This is a specification section for demolition work (Section 02 41 00) from a federal construction contract dated August 1, 2017, applicable to a Medical Center project.

The specification establishes comprehensive requirements for the complete demolition and removal of buildings, structures, utilities, and debris from designated trash dumps. The contractor must demolish buildings and structures as required for new utility service line installation and to full depth within areas defined by hypothetical lines located 1,500 mm (5 feet) outside building lines of new structures. For multi-story buildings exceeding two stories, demolition must proceed story by story from the highest level down to the third floor, with simultaneous demolition of first and second stories permitted. All debris including brick, concrete, stone, and metals becomes contractor property and must be disposed of daily off-site or stored in Resident Engineer-approved areas. The contractor must break up concrete slabs below grade into pieces not exceeding 600 mm (24 inches) square and dispose of all materials in compliance with applicable federal, state, and local regulations. Materials in trash dump areas up to 1,500 mm (5 feet) below surrounding grade are included in lump sum compensation; materials deeper or identified as hazardous shall be handled as unforeseen conditions. The specification requires strict safety and environmental controls including dust chutes with control gates, fire extinguishers, maintained access to fire hydrants, water sprinklers for dust control, and structural support provisions to prevent overloading. The contractor must survey the site, examine drawings, coordinate work with other sections, and maintain shoring and bracing as required, with Resident Engineer approval for all repairs and reinforcement. Upon completion, the site must be left in clean condition with all debris and non-reserved materials removed from the Medical Center.

View the file

Other files

File Type Posted
SOW Attachment 11 - Building 644 Electrical As-Built Drawings.pdf PDF
36C26126R0037 0002.docx DOCX document
SOW Attachment 7 - Artificial Grass Area Site Layout.pdf PDF
36C26126R0037 0001.docx DOCX document
321723 PAVEMENT MARKINGS.pdf PDF
36C26126R0037_2.docx DOCX document
323113 CHAIN LINK FENCES AND GATES.pdf PDF
017419 Construction Waste Management.pdf PDF
013323 Shop drawings Product Data and Samples.pdf PDF
260511 Electrical Installations.pdf PDF
010000 General Requirements.pdf PDF
SOW Attachment 4 - Construction Details.pdf PDF
CA20260018 Wage Determination.pdf PDF
013526 Safety Requirements.pdf PDF
321216 ASPHALT PAVING.pdf PDF
SOW Attachment 3 - Generator Encloser Area.pdf PDF
SOW Attachment 5 - Generator Tap Box Photo.pdf PDF
014529 TESTING LABORATORY SERVICES.pdf PDF
013216 - Project Schedules.pdf PDF
SOW Attachment 7 - Artificial Grass Area S.pdf PDF
SOW Attachment 2 - Generator Encloser Area.pdf PDF
014500 Quality Control.pdf PDF
SOW Attachment 8 - Artificial Grass Area P.pdf PDF
SOW Attachment 6 - Building 651 Correction.pdf PDF
015719 Temporary Environmental Controls.pdf PDF
SOW Attachment 1 - Mather Campus Map.pdf PDF
312011 Earthwork Short Form.pdf PDF
320523 CEMENT AND CONCRETE.pdf PDF
SOW Attachment 9 - Handrail Installation P.pdf PDF
014219 Reference Standards.pdf PDF
Supplemental Price Breakdown by Division Sheet.docx DOCX document
REQUEST FOR INFORMATION FORM.docx DOCX document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

08-01-17

02 41 00 - 1

SECTION 02 41 00

DEMOLITION

PART 1 - GENERAL

1.1 DESCRIPTION:

This section specifies demolition and removal of buildings, portions of buildings, utilities, other structures and debris from trash dumps shown.

1.2 RELATED WORK:

A. Demolition and removal of roads, walks, curbs, and on-grade slabs outside buildings to be demolished: Section 31 20 11, EARTH MOVING

(SHORT FORM).

B. Safety Requirements: Section 01 35 26 Safety Requirements Article, ACCIDENT PREVENTION PLAN (APP).

C. Disconnecting utility services prior to demolition: Section 01 00 00, GENERAL REQUIREMENTS.

D. Reserved items that are to remain the property of the Government:

Section 01 00 00, GENERAL REQUIREMENTS.

E. Not used.

F. Not used.

G. Environmental Protection: Section 01 57 19, TEMPORARY ENVIRONMENTAL

CONTROLS.

H. Construction Waste Management: Section 01 74 19 CONSTRUCTION WASTE

MANAGEMENT.

I. Infectious Control: Section 01 35 26, SAFETY REQUIREMENTS.

1.3 PROTECTION:

A. Perform demolition in such manner as to eliminate hazards to persons and property; to minimize interference with use of adjacent areas, utilities and structures or interruption of use of such utilities; and to provide free passage to and from such adjacent areas of structures.

