This document is a Phasing Description Narrative for the Armed Forces Retirement Home (AFRH) Sheridan Building renovation project (AFRH-042), prepared by AE Works on May 14, 2026. It provides a comprehensive breakdown of phased construction scope across two areas (Area A North and Area B South) aligned with AE Works' Opinion of Probable Costs submitted September 25, 2025, with specific scope reallocations dated March 17, 2026.

The phasing narrative divides work across multiple discipline areas including Civil, Structural, Architecture, Fire Protection, Fire Alarm, Mechanical, Electrical, Plumbing, Telecom, Security, and Food Service. Area A (North) encompasses all work associated with building construction on the north side, including the exterior lobby entrance and basement work excluding support for community room and south infill areas. Area A also includes all first floor work north of centerline (CL) 14, floors 2-8 north of CL 14 with elevators and main lobby, and various MEP systems in those zones. Area B (South) covers building construction on the south side with installation of new generators and associated electrical tie-ins listed as Option #1. Area B includes basement work needed for community room and south infill areas, first floor work south of CL 14 excluding elevators and main lobby, and floors 2-7 south of CL 14 including elevators and main lobby. Critical requirements include maintaining access to Laundry and storage rooms G002, G004, G012, and G012A throughout construction, with fire pump relocation noted as a separate contract and demolition of abandoned steam pipe in the tunnel designated as base bid scope. All applicable specifications apply to both areas.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 Making Building Projects a Better Value

Armed Forces

Retirement Home

Sheridan Building

Project No.

AFRH-042

Armed Forces Retirement Home

Justin Seffens Lead Facilities Manager

05.14.26

This phasing description narrative provides a breakdown of phasing areas in alignment with AE Works’ Opinion of Probable Costs submitted on September

25, 2025 and specific scope items reallocated on March 17, 2026 from the phased construction of Areas A and B of the design documents.

Discipline Area A (North) Area B (South)

Civil • All work associated with building construction to north side of building.

• Exterior area including lobby entrance.

• All work associated with building construction to south side of building.

• Installation of new generators and associated tie-ins to new electrical gear to be listed as Option #1

Structural • All work in basement, (including Shell Space A [G201]), but excluding support for community room center infill (“Shell Space B [G201]”) and south infill areas (“Shell Spaces C [G333] and D [G324]”).

• Access to Laundry and storage rooms G002, G004, G012 and G012A must be maintained.

• All first floor to north of CL 14 including elevators and main lobby (area between CL 15.5/G.6 and 18/N) and balcony enclosures at CL 14.

• Floors 2-8: all areas north of CL 14 including elevators and main lobby.

• All work in basement needed for support for community room center infill (“Shell Space B [G201]”) and south infill areas (“Shell Spaces C [G333] and D [G324]”)

• All first floor to south of CL 14 excluding elevators and main lobby (area between CL 15.5/G.6 and 18/N).

• Floors 2-7: all areas south of CL 14 including elevators and main lobby.

Architecture • All work in basement, excluding support for community room center infill (“Shell Space B”) and south infill areas (“Shell Spaces C and D”).

• Access to Laundry and storage rooms G002, G004, G012 and G012A must be maintained.

• All work in basement needed for support for community room center infill (“Shell Space B”) and south infill areas (“Shell Spaces C and D”).

• All first floor to south of CL 14 excluding elevators and main lobby (area between CL

2 Making Building Projects a Better Value

Retirement Home

Sheridan Building

Project No.

AFRH-042

• All first floor to north of CL 14 including elevators and main lobby (area between CL 15.5/G.6 and 18/N) and balcony enclosures at CL 14.

• Floors 2-8: all areas north of CL 14 including elevators and main lobby.

15.5/G.6 and 18/N).

• Floors 2-7: all areas south of CL 14 including elevators and main lobby.

Fire Protection

• All work in basement, excluding support for community room center infill (“Shell Space B”) and south infill areas (“Shell Spaces C and D”).

• All first floor to north of CL 14 including elevators and main lobby (area between CL 15.5/G.6 and 18/N) and balcony enclosures at CL 14.

• Floors 2-8: all areas north of CL 14 including elevators and main lobby.

• Fire pump relocation to be under separate contract.

• All work in basement needed for support for community room center infill (“Shell Space B”) and south infill areas (“Shell Spaces C and D”).

• All first floor to south of CL 14 excluding elevators and main lobby (area between CL 15.5/G.6 and 18/N).

• Floors 2-7: all areas south of CL 14 including elevators and main lobby.

• Fire pump relocation to be under separate contract.

Fire Alarm • All work in basement, excluding support for community room center infill (“Shell Space B”) and south infill areas (“Shell Spaces C and D”).

• All first floor to north of CL 14 including elevators and main lobby (area between CL 15.5/G.6 and 18/N) and balcony enclosures at CL 14.

• Floors 2-8: all areas north of CL 14 including elevators and main lobby.

• All work in basement needed for support for community room center infill (“Shell Space B”) and south infill areas (“Shell Spaces C and D”).

• All first floor to south of CL 14 excluding elevators and main lobby (area between CL 15.5/G.6 and 18/N).

• Floors 2-7: all areas south of CL 14 including elevators and main lobby.

Mechanical • All work in basement, excluding support for community room center infill (“Shell Space B”) and south infill areas (“Shell Spaces C and D”).

• All first floor to north of CL 14 including elevators and main lobby (area between CL 15.5/G.6 and 18/N) and balcony enclosures at CL 14.

• All work in basement needed for support for community room center infill (“Shell Space B”) and south infill areas (“Shell Spaces C and D”) including AHU- 5.

• All first floor to south of CL 14 excluding elevators and main

15.5/G.6 and 18/N).

3 Making Building Projects a Better Value

Retirement Home

Sheridan Building

Project No.

AFRH-042

• Floors 2-8: all areas north of CL 14 including elevators and main lobby.

• Demolition of abandoned steam pipe in tunnel.

• Floors 2-7: all areas south of CL 14 including elevators and main lobby.

• Installation of new (GFE) chiller plant.

Electrical • All work in basement, excluding support for community room center infill (“Shell Space B”) and south infill areas (“Shell Spaces C and D”).

• All first floor to north of CL 14 including elevators and main lobby (area between CL 15.5/G.6 and 18/N) and balcony enclosures at CL 14.

• Floors 2-8: all areas north of CL 14 including elevators and main lobby.

• All work in basement needed for support for community room center infill (“Shell Space B”) and south infill areas (“Shell Spaces C and D”).

• All first floor to south of CL 14 excluding elevators and main lobby (area between CL 15.5/G.6 and 18/N).

• Floors 2-7: all areas south of CL 14 including elevators and main lobby.

• Installation of new generators and associated tie-ins to new electrical gear to be listed as Option #1

Plumbing • All work in basement, excluding support for community room center infill (“Shell Space B”) and south infill areas (“Shell Spaces C and D”).

• All sanitary riser connections to under-slab laterals north of CL 16.5.

• All first floor to north of CL 14 including elevators and main lobby (area between CL 15.5/G.6 and 18/N) and balcony enclosures at CL 14.

• Floors 2-8: all areas north of CL 14 including elevators and main lobby.

• All work in basement needed for support for community room center infill (“Shell Space B”) and south infill areas (“Shell Spaces C and D”).

• All sanitary riser connections to under-slab laterals south of CL 16.5.

• All first floor to south of CL 14 excluding elevators and main lobby (area between CL 15.5/G.6 and 18/N).

• Floors 2-7: all areas south of CL 14 including elevators and main lobby.

Telecom • All work in basement, excluding support for community room center infill (“Shell Space B”) and south infill areas (“Shell Spaces C and D”).

• All first floor to north of CL 14 including elevators and main lobby (area between CL 15.5/G.6 and 18/N) and balcony enclosures

• All work in basement needed for support for community room center infill (“Shell Space B”) and south infill areas (“Shell Spaces C and D”).

• All first floor to south of CL 14 excluding elevators and main

15.5/G.6 and 18/N).

4 Making Building Projects a Better Value

Retirement Home

Sheridan Building

Project No.

AFRH-042

at CL 14.

• Floors 2-8: all areas north of CL 14 including elevators and main lobby.

• Floors 2-7: all areas south of CL 14 including elevators and main lobby.

Security • All work in basement, excluding support for community room center infill (“Shell Space B”) and south infill areas (“Shell Spaces C and D”).

• All first floor to north of CL 14 including elevators and main lobby (area between CL 15.5/G.6 and 18/N) and balcony enclosures at CL 14.

• Floors 2-8: all areas north of CL 14 including elevators and main lobby.

• All work in basement needed for support for community room center infill (“Shell Space B”) and south infill areas (“Shell Spaces C and D”).

• All first floor to south of CL 14 excluding elevators and main lobby (area between CL 15.5/G.6 and 18/N).

• Floors 2-7: all areas south of CL 14 including elevators and main lobby.

Food Service • Food service areas on north side of building.

• Food service areas on south side of building.

• Food service of community room.

Specifications All applicable All applicable

301.6 301.2

300.7

317.2

317.4

316.7

316.6

316.3316.4

316.5

316.8 GAS

UG VAULT

12"RPC

230430630831

231431

304306

E E

W

C O

N C

W

ALK

C O

N C

W A

LK

C O

N C

W

AL

K

PAVERS

CO

NC

CONC WALK

BUS

STOP

BUS

STOP

C O

N C

W A

LK

C .C

G

C .C

G

C .C

G

C .C

G

FFFE=317.80'

FFE=317.80'

BFE=303.80'

FFE=317.80'

EXISTING

GENERATOR

TO BE REMOVED

ENTRANCE LOBBY

TO BE REMOVED

SAW CUT CONCRETE WALK AND

LANDING

TO BE REMOVED

SAW CUT CURB & GUTTER

TO BE REMOVED

EXISTING

TREE TO BE

REMOVED

EXISTING

SIDEWALK TO

BE REMOVED

EXISTING

PAVEMENT TO

BE REMOVED

CURB & GUTTER

TO BE REMOVED

EXISTING SIGN

TO BE REMOVED

EX UG WATER

TANKS, TO BE REMOVED. BACKFILL

EXCAVATION IN ACCORDANCE WITH

SPECIFICATIONS. REFER TO

ARCHITECTURAL PLANS FOR

FOUNDATION REPAIR, DAMP

PROOFING AND WATER PROOFING.

SAW CUT CONCRETE WALK AND

LANDING

TO BE REMOVED

EXISTING HANDICAP RAMP,

SIDEWALK, CURB AND

ASPHALT TO BE REMOVED.

EXISTING HANDICAP RAMP,

SIDEWALK AND CURB TO BE

REMOVED.

