This document is a Pricing Addendum related to a federal contract opportunity for the demolition of Building 531 located at Paine Field in Everett, Washington. The Pricing Addendum provides a Bid Schedule with line items for various demolition-related work, including General Conditions, Demolition, Asbestos Abatement, Lead Remediation, PCB Remediation, and Site Work. It also includes a description of work categories such as Sustainment Maintenance, Restoration & Modernization, Sustainment Repair, and Minor Construction. The related federal contract opportunity is Solicitation Number W50S9E24QA003, which requires the contractor to provide all materials, labor, equipment, and transportation to perform the demolition work detailed in the Statement of Work. The solicitation has a site visit scheduled for April 17, 2024, with questions due by April 24, 2024, and all quotes required to be valid through September 30, 2024.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

PROJECT NAME:Demolish Building 531BID SCHEDULE
PROJECT NUMBER:STD172115
LOCATION:Paine Field, WA

OFFEROR'S NAME:

Item No.DivisionBase Bid DescriptionEst QtyUnitsSub PricesWork Class
101General Condition/Requirements1JobDemo
201General Condition/Requirements (Waste Recycle / Non Hazard)1JobDemo
301General Condition/Requirements (Hazardous Waste)1JobDemo
402Existing Conditions (Demolition)1JobDemo
513Special Construction (Asbestos Abatement)1JobDemo
613Special Construction (Lead Remediation)1JobDemo
713Special Construction (PCB Remediation)1JobDemo
831Site Work1JobDemo

BASE BID TOTAL PRICE $ - 0

Option No.
11Job522

OPTION BID TOTAL PRICE $ - 0

Sheet2

521Sustainment MaintenanceThese work items include maintaing interior and exterior finishes by replacing carpet, floor and ceiling tile, painting and landscaping.
522Restoration & ModernizationThese work items include upgrading or replacement of facility components to meet current code or requirements (e.g. replace fire detection system and install a sprinkler system and upgrade electrical).
524Sustainment RepairThese work items include major repairs or replacement of facility components (e.g. replace the HVAC system; replace the roofing system and associated lightning protection system and relocate miscellaneous mechanical units and fixtures, update electrical to meet sustainment requirements).
529Minor ConstructionMinor Construction includes to build, develop, convert, or extend real property and systems or components [e.g. facility expansion, increase total volume, installation of equipment not presently installed (HVAC), upgrading exterior surface conditions (new side walk or gravel to asphalt), increased dimensions of paved surfaces, adding/expanding utilities (water, electric, etc.)].
TeleTelecommunicationAll pathways, including conduit and boxes, are to be included in base bid line item for MINOR CONSTRUCTION, REPAIR or MODERNIZATION based criteria.
DemoDemolish, EEIC 53601This work includes any and all requirements associated with contamination cleanup (e.g. soil, fuel, asbestos containing material, mold for a demolition type of project.