Comply with requirements of GENERAL CONDITIONS Article, ACCIDENT

PREVENTION.

B. Provide safeguards, including warning signs, barricades, temporary fences, warning lights, and other similar items that are required for protection of all personnel during demolition and removal operations.

Comply with requirements of Section 01 00 00, GENERAL REQUIREMENTS, Article PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES AND IMPROVEMENTS.

02 41 00 - 2

C. Maintain fences, barricades, lights, and other similar items around exposed excavations until such excavations have been completely filled.

D. Provide enclosed dust chutes with control gates from each floor to carry debris to truck beds and govern flow of material into truck.

Provide overhead bridges of tight board or prefabricated metal construction at dust chutes to protect persons and property from falling debris.

E. Prevent spread of flying particles and dust. Sprinkle rubbish and debris with water to keep dust to a minimum. Do not use water if it results in hazardous or objectionable condition such as, but not limited to; ice, flooding, or pollution. Vacuum and dust the work area daily.

F. In addition to previously listed fire and safety rules to be observed in performance of work, include following:

1. No wall or part of wall shall be permitted to fall outwardly from structures.

2. NOT USED.

3. Wherever a cutting torch or other equipment that might cause a fire is used, provide and maintain fire extinguishers nearby ready for immediate use. Instruct all possible users in use of fire extinguishers.

4. Keep hydrants clear and accessible at all times. Prohibit debris from accumulating within a radius of 4500 mm (15 feet) of fire hydrants.

G. Before beginning any demolition work, the Contractor shall survey the site and examine the drawings and specifications to determine the extent of the work. The contractor shall take necessary precautions to avoid damages to existing items to remain in place, to be reused, or to remain the property of the Medical Center; any damaged items shall be repaired or replaced as approved by the Resident Engineer. The

Contractor shall coordinate the work of this section with all other work and shall construct and maintain shoring, bracing, and supports as required. The Contractor shall ensure that structural elements are not overloaded and shall be responsible for increasing structural supports or adding new supports as may be required as a result of any cutting, removal, or demolition work performed under this contract. Do not overload structural elements. Provide new supports and reinforcement

02 41 00 - 3 for existing construction weakened by demolition or removal works.

Repairs, reinforcement, or structural replacement must have Resident

Engineer’s approval.

H. The work shall comply with the requirements of Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS.

I. The work shall comply with the requirements of Section 01 00 00, GENERAL REQUIREMENTS and Section 01 35 26, SAFETY REQUIREMENTS.

1.4 UTILITY SERVICES:

A. Demolish and remove outside utility service lines shown to be removed.

B. Remove abandoned outside utility lines that would interfere with installation of new utility lines and new construction.

PART 2 - PRODUCTS (NOT USED)

PART 3 – EXECUTION

3.1 DEMOLITION:

A. Completely demolish and remove buildings and structures, including all appurtenances related or connected thereto, as noted below:

1. As required for installation of new utility service lines.

2. To full depth within an area defined by hypothetical lines located

1500 mm (5 feet) outside building lines of new structures.

B. Debris, including brick, concrete, stone, metals and similar materials shall become property of Contractor and shall be disposed of by him daily, off the Medical Center to avoid accumulation at the demolition site. Materials that cannot be removed daily shall be stored in areas specified by the Resident Engineer. Break up concrete slabs below grade that do not require removal from present location into pieces not exceeding 600 mm (24 inches) square to permit drainage. Contractor shall dispose debris in compliance with applicable federal, state or local permits, rules and/or regulations.

C. In removing buildings and structures of more than two stories, demolish work story by story starting at highest level and progressing down to third floor level. Demolition of first and second stories may proceed simultaneously.

D. Remove and legally dispose of all materials, other than earth to remain as part of project work, from any trash dumps shown. Materials removed shall become property of contractor and shall be disposed of in compliance with applicable federal, state or local permits, rules and/or regulations. All materials in the indicated trash dump areas, including above surrounding grade and extending to a depth of 1500mm

02 41 00 - 4

(5feet) below surrounding grade, shall be included as part of the lump sum compensation for the work of this section. Materials that are located beneath the surface of the surrounding ground more than 1500 mm

(5 feet), or materials that are discovered to be hazardous, shall be handled as unforeseen. The removal of hazardous material shall be referred to Hazardous Materials specifications.

E. Remove existing utilities as indicated or uncovered by work and terminate in a manner conforming to the nationally recognized code covering the specific utility and approved by the Resident Engineer.

When Utility lines are encountered that are not indicated on the drawings, the Resident Engineer shall be notified prior to further work in that area.

3.2 CLEAN-UP:

On completion of work of this section and after removal of all debris, leave site in clean condition satisfactory to Resident Engineer.

Clean-up shall include off the Medical Center disposal of all items and materials not required to remain property of the Government as well as all debris and rubbish resulting from demolition operations.

- - - E N D - - -