishes, acoustic treatment, and painting/coating). The catalog includes comprehensive labor rates ranging from $40.14 per hour for unarmed watch/guard personnel to $189.28 per hour for sheet metal workers, along with detailed equipment rental costs for air compressors, electrical equipment, generators, and related construction machinery available on daily, weekly, and monthly bases. Unit prices are presented as complete and in-place costs incorporating all direct labor at prevailing wage rates with fringe benefits, equipment including fuel and lubricants, materials with delivery and waste allowances, fasteners, testing, and balancing as applicable to specific tasks.

The adjustment factors incorporated into unit pricing account for overhead, profit, subcontractor costs, taxes, permits, project management, mobilization, safety equipment, daily cleanup, professional final cleanup, and business risks including productivity loss and inflation. The document establishes standard interpretations for working heights up to 14 feet for general work and up to 4 feet for masonry work without additional scaffolding charges, defines restricted and confined working spaces, and provides conversion factors, material weights, and demolition bulk factors for calculating quantities. Payment to contractors is calculated as Published Unit Price × Installation (or Demolition) Quantity × Appropriate Adjustment Factor, with no additional compensation permitted beyond unit prices and adjustment factors as defined in the Job Order Contract. The CTC serves as the pricing mechanism for the County of San Mateo's Flooring Job Order Contracts (JOC 2712 and 2713) with proposed awards of up to two contractors, each receiving aggregate fiscal obligations not to exceed $2.0 million over a maximum one-year term, with individual job orders issued by Notice to Proceed as warranted.

View the file

Other files

File Type Posted
Flooring_Job_Order_Contracts_(JOC_2712_and_2713)_-_Class_C15_License.pdf PDF
Technical_Specifications_-_Distribution.pdf PDF
Using_The_Construction_Task_Catalog®_-_Distribution.pdf PDF
_I_Equal_Benefits_Compliance_Ordinance.pdf PDF
Table_of_Contents_-_Distribution.pdf PDF
_K_Contractor_Employee_Jury_Service_Ordinance_No.4324_Chapter_2.85.pdf PDF
Contractor's_Declaration_Form_JOC_2712_and_2713_-_Flooring.pdf PDF
JOC_2027_Sample_Agreement.pdf PDF
San_Mateo_County_PLA_(executed)_2025.pdf PDF
Bid_Bond_JOC_2712_and_2713_-_Flooring.pdf PDF
Anti-Trust_Laws_Questionnaire_JOC_2712_and_2713_-_Flooring.pdf PDF
JOC_2027_Contract_Documents_General_Conditions_Special_Provisions_final.pdf PDF
PLA_Resolution.pdf PDF
_L_Recycling_and_Diversion_of_Debris_from_Construction_and_Demolition_Ordinance_No._4099_Chapter_4.105.pdf PDF
Payment_and_Performance_Bonds_Sample.pdf PDF
EEO_Questionnaire_for_JOC_2712_and_2713_-_Flooring.pdf PDF
_O_JOC_System_License_and_Fee_Agreement_Sample.pdf PDF
_G_EEO_Certification_of_Compliance.pdf PDF
JOC_2027_Bid_Form_final.xlsx XLSX spreadsheet
EEO_Contractor_Report_Form_JOC_2712_and_2713_-_Flooring.pdf PDF
Standard_Contract_Template_-_Under_$200K_DRAFT.docx DOCX document
_D_EEO_Program_Supplemental_General_Conditions.pdf PDF
Standard_Contract_Template_-_Over_$200K_DRAFT.docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Job Order Contract Construction Task Catalog® CSI Divisions 01-09 2026

County of San Mateo

Flooring

This Page Intentionally Left Blank

Table of Contents

2026 copyright © 2026 The Gordian Group, Inc.

County of San Mateo, Flooring Page TOC - 1

00 Using The Construction Task Catalog® 1

01 General Requirements 1 01 10 Summary

01 11 Summary Of Work 01 20 Price and Payment Procedures

01 22 Unit Prices 01 30 Administrative Requirements

01 31 Project Management and Coordination 01 35 Special Procedures

01 50 Temporary Facilities and Controls 01 51 Temporary Utilities 01 52 Construction Facilities 01 54 Construction Aids 01 56 Temporary Barriers and Enclosures 01 58 Project Identification

01 60 Product Requirements 01 66 Product Storage and Handling Requirements

01 70 Execution and Closeout Requirements 01 71 Examination and Preparation 01 74 Cleaning and Waste Management

02 Existing Conditions 1 02 30 Subsurface Investigation

02 32 Geotechnical Investigations 02 40 Demolition and Structure Moving

02 41 Demolition 02 42 Removal and Salvage of Construction Materials 02 43 Structure Moving

02 60 Contaminated Site Material Removal 02 61 Removal and Disposal of Contaminated Soils

02 80 Facility Remediation 02 81 Transportation and Disposal of Hazardous Materials 02 82 Asbestos Remediation 02 83 Lead Remediation 02 84 Polychlorinated Biphenyl Remediation 02 87 Bio-Hazard Material Remediation 02 89 Hazmat Ancillary Tasks and Support

02 90 Disaster Recovery 02 90 50 Cleaning and Disaster Cleanup 02 90 55 Emergency Clean-up

03 Concrete 1 03 01 Maintenance of Concrete

03 01 30 Maintenance of Cast-In-Place Concrete 03 05 Common Work Results For Concrete

