Attachment 5 - Revised Proposed Payment Schedule .xlsx
XLSX spreadsheet 12 KB Posted
- Solicitation number
- SUB-2025-10354
- Issued by
-
Department of Energy Office of Science
About this file
This document is a proposed payment schedule Excel spreadsheet for a solicitation (SUB-2025-10354) issued by the National Renewable Energy Laboratory (NREL) for the Integrated Biorefinery Facility North High Bay Revitalization project. The payment schedule details deliverables for two specific process equipment units: a Hydroprocessor and a Distillation Column, with each unit having eight milestone stages from Front End Loading (FEL) III Review to Equipment Commissioning.
The solicitation seeks expertise in designing, building, and commissioning process equipment for biomass conversion and waste carbon utilization technologies, targeting a production capacity of approximately one barrel per day. The equipment is intended to create a flexible, plug-and-play research environment that supports pilot-scale experiments. While the payment schedule shows $0.00 for each deliverable and total price, the broader project aims to advance renewable technologies by providing standard unit operations that lower barriers to conducting pilot experiments. The opportunity is managed by the Department of Energy Office of Science and focuses on engineering design, procurement, and fabrication of adaptable research equipment.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| RFP# SUB-2025-10354 | ||
| Proposed Payment Occurrence Table - Hydroprocessor | ||
| Deliverable | Description | Price |
| 6.1 | Front End Loading (FEL) III Review & Documentation | $0.00 |
| 6.2 | Detailed PHA Report | $0.00 |
| 6.3 | Long Lead – Equipment Ordered (provide confirmation documentation to NREL) | $0.00 |
| 6.4 | Short Lead – Equipment Ordered (provide confirmation documentation to NREL) | $0.00 |
| 6.5 | Factory Acceptance Test | $0.00 |
| 6.6 | Documentation for Equipment | $0.00 |
| 6.7 | Delivery of Equipment | $0.00 |
| 6.8 | Commissioning of Equipment | $0.00 |
| Total Price | $0.00 | |
| Proposed Payment Occurrence Table - Distillation Column | ||
| Deliverable | Description | Price |
| 6.1 | Front End Loading (FEL) III Review & Documentation | $0.00 |
| 6.2 | Detailed PHA Report | $0.00 |
| 6.3 | Long Lead – Equipment Ordered (provide confirmation documentation to NREL) | $0.00 |
| 6.4 | Short Lead – Equipment Ordered (provide confirmation documentation to NREL) | $0.00 |
| 6.5 | Factory Acceptance Test | $0.00 |
| 6.6 | Documentation for Equipment | $0.00 |
| 6.7 | Delivery of Equipment | $0.00 |
| 6.8 | Commissioning of Equipment | $0.00 |
| Total Price | $0.00 | |
| Total Price: Both Units | $0.00 | |
| Discount for providing both units (if any) | $0.00 | |
| TOTAL: | $0.00 |
File details come from the government source that posted it. Updated .