About this file

This document includes a marketing brochure for STARC Systems modular wall panels and related federal contract opportunity. The brochure promotes STARC Systems' reusable panel systems for renovations, temporary isolation barriers, anterooms, and modular rooms. It highlights installations at various VA and military hospitals across applications such as negative pressure spaces, isolation areas, construction barriers, and corridor isolation kits. The second section describes a Department of Veterans Affairs solicitation to correct deficiencies for Project 520-22-178, which is a 100% set-aside for Veteran Owned Small Businesses. Offerors must respond by the solicitation response date of 36C25623R0012 to be considered for the award.

View the file

Other files

File Type Posted
36C25623R0012 RFI Responses R1.docx DOCX document
Wall Guard Specs.pdf PDF
BL T-102 flooring common areas.pdf PDF
T-105.pdf PDF
Starc Catalog.pdf PDF
Canopy 3.pdf PDF
Access Drive for Rollup Door.pdf PDF
REVISED SOW 520-22-178 Correct FCA Deficiencies Multiple Bldgs 11.23.22.docx DOCX document
36C25623R0012 0001.pdf PDF
Canopy 1.pdf PDF
T-104 Rm 101-103-104-104A-104B-104C-C113-C111.pdf PDF
Canopy 2.pdf PDF
T-102 Renovations Floor Covering 4-12-22.pdf PDF
SOW 520-22-178 Correct FCA Deficiencies Multiple Bldgs R1.docx DOCX document
bldg 3 various room elevations and details- Laundry_Garbage Chutes.pdf PDF
36C25623R0012 EXHIBIT B.docx DOCX document
42 - 3-4 - Ground Floor Plan Area 2.pdf PDF
Exhibit 15 Walkways For Dock Access.pdf PDF
Brand Name JA-FCA-22-178_Signed 1_Redacted.pdf PDF
36C25623R0012 EXHIBIT C.docx DOCX document
Specs_05_16.pdf PDF
31 ACCESS DRIVE.pdf PDF
B30 - Dock LVT 8-22-22.pdf PDF
51 - 3-13 - Third Floor Plan Area 2.pdf PDF
T-105 ArchDiagram.pdf PDF
Exhibit 3 Chutes-VA HOSPITAL_Redacted.pdf PDF
T102 Floor Framing Layout.pdf PDF
ICRA Contracting Only.pdf PDF
36C25623R0012 EXHIBIT A.docx DOCX document
48 - 3-10 - Second Floor Plan Area 2.pdf PDF
VHA Supplemental Contract Requirements for Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors.pdf PDF
T-102 Fire Spklr Shop Drawing.pdf PDF
36C25623R0012 EXHIBIT D.docx DOCX document
VA Medical Ctr Bldg 3 2204284 IH Survey Report_PDF FINAL 04 19 2022 0934.pdf PDF
Handrails Details.pdf PDF
36C25623R0012 EXHIBIT E.docx DOCX document
T-102-FLOORING Issues_Updated.pdf PDF
96 - 3-58 - Toilet Room and Shower Elevations Soiled Linen and Trash Rooms.pdf PDF
WD MS20220050 Mod 3 dtd 10-7-2022.pdf PDF
36C25623R0012 Solicitation.pdf PDF
T-104 ArchDiagram.pdf PDF
30a - Wall Paint Details.pdf PDF
T-102 Blocking and TieDown Details.pdf PDF
Exhibit 30 - Automatic Scan Door Opener.pdf PDF
36C25623R0012 EXHIBIT F.docx DOCX document
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Made in USA starcsystems.com

Reducing Risk & Disruption during Renovation

Hope Chalmers, RSM hchalmers@starcsystems.com

• Tampa VA

• Memphis VA

• Lexington VA

• Columbia VA

• Mountain Home VA

• Augusta (Georgia) VA

• Louisville VA

• St. Louis VA

• Detroit VA

• Madison VA

• Augusta (Maine) VA

• West Roxbury VA

• El Paso VA

• Muskogee VA

• Kansas City VA

• Lebanon VA

• Martinsburg VA

• Charleston VA

• Twentynine Palms VA

• Palo Alto VA

• Minneapolis VA

• Albuquerque VA

• Birmingham VA

• Robert E. Bush Naval Hospital

• Sacramento VA

• Orlando VA

• Naval Health Clinic-Charleston

• Walter Reed Hospital

• US Navy Hospital, Okinawa, Japan

VA and Military Hospitals Using STARC Systems Now

Jack C. Montgomery Muskogee VA

“We use it for everything;

anterooms, renovations, admissions, and anywhere else. I wish we could have started using it sooner.”