03 05 13 Concrete Admixtures 03 10 Concrete Forming and Accessories

03 11 Concrete Forming 03 15 Concrete Accessories

03 20 Concrete Reinforcing 03 21 Reinforcement Bars 03 22 Fabric and Grid Reinforcing

03 30 Cast-In-Place Concrete 03 30 53 Miscellaneous Cast-in-Place Concrete 03 31 Structural Concrete 03 35 Concrete Finishing 03 37 Specialty Placed Concrete 03 39 Concrete Curing

03 40 Precast Concrete 03 41 Precast Structural Concrete 03 48 Precast Concrete Specialties

03 50 Cast Decks and Underlayment

Table of Contents copyright © 2026 The Gordian Group, Inc. 2026 Page TOC - 2 County of San Mateo, Flooring

03 51 Cast Roof Decks 03 53 Concrete Topping 03 54 Cast Underlayment

03 60 Grouting 03 61 Cementitious Grouting 03 62 Non-Shrink Grouting 03 63 Epoxy Grouting 03 64 Injection Grouting

08 Openings 1 08 05 Common Work Results for Openings

08 05 13 Door Options and Modifications

09 Finishes 1 09 01 Maintenance of Finishes

09 01 20 Maintenance of Plaster and Gypsum Board 09 01 30 Maintenance of Tiling 09 01 50 Maintenance of Ceilings 09 01 60 Maintenance of Flooring 09 01 80 Maintenance of Acoustic Treatment 09 01 90 Maintenance of Painting and Coating

09 05 Common Work Results for Finishes 09 05 61 Common Work Results for Flooring Preparation 09 05 71 Acoustic Underlayment

09 20 Plaster and Gypsum Board 09 22 Supports for Plaster and Gypsum Board 09 23 Gypsum Plastering 09 24 Cement Plastering 09 28 Backing Boards and Underlayments 09 29 Gypsum Board

09 30 Tiling 09 30 13 Ceramic Tiling 09 30 16 Quarry Tiling 09 30 33 Stone Tiling 09 31 Thin-Set Tiling 09 32 Mortar-Bed Tiling 09 34 Waterproofing-Membrane Tiling 09 35 Chemical-Resistant Tiling 09 39 Tiling Transitions

09 50 Ceilings 09 51 Acoustical Ceilings 09 53 Acoustical Ceiling Suspension Assemblies 09 54 Specialty Ceilings 09 57 Special Function Ceilings

09 60 Flooring 09 61 Flooring Treatment 09 63 Masonry Flooring 09 64 Wood Flooring 09 65 Resilient Flooring 09 66 Terrazzo Flooring 09 67 Fluid-Applied Flooring 09 68 Carpeting 09 69 Access Flooring

09 70 Wall Finishes 09 72 Wall Coverings 09 73 Wall Carpeting 09 74 Flexible Wood Sheets 09 77 Special Wall Surfacing

09 80 Acoustic Treatment 09 81 Acoustic Insulation 09 84 Acoustic Room Components

09 90 Painting and Coating 09 91 Painting 09 93 Staining and Transparent Finishing 09 96 High-Performance Coatings 09 97 Special Coatings

Using The Construction Task Catalog®

County of San Mateo, Flooring Page 00 - 1

CTC Information:

This Construction Task Catalog® was developed and customized by The Gordian Group, Inc.

specifically for County of San Mateo, priced locally using current labor, material and equipment costs, and published in September 2026.

The Gordian Group, Inc. licenses the use of this CTC and other proprietary information and software for the sole purpose of providing Job Order Contracting services to County of San Mateo. Use of The Gordian Group’s CTC and other proprietary information and software for any other purpose or any other entity is expressly prohibited without the express written consent of The Gordian Group, Inc.

MasterFormat™

The tasks in this Construction Task Catalog are organized using CSI’s MasterFormat.

The Unit Prices Include:

LABOR COSTS:

Labor costs include unloading equipment, materials, and tools, and transporting the same up or down 2 stories and 125' to reach the project site; layout;

measuring and cutting to fit; performing the task;

disposal of excess material; and time for lunch and breaks.

Labor costs include direct labor through the working foreperson level at straight-time prevailing wage rates including fringe benefits and an allowance for Social Security and Medicare taxes, worker's compensation, unemployment insurance and employee benefits.

Labor costs are based on workers familiar with and skilled in the performance of the task following OSHA requirements.

EQUIPMENT COSTS:

Equipment costs include all equipment required to accomplish the task.

Mobilization is included for all equipment except large equipment (e.g. cranes, pile drivers, bulldozers, excavators, backhoes, bobcats etc.), which exclude mobilization.

Equipment costs include all operating expenses such as fuel, electricity, lubricants, etc.

MATERIAL COSTS:

Material costs include the cost of the material, delivery, and all incidentals and accessories integral to the installation.

Material costs include manufacturer's and/or fabricator's shop drawings.

Material costs for roofing, drywall, VCT, carpet, wall covering, ceiling tile, pipe, conduit, concrete, etc.

include an allowance for waste. This list is not intended to be all inclusive, but descriptive of the types of construction materials that are typically sold in standard lengths, sizes and weights.

Complete and In-Place Construction:

Unit prices are for complete and in-place construction and include all labor, equipment and material required to complete the task as described in the CTC.