SAW CUT

CURB &

GUTTER

TO BE

REMOVED

SAW CUT CURB & GUTTER

TO BE REMOVED

SAW CUT CURB & GUTTER

TO BE REMOVED

REMOVE , STORE AND

REINSTALL EXISTING

MAILBOX

EXISTING BUS STOP

TO REMAIN

EXISTING BUS STOP

TO REMAIN

SAW CUT CONCRETE WALK AND

LANDING

TO BE REMOVED

SAW CUT EXISTING

ASPHALT TO BE

REMOVED

SAW CUT EXISTING

ASPHALT TO BE

REMOVED

SAW CUT

EXISTING

ASPHALT TO BE

REMOVED

SAW CUT

CURB &

GUTTER

TO BE

REMOVED

SAW CUT

EXISTING

ASPHALT TO BE

REMOVED

SAW CUT

EXISTING

ASPHALT TO BE

REMOVED

SAW CUT CURB & GUTTER

TO BE REMOVED

SAW CUT AND REMOVE

EXISTING SIDEWALK

SAW CUT CURB & GUTTER

TO BE REMOVED

SAW CUT AND REMOVE

EXISTING SIDEWALK

PENNONI ASSOCIATES INC.

8890 McGaw Road, Suite 100

Columbia, MD 21045 T 410.997.8900 F 410.997.9282

DATE:

DRAWN BY:

CHECKED BY:

PROJ. NO:

DRAWING NO:

DRAWING TITLE:

PROJECT NAME:

CLIENT:

HJM/JSN

JAR

AEWLA22050

NO DATE REVISION

AFRH SHERIDAN

RENOVATION

140 ROCK CREEK CHURCH RD N

Washington, DC 20011

ARMED FORCES

RETIREMENT HOME -

WASHINGTON D.C.

418 BEAVER STREET

SEWICKLEY, PA 15143

PH: 412.287.7333

www.aeworks.com

March 10, 2023

PROFESSIONAL:

COPYRIGHT 2020 BY AE WORKS LTD ALL RIGHTS RESERVED

SUBMISSION:

CONSTRUCTION BID

DOCUMENTS

N

AE WORKS®

DC 906711 JAMES A RUFF 3/10/2023

00 30' 60'

LEGEND

PROPERTY LINE

EXISTING CONTOURS 18

EXISTING WATER

EXISTING STORM DRAIN

EXISTING SEWER

EXISTING ROAD

EXISTING UNDERGROUND

ELECTRIC

EXISTING UNDERGROUND

COMMUNICATION

EXISTING BUILDING

EXISTING UNDERGROUND

STEAM

CS10

Demolition Plan

DEMOLITION PLAN

SCALE: 1" = 30'

PROPOSED DEMOLITION

DEMOLITION NOTES:

1. THE CONTRACTOR IS RESPONSIBLE FOR DISPOSING OF ANY DEMOLITION MATERIAL.

2. ALL DEMOLISHED MATERIAL IS TO BE REMOVED FROM THE PROPERTY AND DISPOSED OF IN AN APPROVED FACILITY.

3. WHEN PRACTICAL, DEMOLISHED MATERIAL IS TO BE RECYCLED.

4. THE LIMITS OF DEMOLITION ARE APPROXIMATE. THE CONTRACTOR SHALL EXPAND OR LIMIT THE DEMOLITION AS

NECESSARY TO CONSTRUCT THE PROPOSED IMPROVEMENTS.

5. ALL HARD SURFACES ARE TO BE SAW CUT. NO JAGGED EDGES ARE PERMITTED.

6. DEMOLITION INCLUDES ANY SUB BASE OR SUB GRADE MATERIAL.

7. NO DEMOLISHED MATERIAL IS TO BE BURIED ON THE SITE OR PROPERTY.

8. FILL MATERIAL, TO RESTORE THE AREA OF DEMOLITION, IS THE RESPONSIBILITY OF THE CONTRACTOR TO SOURCE

AND PLACE.

PHASING DESCRIPTIONS

NOT

FOR

CONSTRUCTION

BASE BID SCOPE

OPTION SCOPE

GENERATORS ARE OPTION 1

This sheet addresses exterior scope only

UP

2N

2N

3N

3N

4N

4N 5 6 7 8 10 12

14 15 16 17 18

19 21 23 25 26 27

NN

MM

LL

KK

JJ

G

F

E

D

C

B

A

HN

GN

FN

EN

DN

CN

BN

AN

HS

FS

ES

DS

CS

BS

AS

NSNN

1N

1N

29S

29S

30S 31S

31S

32S

32S

13119 22

2215.5 16.5

6.2

A.5A.5

B.5B.5

C.5 C.5

D.5D.5

E.5E.5

F.5F.5

26.5

26.5248.8

G.6

24.2

H.1 H.1

P A

R T

B A

D

0B

P A

R T

A A

D

0A

5.5 17.5

27.85.3

P A

R T

B A

D

0B

P A

R T

A A

D

0A

CORRIDOR

G111D

POST OFFICE

G111

VESTIBULE

G111C

STAIRS

G-1

SORTING

G111B

POSTAL SERVICE

G111A

MECHANICAL

G110MECHANICAL

G107

WRAPPING RM

G105

ELEV EQUIP

G104

STOR

G106

BEAUTY SALON

G105A

STOR

G103

TOILET

G101 STORAGE

G102

CORRIDOR

G100

TRANSFORMER

ROOM

G001

LAUNDRY

G002

STAIRS

G-6

CORRIDOR

G003

MECHANICAL

G202

ELEC

G006

STORAGE

G004

WOMEN'S

G007

JC

G008

CORRIDOR

G209

RESIDENT

COMPUTER GAME

ROOM

G211A

WOOD SHOP

G211

HOBBY ROOM

G206

FAN ROOM

G207

HOBBY ROOM

G205

WOOD SHOP

G210

PAINT ROOM

G213

STAIRS

G-2

WOOD SHOP

G208

STOR

G010

CORRIDOR

G011

STOR

G302

STOR

G304

CORRIDOR

G315

JC

G306

EQUIP

G308

OFFICE

G312

STOR

G316

ELEC

G316A

MECHANICAL

G314

SAUNA

G311

SAUNA

G305

WOMEN'S

LOCKERS

G310

TOILETS

G309

TOILETS

G307

MEN'S LOCKERS

G303

STORAGE

G301

BANK

G014

ELEVATOR LOBBY

G013

MECHANICAL

G323

OFFICE

G322AVESTIBULE

G322

JC

G321

CANTEEN

G317

THRIFT SHOP

G324A

FAN ROOM

G320

STAIRS

G-3

MEN'S

G015 JC

G017

PHONE BOOTH

G016

CORRIDOR

G024

TRASH ROOM

G021

STAIRS

G-7

TRANSFORMER

ROOM

G023

MECHANICAL

G022

FIRE PUMP RM

G020

STORAGE

G023

STORAGE

G018

STORAGE

G012A

MECHANICAL

G405

ELECTRICAL

G403

MECHANICAL

G404

KILN ROOM

G408

OFFICE

G411

CERAMICS ROOM

G409

TOILET

G410

ELEVATOR LOBBY

G026

CORRIDOR

G401

STORAGE

G407

CORRIDOR

G029

ELEV RM

G028

SERVICE

CORRIDOR

G030

STAIRS

G-4

STEAM TUNNEL

G031

CORRIDOR

G005

STORAGE

G012

VESTIBULE

G007A

VESTIBULE

G015A

CORRIDOR

G019

STAIRS

G-5

DEMARC

G022A

G315C

OFFICE

G315D

CONF/BREAK

G315B

OFFICE

G315A

OFFICE/STORAGE

G315

FACILITY

MAINTENANCE

AREA

G201

BOWLING ALLEY

G201A

PIN SETTING

G326

SUPPLY

G325

SUPPLYG329

FREEZER

G330

SUPPLY

G328

SUPPLY

G327

TOILET

G324B

MECHANICAL

G324

P/X STORE

AD202

AD2022

AD201 2

AD201

TO

SCOTT

BLDG

SEE CS-SERIES

AND MECH

HD107

14' - 10"

15' - 6"

A B

N

DATE:

DRAWN BY:

CHECKED BY:

PROJ. NO:

DRAWING NO:

DRAWING TITLE:

PROJECT NAME:

CLIENT:

418 BEAVER STREET

SEWICKLEY, PA 15143

PH: 412.287.7333

www.aeworks.com

PROFESSIONAL:

COPYRIGHT 2024 BY AE WORKS LTD ALL RIGHTS RESERVED.

SUBMISSION:

CONSTRUCTION BID

DOCUMENTS

AE WORKS®

A u to d e s k D o c s

/A F

R H

-0

S h e ri d a n /A

F R

H -0

A R

C H

-2

.r v t

/5

/2

:1

:5

A

M

AD100

TW

DC

AFRH-033

OVERALL BASEMENT

DEMOLITION PLAN

AFRH SHERIDAN

RENOVATION

140 ROCK CREEK

CHURCH ROAD,

NORTHWEST,

WASHINGTON, DC

ARMED FORCES

RETIREMENT HOME -

WASHINGTON D.C.

09/05/25

1/16" = 1'-0"

OVERALL BASEMENT DEMOLITION PLAN

GENERAL DEMOLITION NOTES

1 VERIFY ALL EXISTING CONDITIONS AND COORDINATE ALL DEMOLITION ACTIVITIES

WITH ANY NEW CONSTRUCTION AS INDICATED WITHIN THE CONSTRUCTION

DOCUMENTS. DO NOT SCALE DRAWINGS.

2 PERFORM ALL NECESSARY DEMOLITION ACTIVITIES AS REQUIRED FOR INSTALLATION

OF NEW CONSTRUCTION AS INDICATED WITHIN THE CONSTRUCTION DOCUMENTS.

COORDINATE WITH THOSE DOCUMENTS FOR EXACT DIMENSIONS AND LOCATIONS OF

FINISHED WORK.

3 ALL DEMOLITION NOT SPECIFICALLY INDICATED, BUT NECESSARY TO COMPLETE THE

PROJECT AS INDICATED ON THE CONSTRUCTION DOCUMENTS, TO BE THE

RESPONSIBILITY OF THE CONTRACTOR.

4 INSPECT AND ACCESS EACH SPACE AND FULFILL THE INTENT OF THE WORK

REQUIRED BY THE CONTRACT DOCUMENTS. DEVIATIONS REQUIRED BY EXISTING

FIELD CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT PRIOR

TO PROCEEDING WITH THE WORK.

5 ANY CUTTING AND REMOVAL INDICATED ON THE CONSTRUCTION DOCUMENTS ARE

GENERAL INDICATIONS ONLY AND MAY NOT NECESSARILY SHOW THE FULL EXTENT

OF CUTTING AND REMOVAL NECESSARY.

6 THROUGHOUT THE COURSE OF DEMOLITION ACTIVITIES, PROPERLY PROTECT AND

EXISTING CONSTRUCTION INDICATED TO REMAIN. EXCERCISE CARE WHEN REMOVING

ADJACENT CONSTRUCTION AND PROPERLY REPAIR (TO ORIGINAL CONDITION) ANY

AREAS SCHEDULED TO REMAIN THAT SUSTAIN DAMAGE AS A RESULT OF DEMOLITION

ACTIVITIES.

7 CONSTRUCT DUST PROOF PROTECTIVE BARRIERS AS NECESSARY AT AREAS OF

INTERIOR DEMOLITION TO PROTECT EXISTING CONSTRUCTION AND EQUIPMENT

SCHEDULED TO REMAIN.

8 PERFORM ALL WORK REQUIRED TO PROTECT BUILDING OCCUPANTS AND EXISTING

BUILDING UTILITIES. THE BUILDING WILL REMAIN IN OPERATION THROUGHOUT THE

COURSE OF DEMOLITION AND CONSTRUCTION ACTIVITIES.

