This document provides stability restrictions and operating requirements for an excavator barge named KEEN, U.S. ON 1279883. The barge measures 102.53 feet in length, 42.65 feet in width, and has a maximum draft of 4 feet 4 1/8 inches. The stability letter stipulates that operations are limited to rivers, lakes, bays and sounds in summer months only. Cargo is restricted to a maximum of 22.25 long tons at a certain height above the baseline. The document outlines lifting capacity charts for cranes on the barge and ready-to-lift conditions depending on crane positioning and environmental factors. Any weight changes to the barge require re-evaluation and authorization from the Coast Guard. Maintaining bilge pumping and freeing ports is also mandated. The related federal contract opportunity is solicitation number W912BU-23-B-0024 for an excavator barge from the Department of the Army Corps of Engineers Engineering District Philadelphia.

View the file

Other files for this federal contract opportunity

Other files attached to Excavator Barge, newest first.
File Type Posted
W912BU-23-B-0024 Amendment 2.pdf PDF
W912BU-23-B-0024 Amendment 1.pdf PDF
W912BU-23-B-0024.pdf PDF
871-B690-01 Compressed Air.pdf PDF
871-B552-01 Spudwell Structure and Spud Handling Sys.pdf PDF
871-B637-01 Waste Oil System.pdf PDF
871-B427-01 Vertical and Inclined Ladders.pdf PDF
871-B415-01 Doors Windows Hatches and Manholes.pdf PDF
871-B309-01 Transverse Structure.pdf PDF
871-B305-01 Scantling Plan.pdf PDF
871-B307-01 Shell Plating.pdf PDF
871-B405-01 Cathodic Protection.pdf PDF
871-B115-01 WEIGHT ESTIMATES.pdf PDF
871-B205-01 PROFILE.pdf PDF
871-B000-02 Drawing Index.pdf PDF
731-E170-01 DRY DOCKING PLAN.pdf PDF
871-B720-02 DC One Line Diagram.pdf PDF
871-B730-01 Lighting Plan.pdf PDF
871-B730-02 Receptacle Plan.pdf PDF
871-B660-01 BILGE AND BALLAST SYSTEM.pdf PDF
871-B675-01 Deck Washdown System.pdf PDF
871-B552-02 Traveling Spud.pdf PDF
871-B548-01 Excavator Matting and Tie Downs.pdf PDF
871-B655-01 Hydraulic Oil System.pdf PDF
871-B598-01 Rev A Boarding Ramp.pdf PDF
871-B552-03 Traveling Spud Track Details.pdf PDF
871-B425-01 Walkways Railings and Gratings.pdf PDF
871-B436-01 Insulation Sheathing Joinery Details.pdf PDF
871-B420-01 Deck Fittings.pdf PDF
871-B406-01 MDC STANDARD FLOATING PLANT PAINT SCHEDULE.pdf PDF
871-B301-01 Welding Schedule.pdf PDF
871-B155-01 INTACT STABILITY.pdf PDF
871-B000-01 Title Sheet.pdf PDF
793-B725-02 CABLE SCHEDULE AND VOLTAGE DROP (DC).pdf PDF
793-B685-03 DECKHOUSE HEATING AND COOLING LOAD CALCULATIONS.pdf PDF
703-B685-01 REV2 VENTILATION SYSTEM.pdf PDF
703-B685-02 REV- AIR CONDITIONING SYSTEM.pdf PDF
871-B670-01 Vents Sounds Overflows and Fills.pdf PDF
871-B672-01 Drainage System.pdf PDF
871-B720-02 DC One-Line Diagram.pdf PDF
871-B665-01 Potable Water System.pdf PDF
871-B630-01 Fuel Oil System.pdf PDF
871-B410-01 Fendering Details.pdf PDF
871-B399-01 ABS Structure Calculations.pdf PDF
871-B325-01 Seachest Details.pdf PDF
871-B215-01 General Arrangement.pdf PDF
871-B311-01 Longitudinal Structure.pdf PDF
871-B150-01 DAMAGE STABILITY.pdf PDF
703-B725-03 REV- EMERGENCY LIGHTING VOLTAGE DROP AND CABLE SCHEDULE.pdf PDF
871-B760-01 Shore Power and Off-Vessel Power Details.pdf PDF
Show all 50

Excavator Barge has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABS Plaza, 1 6855 Northchase Drive | Houston, TX 77060 USA TEL: 1 -281 -877-6000 | FAX: 1 -281 -877-6001 | Email: ABS-WorldHQ@eagle.org | www.eagle.org

Stability Letter 29 March 2018

Master, �KEEN� ON: 1279883 Conrad Industries, Hull C-1166 102.53� (LOA) x 42.65� x 8�-6� Deck Crane Barge [I]

You are responsible for maintaining this barge in a satisfactory stability condition at all times and for following the instructions and precautions listed below. All log entries required by 46 CFR 97.35 shall be made prior to getting underway for each voyage.

An inclining experiment witnessed by ABS Americas on behalf of the U.S. Coast Guard was conducted on the �KEEN�, U.S. ON 1279883 at Conrad Industries, in Amelia, Louisiana on 20 November 2017. On the basis of this inclining experiment, stability calculations have been performed.

Results indicate that the stability of the �KEEN�, as presently outfitted and equipped, is satisfactory for operation on River Service only, provided that the following restrictions are observed.

OPERATING RESTRICTIONS

1. ROUTE: Operations are limited to rivers, lakes, bays, sounds and great lakes summer service only. Since the barge�s route is based upon other considerations in addition to stability, you are cautioned that the route may be further limited to that specified on the Certificate of Inspection.