If the Contractor uses a crane or other lifting equipment (except a truck mounted boom lift or other equipment as part of the delivery process) to lift material onto a roof, even if that roof is less than 2 stories, the contractor will be paid for such crane or lifting equipment as a separate task.

Page 00 - 2 County of San Mateo, Flooring

Unit prices for imported materials (e.g. aggregate, sand, soil, etc.) include delivery up to 15 miles from the closest approved source.

Unit prices include all fasteners such as anchor bolts, lag bolts, screws, adhesive, wedge anchors, expansion bolts, roofing clips (excluding hurricane clips) that are required. Fasteners listed separately in the CTC are for use with Owner furnished material and equipment or relocating or reinstalling existing material and equipment.

Unit prices exclude more substantial mounting material such as threaded rod or angle iron unless the task description states otherwise.

Unit prices for doors and windows, duct work, plumbing fixtures, seamless floors, countertops, flashing, pitch pockets, skylights, curbs, roofing, etc.

include sealant and caulking.

Unit prices include testing, calibration, balancing and the like required to ensure proper installation, construction and performance (e.g. compaction test for backfill, balancing of heating ventilation and air conditioning, pneumatic or hydrostatic testing, soaping of joints, disinfection and flushing, others as required). Use of owner supplied materials, equipment or tying into existing equipment/piping may justify testing, balancing, etc.

Demolition:

Unit prices for demolition include all labor, equipment and material required for the complete removal of the items; clean-up of the area; and transporting the demolished items up or down 2 stories into a truck, dumpster, or to an owner designated area, located within 125' of the project site.

Unit prices for demolition exclude costs for hauling (See 01741900), dump fees (See 01741900), dumpsters (See 01741900), and trash chutes (See 01741900).

If the item being demolished is attached to another item being removed and can be removed as one item, then that item shall not be priced as a separate demolition task, unless the component alone must be demolished to accomplish the task (e.g. demolition of pipe includes pipe fittings unless the fitting must be demolished separately to accomplish the task; demolition of a wood door includes hinges, hardware, closures, kick plates, etc.).

The description "replace" includes the demolition of the existing item and the installation of the new item.

The descriptions "remove and relocate" or "remove and reinstall" includes the removal, cleaning of item and installation of the existing item in either the same location or another location.

The description "reinstall" includes the cleaning and installation of the existing item.

Salvageable materials remain the property of the Owner and shall be turned over as directed when specified in the Job Order.

The Adjustment Factors Include:

BUSINESS COSTS:

Overhead costs, including, unless specifically excluded in the Contract Documents, but not limited to;

• home office overhead

• insurance, bonds, and indemnification

• project meetings, training, management and supervision

• mobilization and close-out for the contract and each Job Order and

• project office staff and equipment.

Profit.

Subcontractor's overhead and profit.

All taxes for which a waiver is not available including material sales tax and equipment rental.

Employee or Subcontractor’s wage rates that exceed the prevailing wage rates.

County of San Mateo, Flooring Page 00 - 3

Fringe benefits, payroll taxes, worker’s compensation, insurance costs and any other payment mandated by law in connection with labor that exceeds the labor rate allowances.

Cost of financing the work.

Business risks such as the risk of a lower than expected volume of work, smaller than anticipated Job Orders, poor Subcontractor performance, and inflation or material cost fluctuations.

CONSTRUCTION RELATED COSTS:

Services required to obtain filings and permits.

Preparation and modification of proposals, sketches, drawings, submittals, as-built drawings, CADD drawings, microfilm, and other project records.

Incidental engineering and architectural services.

Office trailer and portable toilets for Contractor’s use.

Construction vehicles such as pick-up trucks, utility trucks, vans, flat bed trucks, tractors, trailers, etc.

Storage devices or items such as gang boxes and containers for Contractor's tools, equipment and materials.

Basic safety and warning signage, minor barricades (e.g., construction tape, etc.) and personnel safety equipment (e.g., hard hats, safety harnesses with lifeline or cabling, protective clothing, safety glasses, face shields, etc.).

Meeting Owner security requirements.

Excess waste including roofing, drywall, VCT, carpet, wall covering, ceiling tile, pipe, conduit, siding, concrete, etc. This list is not intended to be all inclusive, but descriptive of the types of construction materials that are typically sold in standard lengths, sizes and weights.

Removing and returning Owner's furniture and furnishings (e.g. chairs, tables, pictures, etc. but excluding modular furniture, wall or ceiling attached or fastened devices or furnishings, safes or other furniture requiring disassembly).

Sealing, windows, and openings with plastic to contain construction dust and debris within the work area.

Daily clean-up.

Final professional project clean-up.

Working in extreme temperatures (below or above normal) or adverse conditions such as excessive rain, wind, sleet or snow.

Costs resulting from inadequate supply of building materials, fuel, electricity, or skilled labor.

Costs resulting from productivity loss.

Differences in project size; complexity and location.

All costs for other than discreet items of work specifically required to complete a particular Job Order.

PRICE VARIATIONS:

Contractors may find differences in labor, equipment and material costs due to certain economic factors. Variations in labor cost can also result from labor efficiency, labor restrictions, working conditions and local work rules. Variations in material costs can also result from the quantity of material purchased, the existing relationship with suppliers, and because the materials have been discontinued or have become obsolete.

While diligent effort is made to provide accurate and reliable up-to-date pricing, it is the responsibility of the Contractor to review and analyze the unit prices, and to calculate their Adjustment Factors accordingly, prior to bidding.