9 PROVIDE ALL NECESSARY TEMPORARY BRACING AND SHORING AS REQUIRED TO

MAINTAIN THE INTEGRITY AND STRUCTURAL STABILITY OF THE BUILDING AND ITS

INDIVIDUAL ELEMENTS.

10 EXCEPT AS NOTED OTHERWISE, REMOVE ALL DEMOLISHED MATERIALS FROM THE

SITE AND DISPOSE OF IN ACCORDANCE WITH ALL LOCAL, STATE AND FEDERAL LAW

REGULATIONS. DO NOT BURN, BURY OR SELL MATERIALS ON THE PROJECT SITE. AT

THE COMPLETION OF EACH WORK DAY, CLEAN THE ENTIRE WORK AREA AND LEAVE IN

A NEAT CONDITION FREE OF DEBRIS AND RUBBISH.

11 STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, TELECOMMUNICATION, AND

CIVIL DOCUMENTS PROVIDE ADDITIONAL DEMOLITION REQUIREMENTS. THE

CONTRACTOR IS RESPONSIBLE FOR ALL DOCUMENTS THAT MAY PROVIDE ADDITIONAL

DEMOLITION REQUIREMENTS BEYOND THOSE SPECIFICALLY INDICATED ON THE

ARCHITECTURAL DEMOLITION PLANS.

12 THROUGHOUT THE COURSE OF DEMOLITION ACTIVITIES, PATCH, REPAIR AND

PREPARE EXISTING EXPOSED SURFACES AND/OR ADJACENT MATERIAL AS REQUIRED

TO RECEIVE NEW FINISHES.

13 CAREFULLY REMOVE AND DELIVER TO THE OWNER ANY EXISTING FIRE

EXTINGUISHERS OR OTHER IDENTIFIED ITEMS FOUND WITHIN THE LIMIT OF

DEMOLITION ACTIVITIES.

14 THE OWNER RESERVES THE RIGHT TO REMOVE ITEMS SCHEDULED FOR DEMOLITION

PRIOR TO THE START OF DEMOLITION ACTIVITIES AND MAY CLAIM ANY ITEMS

REMOVED BY THE CONTRACTOR THROUGHOUT THE COURSE OF DEMOLITION.

15 ALL CEILINGS FROM THE FIRST FLOOR THROUGH THE SEVENTH TO BE REMOVED

ENTIRELY. THE MAJORITY OF THE CEILINGS ON THESE FLOORS IS ACT GRID AND

DRYWALL BULKHEADS. ALL ASSOCIATED LIGHT FIXTURES, DUCTWORK, VENTS,

GRILLES AND CEILING MOUNTED ITEMS TO BE REMOVED. FOR DEMOLITION OF THE

BASEMENT LEVEL, REFER TO THE PARTIAL DEMO PLANS KEYNOTES.

NO DATE REVISION

FESSIONAL:

09/05/25

PHASING DESCRIPTIONS

NOT

FOR

CONSTRUCTION

BASE BID SCOPE

OPTION SCOPE

MATCHLINE FOR DRAWINGS,

NOT PHASES BORDER

3N

3N

4N

4N

8 10 12

19 21 23

NN

MM

LL

KK

JJ

HH

GG

FF

EE

DD

CC

BB

AA

HNHN

GNGN

FNFN

ENEN

DNDN

CNCN

BNBN

ANAN

HS HS

GS GS

FS FS

ES ES

DS DS

CS CS

BS BS

AS AS

NSNN

1N

1N

29S

29S

30S

30S

31S

31S

32S

32S

15.5

15.5

16.5

16.5

A.5A.5

B.5B.5

C.5C.5

D.5D.5

E.5E.5

F.5F.5

G.6 G.6

P A

R T

B A

D

1B

P A

R T

A A

D

1A

17.5

17.5

5.3

5.3

LAUNDRY

ACTIVITY

CORRIDOR

VESTIBULE

ACTIVITY

HOUSE KEEPING

1-5

STAIRS

UNIT

UNIT

UNIT

UNIT

1-1

STAIRS

UNIT

TUB ROOM

UNIT

UNIT

UNIT

UNIT

UNIT

1-6

STAIRS

TUB ROOM

TOILET

LAUNDRY 1014

TOILET

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

1-2

STAIRS

UNIT

UNIT

UNIT

CORRIDOR

FIRE

LOBBY

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

1-3

STAIRS

UNIT

UNIT

UNIT

UNIT

CORRIDOR

ELEC.

VENDING

LOUNGE 1029

TUB ROOM

J.C.

BLDG. MGMT.

UNIT 1032

FACILITY

MAINTENANCE

UNIT

1-7

STAIRS

UNIT

GENERAL

PURPOSE

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

1-4

STAIRS 1413

UNIT

UNIT

UNIT

TUB ROOM

LAUNDRY

CORRIDOR

CORRIDOR

ELEVATOR LOBBY 1041

VESTIBULE

FIRE

STORAGE1002

GEN. PURPOSE

LOUNGE 1022

MECH. RM.

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

ELEC.

UNIT

TLT.

TUB RM.

ELEC.

CLT.

ELEC.

AD201 2

AD201

AD202

AD2022

A B

N

DATE:

DRAWN BY:

CHECKED BY:

PROJ. NO:

DRAWING NO:

DRAWING TITLE:

PROJECT NAME:

CLIENT:

418 BEAVER STREET

SEWICKLEY, PA 15143

PH: 412.287.7333

www.aeworks.com

PROFESSIONAL:

COPYRIGHT 2024 BY AE WORKS LTD ALL RIGHTS RESERVED.

SUBMISSION:

CONSTRUCTION BID

DOCUMENTS

AE WORKS®

A u to d e s k D o c s

/A F

R H

-0

S h e ri d a n /A

F R

H -0

A R

C H

-2

.r v t

/5

/2

:1

:1

A

M

AD101

TW

DC

AFRH-033

OVERALL FIRST FLOOR

DEMOLITION PLAN

AFRH SHERIDAN

RENOVATION

140 ROCK CREEK

CHURCH ROAD,

NORTHWEST,

WASHINGTON, DC

ARMED FORCES

RETIREMENT HOME -

WASHINGTON D.C.

09/05/25

1/16" = 1'-0"

OVERALL FIRST FLOOR DEMOLITION PLAN

GENERAL DEMOLITION NOTES

1 VERIFY ALL EXISTING CONDITIONS AND COORDINATE ALL DEMOLITION ACTIVITIES

WITH ANY NEW CONSTRUCTION AS INDICATED WITHIN THE CONSTRUCTION

DOCUMENTS. DO NOT SCALE DRAWINGS.

2 PERFORM ALL NECESSARY DEMOLITION ACTIVITIES AS REQUIRED FOR INSTALLATION

OF NEW CONSTRUCTION AS INDICATED WITHIN THE CONSTRUCTION DOCUMENTS.

COORDINATE WITH THOSE DOCUMENTS FOR EXACT DIMENSIONS AND LOCATIONS OF

FINISHED WORK.

3 ALL DEMOLITION NOT SPECIFICALLY INDICATED, BUT NECESSARY TO COMPLETE THE

PROJECT AS INDICATED ON THE CONSTRUCTION DOCUMENTS, TO BE THE

RESPONSIBILITY OF THE CONTRACTOR.

4 INSPECT AND ACCESS EACH SPACE AND FULFILL THE INTENT OF THE WORK

REQUIRED BY THE CONTRACT DOCUMENTS. DEVIATIONS REQUIRED BY EXISTING

FIELD CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT PRIOR

TO PROCEEDING WITH THE WORK.

5 ANY CUTTING AND REMOVAL INDICATED ON THE CONSTRUCTION DOCUMENTS ARE

GENERAL INDICATIONS ONLY AND MAY NOT NECESSARILY SHOW THE FULL EXTENT

OF CUTTING AND REMOVAL NECESSARY.

6 THROUGHOUT THE COURSE OF DEMOLITION ACTIVITIES, PROPERLY PROTECT AND

EXISTING CONSTRUCTION INDICATED TO REMAIN. EXCERCISE CARE WHEN REMOVING

ADJACENT CONSTRUCTION AND PROPERLY REPAIR (TO ORIGINAL CONDITION) ANY

AREAS SCHEDULED TO REMAIN THAT SUSTAIN DAMAGE AS A RESULT OF DEMOLITION

ACTIVITIES.

7 CONSTRUCT DUST PROOF PROTECTIVE BARRIERS AS NECESSARY AT AREAS OF

INTERIOR DEMOLITION TO PROTECT EXISTING CONSTRUCTION AND EQUIPMENT

SCHEDULED TO REMAIN.

8 PERFORM ALL WORK REQUIRED TO PROTECT BUILDING OCCUPANTS AND EXISTING

BUILDING UTILITIES. THE BUILDING WILL REMAIN IN OPERATION THROUGHOUT THE

COURSE OF DEMOLITION AND CONSTRUCTION ACTIVITIES.

9 PROVIDE ALL NECESSARY TEMPORARY BRACING AND SHORING AS REQUIRED TO

MAINTAIN THE INTEGRITY AND STRUCTURAL STABILITY OF THE BUILDING AND ITS

INDIVIDUAL ELEMENTS.

10 EXCEPT AS NOTED OTHERWISE, REMOVE ALL DEMOLISHED MATERIALS FROM THE

SITE AND DISPOSE OF IN ACCORDANCE WITH ALL LOCAL, STATE AND FEDERAL LAW

REGULATIONS. DO NOT BURN, BURY OR SELL MATERIALS ON THE PROJECT SITE. AT

THE COMPLETION OF EACH WORK DAY, CLEAN THE ENTIRE WORK AREA AND LEAVE IN

A NEAT CONDITION FREE OF DEBRIS AND RUBBISH.

11 STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, TELECOMMUNICATION, AND

CIVIL DOCUMENTS PROVIDE ADDITIONAL DEMOLITION REQUIREMENTS. THE

CONTRACTOR IS RESPONSIBLE FOR ALL DOCUMENTS THAT MAY PROVIDE ADDITIONAL

DEMOLITION REQUIREMENTS BEYOND THOSE SPECIFICALLY INDICATED ON THE

ARCHITECTURAL DEMOLITION PLANS.

12 THROUGHOUT THE COURSE OF DEMOLITION ACTIVITIES, PATCH, REPAIR AND

PREPARE EXISTING EXPOSED SURFACES AND/OR ADJACENT MATERIAL AS REQUIRED

TO RECEIVE NEW FINISHES.

13 CAREFULLY REMOVE AND DELIVER TO THE OWNER ANY EXISTING FIRE

EXTINGUISHERS OR OTHER IDENTIFIED ITEMS FOUND WITHIN THE LIMIT OF

DEMOLITION ACTIVITIES.

14 THE OWNER RESERVES THE RIGHT TO REMOVE ITEMS SCHEDULED FOR DEMOLITION

PRIOR TO THE START OF DEMOLITION ACTIVITIES AND MAY CLAIM ANY ITEMS

REMOVED BY THE CONTRACTOR THROUGHOUT THE COURSE OF DEMOLITION.