Asst. Chief of Engineering, Clint Boling

The Premier Infection Isolation and

Occupied Renovation Solutions

• Airtight reusable panels exceed ICRA Class IV

• Fast and simple installation

• Exceptionally durable and reusable

• Easily reconfigurable as needs change

Made in USA starcsystems.comstarcsystems.comMade in USA

Private Healthcare

Used for Renovation and Isolation by Leading Health

Systems in all 50 States

“STARC temporary walls … the ideal solution for infection control during the pandemic or containment during patient occupied renovation.”

Assistant Director for Major Hospital Projects at SUNY, Alvin

Dunaisky

U.S. Naval Hospital, Okinawa, Japan

270 feet purchased for following applications:

• Provide negative pressure space outside OR for transport of infected patients from the positive pressure OR to the recovery area.

• Create instant isolation areas, as needed, to allow for expansion during emergencies.

• Create a clean barrier appearance without the need for construction

Scaife Hall - University of Pittsburgh

Naval Clinic Charleston, South Carolina

"During COVID, STARC replaced plastic to create isolation between construction zones and patients,” “STARC allowed us to gain better control of negative air processes and use HVAC systems more efficiently and safely. Could have used twice as much

STARC walls as we purchased!“

Bill Keene, Facility Manager

Navy Facilities Using STARC Across Multiple Applications

STARC Anterooms Transform Patient Rooms into Isolation

• Create a safe negative pressure zone for donning & doffing PPE

• Installs in minutes

• Easily moved or reconfigured

“Your wall system has been our foundation to designing and creating negative air isolation units for our ICU and Emergency Departments along with our Long-Term Care unit.”

Kelly Trout, Regulatory Compliance

Specialist

Hendricks Regional Health

STARC Modular Rooms Transform Open Spaces

Before After

• Isolates potentially infectious patients in emergency departments

• Provides increased visibility or privacy

Creates immediate semi-permanent solutions that avoid disruptive construction and can be reconfigurated as needs change

Entire Wings Can be Turned into Isolation Capacity

Oklahoma Veteran's Affairs

• Corridor kits are being utilized in each facility to create dedicated

COVID space

• System-wide purchase of corridor kits for 7 facilities, consisting of

VAMCs and VA Centers

STARC Pop-Up Creates Additional Isolation Space

• Allows creation of isolation rooms within unoccupied spaces.

• Vision options allow for constant monitoring without entering room.

• Picture - Broward Health had an emergent need to set up multiple Acute

Care Rooms. That was easily achieve with STARC panels.

STARC Walls Transform to Meet Present Needs

Northwell Lenox Hill Hospital, NYC

• Installed 30 feet of see-through panels and doors in two hours, transforming an operating room into a recovery area.

• Used solid panels to section off a doctors' suite into individual testing sites.

"I am going to expand my stock. I will never use another product.“

Thomas Picciano, Manager of Engineering

Partitions Providing Safety Throughout Facilities

• Allows ability to direct patient traffic in public areas

• Isolates potentially infectious patients from others

• Allows for continued visibility

• Real wall appearance & stability

• Superior durability

• Reduce noise by up to 50%

• Fast, easy, disruption-free installation

• Telescope from 6’10” to 10’3”

• Widths from 12”- 42’’

Exceeds ICRA Class IV

Requirements

ASTM E-84 Class A Fire &

Smoke Rated

The STARC System Solution

Simple, Airtight Panel

Connections

Fast, tool-free connection between panels!

Integrated

Pressure Ports

Pressure Monitor

Bracket

Standard

12” Duct Collar

Integrated Negative Air Panels and Air-Tight Doors Exceeds ICRA Class IV Requirements

Multiple Widths

Available in 42” and 54” widths

Superior

Hinge System

Hope Chalmers, Regional Sales Manager - SE hchalmers@starcsystems.com

847-420-792 mailto:hchalmers@starcsystems.com

File details come from the government source that posted it. Updated .