This document contains responses to 34 questions regarding a solicitation for correcting deficiencies at multiple buildings on a federal facility. The solicitation seeks to replace or repair exhaust fans, gutters, downspouts, windows, doors, flooring, handrails, signs, and parking areas across 15 buildings. It also involves constructing new concrete foundations, stairs, ramps, and landings at several buildings. The solicitation was reposted with an extended deadline of December 6, 2022 at 3:00pm Central Time due to the number of questions submitted. The work is set aside for Veteran Owned Small Businesses. No drawings or specifications were provided, but field measurements were to be taken during site visits to determine dimensions and scope. Replacements and repairs are to match existing designs where possible.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOR OFFICIAL USE ONLY
Source Selection Sensitive Information—See FAR 2.101 & 3.104 Project No. 520-22-178 Correct FCA Deficiencies 36C25623R0012
EXHIBIT F
REQUEST FOR INFORMATION (RFI) FORM
| 1. Proposal RFI #1 – Bid due time in block 13.a states “3:00pm CDT.” Please clarify if this is to be 3:00pm CST. |
| Solicitation extended to December 6, 2022, 3:00pm, Central Time |
| 2. Proposal RFI #2 – Document “SOW+520-22-178+Correct+FCA+Deficiencies+Multiple+Bldgs+R1” mentions file “T-102 NEW STARC-Full Product Catalog.” However, this file was not provided via Sam.gov. Please provide this document. |
| See attachment for Starc Catalog. |
www.starcsystems.com
| 3. Proposal RFI #3 - Document “SOW+520-22-178+Correct+FCA+Deficiencies+Multiple+Bldgs+R1” includes fans to be installed as part of the scope of work. Can they be substituted with dehumidifiers connected to a drainage system? |
| Yes. This would necessitate that they were outdoor rated and that could accommodate 150% of the crawlspace and maintain the humidity to recommend levels. |
4. Proposal RFI #4 - Document “SOW+520-22-178+Correct+FCA+Deficiencies+Multiple+Bldgs+R1”, states under Building 31 to “see Exhibit 31 Exhaust Fans.” However, this document was not posted to Sam.gov. Please provide this document.
Removed Exhibit sentence. Type of exhaust fan provided in SOW.
5. Proposal RFI #5 - Drawing 001, New Access Drives Building 31 Roll Up Door, does not seem to be scalable. Please provide a drawing that is scalable so we can get a better understanding of dimensions and scope of work.
All dimensions are on pdf.
6. Proposal RFI #6 - Document “SOW+520-22-178+Correct+FCA+Deficiencies+Multiple+Bldgs+R1”, states under Building 30 to “see Exhibit 30a Automatic Scan Opener Details.” However, this document was not posted to Sam.gov. Please provide this document.
The SOW should read “see Exhibit 30 Automatic Scan Opener Details”
| 7. Proposal RFI #7 - Please schedule another walk through so that some of our subcontractors can dig deeper into the uniqueness of this project. |
| There will be no additional site visits scheduled. |
| 8. Proposal RFI #8 – Please provide a drawing for Building 31 that indicates the location and quantity of the Exhaust Fans that need to be replaced. |
| The proposal shall include RW Martin to purchase and install their industrial products. See RFI #4 |
9. Proposal RFI #9 - Please provide a Spec Section for the Canopy, including basis of design if we are to match the existing canopy.
There are no specs for the canopy. See Canopy 1, 2, and 3 Drawings from previous project for the basis of design.
| 10. Proposal RFI #10 - Due to the complexity of the project and the Thanksgiving Holiday, please extend the bid date to 12/6/22 and the RFI period to 11/22. |
| Solicitation will be extended to3:00pm Central Time, December 6, 2022, due to delay with posting RFI responses. The RFI submittal period has expired. |
| 11. Proposal RFI #11 - Due to the instability in our current economy with price escalations and procurement issues, please change the contract type to a Fixed-Price with Economics Price Adjustments pursuant to FAR 16.203. |
| The Fixed Price with Economics Price Adjustments will not be included with this solicitation/contract. |
| 12. Proposal RFI #12 - Please confirm that this project is tax exempt. |
| No, this project is not tax exempt. |
| 13. Proposal RFI #13 – Please provide drawings for Building 2 that show: the location of the canopy that needs to be removed, the elevation of the wood window where the trim needs to be replaced, and the elevation of the Double Door that needs to be replaced. |
| The drawings are not available. Site Visit measurements were to be taken as well as any pictures. |
| 14. Proposal RFI #2 – Please provide drawings of the existing deck and stairs at Building T-105 that need to be demoed. |
| No drawings exist |
| 15. Proposal RFI #3 – We do not understand what you mean by “…stairs with metal landing on concrete slab” for Building T-104 and T-105. Please provide drawings (design, details, sections, elevations, etc.) of the new stairs to be built. |
| Concrete slab with an aluminum landing and stairs on top. Field measurements were to be taken during site visit. |
16. Proposal RFI #4 – The new stairs for Building T-104 and T-105 are to be “NON-Slip.” Are these metal treads? Or are they concrete filled pan stair treads? Please provide details and drawings for these stairs.
This is only an idea. Open to ideas. Submittals are required once the contract is awarded.
17. Proposal RFI #5 – In order to know the complete scope of work, please provide drawings of the existing wood deck, including sections and elevations at Building T-104.
Please also include drawings of details on the shoring up of the concrete foundation (existing as well as proposed).
No drawings exist. Site Visit measurements were to be taken as well as any pictures.
18. Proposal RFI #6 - Building T-104 has the following statement (third bullet):
“Contractor to provide on the exterior ramp requires 2 handrails 50 linear feet.” Please provide design detail drawings on the type and style of the handrails and how it attaches to the ramp as well as location of these handrails.