15 ALL CEILINGS FROM THE FIRST FLOOR THROUGH THE SEVENTH TO BE REMOVED

ENTIRELY. THE MAJORITY OF THE CEILINGS ON THESE FLOORS IS ACT GRID AND

DRYWALL BULKHEADS. ALL ASSOCIATED LIGHT FIXTURES, DUCTWORK, VENTS,

GRILLES AND CEILING MOUNTED ITEMS TO BE REMOVED. FOR DEMOLITION OF THE

BASEMENT LEVEL, REFER TO THE PARTIAL DEMO PLANS KEYNOTES.

NO DATE REVISION

FESSIONAL:

09/05/25

PHASING DESCRIPTIONS

NOT

FOR

CONSTRUCTION

BASE BID SCOPE

OPTION SCOPE

3N

3N

4N

4N 5 6 7 8 10 12

14 15

19 21 23 25 26 27 28

NN

MM

LL

KK

J

J

H

H

GG

FF

EE

DD

CC

BB

AA

HNHN

GNGN

FNFN

ENEN

DNDN

CNCN

BNBN

ANAN

HS HS

GS GS

FS FS

ES ES

DS DS

CS CS

BS BS

AS AS

NSNN

KN

1N

1N

29S

29S

30S

30S

31S

31S

32S

32S

15.5

15.5

16.5

16.5

G.6

H.1

H.1

P A

R T

B A

D

2B

P A

R T

A A

D

2A

17.5

17.5

LAUNDRY

UNIT

CORRIDOR

UNIT

HOUSE KEEPING

2-5

STAIRS

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

2-1

STAIRS

UNIT

UNIT

TUB ROOM

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

2-6

STAIRS

TUB ROOM

TOILET

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

2-2

STAIRS

UNIT

UNIT

UNIT

UNIT

CORRIDOR

FIRE

MECH. RM

LOBBY

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

2-3

STAIRS

UNIT

UNIT

UNIT

UNIT

CORRIDOR

VENDING

LOUNGE 2027

TUB ROOM

JAN

ELEC.

UNIT

UNIT

UNIT

UNIT

DEN

2-7

STAIRS

UNIT

DINING

SERVERY

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

2-4

STAIRS 2415

UNIT

UNIT

UNIT

TUB ROOM

LAUNDRY

CORRIDOR

CORRIDOR

ELEVATOR LOBBY

2405B

SOILED LINEN

UNISEX TLT.

ELEC.

ELEC.

UNIT

VENDING

ELEC.

UNIT

ELEC.

AD201 2

AD201

AD202

AD2022

EXISTING SERVERY DEMO ON BOTH 2ND AND 3RD FLOORS

A419

A B

N

DATE:

DRAWN BY:

CHECKED BY:

PROJ. NO:

DRAWING NO:

DRAWING TITLE:

PROJECT NAME:

CLIENT:

418 BEAVER STREET

SEWICKLEY, PA 15143

PH: 412.287.7333

www.aeworks.com

PROFESSIONAL:

COPYRIGHT 2024 BY AE WORKS LTD ALL RIGHTS RESERVED.

SUBMISSION:

CONSTRUCTION BID

DOCUMENTS

AE WORKS®

A u to d e s k D o c s

/A F

R H

-0

S h e ri d a n /A

F R

H -0

A R

C H

-2

.r v t

/5

/2

:1

:5

A

M

AD102

TW

DC

AFRH-033

OVERALL SECOND

FLOOR DEMOLITION

PLAN

AFRH SHERIDAN

RENOVATION

140 ROCK CREEK

CHURCH ROAD,

NORTHWEST,

WASHINGTON, DC

ARMED FORCES

RETIREMENT HOME -

WASHINGTON D.C.

09/05/25

1/16" = 1'-0"

OVERALL SECOND FLOOR DEMOLITION PLAN

GENERAL DEMOLITION NOTES

1 VERIFY ALL EXISTING CONDITIONS AND COORDINATE ALL DEMOLITION ACTIVITIES

WITH ANY NEW CONSTRUCTION AS INDICATED WITHIN THE CONSTRUCTION

DOCUMENTS. DO NOT SCALE DRAWINGS.

2 PERFORM ALL NECESSARY DEMOLITION ACTIVITIES AS REQUIRED FOR INSTALLATION

OF NEW CONSTRUCTION AS INDICATED WITHIN THE CONSTRUCTION DOCUMENTS.

COORDINATE WITH THOSE DOCUMENTS FOR EXACT DIMENSIONS AND LOCATIONS OF

FINISHED WORK.

3 ALL DEMOLITION NOT SPECIFICALLY INDICATED, BUT NECESSARY TO COMPLETE THE

PROJECT AS INDICATED ON THE CONSTRUCTION DOCUMENTS, TO BE THE

RESPONSIBILITY OF THE CONTRACTOR.

4 INSPECT AND ACCESS EACH SPACE AND FULFILL THE INTENT OF THE WORK

REQUIRED BY THE CONTRACT DOCUMENTS. DEVIATIONS REQUIRED BY EXISTING

FIELD CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT PRIOR

TO PROCEEDING WITH THE WORK.

5 ANY CUTTING AND REMOVAL INDICATED ON THE CONSTRUCTION DOCUMENTS ARE

GENERAL INDICATIONS ONLY AND MAY NOT NECESSARILY SHOW THE FULL EXTENT

OF CUTTING AND REMOVAL NECESSARY.

6 THROUGHOUT THE COURSE OF DEMOLITION ACTIVITIES, PROPERLY PROTECT AND

EXISTING CONSTRUCTION INDICATED TO REMAIN. EXCERCISE CARE WHEN REMOVING

ADJACENT CONSTRUCTION AND PROPERLY REPAIR (TO ORIGINAL CONDITION) ANY

AREAS SCHEDULED TO REMAIN THAT SUSTAIN DAMAGE AS A RESULT OF DEMOLITION

ACTIVITIES.

7 CONSTRUCT DUST PROOF PROTECTIVE BARRIERS AS NECESSARY AT AREAS OF

INTERIOR DEMOLITION TO PROTECT EXISTING CONSTRUCTION AND EQUIPMENT

SCHEDULED TO REMAIN.

8 PERFORM ALL WORK REQUIRED TO PROTECT BUILDING OCCUPANTS AND EXISTING

BUILDING UTILITIES. THE BUILDING WILL REMAIN IN OPERATION THROUGHOUT THE

COURSE OF DEMOLITION AND CONSTRUCTION ACTIVITIES.

9 PROVIDE ALL NECESSARY TEMPORARY BRACING AND SHORING AS REQUIRED TO

MAINTAIN THE INTEGRITY AND STRUCTURAL STABILITY OF THE BUILDING AND ITS

INDIVIDUAL ELEMENTS.

10 EXCEPT AS NOTED OTHERWISE, REMOVE ALL DEMOLISHED MATERIALS FROM THE

SITE AND DISPOSE OF IN ACCORDANCE WITH ALL LOCAL, STATE AND FEDERAL LAW

REGULATIONS. DO NOT BURN, BURY OR SELL MATERIALS ON THE PROJECT SITE. AT

THE COMPLETION OF EACH WORK DAY, CLEAN THE ENTIRE WORK AREA AND LEAVE IN

A NEAT CONDITION FREE OF DEBRIS AND RUBBISH.

11 STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, TELECOMMUNICATION, AND

CIVIL DOCUMENTS PROVIDE ADDITIONAL DEMOLITION REQUIREMENTS. THE

CONTRACTOR IS RESPONSIBLE FOR ALL DOCUMENTS THAT MAY PROVIDE ADDITIONAL

DEMOLITION REQUIREMENTS BEYOND THOSE SPECIFICALLY INDICATED ON THE

ARCHITECTURAL DEMOLITION PLANS.

12 THROUGHOUT THE COURSE OF DEMOLITION ACTIVITIES, PATCH, REPAIR AND

PREPARE EXISTING EXPOSED SURFACES AND/OR ADJACENT MATERIAL AS REQUIRED

TO RECEIVE NEW FINISHES.

13 CAREFULLY REMOVE AND DELIVER TO THE OWNER ANY EXISTING FIRE

EXTINGUISHERS OR OTHER IDENTIFIED ITEMS FOUND WITHIN THE LIMIT OF

DEMOLITION ACTIVITIES.

14 THE OWNER RESERVES THE RIGHT TO REMOVE ITEMS SCHEDULED FOR DEMOLITION

PRIOR TO THE START OF DEMOLITION ACTIVITIES AND MAY CLAIM ANY ITEMS

REMOVED BY THE CONTRACTOR THROUGHOUT THE COURSE OF DEMOLITION.

15 ALL CEILINGS FROM THE FIRST FLOOR THROUGH THE SEVENTH TO BE REMOVED

ENTIRELY. THE MAJORITY OF THE CEILINGS ON THESE FLOORS IS ACT GRID AND

DRYWALL BULKHEADS. ALL ASSOCIATED LIGHT FIXTURES, DUCTWORK, VENTS,

GRILLES AND CEILING MOUNTED ITEMS TO BE REMOVED. FOR DEMOLITION OF THE

BASEMENT LEVEL, REFER TO THE PARTIAL DEMO PLANS KEYNOTES.

NO DATE REVISION

FESSIONAL:

09/05/25

PHASING DESCRIPTIONS

NOT

FOR

CONSTRUCTION

BASE BID SCOPE

OPTION SCOPE

3N

3N

4N

4N 5 6 7 8 10 12

14 15

17 18

19 21 23

27 28

NN

MM

LL

K

K

J J

HH

GG

FF

EE

DD

CC

BB

AA

HNHN

GNGN

FNFN

ENEN

DNDN

CNCN

BNBN

ANAN

HS HS

GS GS

FS FS

ES ES

DS DS

CS CS

BS BS

AS AS

NSNN

KN

1N

1N

29S

29S

30S

30S

31S

31S

32S

32S

15.5

15.5

16.5

16.5

A.5A.5

B.5B.5

C.5C.5

D.5D.5

E.5E.5

F.5F.5

P A

R T

B A

D

3B

P A

R T

A A

D

3A

17.5

17.5

LAUNDRY

UNIT

CORRIDOR

UNIT

HOUSE KEEPING

3-5

STAIRS

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

3-1

STAIRS

UNIT

UNIT

TUB ROOM

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

3-6

STAIRS

TUB ROOM

TOILET

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

3-2

STAIRS

UNIT

UNIT

UNIT

UNIT

CORRIDOR

FIRE

MECH. RM

LOBBY

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

3-3

STAIRS

UNIT

UNIT

UNIT

UNIT

CORRIDOR

VENDING

LOUNGE 3027

TUB ROOM

JAN

ELEC.

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

3-7

STAIRS

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

UNIT

3-4

STAIRS 3415

UNIT

UNIT

UNIT

TUB ROOM

LAUNDRY

CORRIDOR

CORRIDOR

ELEVATOR LOBBY

UNIT

TLT.

TUB RM.

ELEC.

ELEC.

UNIT

VENDING

ELEC.

UNIT

ELEC.