Contractors may experience differences in decimal rounding on unit prices that may vary from unit prices set forth in the CTC.

GENERAL COSTS:

This list is not exhaustive and is intended to provide general examples of cost items to be included in the Contractor's Adjustment Factor as defined in the Contract.

Page 00 - 4 County of San Mateo, Flooring

The only compensation to be paid to a Contractor for the unit price tasks will be:

Published Unit Price

X Installation (or Demolition)

Quantity

X Appropriate Adjustment

Factor

No additional payments of any kind whatsoever will be made. All costs not included in the unit prices must be part of the Adjustment Factors.

General Interpretations:

WORKING HEIGHT:

Typical working height for work other than masonry is up to 14' above the finished floor or stationary working surface. The Contractor will not be paid for scaffolding, lifts, or similar equipment for work below 14'.

Typical working height for masonry work is up to 4' above the finished floor or stationary working surface. The Contractor will not be paid for scaffolding, lifts, or similar equipment for masonry work below 4'.

FIELD ENGINEERING:

Surveying tasks shall be used only when the Owner requests the Contractor to perform topographic surveys, property line surveys or to establish horizontal and vertical controls.

ASSEMBLIES:

Assembly unit prices take precedence over individual component pricing.

TESTING:

Contractor will be paid for testing existing material, as required by the technical specifications and as directed by the Owner (record tests) at the unit price for the appropriate task. The cost of process quality control testing routinely performed by the Contractor is included in the unit prices for the individual tasks.

MISCELLANEOUS:

For the purpose of calculating the quantity of a task, quantities are calculated on a per project basis. The quantity so determined shall be used for the task and all appropriate modifiers, unless the task states otherwise.

Whenever there are alternative tasks that may be selected to complete work the Contractor shall select the most practical and economical tasks available (e.g. rental of equipment by weeks or months rather than days or painting by roller or spray rather than brush).

Restricted Working Space is defined as any area with less than 3' vertical or horizontal clearance and includes areas such as crawl spaces, ceiling plenums where the grid is not removed, narrow piping tunnels, and equipment rooms where the space to install the new work is congested as a result of equipment and piping placement that meet these dimensional restrictions. A Restricted Working Space modifier is available for certain mechanical piping and piping accessories tasks and for certain electrical conduit and conduit accessories tasks. Only those tasks with a modifier for Restricted Working Space are eligible for a price adjustment, and then only if the modifier applies to the contemplated tasks. A non pre-priced task will not be allowed because of Restricted Working Space for any CTC task.

Confined Working Space is defined according to the OSHA definition 29 CFR 1926.21(b)(6)(i): "Any space having limited means of egress, which is subject to accumulation of toxic or flammable contaminants or has an oxygen deficient atmosphere, including, but not limited to, storage tanks, process vessels, bins, boilers, ventilation and exhaust duct, sewers, underground vaults, tunnels, pipelines and open top spaces more than 4 feet in depth such as pits and tubs." The Contractor shall conform to all OSHA and Owner requirements for working in Confined Working Spaces. Required

County of San Mateo, Flooring Page 00 - 5 ventilation and air monitoring equipment tasks shall be priced from the CTC.

Whenever a material, article or piece of equipment is identified in the CTC or in the specifications by reference to manufacturers’ or vendors’ names, trade names, catalogue numbers, or make, the identification is intended to establish a standard.

Any material, article or equipment of another manufacturer or vendor which performs satisfactorily the duties imposed by the general design may be considered equally acceptable provided that, in the opinion of the Owner, the material, article or equipment so proposed is of equal quality, substance and function. The Contractor shall not provide, furnish or install any proposed material, article or equipment without the prior written approval of the Owner. The burden of proof and all costs related thereto concerning the "or equal" nature of the substitute item, whether approved or disapproved, shall be borne by the Contractor.

SPECIFICATIONS:

Specifications for tasks shall be interpreted as follows: All labor, material, equipment, spare parts, services, and work required by a specification shall be considered part of the unit price, unless the task description or technical specifications state otherwise.

Useful Information:

UNIT OF MEASURE DEFINITIONS:

ACR – Acre, BAG – Bag, BBL – Barrel, BCY - Bank (In-place) Cubic Yards, BF - Board Foot, BOX - Box (each), BTU - British Thermal Unit, C - One Hundred, CCF - One Hundred Cubic Feet, CCY - Compacted Cubic Yards, CF - Cubic Foot, CFM - Cubic Feet Per Minute, CI – Cubic Inch, CLF - One Hundred Linear Feet, CSF - One Hundred Square Feet, CSY - Hundred Square Yards, CWT - Hundred Weight, CY - Cubic

Yard, CYM - Cubic Yard Mile, DAY – Day, DRM - Drum (each), EA – Each, FLR - Floor (Per Floor), FT – Foot, GAL – Gallon, GSF - Ground Square Foot, HR – Hour, HWT - Hundred Carton Weight, HYR – Half Year, IN – Inch, JOB – Job, LAN – Lane, LB – Pound, LCY - Loose (Excavated) Cubic Yards, LF - Linear Foot, LFD

- Linear Feet Per Day, LIT – Liter, LOT – Lot, MBF - One Thousand Board Feet, MBH - One Thousand British Thermal Units, MCF – One Thousand Cubic Feet, MF3 - One Thousand Cubic Feet Per Minute, MGL – One Thousand Gallons, MI – Mile, MLF - One Thousand Linear Feet, MO – Month, MSF - One Thousand Square Feet, MSY - One Thousand Square Yards, MT – Metric Ton, MTK – Metric Ton Kilometer, M2 – Square Meter, M3K – Cubic Meter Kilometer, NTE