Please clarify if there is a total of 50 feet of handrails or two handrails of 50 feet each.
Please also clarify if there is any removal of handrails.
Depending on the ADA ramp, you will need 2 individual handrails that coincide with the length of the ramp. The 50’ ramp is wooden, and no handrails are present. Field measurements were to be taken during site visit.
19. Proposal RFI #7 - Building T-104 has the following statement (third bullet):
“Remove curb.” Please clarify if we are only removing curb or also replacing it. Please provide detail drawings where the curb is being removed and how much.
Depending on how you prefer to do the work. ADA Sidewalk strips need to be installed that are flush with the walk. Field measurements were to be taken during site visit.
| 20. Proposal RFI #8 - Building T-104 has the following statement (third bullet):“..and replace 5 -feet by 30-feet to be flush with parking lot.” Are we to replace a section of concrete sidewalk? Or is this a section of asphalt? Please provide drawings showing this section and details. |
| Concrete. Field measurements were to be taken during site visit. |
21. Proposal RFI #9 - Building T-104 has the following statement (third bullet):
“Provide sign, stripes, and logo…” Please provide drawings and details of what kind of sign, location and design of stripes, etc.
ADA Compliant Handicap Parking Logo and striping.
| 22. Proposal RFI #10 - Please confirm that the statement “Remove existing Common Corridor Areas to include Utility Room, Halls and Restrooms” refers to the removal of the flooring and base in Buildings T-104 down to the subfloor only (nothing else is being removed). |
| Correct. The common areas flooring only. Field measurements were to be taken during site visit. |
| 23. Proposal RFI #11 - Please confirm that the statement “Remove existing Common Corridor Areas to include Utility Room, Halls and Restrooms” refers to the removal of the flooring and base in Buildings T-105 down to the subfloor only (nothing else is being removed). |
| Correct. The common areas flooring only. Field measurements were to be taken during site visit. |
| 24. Proposal RFI #12 - Please confirm that for Building T-104 statement “Remove existing Common Corridor Areas to include Utility Room, Halls and Restrooms” refers to the following spaces: Waiting Room 104, C-113, M. TLT 103, F. TLT 105, Mech 104A, Mech 104B, and Mech 104C. |
| Attached Drawing. Rm 101, 103, 105, 104, 104A, 104B, 104C, C-113, C-111 |
| 25. Proposal RFI #13 - Please confirm that for Building T-105 statement “Remove existing Common Corridor Areas to include Utility Room, Halls and Restrooms” refers to the following spaces: Waiting Room 100, Corridor 103, Women Toilet 104, Men Toilet 105, Elect 100, Mech 102A, Mech 106A and Riser Rm 100B. |
| Attached Drawing. Rm 100, 100A, 100B, 102A, 103, 104, 105, 106A |
26. Proposal RFI #14: is the intent for the new concrete foundation with spread footings for Buildings T-102 and T-104 to be a 1’ high x 2’ wide continuous footing with an 8” foundation wall centered in the footing to support the perimeter walls of the building?
Please confirm that this will only pertain to the 4 exterior perimeter walls and that there will not be any interior foundations needed.
Or is the intent to put a continuous footing and use earthquake straps to secure the building to the footing.
Please provide details and drawings for these concrete foundations.
Yes, if the foundation wall adjusts overall height, then the interior footer MUST be supported.
There are no foundations, trailer tie downs only. We need to provide concrete foundation with spread footings for permanent construction and to resist wind loads.
No drawings available.
| 27. Proposal RFI #15 - Please provide drawings for Building T-102 that show locations and quantities of existing gutters and downspouts that need to be replaced. |
| Field measurements were to be taken during site visit. |
| 28. Proposal RFI #16 - Please provide drawings that indicate the locations where 2-inch Collets are to be installed on the hand rails. |
| No drawings are available. Field measurements were to be taken during site visit. |
| 29. Proposal RFI #17 - Please confirm that the entire Building T-102 will be vacated during the renovation. |
| I confirm the ENTIRE building T-102 will be vacated during renovations. |
30. Proposal RFI #18 - Please provide drawings for Building T-102 that indicate which rooms are offices versus Common Corridor Areas, Utility Rooms and Restrooms so we can properly determine which areas will receive carpet versus LVT flooring.
Field measurements were to be taken during site visit.
| 31. Proposal RFI #19 - Building 15 is to receive new handrails at the Main Building entrance. Is it a total of 40 linear feet or is there 40 feet on each side of the stairs? Please provide detailed drawings, design, dimensions and specifications for the Black Powder Coated Handrails at Main Building entrance. |
| Approximately 40 LF is the total distance. Field measurements were to be taken during site visit. No specifications are available. |
| 32. Proposal RFI #20 - The scope of work for Building 2 includes the installation of a new canopy. Please provide detail drawings of the location, layout, dimensions and design of the canopy. |
| Please see RFI #9 above |
| 33. Proposal RFI #21 – Please extend the bid date to 12/6/22 as we have so many questions and are missing a lot of important information in order to develop the proper pricing. |
| Solicitation extended to December 6, 2022, 3:00pm Central Time. |
34. Proposal RFI #1 – Building 30 is to receive additional wall bumpers in Room 1H100. File “30a Wall Paint Details” indicates “Antique White 014” by inpro for “Wall Protection. However, please see the attached photo which appears to be showing a dark blue color. Please clarify the specifications for the wall bumper.
Nu-Tree® Heavy Duty Wall Guards - Wall Protection | Inpro Corporation Dove Gray 0106 image1.jpeg image2.jpeg