AD201 2

AD201

AD202

AD2022

A B

N

DATE:

DRAWN BY:

CHECKED BY:

PROJ. NO:

DRAWING NO:

DRAWING TITLE:

PROJECT NAME:

CLIENT:

418 BEAVER STREET

SEWICKLEY, PA 15143

PH: 412.287.7333

www.aeworks.com

PROFESSIONAL:

COPYRIGHT 2024 BY AE WORKS LTD ALL RIGHTS RESERVED.

SUBMISSION:

CONSTRUCTION BID

DOCUMENTS

AE WORKS®

A u to d e s k D o c s

/A F

R H

-0

S h e ri d a n /A

F R

H -0

A R

C H

-2

.r v t

/5

/2

:1

:3

A

M

AD103

TW

DC

AFRH-033

OVERALL TYPICAL

FLOOR DEMOLITION

PLAN (FLOORS 3-7)

AFRH SHERIDAN

RENOVATION

140 ROCK CREEK

CHURCH ROAD,

NORTHWEST,

WASHINGTON, DC

ARMED FORCES

RETIREMENT HOME -

WASHINGTON D.C.

09/05/25

1/16" = 1'-0"

OVERALL TYPICAL FLOOR DEMOLITION PLAN

GENERAL DEMOLITION NOTES

1 VERIFY ALL EXISTING CONDITIONS AND COORDINATE ALL DEMOLITION ACTIVITIES

WITH ANY NEW CONSTRUCTION AS INDICATED WITHIN THE CONSTRUCTION

DOCUMENTS. DO NOT SCALE DRAWINGS.

2 PERFORM ALL NECESSARY DEMOLITION ACTIVITIES AS REQUIRED FOR INSTALLATION

OF NEW CONSTRUCTION AS INDICATED WITHIN THE CONSTRUCTION DOCUMENTS.

COORDINATE WITH THOSE DOCUMENTS FOR EXACT DIMENSIONS AND LOCATIONS OF

FINISHED WORK.

3 ALL DEMOLITION NOT SPECIFICALLY INDICATED, BUT NECESSARY TO COMPLETE THE

PROJECT AS INDICATED ON THE CONSTRUCTION DOCUMENTS, TO BE THE

RESPONSIBILITY OF THE CONTRACTOR.

4 INSPECT AND ACCESS EACH SPACE AND FULFILL THE INTENT OF THE WORK

REQUIRED BY THE CONTRACT DOCUMENTS. DEVIATIONS REQUIRED BY EXISTING

FIELD CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT PRIOR

TO PROCEEDING WITH THE WORK.

5 ANY CUTTING AND REMOVAL INDICATED ON THE CONSTRUCTION DOCUMENTS ARE

GENERAL INDICATIONS ONLY AND MAY NOT NECESSARILY SHOW THE FULL EXTENT

OF CUTTING AND REMOVAL NECESSARY.

6 THROUGHOUT THE COURSE OF DEMOLITION ACTIVITIES, PROPERLY PROTECT AND

EXISTING CONSTRUCTION INDICATED TO REMAIN. EXCERCISE CARE WHEN REMOVING

ADJACENT CONSTRUCTION AND PROPERLY REPAIR (TO ORIGINAL CONDITION) ANY

AREAS SCHEDULED TO REMAIN THAT SUSTAIN DAMAGE AS A RESULT OF DEMOLITION

ACTIVITIES.

7 CONSTRUCT DUST PROOF PROTECTIVE BARRIERS AS NECESSARY AT AREAS OF

INTERIOR DEMOLITION TO PROTECT EXISTING CONSTRUCTION AND EQUIPMENT

SCHEDULED TO REMAIN.

8 PERFORM ALL WORK REQUIRED TO PROTECT BUILDING OCCUPANTS AND EXISTING

BUILDING UTILITIES. THE BUILDING WILL REMAIN IN OPERATION THROUGHOUT THE

COURSE OF DEMOLITION AND CONSTRUCTION ACTIVITIES.

9 PROVIDE ALL NECESSARY TEMPORARY BRACING AND SHORING AS REQUIRED TO

MAINTAIN THE INTEGRITY AND STRUCTURAL STABILITY OF THE BUILDING AND ITS

INDIVIDUAL ELEMENTS.

10 EXCEPT AS NOTED OTHERWISE, REMOVE ALL DEMOLISHED MATERIALS FROM THE

SITE AND DISPOSE OF IN ACCORDANCE WITH ALL LOCAL, STATE AND FEDERAL LAW

REGULATIONS. DO NOT BURN, BURY OR SELL MATERIALS ON THE PROJECT SITE. AT

THE COMPLETION OF EACH WORK DAY, CLEAN THE ENTIRE WORK AREA AND LEAVE IN

A NEAT CONDITION FREE OF DEBRIS AND RUBBISH.

11 STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, TELECOMMUNICATION, AND

CIVIL DOCUMENTS PROVIDE ADDITIONAL DEMOLITION REQUIREMENTS. THE

CONTRACTOR IS RESPONSIBLE FOR ALL DOCUMENTS THAT MAY PROVIDE ADDITIONAL

DEMOLITION REQUIREMENTS BEYOND THOSE SPECIFICALLY INDICATED ON THE

ARCHITECTURAL DEMOLITION PLANS.

12 THROUGHOUT THE COURSE OF DEMOLITION ACTIVITIES, PATCH, REPAIR AND

PREPARE EXISTING EXPOSED SURFACES AND/OR ADJACENT MATERIAL AS REQUIRED

TO RECEIVE NEW FINISHES.

13 CAREFULLY REMOVE AND DELIVER TO THE OWNER ANY EXISTING FIRE

EXTINGUISHERS OR OTHER IDENTIFIED ITEMS FOUND WITHIN THE LIMIT OF

DEMOLITION ACTIVITIES.

14 THE OWNER RESERVES THE RIGHT TO REMOVE ITEMS SCHEDULED FOR DEMOLITION

PRIOR TO THE START OF DEMOLITION ACTIVITIES AND MAY CLAIM ANY ITEMS

REMOVED BY THE CONTRACTOR THROUGHOUT THE COURSE OF DEMOLITION.

15 ALL CEILINGS FROM THE FIRST FLOOR THROUGH THE SEVENTH TO BE REMOVED

ENTIRELY. THE MAJORITY OF THE CEILINGS ON THESE FLOORS IS ACT GRID AND

DRYWALL BULKHEADS. ALL ASSOCIATED LIGHT FIXTURES, DUCTWORK, VENTS,

GRILLES AND CEILING MOUNTED ITEMS TO BE REMOVED. FOR DEMOLITION OF THE

BASEMENT LEVEL, REFER TO THE PARTIAL DEMO PLANS KEYNOTES.

NO DATE REVISION

FESSIONAL:

09/05/25

PHASING DESCRIPTIONS

NOT

FOR

CONSTRUCTION

BASE BID SCOPE

OPTION SCOPE

DN

DN

DN

DN

DNDN

UP

2N

2N

3N

3N

4N

4N 5 6 7 8 10 12

14 15 16 17 18

19 21 23 25 26 27 28

N

N

MM

LL

KK

J

J

H

H

GG

FF

EE

DD

C

C

BB

AA

HN

GN

FN

EN

DN

CN

BN

AN

HS

GS

FS

ES

DS

CS

BS

AS

NSNN

KN

1N

1N

29S

29S

30S

30S

31S

31S

32S

32S

9 22

2215.5 16.5

6.2

A.5A.5

B.5B.5

C.5C.5

D.5D.5

E.5E.5

F.5F.5

26.52415.2 15.48.8

G.6 G.6

24.2

H.1 H.1

8.5 24.5

CORRIDOR

G111D

POST OFFICE

G111

VESTIBULE

G111C

STAIRS

G-1

SORTING

G111B

POSTAL SERVICE

G111A

POST OFFICE

G111

MECHANICAL

G107

WRAPPING RM

G105

BEAUTY SALON

G105A

STOR

G103

TOILET

G101 STORAGE

G102

CORRIDOR

G100

STOR

G106

ELEV EQUIP

G104

MECHANICAL

G110

TRANSFORMER

ROOM

G001

LAUNDRY

G002

STAIRS

G-6

C O

R R

ID

O

R

G

MECHANICAL

G202

SHELL SPACE A

G201

STORAGE

G004

ELEC

G006

RESIDENT

COMPUTER GAME

ROOM

G211A

WOOD SHOP

G211

WOOD SHOP

G210

HOBBY ROOM

G205

WOMEN'S

G007

JC

G008

CORRIDOR

G209

HOBBY ROOM

G206

FAN ROOM

G207

STAIRS

G-2

PAINT ROOM

G213

WOOD SHOP

G208

SHELL SPACE B

G313

STOR

G302

STOR

G010

CORRIDOR

G011

STORAGE

G301

BANK

G014

ELEVATOR LOBBY

G013

STORAGE

G012A

STORAGE

G018

STORAGE

G023

FIRE PUMP RM

G020

MECHANICAL

G022

TRASH ROOM

G021

MEN'S

G015

JC

G017

PHONE BOOTH

G016

CORRIDOR

G024

TRANSFORMER

ROOM

G023

STAIRS

G-7

CANTEEN

G317

THRIFT SHOP

G324A

FAN ROOM

G320

STAIRS

G-3

SHELL SPACE C

G333

CHILLER

G325A

CHILLER

G325

SHELL SPACE D

G324

ELEVATOR LOBBY

G026

SERVICE

CORRIDOR

G030

ELEV RM

G028

CORRIDOR

G029

ELECTRICAL

G403

MECHANICAL

G405

STORAGE

G407

MECHANICAL

G404

KILN ROOM

G408

OFFICE

G411

TOILET

G410

STAIRS

G-4

CERAMICS ROOM

G409

CORRIDOR

G401

THRIFT SHOP

G324A

STEAM TUNNEL

G031

P A

R T

B A

0B

P A

R T

A A

0A

CORRIDOR

G005

STORAGE

G012

A301

A301

A301

A302

A302

VESTIBULE

G015AVESTIBULE

G007A

CORRIDOR

G019

STAIRS

G-5

17.8

DEMARC

G022A

5.5

G.4

6.7 7.6 17.5

17.6 20

A.6A.6

D.6D.6

E.6 E.6

F.6F.6

G.3G.3

F.8

F.9

G.5 G.5

27.825.5

G.2

27.9

G.5a

AN.1

A.1 A.1

AS.1

MECH

G314

4'

7/

8"

6' - 0"7' - 1"7' - 1"6' - 0"

9'

8'

7'

9'

9'

/2

8' - 3 1/2"5' - 9 1/2"

CEILING

ABOVE

NORTH

LOADING

DOCK

SOUTH

LOADING

DOCK

5" 41' - 10" 11" 137' - 6" 1' - 0" 18' - 0" 1' - 0" 131' - 1" 1' - 6 1/4"

A210

A211

A210 1

A2112

CEILING

ABOVE

TO

SCOTT

BLDG

SEE CS-SERIES

AND MECH

HD107

381' - 4" 48' - 0 3/4"

SEE A101

4' - 11"

8'

/4

SEE CS-SERIES SEE CS-SERIES

TELECOM

G006A

TELECOM

G016A

8'

/2

111' - 0" 41' - 7" 7' - 5 1/2" 61' - 2 1/2" 7' - 6" 41' - 7" 42' - 1 1/2"

381' - 4"

8'

7'

/2

1:12

1:12

1:12

1:12

A B

EXSITING JOINT LOCATION NEW JOINT LOCATION

EXPANSION JOINT LEGEND

N

DATE:

DRAWN BY:

CHECKED BY:

PROJ. NO:

DRAWING NO:

DRAWING TITLE:

PROJECT NAME:

CLIENT:

418 BEAVER STREET

SEWICKLEY, PA 15143

PH: 412.287.7333

www.aeworks.com

PROFESSIONAL:

COPYRIGHT 2024 BY AE WORKS LTD ALL RIGHTS RESERVED.