– Note, OPN – Opening, OUT - Outlet or Output (each), OZ – Ounce, PKG – Package, PNT – Point, PR – Pair, QT – Quart, ROL - Roll (each), ROM – Room, ROW – Row, RSR - Riser (Per Rise), SEA – Seat, SET – Set, SF - Square Foot, SHT – Sheet, SI - Square Inch, STP - Stop (each), SQ - Square or One Hundred Square Feet, SY - Square Yard, SYI – Inches per Square Yard, TNM

- Tons per Mile, TON – Ton, TRK – Truck Load, UI - United Inch, UNT – Unit, VLF - Vertical Linear Foot, WK

– Week, YD – Yard, YR – Year

MATERIAL WEIGHTS:

EARTHEN MATERIAL

The following engineering values for establishing shrink/swell factors shall be used unless otherwise directed by the Owner.

Material Weight (Lbs Per CY)

Material In-place (Bank)

Loose (Excavated Materials) Compacted

Earth, Common (Average)

3170 2536 3520

Sand 2880 2590 3240 Earth, Rock Mix.

(75% E/ 25% R)

3380 2370 3720

Earth, Rock Mix.

(50% E/50% R)

3750 2710 4000

Earth, Rock 4120 3140 3680

Page 00 - 6 County of San Mateo, Flooring

Mix.

(25% E/ 75% R) Gravel (Average)

3280 2730 3570

Limestone 4380 2690 3220 Riprap Rock (Average)

4500 2610 3150

Granite 4540 2640 3170 Basalt 4950 3020 3640 Clay 3220 2150 3570 Gneiss 4550 2720 3180

BULK FACTORS FOR DEMOLITION:

The following bulk factors shall be used to calculate the volume of demolished material to be transported from the project site.

• Asphalt = 1.25

• Concrete = 1.40

CONVERSIONS:

1 Acre = 43,560 Square Feet = 4046.8 Square Meters

1 Board Foot = 12” x 12” x 1” = 144 Cubic Inches

1 Centimeter = 0.3937 Inches = 0.0328 Feet

1 Cubic Foot = 0.03704 Cubic Yards = 0.02832 Cubic Meters

1 Cubic Meter = 1.3080 Cubic Yards = 35.3147 Cubic Feet

1 Cubic Yard = 27 Cubic Feet = 0.7646 Cubic Meters

1 Foot = 12 Inches = 0.3048 Meters

1 Inch = 2.54 Centimeters = 0.0254 Meters

1 Kilogram = 2.2046 Pounds

1 Kilometer = 0.6214 Miles = 3280 Feet

1 Meter = 100 Centimeters = 3.2808 Feet

1 Mile = 5280 Feet = 1.6093 Kilometers

1 Pound = 0.4536 Kilograms

1 Square Foot = 144 Square Inches = .0929 Square Meters

1 Square Meter = 1.1960 Square Yards = 10.7639 Square Feet

1 Square Yard = 9 Square Feet = 0.8361 Square Meters

1 Ton = 2000 Pounds = 907.185 Kilograms

1 Yard = 3 Feet = 0.9144 Meters

Sheet Metal Thickness (inches) Gage No.

Steel Sheet

Galvanized Steel Sheet

Stainless Steel Sheet

Aluminum Sheet

10 .135 .138 .141 11 .120 .123 .125 12 .105 .108 .109 13 .090 .093 .094 .072 14 .075 .079 .078 .064 15 .067 .071 .070 .057 16 .060 .064 .063 .051 17 .054 .058 .056 .045 18 .048 .052 .050 .040 19 .042 .046 .044 .036 20 .036 .040 .038 .032 21 .033 .037 .034 .028 22 .030 .034 .031 .025 23 .027 .031 .028 .023 24 .024 .028 .025 .020 25 .021 .025 .022 .018 26 .018 .022 .019 .017

STANDARD GEOMETRY:

Circle

• Circumference = 2 π radius = π diameter

• Area = π radius2 = π (diameter2 / 4)

Cylinder

• Volume = (π radius2)height

• Surface Area = 2 π radius2+(2 π radius)height

Sphere

• Volume = (4 π radius3) / 3

• Surface Area = 4 π radius2 π = 3.14159

United Inch

County of San Mateo, Flooring Page 00 - 7

• The industry standard for measuring windows is the United Inch or UI. The UI is determined by adding the width and the height in inches.

TRADEMARKS

Gordian JOC Solution, JOC Complete Solution, JOC Complete Solution Plus, PROGEN, eGordian, ezIQC, Construction Task Catalog, Catalog of Construction Tasks, DMAP, The Standard for Job Order Contracting and 6 Phase Development and Implementation Process are either registered trademarks or trademarks of The Gordian Group, Inc. The names of actual companies and products mentioned herein may be the trademarks of their respective owners

Page 00 - 8 County of San Mateo, Flooring

THIS PAGE INTENTIONALLY LEFT BLANK

General Requirements 01

Summary 01 10 Summary Of Work 01 11

MINOR TOTAL DIRECT DEMOLITION

CSI UOM DESCRIPTION UNIT COST UNIT COST

2026 copyright 2026 The Gordian Group, Inc.