2. DRAFT AND TRIM: A minimum freeboard of 4 feet 2-3/4 inches measured from the main deck amidships must be maintained. This corresponds to a maximum molded draft of 4 feet 3- 3/4 inches (4 feet 4-1/8 inches extreme). Trim and heel should be minimized.

3. DECK CARGO: Deck cargo shall not exceed 22.25 LT at 11.13�above baseline.

4. TANKS:

a. No more than one centerline or P/S pair of the tanks may be partially filled at one time.

b. Any cross connections between port and starboard tank pairs shall be kept closed at all times when underway.

5. HULL OPENINGS: Any openings that could allow water to enter into the hull or superstructure should be kept closed during lifting or when rough weather or river conditions exist or are anticipated.

6. LIFTING OPERATIONS:

a. Lifting is permitted only on River Service.

b. The wind speed shall not exceed 40 mph during lifting operations

c. The capacities shown on the attached Crane Load Charts, bearing ABS Americas approval stamp dated 29 March 2018, shall not be exceeded. Legible copies of these charts must be maintained in the crane operator�s control stations in clear sight of the

Electronically published by ABS Houston.

Reference T1716010, dated 29-MAR-2018.

http://www.eagle.org

�KEEN�

Conrad Industies., Hull C-1166

ON 1279883

29 March 2018

Page: 2 of 3 operator. Any further manufacturer restrictions regarding wind, dynamic loading, machine list, machine trim and heel pin angle shall be followed.

d. Only one crane shall be operated during lifting operations.

e. Prior to lifting, operator shall ensure that the crane is in accordance with the following Ready-To-Lift conditions:

a. Maintenance Crane Lifting Operations � Ready-To-Lift Condition

1) With the Maintenance Crane positioned on centerline, facing aft with 0° boom elevation, the �READY-TO-LIFT� condition of the barge shall be:

i) Vessel List: Not to exceed 0.20° to Port or Starboard

ii) Vessel Trim: Not to exceed 0.20° Forward or Aft

iii) Draft: Not to exceed 4�-6� @ Fwd Node Draft Marks (9�-6� Fwd FR 0)

2) The operators shall make adjustments to the Wicket Crane position to place the barge in the �Ready-To-Lift� condition, making allowances for the tank loads, deck loads, other loads and environmental factors.

b. Wicket Lifting Operations (Port Side Only) � Ready-To-Lift Condition

1) Maintenance Crane Ready-To-Lift Position: fully retracted, 0° boom angle elevation, facing forward, ~35° off centerline to starboard.

2) Wicket Lifter Crane Ready-To-Lift Position: �stowed� with boom facing aft over the deck, ~25° off centerline to port, lowered to the deck with the jib tucked under/fully retracted.

3) The barge �READY-TO-LIFT� condition shall be:

i)Vessel List: Not Less Than 0.25° to Starboard.

ii) Vessel Trim: Not to exceed 0.50° Forward or Aft

iii) Draft: Not to exceed 4�-9� @ Fwd Node Draft Marks (9�-6� Fwd FR 0)

4) The operators shall make adjustments to the Maintenance Crane position to place the barge in the �Ready-To-Lift� condition, making allowances for the tank loads, deck loads, other loads and environmental factors.

c. Wicket 360° Lifting Operations � Ready-To-lift Condition

1) Maintenance Crane Ready-To-Lift Position: fully retracted, 0° boom angle elevation, facing forward on centerline.

2) Wicket Lifter Crane Ready-To-Lift Position: �stowed� with boom facing aft over the deck, ~25° off centerline to port, lowered to the deck with the jib tucked under/fully retracted.

3) The barge �READY-TO-LIFT� condition shall be:

i) Vessel List: Not to exceed 0.30° to Port or Starboard.

Electronically published by ABS Houston.

�KEEN�

Conrad Industies., Hull C-1166

ON 1279883

29 March 2018

Page: 3 of 3

ii) Vessel Trim: Not to exceed 0.10° Forward or Aft

iii) Draft: Not to exceed 4�-5� @ Fwd Node Draft Marks (9�-6� Fwd FR 0)

4) Derated 360° Swing Load Chart shall be used.

7. WEIGHT CHANGES: This stability letter has been issued based upon the following lightship characteristics:

Weight: 567.04 Long Tons VCG: 12.30 Feet above baseline LCG: 41.31 Feet Aft of Frame 0 TCG: 0.97 Feet Stbd. Of Centerline

We note that the barge is not fitted with permanent ballast, and the lightship includes the cranes and booms in their stowed positions. Spuds are excluded from lightship.

Any alternations resulting in a change in these parameters will invalidate this stability letter.

No fixed ballast or other such weights shall be added, removed and/or relocated without the authorization and supervision of the cognizant OCMI or ABS.

8. BILGES: The barge's bilges and voids shall be kept pumped to minimum contents at all times consistent with pollution prevention requirements.

9. LIST: You should make every effort to determine the cause of any list of the barge before taking corrective action.

10. FREEING PORTS: Deck freeing ports shall be maintained operable and completely unobstructed at all times.

11. WATERTIGHT BULKHEADS: No watertight bulkheads shall be removed or altered without the authorization and supervision of the cognizant Officer in Charge, Marine Inspection (OCMI).

This stability letter shall be maintained in a suitable location on board the barge at all times.

Very truly yours, Roy H. Bleiberg Vice President of Engineering ABS Americas

By: _______________________________ William (Bill) Leyrer Managing Principal Engineer ABS Americas � Houston SED

Attachment: Crane Load Charts, bearing ABS Americas approval stamp dated 29 March 2018

Electronically published by ABS Houston.

A P P E N D IX A

Electronically published by ABS Houston.

A P P E N

D I X

P P E N

D I X

A

File details come from the government source that posted it. Updated .