SUBMISSION:

CONSTRUCTION BID

DOCUMENTS

AE WORKS®

A u to d e s k D o c s

/A F

R H

-0

S h e ri d a n /A

F R

H -0

A R

C H

-2

.r v t

/5

/2

:1

:1

A

M

A100

AC

RS

AFRH-033

OVERALL BASEMENT

FLOOR PLAN

AFRH SHERIDAN

RENOVATION

140 ROCK CREEK

CHURCH ROAD,

NORTHWEST,

WASHINGTON, DC

ARMED FORCES

RETIREMENT HOME -

WASHINGTON D.C.

09/05/25

1/16" = 1'-0"

OVERALL BASEMENT FLOOR PLAN

GENERAL CONSTRUCTION NOTES

1. PARTITION TYPES: UNLESS OTHERWISE NOTED, NEW PARTITIONS SHALL BE TYPE A3.

AT EXISTING COLUMNS AND PERIMETER NEW PARTITIONS SHALL BE D3 UNLESS NOTED

OTHERWISE.

2. CONTRACTOR TO COORDINATE ALL BLOCKING FOR CASEWORK , ACCESSORIES, ETC.

3. PROVIDE ADEQUATE BACKUP AND BLOCKING FOR ALL WALL OR CEILING MOUNTED

EQUIPMENT, ARCHITECTURAL WOODWORK, HANDRAILS, LIGHTING, OR OTHER

MISCELLANEOUS ITEMS AS SHOWN ON DRAWINGS.

4. REFER TO REFLECTED CEILING PLANS FOR THE CEILING TYPE AND HEIGHT.

COORDINATE HEIGHTS OF GYPSUM BOARD WITH CEILING HEIGHT AND WITH PARTITION

DETAILS SHOWN HERE.

5. REFER TO FINISH SCHEDULE, INTERIOR ELEVATIONS, AND ARCHITECTURAL

CASEWORK DETAILS FOR WALL FINISHES AND WALL MOUNTED ACCESSORIES TO

COORDINATE BLOCKING REQUIREMENTS.

6. AT CERAMIC TILE, INSTALL CEMENTITIOUS BACKER BOARD. SHIM BACKER BOARD AS

REQUIRED TO RESULT IN A FLUSH TRANSITION TO NON-BACKER BOARD.

7. IN TOILET ROOMS, PROVIDE MOISTURE RESISTANT GYPSUM BOARD ON ALL WALLS.

8. PARTITION THICKNESS DIMENSIONS AS SHOWN ARE MINIMUM NOMINAL DIMENSIONS.

ACTUAL DIMENSIONS MAY DIFFER SLIGHTLY TO SUIT FIELD CONDITIONS.

NO DATE REVISION

FESSIONAL:

09/05/25

PHASING DESCRIPTIONS

NOT

FOR

CONSTRUCTION

BASE BID SCOPE

OPTION SCOPE

3N

3N

4N

4N 5 6 7 8 10 12

14 15 16 17 18

21 23 25 26 27 28

NN

MM

LL

KK

JJ

HH

GG

FF

EE

DD

CC

BB

AA

HN

GN

FN

EN

DN

CN

BN

AN

HS

GS

FS

ES

DS

CS

BS

AS

NSNN

1N

1N

29S

29S

30S 31S

31S

32S

32S

9 22

15.5 16.5

P P

Q Q

A2112

6.2

A.5A.5

B.5B.5

C.5C.5

D.5D.5

E.5

E.5

F.5F.5

26.52415.48.8 24.28.5 24.5

TELECOM

ELEC

FIRE

1017 MECH

LAUNDRY

CORRIDOR

ELEVATOR LOBBY

JC

ELEC

CORRIDOR

STAIRS

1-5

OPEN

DINING/NUTRITION

CORRIDOR

MRT

STAIRS

1-6

OFFICE

OFFICE

NURSE/CHARTING

1219 TLT

LINEN

TLT

SPA

STAIRS

1-2

MEN'S TLT

TLT VESTIBULE

1018C

ELEVATOR LOBBY

VESTIBULE

WOMEN'S TLT

STAIRS

1-1

TLT

MRT

SERVERY

OPEN

DINING/NUTRITION

STAIRS

1-7

CLEAN

O2 GAS STOR

1318A

MED ROOM

STOR

STAIRS

1-3

STAFF

ELEVATOR LOBBY

VESTIBULE

LINEN

ELEC

JC

CORRIDOR

SAT. NURSE/MED

DISP.

TRASH

UNIT E

UNIT D2

UNIT E

UNIT D1

UNIT E

UNIT E

UNIT D1

UNIT D1

UNIT D2

UNIT B

UNIT B

UNIT B

1205 UNIT A

UNIT B

UNIT D5

UNIT B3

UNIT B3

UNIT B

UNIT B

UNIT B

UNIT B2

UNIT D4

UNIT A

UNIT D3

UNIT B4

UNIT A

UNIT D4

UNIT B

UNIT B

UNIT A

UNIT B

UNIT B

UNIT D5

UNIT B

UNIT B

UNIT B3

UNIT B

UNIT E

UNIT D2

UNIT D1

UNIT D1

UNIT E

UNIT E

UNIT E

UNIT E

UNIT D1

STAIRS

1-4

CORRIDOR

1300A

UNIT A2

UNIT B2

ELEC

TLT

1322SPA

STORAGE

STORAGE

VESTIBULE

1019A

WAITING ROOM

1019C

VESTIBULE

1019D

WAITING ROOM

1019B

A301

A301

A301

A302

A302

P A

R T

B A

1B

P A

R T

A A

1A

UNIT D2

UNIT B3

G.4

6.7

17.5

17.6 20

A.6A.6

D.6

D.6

E.6E.6

F.6

G.3

F.8

UNIT E

G.2

14' - 8" 14' - 8"

46' - 10" 42' - 1 1/2" 26' - 2 1/2"41' - 7"41' - 7"47' - 1 1/2"21' - 2 1/2" 42' - 8"

CORRIDOR

G.5a

SOILED

OFFICE

CLEAN

MED DISPENSING

VESTIBULE

TRASH

AN.1 AS.1

LOBBY TLT

1018D

LOBBY TLT

1018B

TLT VESTIBULE

1018A

NURSE/CHARTING

STAFF LOUNGE

SOILED

42' - 8"

CORRIDOR

UNIT A2

SERVERY

CORRIDOR

CORRIDOR

5'

/2

1'

0"

5" 41' - 10" 6" 109' - 5" 1' - 3 1/2" 1' - 3 1/2" 109' - 5" 6" 41' - 10" 5"

OPEN

TO

BELOW

OPEN

TO

BELOW

7' - 0"

8'

/2

8'

A210

16' - 8" 7' - 0"

395' - 4"

1' - 0"6' - 0"

UNDERGROUND ACCESS

TO SCOTT BLDG. SEE

BASEMENT PLAN

16' - 8"

12' - 2 1/2"

SEE A100

A211

7'

/2

A210 1

SEE CS-SERIES

SEE CS-SERIES

24' - 5 1/2" 25' - 6" 24' - 5 1/2"

381' - 4"

9'

/2

/2

6'

/8

7'

/2

COMMUNITY ROOM

KITCHEN

1503A

TLT

1503B

JC

1503C

ELEC

TELECOM

UNIT D3

UNIT B4

CANOPY EDGE ABOVE

5'

/2

1'

0"

5'

9'

5'

A B

EXSITING JOINT LOCATION NEW JOINT LOCATION

EXPANSION JOINT LEGEND

N

DATE:

DRAWN BY:

CHECKED BY:

PROJ. NO:

DRAWING NO:

DRAWING TITLE:

PROJECT NAME:

CLIENT:

418 BEAVER STREET

SEWICKLEY, PA 15143

PH: 412.287.7333

www.aeworks.com

PROFESSIONAL:

COPYRIGHT 2024 BY AE WORKS LTD ALL RIGHTS RESERVED.

SUBMISSION:

CONSTRUCTION BID

DOCUMENTS

AE WORKS®

A u to d e s k D o c s

/A F

R H

-0

S h e ri d a n /A

F R

H -0

A R

C H

-2

.r v t

/5

/2

:1

:4

A

M

A101

AC

RS

AFRH-033

OVERALL FIRST FLOOR

PLAN

AFRH SHERIDAN

RENOVATION

140 ROCK CREEK

CHURCH ROAD,

NORTHWEST,

WASHINGTON, DC

ARMED FORCES

RETIREMENT HOME -

WASHINGTON D.C.

09/05/25

1/16" = 1'-0"

OVERALL FIRST FLOOR PLAN

GENERAL CONSTRUCTION NOTES

1. PARTITION TYPES: UNLESS OTHERWISE NOTED, NEW PARTITIONS SHALL BE TYPE A3.

AT EXISTING COLUMNS AND PERIMETER NEW PARTITIONS SHALL BE D3 UNLESS NOTED

OTHERWISE.

2. CONTRACTOR TO COORDINATE ALL BLOCKING FOR CASEWORK , ACCESSORIES, ETC.

3. PROVIDE ADEQUATE BACKUP AND BLOCKING FOR ALL WALL OR CEILING MOUNTED

EQUIPMENT, ARCHITECTURAL WOODWORK, HANDRAILS, LIGHTING, OR OTHER

MISCELLANEOUS ITEMS AS SHOWN ON DRAWINGS.

4. REFER TO REFLECTED CEILING PLANS FOR THE CEILING TYPE AND HEIGHT.

COORDINATE HEIGHTS OF GYPSUM BOARD WITH CEILING HEIGHT AND WITH PARTITION

DETAILS SHOWN HERE.

5. REFER TO FINISH SCHEDULE, INTERIOR ELEVATIONS, AND ARCHITECTURAL

CASEWORK DETAILS FOR WALL FINISHES AND WALL MOUNTED ACCESSORIES TO

COORDINATE BLOCKING REQUIREMENTS.

6. AT CERAMIC TILE, INSTALL CEMENTITIOUS BACKER BOARD. SHIM BACKER BOARD AS

REQUIRED TO RESULT IN A FLUSH TRANSITION TO NON-BACKER BOARD.

7. IN TOILET ROOMS, PROVIDE MOISTURE RESISTANT GYPSUM BOARD ON ALL WALLS.

8. PARTITION THICKNESS DIMENSIONS AS SHOWN ARE MINIMUM NOMINAL DIMENSIONS.

ACTUAL DIMENSIONS MAY DIFFER SLIGHTLY TO SUIT FIELD CONDITIONS.