County of San Mateo, Flooring Page 01 - 1

01 General Requirements

01 10 Summary (01)

01 11 Summary Of Work (01 10)

01 11 13 Work Covered by Contract Documents (01 11)

Note: For specification publishing. Review specifications for requirements.

01 11 13 00-0001 NTE Work Covered by Contract Documents .................................................................................................................................. 0.00 Note: For specification publishing. Review specifications for requirements.

XXXXXXX

01 20 Price and Payment Procedures (01)

01 22 Unit Prices (01 20)

Note: Provide digital copies of photographs.

01 22 16 Unit Price Payment (01 22)

01 22 16 00-0001 Reimbursable Fees (01 22 16)

Note: Reimbursable fees include but are not limited to permits, special inspections, special insurance, additional warranties, tolls, expedited shipping costs, etc, which are not included in a task or an Adjustment Factor as explained in the Contract or The Construction Task Catalog®.

01 22 16 00-0002 EA Reimbursable Fees ................................................................................................................................................................. 1.00

Note: Reimbursable Fees will be paid to the contractor for eligible costs as directed by Owner. Insert the appropriate quantity to adjust the base cost to the actual Reimbursable Fee. If there are multiple Reimbursable Fees, list each one separately and add a comment in the "note" block to identify the Reimbursable Fee (e.g.

sidewalk closure, road cut, various permits, extended warranty, expedited shipping costs, etc.). A copy of each receipt, invoice, or proof of payment shall be submitted with the Price Proposal.

XXXXXXX

01 22 16 00-0003 Negotiated Travel Costs (01 22 16)

Note: To be used only at the request of authorized personal for non-commuting travel costs.

01 22 16 00-0004 EA Negotiated Travel Costs ......................................................................................................................................................... 1.00 Note: Supporting documentation must be included with each Work Order.

XXXXXXX

01 22 20 Wage Rates (01 22)

01 22 20 00-0001 Local Labor/Wage Rates (01 22 20)

Note: Welders receive the rate prescribed for the craft performing the operation to which the welding is incidental.

01 22 20 00-0002 HR Asbestos Removal Worker ................................................................................................................................................. 102.72 Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 5.14 For Apprentice, Deduct -20.54

01 22 20 00-0003 HR Insulator .............................................................................................................................................................................. 171.48

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 8.57 For Apprentice, Deduct -34.30

01 22 20 00-0004 HR Boilermaker......................................................................................................................................................................... 132.66

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 6.63 For Apprentice, Deduct -26.53

01 22 20 00-0005 HR Brick Layer .......................................................................................................................................................................... 123.20

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 6.16 For Apprentice, Deduct -24.64

01 22 20 00-0006 HR Carpenter ............................................................................................................................................................................ 153.13

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 7.66 For Apprentice, Deduct -30.63

01 22 20 00-0007 HR Carpet, Linoleum ................................................................................................................................................................ 142.58

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 7.13 For Apprentice, Deduct -28.52

01 22 20 00-0008 HR Cement Mason ................................................................................................................................................................... 106.31

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 5.32 For Apprentice, Deduct -21.26

01 22 20 00-0009 HR Drywall Finisher .................................................................................................................................................................. 144.24

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 7.21 For Apprentice, Deduct -28.85

01 22 20 00-0010 HR Electrician, Inside Wireman ................................................................................................................................................ 179.98

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 9.00 For Apprentice, Deduct -36.00

01 22 20 00-0011 HR Equipment Operator, Crane, Group 1-A ............................................................................................................................. 138.08

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

01 22 20 00-0012 HR Equipment Operator, Crane, Group 2-A ............................................................................................................................. 135.61 Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 6.78

01 20 Price and Payment Procedures 01 22 Unit Prices copyright 2026 The Gordian Group, Inc. 2026 Page 01 - 2 County of San Mateo, Flooring

01 22 20 00-0013 HR Equipment Operator, Crane, Group 3-A ............................................................................................................................. 133.22

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

01 22 20 00-0014 HR Equipment Operator, Medium, Group 3 .............................................................................................................................. 132.68 Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 6.63 For Apprentice, Deduct -26.54

01 22 20 00-0015 HR Equipment Operator, Medium, Group 4 .............................................................................................................................. 130.64

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

01 22 20 00-0016 HR Equipment Operator, Medium, Group 5 .............................................................................................................................. 128.98 Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

01 22 20 00-0017 HR Equipment Operator, Light, Group 6 ................................................................................................................................... 127.13

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 6.36 For Apprentice, Deduct -25.43

01 22 20 00-0018 HR Equipment Operator, Light, Group 7 ................................................................................................................................... 125.54

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

01 22 20 00-0019 HR Equipment Operator, Light, Group 8 ................................................................................................................................... 123.96 Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

01 22 20 00-0020 HR Glazier ................................................................................................................................................................................ 134.30

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 6.72 For Apprentice, Deduct -26.86

01 22 20 00-0021 HR Laborer ................................................................................................................................................................................. 97.85

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

01 22 20 00-0022 HR Lather.................................................................................................................................................................................. 142.83 Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 7.14 For Apprentice, Deduct -28.57

01 22 20 00-0023 HR Marble Setter ...................................................................................................................................................................... 132.74

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 6.64 For Apprentice, Deduct -26.55

01 22 20 00-0024 HR Millwright ............................................................................................................................................................................. 144.15

