This document contains a flooring material selection memo and information on a related federal contract opportunity. The memo specifies that the existing 16"x16" LVT floor covering in corridor B30/C1-37 is being replaced with 18"x18" LVT from Tarkett called ETR Travertine in the color NAVONA Travertine. The new flooring is to be installed in a straight/monolithic pattern with arrows running in the same direction. The memo also notes that the existing cove wall base is discontinued and requests advice if it needs replacement.

The related federal contract opportunity is solicitation number 36C25622R0012 from the Department of Veterans Affairs for corrective work at Project 520-22-178. This is a re-solicitation as the original solicitation did not receive any offers. This project is set aside 100% for Veteran Owned Small Businesses.

View the file

Other files

File Type Posted
36C25623R0012 RFI Responses R1.docx DOCX document
Wall Guard Specs.pdf PDF
BL T-102 flooring common areas.pdf PDF
T-105.pdf PDF
Starc Catalog.pdf PDF
Canopy 3.pdf PDF
Access Drive for Rollup Door.pdf PDF
REVISED SOW 520-22-178 Correct FCA Deficiencies Multiple Bldgs 11.23.22.docx DOCX document
36C25623R0012 0001.pdf PDF
Canopy 1.pdf PDF
T-104 Rm 101-103-104-104A-104B-104C-C113-C111.pdf PDF
Canopy 2.pdf PDF
T-102 Renovations Floor Covering 4-12-22.pdf PDF
SOW 520-22-178 Correct FCA Deficiencies Multiple Bldgs R1.docx DOCX document
bldg 3 various room elevations and details- Laundry_Garbage Chutes.pdf PDF
36C25623R0012 EXHIBIT B.docx DOCX document
42 - 3-4 - Ground Floor Plan Area 2.pdf PDF
Exhibit 15 Walkways For Dock Access.pdf PDF
Brand Name JA-FCA-22-178_Signed 1_Redacted.pdf PDF
36C25623R0012 EXHIBIT C.docx DOCX document
Specs_05_16.pdf PDF
31 ACCESS DRIVE.pdf PDF
51 - 3-13 - Third Floor Plan Area 2.pdf PDF
T-105 ArchDiagram.pdf PDF
Exhibit 3 Chutes-VA HOSPITAL_Redacted.pdf PDF
T102 Floor Framing Layout.pdf PDF
ICRA Contracting Only.pdf PDF
36C25623R0012 EXHIBIT A.docx DOCX document
48 - 3-10 - Second Floor Plan Area 2.pdf PDF
VHA Supplemental Contract Requirements for Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors.pdf PDF
T-102 Fire Spklr Shop Drawing.pdf PDF
36C25623R0012 EXHIBIT D.docx DOCX document
T-102 STARC Systems.pdf PDF
VA Medical Ctr Bldg 3 2204284 IH Survey Report_PDF FINAL 04 19 2022 0934.pdf PDF
Handrails Details.pdf PDF
36C25623R0012 EXHIBIT E.docx DOCX document
T-102-FLOORING Issues_Updated.pdf PDF
96 - 3-58 - Toilet Room and Shower Elevations Soiled Linen and Trash Rooms.pdf PDF
WD MS20220050 Mod 3 dtd 10-7-2022.pdf PDF
36C25623R0012 Solicitation.pdf PDF
T-104 ArchDiagram.pdf PDF
30a - Wall Paint Details.pdf PDF
T-102 Blocking and TieDown Details.pdf PDF
Exhibit 30 - Automatic Scan Door Opener.pdf PDF
36C25623R0012 EXHIBIT F.docx DOCX document
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B30 - Dock RE: Floor Covering Material Selection and installation method August 22, 2022 Shannon Day - Interior Designer

B30/ C1-37 Corridor

• Existing floor covering is no longer available, unable to provide an exact match

• Current floor covering LVT is 16”x16”

• Cannot find manufacturer that provides a 16”x16”

• New selected LVT shall be 18”x18” LVT

• Remove first three rows of the existing LVT that butt to the double doors

• Manufacturer: Tarkett

• Name: ETR Travertine

• Color Number and Name: 7211/NAVONA Travertine

• Size: 18”x18”

• Installation method: straight/Monolithic (arrows run the same direction)

B30/C1-37Cove Wall Base

• Existing cove wall base is discontinued – NA

• Should be able to remove the existing LVT and insert new LVT

• If wall base needs to be replaced – please advise