1 *1401 FIRST FLOOR ENLARGED ACCESSIBLE UNIT E TYPE A 350-375 SF A418

1101, 1102, 1104, 1106, 1108, 1402, 1404, 1406, 1408 FIRST FLOOR ENLARGED ACCESSIBLE UNIT E TYPE A 275-300 SF A418

1 1204, 1305 FIRST FLOOR ENLARGED ACCESSIBLE UNIT D5 TYPE A 400-450 SF A418

1 1001, 1008 FIRST FLOOR ENLARGED ACCESSIBLE UNIT D4 TYPE A 400-450 SF A416

1 1003, 1006 FIRST FLOOR ENLARGED ACCESSIBLE UNIT D3 TYPE A 400-450 SF A416

1103, 1109, 1403, FIRST FLOOR ENLARGED ACCESSIBLE UNIT D2 -

BARIATRIC

TYPE A -

BARIATRIC 400-450 SF A417

1105, 1107, 1110, 1405, 1407, 1410 FIRST FLOOR ENLARGED ACCESSIBLE UNIT D1 TYPE A 400-450 SF A417

1 1004, 1005 FIRST FLOOR ENLARGED ACCESSIBLE UNIT B4 TYPE A 625-650 SF A415

1206, 1208, 1307, 1309 FIRST FLOOR ENLARGED ACCESSIBLE UNITS B3 TYPE A 650-675 SF A415

1 1212, 1312 FIRST FLOOR ENLARGED ACCESSIBLE UNIT B2 TYPE A 600-630 SF A414

1201, 1203, 1205, 1207, 1209, 1210, 1211, 1301, 1302, 1304, 1306, 1308, 1310, 1311 FIRST FLOOR ENLARGED ACCESSIBLE UNIT B TYPE A 575-600 SF A414

1 1501, 1502 FIRST FLOOR ENLARGED ACCESSIBLE UNIT A2 TYPE A 700-730 SF A413

1002, 1007, 1202, 1303 FIRST FLOOR ENLARGED ACCESSIBLE UNIT A TYPE A 675-700 SF A413

FLOOR ROOM NUMBERS ROOM DESCRIPTION

ANSI 117.1 CH11

DWELLING TYPE SIZE RANGE 1/4" ENLARGED PLAN

RESIDENT ROOM TYPE SCHEDULE - FIRST FLOOR

NO DATE REVISION

FESSIONAL:

09/05/25

PHASING DESCRIPTIONS

NOT

FOR

CONSTRUCTION

BASE BID SCOPE

OPTION SCOPE

3N

3N

4N

4N 5 6 7 8 10 12

14 15 16 17 18

19 21 23 25 26 27 28

NN

MM

LL

K

JJ

H

H

GG

FF

EE

DD

CC

BB

AA

HN

GN

FN

EN

DN

CN

BN

AN

HS

GS

FS

ES

DS

CS

BS

AS

NSNN

KN

1N

1N

29S

29S

30S 31S

31S

32S

32S

9 22

15.5 16.5

P P

Q Q

A210 1

A2112

A211

D.5D.5

2415.4

CORRIDOR

UNIT E1

UNIT D9

STAIRS

2-5

ELEVATOR LOBBY

ELEC

JANITOR

UNIT A2

UNIT A2

UNIT A2

UNIT A2

STAIRS

2-1

UNIT A1

LAUNDRY

UNIT D8

TRASH

CORRIDOR

UNIT E1

UNIT D9

UNIT A2 OPP

UNIT A2 OPP

UNIT A2 OPP

UNIT A2 OPP

UNIT D8

UNIT A1

LAUNDRY

TRASH

JANITOR

ELEVATOR LOBBY

ELEC

STAIRS

2-4

UNIT A2 OPP

UNIT A2

UNIT D8

UNIT A2 OPP

UNIT C1

UNIT C2

UNIT D1

UNIT D1

LOUNGE

UNIT C2

UNIT C1

UNIT A2 OPP

2011 UNIT D8

UNIT A2

UNIT A2 OPP

ELEC.

TELECOM

ELEVATOR LOBBY

TELECOM

ELEC

STAIRS

2-6

STAIRS

2-7

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

STAIRS

2-2

UNIT D2

UNIT D7

UNIT D4 OPP

UNIT D4

UNIT D5

LAUNDRY

UNIT D6

UNIT D6 OPP

UNIT A3

CORRIDOR

UNIT D7

UNIT D2

UNIT D3 OPP

UNIT D3

UNIT D4

UNIT D4 OPP

UNIT D5 OPP

LAUNDRY

STAIRS

2-3

UNIT D6

2307 UNIT D6 OPP

UNIT A3

CORRIDOR

CORRIDOR

A301

A301

A301

A302

A302

P A

R T

B A

2B

P A

R T

A A

2A

VESTIBULE

17.5

17.6 20

D.6D.6

E.6E.6

F.6F.6

G.3G.3

UNIT D3 OPP

TLT

2414A

A210

16' - 8" 16' - 8"

/8

3/

8"

5" 42' - 4" 295' - 10" 42' - 4" 5"

5"

8'

/2

8'

381' - 4"

395' - 4"

1'

/2

7' - 0" 50' - 9 3/8" 51' - 0 1/4" 8' - 1 3/8" 42' - 8" 8' - 1 3/8"

6' - 6 5/8" 46' - 10" 6' - 6 5/8"

8' - 1 3/8" 42' - 8" 59' - 1 5/8" 50' - 9 3/8" 7' - 0"

6'

1/

8"

/2

7'

/8

/8

"UNIT D3

SPA

ROOF TYPE

R3. SEE A560

ROOF TYPE

R5. SEE A560

ROOF TYPE

R5. SEE A560

A B

N

DATE:

DRAWN BY:

CHECKED BY:

PROJ. NO:

DRAWING NO:

DRAWING TITLE:

PROJECT NAME:

CLIENT:

418 BEAVER STREET

SEWICKLEY, PA 15143

PH: 412.287.7333

www.aeworks.com

PROFESSIONAL:

COPYRIGHT 2024 BY AE WORKS LTD ALL RIGHTS RESERVED.

SUBMISSION:

CONSTRUCTION BID

DOCUMENTS

AE WORKS®

A u to d e s k D o c s

/A F

R H

-0

S h e ri d a n /A

F R

H -0

A R

C H

-2

.r v t

/5

/2

:1

:3

A

M

A102

AC

RS

AFRH-033

OVERALL SECOND

FLOOR PLAN

AFRH SHERIDAN

RENOVATION

140 ROCK CREEK

CHURCH ROAD,

NORTHWEST,

WASHINGTON, DC

ARMED FORCES

RETIREMENT HOME -

WASHINGTON D.C.

09/05/25

1/16" = 1'-0"

OVERALL SECOND FLOOR PLAN

GENERAL CONSTRUCTION NOTES

1. PARTITION TYPES: UNLESS OTHERWISE NOTED, NEW PARTITIONS SHALL BE TYPE A3.

AT EXISTING COLUMNS AND PERIMETER NEW PARTITIONS SHALL BE D3 UNLESS NOTED

OTHERWISE.

2. CONTRACTOR TO COORDINATE ALL BLOCKING FOR CASEWORK , ACCESSORIES, ETC.

3. PROVIDE ADEQUATE BACKUP AND BLOCKING FOR ALL WALL OR CEILING MOUNTED

EQUIPMENT, ARCHITECTURAL WOODWORK, HANDRAILS, LIGHTING, OR OTHER

MISCELLANEOUS ITEMS AS SHOWN ON DRAWINGS.

4. REFER TO REFLECTED CEILING PLANS FOR THE CEILING TYPE AND HEIGHT.

COORDINATE HEIGHTS OF GYPSUM BOARD WITH CEILING HEIGHT AND WITH PARTITION

DETAILS SHOWN HERE.

5. REFER TO FINISH SCHEDULE, INTERIOR ELEVATIONS, AND ARCHITECTURAL

CASEWORK DETAILS FOR WALL FINISHES AND WALL MOUNTED ACCESSORIES TO

COORDINATE BLOCKING REQUIREMENTS.

6. AT CERAMIC TILE, INSTALL CEMENTITIOUS BACKER BOARD. SHIM BACKER BOARD AS

REQUIRED TO RESULT IN A FLUSH TRANSITION TO NON-BACKER BOARD.

7. IN TOILET ROOMS, PROVIDE MOISTURE RESISTANT GYPSUM BOARD ON ALL WALLS.

8. PARTITION THICKNESS DIMENSIONS AS SHOWN ARE MINIMUM NOMINAL DIMENSIONS.

ACTUAL DIMENSIONS MAY DIFFER SLIGHTLY TO SUIT FIELD CONDITIONS.

2-7 X101, X401 INDEPENDENT LIVING - UNIT E1 TYPE A 350-400 SF A425

2-7 X102, X402 INDEPENDENT LIVING - UNIT D9 TYPE A 450-500 SF A425

2-7 X003, X107, X012, X407 INDEPENDENT LIVING - UNIT D8 TYPE A 450-500 SF A424

2-7 X202,X301 INDEPENDENT LIVING - UNIT D7 TYPE A 450-500 SF A425

2-7 X208, X209, X307, X310 INDEPENDENT LIVING - UNIT D6 TYPE B 450-500 SF A424

2-7 X207, X308 INDEPENDENT LIVING - UNIT D5 TYPE B 450-500 SF A423

2-7 X205, X206, X305, X306 INDEPENDENT LIVING - UNIT D4 TYPE B 450-500 SF A423

2-7 X203, X204, X303, X304 INDEPENDENT LIVING - UNIT D3 TYPE B 450-500 SF A422

2-7 X201, X302 INDEPENDENT LIVING - ACCESSIBLE UNIT D2 TYPE A 450-500 SF A421

2-7 X007, X008 INDEPENDENT LIVING - UNIT D1 TYPE B 450-500 SF A422

2-7 X005, X009 INDEPENDENT LIVING - UNIT C2 TYPE B 550-600 SF A426

2-7 X006, X010 INDEPENDENT LIVING - UNIT C1 TYPE B 550-600 SF A426

2-7 X210, X309 INDEPENDENT LIVING - UNIT A3 TYPE B 750-800 SF A421

2-7 X001, X004, X011, X013 INDEPENDENT LIVING - UNIT A2 OPP DOOR TYPE B 650-700 SF A419

2-7

X002, X014, X103, X104, X105, X106, X403, X404, X405, X406 INDEPENDENT LIVING - UNIT A2 TYPE B 650-700 SF A419

2-7 X108, X408 INDEPENDENT LIVING - ACCESSIBLE UNIT A1 TYPE A 650-700 SF A420

FLOORS ROOM NUMBERS ROOM DESCRIPTION

ANSI 117.1 CH11

DWELLING TYPE SIZE RANGE 1/4" ENLARGED PLAN

RESIDENT ROOM TYPE SCHEDULE - FLOORS 2-7

NO DATE REVISION

FESSIONAL:

