Statement of Work.pdf

PDF 133 KB Posted

Attached to
SXHT 09-1000 - Repair Water Lines, Various
Solicitation number
FA252125B0008
Issued by

About this file

This Statement of Work (SOW) details a water infrastructure replacement project for Patrick Space Force Base in Florida. The project involves removing approximately 29,492 linear feet of existing water mains ranging from 2" to 16" in diameter and installing approximately 24,573 linear feet of new water mains ranging from 4" to 12" in diameter. Work includes trenching, direction boring, pavement restoration, installing valves, back flow preventers, water meters, a water truck fill station, sewer main replacement, and brush clearing. The project is located in the middle and south parts of Patrick Space Force Base, with a performance period of 225 calendar days, scheduled to begin on 31 July 2025. Environmental considerations include potential groundwater contamination with PFAS chemicals, and the project requires compliance with FDEP and FDOT permits and specifications.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

05 /28/25

Statement of Work

SLD 45 Civil Engineer Squadron

Patrick SFB, Florida

1. GENERAL

Project: SXHT 09-1000 “Repair Water Lines, Various, PSFB"

Date: 31 July 2025

Location: Middle & South Part of Patrick Space Force Base

2. STATEMENT OF WORK

The work to be performed under this project consists of providing all labor, equipment, & materials needed to remove from service approx. 9,438 LF of 16", approx. 13,527 LF of 12”, 669 LF of 10”, 1,511 LF of 8”, 941 LF of 6”, 908 LF of 4”, 2,708 LF of 2” or less diameter water mains. Install and place in service approx. 16,638 LF of 12”, 4,139 LF of 8”, 967 LF of 6”, 400 LF of 4”, & 2,429 LF of new water mains. Existing mains to be replaced will be abandoned in place. Water main replacement may require dewatering and the ground water in some areas is impacted with PFAS chemicals. Trenching through pavement with restoration and direction boring will be required to install new mains. Main installation will include temporary insertion valves, permanent isolation valves, back flow preventer assemblies, water meters, a water truck fill station, sewer main replacement (4" @ 200 ln. ft), brush clearing, Maintenance of Traffic plans/execution, FDOT MOT permit as necessary, jumper/disinfection processes as required by FDEP permit, & other associated water main components necessary for a complete and usable potable water transmission system in accordance with Project Drawings and Specifications.

3. PERFORMANCE PERIOD

Period of performance for this project is 225 calendar days.