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 7.21 For Apprentice, Deduct -28.83

01 22 20 00-0025 HR Mold Removal Worker ........................................................................................................................................................ 101.50

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 5.08 For Apprentice, Deduct -20.30

01 22 20 00-0026 HR Painter, Ordinary ................................................................................................................................................................. 114.47

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 5.72 For Apprentice, Deduct -22.89

01 22 20 00-0027 HR Painter, Structural Steel ...................................................................................................................................................... 119.18

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 5.96 For Apprentice, Deduct -23.84

01 22 20 00-0028 HR Paperhanger ....................................................................................................................................................................... 114.47

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 5.72 For Apprentice, Deduct -22.89

01 22 20 00-0029 HR Pile Drivers ......................................................................................................................................................................... 153.36

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 7.67 For Apprentice, Deduct -30.67

01 22 20 00-0030 HR Plasterer ............................................................................................................................................................................. 131.56

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 6.58 For Apprentice, Deduct -26.31

01 22 20 00-0031 HR Plumber .............................................................................................................................................................................. 177.78

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 8.89 For Apprentice, Deduct -35.56

01 22 20 00-0032 HR Powderman ......................................................................................................................................................................... 102.70

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 5.14 For Apprentice, Deduct -20.54

01 22 20 00-0033 HR Rodman (Reinforcing)/Ornamental Steel Worker ............................................................................................................... 126.13

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 6.31 For Apprentice, Deduct -25.23

01 22 20 00-0034 HR Roofer, Composite .............................................................................................................................................................. 147.87

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 7.39 For Apprentice, Deduct -29.57

01 22 20 00-0035 HR Roofer, Metal ...................................................................................................................................................................... 152.46

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 7.62 For Apprentice, Deduct -30.49

01 22 20 00-0036 HR Roofer, Tile/Slate ................................................................................................................................................................ 143.69

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 7.18 For Apprentice, Deduct -28.74

Price and Payment Procedures 01 20 Unit Prices 01 22

2026 copyright 2026 The Gordian Group, Inc.

County of San Mateo, Flooring Page 01 - 3

01 22 20 00-0037 HR Sheet Metal Worker ............................................................................................................................................................ 189.28

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 9.46 For Apprentice, Deduct -37.86

01 22 20 00-0038 HR Sprinkler Installer ................................................................................................................................................................ 165.11

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 8.26 For Apprentice, Deduct -33.02

01 22 20 00-0039 HR Steam / Pipe Fitter .............................................................................................................................................................. 177.41

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 8.87 For Apprentice, Deduct -35.48

01 22 20 00-0040 HR Stone Mason....................................................................................................................................................................... 123.20

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 6.16 For Apprentice, Deduct -24.64

01 22 20 00-0041 HR Iron Worker, Structural ........................................................................................................................................................ 130.01

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 6.50 For Apprentice, Deduct -26.00

01 22 20 00-0042 HR Tile Layer ............................................................................................................................................................................ 115.75

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 5.79 For Apprentice, Deduct -23.15

01 22 20 00-0043 HR Terrazzo Worker ................................................................................................................................................................. 124.65

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 6.23 For Apprentice, Deduct -24.93

01 22 20 00-0044 HR Truck Driver, Light, Group 1................................................................................................................................................ 105.61

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 5.28 For Apprentice, Deduct -21.12

01 22 20 00-0045 HR Truck Driver, Medium, Group 2 ........................................................................................................................................... 106.06

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

01 22 20 00-0046 HR Truck Driver, Heavy, Group 3 ............................................................................................................................................. 106.51 Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

For Foreperson, Add 5.33 For Apprentice, Deduct -21.30

01 22 20 00-0047 HR Truck Driver, Heavy, Group 4 ............................................................................................................................................. 107.04

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

XXXXXXX

01 22 20 00-0048 Rates For Services (01 22 20)

01 22 20 00-0049 HR Watch/Guard Person, Unarmed ............................................................................................................................................ 40.14

Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

01 22 20 00-0050 HR Watch/Guard Person, Armed ................................................................................................................................................ 49.24 Note: For tasks not included in the Construction Task Catalog® and as directed by owner only.

01 22 20 00-0051 HR Fire Watch Laborer ............................................................................................................................................................... 97.85

Note: Fire watchers shall be required whenever welding or cutting is performed in locations where other than a minor fire might develop, or any of the following conditions exist: (1) Appreciable combustible material, in building construction or contents, closer than 35 feet (10.7 m) to the point of operation. (2) Appreciable combustibles are more than 35 feet (10.7 m) away but are easily ignited by sparks. (3) Wall or floor openings within a 35-foot (10.7

m) radius expose combustible material in adjacent areas including concealed spaces in walls or floors. (4) Combustible materials are adjacent to the opposite side of metal partitions, walls, ceilings, or roofs and are likely to be ignited by conduction or radiation.

XXXXXXX

01 22 23 Equipment Usage (01 22)

Note: Includes fuel costs unless otherwise stated. These tasks shall be used for owned, leased or rented equipment. Excludes mobilization unless otherwise stated. See CSI section 01 71 13 00-0000 for equipment delivery, pickup, mobilization and demobilization.

01 22 23 00-0001 Air Equipment (01 22 23)

01 22 23 00-0002 Air Compressors (01 22 23 00-0001)

Note: Includes delivery, set-up, and removal. Excludes operator.