09/05/25

PHASING DESCRIPTIONS

NOT

FOR

CONSTRUCTION

BASE BID SCOPE

OPTION SCOPE

3N

3N

4N

4N 5 6 7 8 10 12

14 15 16 17 18

19 21 23 25 26 27 28

NN

MM

LL

KK

JJ

HH

GG

FF

EE

DD

CC

BB

AA

HN

GN

FN

EN

DN

CN

BN

AN

HS

GS

FS

ES

DS

CS

BS

AS

NSNN

1N

1N

29S

29S

30S

30S

31S

31S

9 22

2215.5 16.5

A210 1

G.6 G.6

UNIT E1

UNIT D9

UNIT A2

UNIT A2

UNIT A2

UNIT A2

UNIT D8

UNIT A1

LAUNDRY

TRASH

ELEVATOR LOBBY

SOILED

ELEC

STAIRS

3-1

STAIRS

3-5

UNIT E1

UNIT D9

ELEVATOR LOBBY

JANITOR

ELEC

UNIT A2

UNIT A2

UNIT A2

UNIT A2

UNIT D8

UNIT A1

TRASH

LAUNDRY

STAIRS

3-4

UNIT A2 OPP

UNIT A2

UNIT A2 OPP

UNIT C1

UNIT C2

UNIT C2

UNIT C1

UNIT A2 OPP

UNIT D1

UNIT D1

UNIT A2 OPP

UNIT A2

UNIT D8

UNIT D8

STAIRS

3-6

ELEC

TELECOM

ELEVATOR LOBBY

LOUNGE

TELECOM

ELEC

STAIRS

3-7

CORRIDOR

UNIT A3

UNIT D6

UNIT D5

UNIT D4

UNIT D3

UNIT D2

UNIT D7

UNIT D3

UNIT D4

UNIT D6

LAUNDRY

STAIRS

3-2

CORRIDOR

UNIT A3

UNIT D6

LAUNDRY

UNIT D4

UNIT D5

UNIT D6

UNIT D4

UNIT D3

UNIT D3

UNIT D7

UNIT D2

STAIRS

3-3

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

A301

A301

A301

A302

A302

P A

R T

B A

3B

P A

R T

A A

3A

VESTIBULE

17.5

SPA

TLT

3414A

A210

A2112

A211

42' - 9" 295' - 10" 3' - 7 1/4" 21' - 6" 17' - 7 3/4"

381' - 4"

8'

/2

/2

8'

/2

5'

1"

7'

/2

7'

/8

9'

8'

/2

7'

/2

50' - 9 3/8" 51' - 0 1/4" 8' - 1 3/8" 42' - 8" 8' - 1 3/8" 59' - 11 1/4" 8' - 1 3/8" 42' - 8" 8' - 1 3/8" 51' - 0 1/4" 50' - 9 3/8"

381' - 4"

A B

EXSITING JOINT LOCATION NEW JOINT LOCATION

EXPANSION JOINT LEGEND

N

DATE:

DRAWN BY:

CHECKED BY:

PROJ. NO:

DRAWING NO:

DRAWING TITLE:

PROJECT NAME:

CLIENT:

418 BEAVER STREET

SEWICKLEY, PA 15143

PH: 412.287.7333

www.aeworks.com

PROFESSIONAL:

COPYRIGHT 2024 BY AE WORKS LTD ALL RIGHTS RESERVED.

SUBMISSION:

CONSTRUCTION BID

DOCUMENTS

AE WORKS®

A u to d e s k D o c s

/A F

R H

-0

S h e ri d a n /A

F R

H -0

A R

C H

-2

.r v t

/5

/2

:1

:0

A

M

A103

AC

RS

AFRH-033

OVERALL TYPICAL

FLOOR PLAN (FLOORS

3-7)

AFRH SHERIDAN

RENOVATION

140 ROCK CREEK

CHURCH ROAD,

NORTHWEST,

WASHINGTON, DC

ARMED FORCES

RETIREMENT HOME -

WASHINGTON D.C.

09/05/25

1/16" = 1'-0"

OVERALL TYPICAL FLOOR PLAN (FLOORS 3-7)

GENERAL CONSTRUCTION NOTES

1. PARTITION TYPES: UNLESS OTHERWISE NOTED, NEW PARTITIONS SHALL BE TYPE A3.

AT EXISTING COLUMNS AND PERIMETER NEW PARTITIONS SHALL BE D3 UNLESS NOTED

OTHERWISE.

2. CONTRACTOR TO COORDINATE ALL BLOCKING FOR CASEWORK , ACCESSORIES, ETC.

3. PROVIDE ADEQUATE BACKUP AND BLOCKING FOR ALL WALL OR CEILING MOUNTED

EQUIPMENT, ARCHITECTURAL WOODWORK, HANDRAILS, LIGHTING, OR OTHER

MISCELLANEOUS ITEMS AS SHOWN ON DRAWINGS.

4. REFER TO REFLECTED CEILING PLANS FOR THE CEILING TYPE AND HEIGHT.

COORDINATE HEIGHTS OF GYPSUM BOARD WITH CEILING HEIGHT AND WITH PARTITION

DETAILS SHOWN HERE.

5. REFER TO FINISH SCHEDULE, INTERIOR ELEVATIONS, AND ARCHITECTURAL

CASEWORK DETAILS FOR WALL FINISHES AND WALL MOUNTED ACCESSORIES TO

COORDINATE BLOCKING REQUIREMENTS.

6. AT CERAMIC TILE, INSTALL CEMENTITIOUS BACKER BOARD. SHIM BACKER BOARD AS

REQUIRED TO RESULT IN A FLUSH TRANSITION TO NON-BACKER BOARD.

7. IN TOILET ROOMS, PROVIDE MOISTURE RESISTANT GYPSUM BOARD ON ALL WALLS.

8. PARTITION THICKNESS DIMENSIONS AS SHOWN ARE MINIMUM NOMINAL DIMENSIONS.

ACTUAL DIMENSIONS MAY DIFFER SLIGHTLY TO SUIT FIELD CONDITIONS.

NO DATE REVISION

FESSIONAL:

09/05/25

PHASING DESCRIPTIONS

NOT

FOR

CONSTRUCTION

BASE BID SCOPE

OPTION SCOPE

3N

3N

4N

4N

14 15

16 17

19 21

25 26 27 28

NN

MM

LL

K

K

JJ

H H

GG

FF

EE

DD

CC

BB

AA

HNHN

GNGN

FNFN

ENEN

DNDN

CNCN

BNBN

ANAN

HS HS

GS GS

FS FS

ES ES

DS DS

CS CS

BS BS

AS AS

NSNN

KN

1N

1N

29S

29S

30S

30S

31S

31S

32S

32S

2215.5 16.5

A.5A.5

B.5B.5

C.5C.5

D.5D.5

E.5E.5

F.5F.5

26.524

2415.2

15.2

15.4

15.4

8.8

8.8 24.2

24.28.5

8.5

24.5

24.5

A301

A301

A301

A302

A302

17.8

17.8

5.5 6.7 7.6 17.5 17.6

17.6 20

A.6A.6

D.6D.6

E.6E.6

F.6F.6

G.3G.3

27.8

27.8

25.55.3

AN.1

AN.1

A.1A.1

AS.1AS.1

11.03

11.04

11.03

11.04

11.03

11.04

11.03

11.04

11.03

11.04

A404

5'

/2

5' - 5 1/2" 7' - 1" 7' - 1" 5' - 5 1/2"

5'

/2

7'

7'

9'

9'

4'

6' - 0"12' - 2 1/2" 9' - 8 1/2" 7' - 1"7' - 1"6' - 0"

R1 R1

R1

R1 R1

R1 R1

R1R4

R2

R3

R3

R4

R4 R4

R4 R4

R5 R5

R4

7.11

7.11

R6 R6

DN DN

11.02

ROOF CJ ROOF CJ

ROOF CJ

ROOF CJ AT

LOWER ROOF

ROOF CJ

ROOF CJ AT

LOWER ROOF

A B

N

DATE:

DRAWN BY:

CHECKED BY:

PROJ. NO:

DRAWING NO:

DRAWING TITLE:

PROJECT NAME:

CLIENT:

418 BEAVER STREET

SEWICKLEY, PA 15143

PH: 412.287.7333

www.aeworks.com

PROFESSIONAL:

COPYRIGHT 2024 BY AE WORKS LTD ALL RIGHTS RESERVED.

SUBMISSION:

CONSTRUCTION BID

DOCUMENTS

AE WORKS®

A u to d e s k D o c s

/A F

R H

-0

S h e ri d a n /A

F R

H -0

A R

C H

-2

.r v t

/5

/2

:1

:3

A

M

A120

AEW

Checker

AFRH-033

OVERALL ROOF PLAN

AFRH SHERIDAN

RENOVATION

140 ROCK CREEK

CHURCH ROAD,

NORTHWEST,

WASHINGTON, DC

ARMED FORCES

RETIREMENT HOME -

WASHINGTON D.C.

09/05/25

GENERAL CONSTRUCTION NOTES

1. PARTITION TYPES: UNLESS OTHERWISE NOTED, NEW PARTITIONS SHALL BE TYPE A3.

AT EXISTING COLUMNS AND PERIMETER NEW PARTITIONS SHALL BE D3 UNLESS NOTED

OTHERWISE.

2. CONTRACTOR TO COORDINATE ALL BLOCKING FOR CASEWORK , ACCESSORIES, ETC.

3. PROVIDE ADEQUATE BACKUP AND BLOCKING FOR ALL WALL OR CEILING MOUNTED

EQUIPMENT, ARCHITECTURAL WOODWORK, HANDRAILS, LIGHTING, OR OTHER

MISCELLANEOUS ITEMS AS SHOWN ON DRAWINGS.

4. REFER TO REFLECTED CEILING PLANS FOR THE CEILING TYPE AND HEIGHT.

COORDINATE HEIGHTS OF GYPSUM BOARD WITH CEILING HEIGHT AND WITH PARTITION

DETAILS SHOWN HERE.

5. REFER TO FINISH SCHEDULE, INTERIOR ELEVATIONS, AND ARCHITECTURAL

CASEWORK DETAILS FOR WALL FINISHES AND WALL MOUNTED ACCESSORIES TO

COORDINATE BLOCKING REQUIREMENTS.

6. AT CERAMIC TILE, INSTALL CEMENTITIOUS BACKER BOARD. SHIM BACKER BOARD AS

REQUIRED TO RESULT IN A FLUSH TRANSITION TO NON-BACKER BOARD.

7. IN TOILET ROOMS, PROVIDE MOISTURE RESISTANT GYPSUM BOARD ON ALL WALLS.

8. PARTITION THICKNESS DIMENSIONS AS SHOWN ARE MINIMUM NOMINAL DIMENSIONS.

ACTUAL DIMENSIONS MAY DIFFER SLIGHTLY TO SUIT FIELD CONDITIONS.

1/16" = 1'-0"

OVERALL ROOF PLAN

SLOPED STEEL

1/4"/FT

GUTTER AND DOWNSPOUT TYP.

EXISTING

ROOF NOT

IN SCOPE

EXISTING

ROOF NOT

IN SCOPE

EXISTING

ROOF NOT

IN SCOPE

EXISTING

ROOF NOT

IN SCOPE

EXISTING

ROOF NOT

IN SCOPE

EXISTING

ROOF NOT

IN SCOPE

SLOPED STEEL

1/4"/FT

GUTTER AND DOWNSPOUT…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .