Supplemental Price Breakdown by Division Sheet.docx

DOCX document 21 KB Posted

Attached to
J061--612A4-26-050 | Install Building 644 Dermatology Generator Site Prep
Solicitation number
36C26126R0037
Issued by

About this file

This is a Supplemental Price Breakdown by Division Sheet template designed for price analysis of the solicitation 36C26126R0037, Project 612A4-26-050, titled "Install Building 644 Dermatology Generator Site Prep" for the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21.

The document is a standard construction cost breakdown form requiring contractors to provide complete divisional cost allocations across the Uniformat Division of Work classification system. Bidders must itemize costs for applicable divisions including General Requirements, Existing Conditions, Concrete, Masonry, Metals, Wood and Plastic, Thermal and Moisture Protection, Doors and Windows, Finishes, Specialties, Equipment, Furnishings, Special Construction, Conveying Equipment, Fire Suppression, Plumbing, HVAC, Electrical, Communications, Electronic Safety and Security, Earthwork, Exterior Improvements, Utilities, and Transportation. The form requires contractors to provide a subtotal, followed by line items for Other costs, Bonds and Insurance, Overhead, and Profit, culminating in a total contract price. The document includes signature and date blocks for authorization by the contractor's representative and their title. This template is intended solely for government price analysis purposes and does not constitute specific pricing requirements or contractual terms.

View the file

Other files

File Type Posted
SOW Attachment 11 - Building 644 Electrical As-Built Drawings.pdf PDF
36C26126R0037 0002.docx DOCX document
SOW Attachment 7 - Artificial Grass Area Site Layout.pdf PDF
36C26126R0037 0001.docx DOCX document
321723 PAVEMENT MARKINGS.pdf PDF
36C26126R0037_2.docx DOCX document
323113 CHAIN LINK FENCES AND GATES.pdf PDF
017419 Construction Waste Management.pdf PDF
013323 Shop drawings Product Data and Samples.pdf PDF
260511 Electrical Installations.pdf PDF
010000 General Requirements.pdf PDF
SOW Attachment 4 - Construction Details.pdf PDF
CA20260018 Wage Determination.pdf PDF
013526 Safety Requirements.pdf PDF
321216 ASPHALT PAVING.pdf PDF
SOW Attachment 3 - Generator Encloser Area.pdf PDF
SOW Attachment 5 - Generator Tap Box Photo.pdf PDF
014529 TESTING LABORATORY SERVICES.pdf PDF
013216 - Project Schedules.pdf PDF
SOW Attachment 7 - Artificial Grass Area S.pdf PDF
SOW Attachment 2 - Generator Encloser Area.pdf PDF
014500 Quality Control.pdf PDF
SOW Attachment 8 - Artificial Grass Area P.pdf PDF
SOW Attachment 6 - Building 651 Correction.pdf PDF
015719 Temporary Environmental Controls.pdf PDF
SOW Attachment 1 - Mather Campus Map.pdf PDF
312011 Earthwork Short Form.pdf PDF
320523 CEMENT AND CONCRETE.pdf PDF
SOW Attachment 9 - Handrail Installation P.pdf PDF
014219 Reference Standards.pdf PDF
024100 Demolition.pdf PDF
REQUEST FOR INFORMATION FORM.docx DOCX document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C26126R0037 612A4-26-050

SOLICITATION: 36C26126R0037 PROJECT: 612A4-26-050

Install Generator Site Prep

PROVIDE COMPLETE DIVISIONAL COST BREAK-OUT FOR COMPLETE PROJECT.

*If necessary, add additional lines for each Division applicable to this project.

**This document is to be used only for price analysis

REF
DESCRIPTION
TOTAL

00000

DIVISION 00-SPECIAL SECTIONS
$
01000
DIVISION 1-GENERAL REQUIREMENTS
$
02000
DIVISION 2-EXISTING CONDITIONS
$

03000

DIVISION 3-CONCRETE
$

04000

DIVISION 4-MASONRY
$

05000

DIVISION 5-METALS
$

06000

DIVISION 6-WOOD AND PLASTIC
$

07000

DIVISION 7-THERMAL AND MOISTURE PROTECTION
$

08000

DIVISION 8-DOORS AND WINDOWS
$

09000

DIVISION 9-FINISHES
$

10000

DIVISION 10-SPECIALTIES
$

11000

DIVISION 11-EQUIPMENT
$

12000

DIVISION 12-FURNISHINGS
$

13000

DIVISION 13-SPECIAL CONSTRUCTION
$

14000

DIVISION 14-CONVEYING EQUIPMENT
$

21000

DIVISION 21-FIRE SUPPRESSION
$

22000

DIVISION 22-PLUMBING
$

23000

DIVISION 23-HEAT, VENTILATING, AND AIR CONDITIONING
$

26000

DIVISION 26-ELECTRICAL
$

27000

DIVISION 27-COMMUNICATIONS
$

28000

DIVISION 28-ELECTRONIC SAFETY AND SECURITY
$

31000

DIVISION 31-EARTHWORK
$

32000

DIVISION 32-EXTERIOR IMPROVEMENTS
$

33000

DIVISION 33-UTILITIES
$

34000

DIVISION 34-TRANSPORTATION
$

SUB TOTAL:

OTHER

BONDS AND INSURANCE

OVERHEAD

PROFIT

TOTAL

__________________________________________________________
(Signature and Typed Name of Authorized Representative)Date

(Title of Authorized Representative)