01 22 23 00-0003 DAY 100 CFM Diesel Powered Portable Air Compressor ........................................................................................................... 173.95

01 22 23 00-0004 WK 100 CFM Diesel Powered Portable Air Compressor ........................................................................................................... 521.84

01 22 23 00-0005 MO 100 CFM Diesel Powered Portable Air Compressor ........................................................................................................ 1,449.56

01 22 23 00-0006 DAY 130 CFM Diesel Powered Portable Air Compressor ........................................................................................................... 208.74

01 22 23 00-0007 WK 130 CFM Diesel Powered Portable Air Compressor ........................................................................................................... 614.61

01 22 23 00-0008 MO 130 CFM Diesel Powered Portable Air Compressor ........................................................................................................ 1,739.48

01 22 23 00-0009 DAY 185 CFM Diesel Powered Portable Air Compressor ........................................................................................................... 278.32

01 22 23 00-0010 WK 185 CFM Diesel Powered Portable Air Compressor ........................................................................................................... 626.21

01 22 23 00-0011 MO 185 CFM Diesel Powered Portable Air Compressor ........................................................................................................ 1,379.98

01 22 23 00-0012 DAY 375 CFM Diesel Powered Portable Air Compressor ........................................................................................................... 394.28

01 22 23 00-0013 WK 375 CFM Diesel Powered Portable Air Compressor ........................................................................................................... 997.30

01 22 23 00-0014 MO 375 CFM Diesel Powered Portable Air Compressor ........................................................................................................ 2,377.28

01 22 23 00-0015 DAY 600 CFM Diesel Powered Portable Air Compressor ........................................................................................................... 876.70

01 22 23 00-0016 WK 600 CFM Diesel Powered Portable Air Compressor ........................................................................................................ 2,110.56

01 22 23 00-0017 MO 600 CFM Diesel Powered Portable Air Compressor ........................................................................................................ 5,260.17

01 22 23 00-0018 DAY 750 CFM Diesel Powered Portable Air Compressor ........................................................................................................ 1,055.28

01 22 23 00-0019 WK 750 CFM Diesel Powered Portable Air Compressor ........................................................................................................ 2,597.62

01 22 23 00-0020 MO 750 CFM Diesel Powered Portable Air Compressor ........................................................................................................ 6,378.08

01 22 23 00-0021 DAY 825 CFM Diesel Powered Portable Air Compressor ........................................................................................................ 1,055.28 copyright 2026 The Gordian Group, Inc. 2026 Page 01 - 4 County of San Mateo, Flooring

01 22 23 00-0022 WK 825 CFM Diesel Powered Portable Air Compressor ........................................................................................................ 2,597.62

01 22 23 00-0023 MO 825 CFM Diesel Powered Portable Air Compressor ........................................................................................................ 6,378.08

01 22 23 00-0024 DAY 1,300 CFM Diesel Powered Portable Air Compressor ..................................................................................................... 1,229.23

01 22 23 00-0025 WK 1,300 CFM Diesel Powered Portable Air Compressor ..................................................................................................... 2,755.33

01 22 23 00-0026 MO 1,300 CFM Diesel Powered Portable Air Compressor ..................................................................................................... 7,347.54

01 22 23 00-0027 DAY 1,600 CFM Diesel Powered Portable Air Compressor ..................................................................................................... 1,530.74

01 22 23 00-0028 WK 1,600 CFM Diesel Powered Portable Air Compressor ..................................................................................................... 3,444.16

01 22 23 00-0029 MO 1,600 CFM Diesel Powered Portable Air Compressor ..................................................................................................... 9,184.43

XXXXXXX

01 22 23 00-0030 Electrical Equipment (01 22 23)

01 22 23 00-0031 Tripod Mounted Floodlights (01 22 23 00-0030)

Note: Includes delivery to job site and pick-up when complete.

01 22 23 00-0032 DAY 500 Watt, 115 Volt, 2 Lamp, Portable Light Stand With Tripod ............................................................................................. 63.14

01 22 23 00-0033 WK 500 Watt, 115 Volt, 2 Lamp, Portable Light Stand With Tripod ........................................................................................... 149.38

01 22 23 00-0034 MO 500 Watt, 115 Volt, 2 Lamp, Portable Light Stand With Tripod ........................................................................................... 315.70

01 22 23 00-0035 DAY 1,000 Watt, 115 Volt, 2 Lamp, Portable Light Stand With Tripod .......................................................................................... 63.14

01 22 23 00-0036 WK 1,000 Watt, 115 Volt, 2 Lamp, Portable Light Stand With Tripod ........................................................................................ 184.80

01 22 23 00-0037 MO 1,000 Watt, 115 Volt, 2 Lamp, Portable Light Stand With Tripod ........................................................................................ 546.70

01 22 23 00-0038 DAY 2,000 Watt, 115 Volt, 2 Lamp, Portable Light Stand With Tripod .......................................................................................... 70.84

01 22 23 00-0039 WK 2,000 Watt, 115 Volt, 2 Lamp, Portable Light Stand With Tripod ........................................................................................ 192.50

01 22 23 00-0040 MO 2,000 Watt, 115 Volt, 2 Lamp, Portable Light Stand With Tripod ........................................................................................ 469.70

XXXXXXX

01 22 23 00-0041 Trailer Mounted Floodlights (01 22 23 00-0030)

Note: Includes delivery to job site and pick-up when complete.

This is the start of the file's text. The full file is on GovTribe.