These are technical drawings (SXHT 09-1000) for a water line replacement project at Patrick Space Force Base in Florida. The comprehensive set of 30 detailed civil engineering drawings covers water distribution system modifications across multiple locations, including State Road A1A, Rescue Road, Control Road, and various base facilities. The project involves replacing approximately 6-16 inch water mains, installing fire hydrants, water services, valves, and associated infrastructure, with specific work segments mapped out across 13 different detailed civil engineering sheets (C-101 through C-122).
The contract (FA252125B0008) is an 8(a) small business set-aside with a project magnitude between $5-10 million, covering water line replacements across Patrick Space Force Base. The project has a 200-calendar day performance period, with key dates including a site visit on August 12th, questions due by August 18th, and bid opening on September 3rd. The work involves complex infrastructure replacement, including horizontal directional drilling (HDD), utility relocations, and careful coordination with base operations, with specific environmental considerations noted for groundwater contamination and potential wildlife impact areas.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MIAMI
TAMPA
ORLANDO
PATRICK SPACE
FORCE BASE
TALLAHASSEE
JACKSONVILLE
TA
XI
W
AY
B200' X 4000'
TAXIWAY M
TAXIW
AY J
TAXIW
AY A
TA
XI
W
AY
B
RUN-UP PAD
TAXIWAY D
290 HEADING
TAXIWAY B
TA
XI
W
AY
Z
TAXIWAY G
TAXIWAY L
RUNWAY 11/29
TAXIW
AY A
IN
ST
RU
M
EN
T
RU
NW
AY
2/
TR
UE
A
ZI
M
UT
H
9.
TR
UE
A
ZI
M
UT
H
.9
TAXIWAY M
0'
X
2'
F
IE
LD
E
LE
V
8'
TAXIWAY E
TA
XI
W
AY
B
TAXIWAY C
TAXIWAY C
ARM/DE-ARM &
T15
SOQ5
TBD
SOQ6
TBD
T7
Unknown
T968
SOQ2
SOQ4
TBD
PAV4
PAV5
PAV1
SOQ3
T13
T-Golon10
PAV9
T14
926926
TBD 932
PAV6
PAV8
10992
SOQ7
PAV2
T1619
T12
T6
10985
TBD
PB8
TBD
TBD
10990
10989
10991
SOQ1
TBD
ANT1
TBD
STATE R
O
AD
A1A
ACCESS ROAD
REDSTONE ROAD
RECREATION ROAD
U N
KN
O
W N
CONTROL ROAD
UNKNOWN
CONTROL ROAD
UNKNOWN
U N
KN
O
W N
ACCESS ROAD
ACCESS ROAD
PEQUOT TRAIL
ACCESS R
OAD
FO
RE
CA
ST
L
AN
E
ATLAS AVENUE
FA
LC
O N
AV
EN
UE
SOUTH TECH ROAD
COUGAR RUN
SANDOLLAR COVE
ENDEAVOR ROAD
ACCESS ROAD
TI
TA
N
RO
AD
PORPOISE COVE
TU
SK
EG
EE
A
IR
M
EN
D
RI
VE
UN
KN
O W
N
SP
AC
EL
IF
T
AV
EN
UE
O M
AL
LE
Y
DR
ACCESS ROAD
NORTH DRIVE
N C
O C
LU
B SO
U
TH
PAR
KIN
G
UTE TRAIL
SEQUOIA TRAIL
JAGUAR AVENUE
DUSKY RUN
PHARMACY DRIVE
ACCESS ROAD
PANTHER RUN
DE
LT
A
DR
IV
E
SHOSHONI TRAIL
C
AN
IN
E
D R
IV
E
JUPITER STREET
ACCESS ROAD THUNDER LANE
THOR STREET
EDWARD H. WHITE II
JUPITER STREET
CHALLENGER STREET
MATADOR STREET
BREAKERS LANE
PERSHING PLACE
RE
SC
UE
R
O
AD
RELAY STATION ROAD
MACE ROAD
SATURN ROAD
6TH HOLE SUNSET BLVD
GR
EE
NS
KE
EP
ER
L
AN
E
STATE ROAD 404
STATE ROAD 404 (ONRAMP)
AC
C
ES
S
R O
AD
AC
C
ESS R
O
AD
H
ABITAT R
U N
C O
N
TR
O L
R O
AD
R
IVER
SID
E TR
AIL
UNKNOWN
UN
KN
O W
N
SO
U
TH
P
AT
R
IC
K
D R
IV
E
ACCESS ROAD
ACCESS ROAD
SCHOOL AVENUE
SC
H
O O
L AVEN
U
E
ARAPAHO
TRAIL
ANGEL
FISHCOVE
C O
N
TR
O L
R O
AD
C
O N
TR
O
L R
O
AD
CHICKASAW
TRAIL
CHOCKTAW
TRAIL
W
ES
T
TE
C H
R O
AD
JUPITER STREET
M
AINTENANCE ROAD
COYOTE RUN
COYOTE RUN
R
EEF
C O
U R
T
ACCESS ROAD
SEQ
U
O
IA
TR
AIL
IROQUIS TRAIL
IROQUIS TRAIL
BEAR RUN
BEAR RUN
ALLIGATOR RUN
ALLIGATOR RUN
U N
KN
O
W N
MINUTEMAN STREET
RE
SC
UE
R O
AD
R
ES
C U
E R
O
AD
R
EE
F C
O U
R T
UNKNOWN
CONTROL ROAD
CONTROL ROAD
SO
U
TH
P
AT
R
IC
K
D R
IV
E
SO
U
TH
PATR
IC
K D
R
IVE
ANVIL ROAD
ANVIL ROAD
ACCESS ROAD
RESCUE ROAD
R
ES
C U
E R
O
AD
CHEROKEE
TRAIL
AC
C
ES
S
R O
AD
AC
C
ES
S
R O
AD
AC
CE
SS
R
O
AD
AC
C
ES
S
R O
AD
U N
KN
O
W N
PINEDA EXPRESSWAY
SOUTH GATE (PERSONNEL ONLY)
BA
N
AN
A
R
IV
ER
BAN
AN
A R
IVER
ATLAN
TIC
O C
EAN
TRUCK
DELIVERY ONLY
BUILDING 423-CONTRACTING OFFICER
BUILDING 535-45TH CES
MAIN GATE (PERSONNEL ONLY)
S.R. A1A
BA
N
AN
A
R
IV
ER
ATLAN
TIC
O C
EAN
GOLF COURSE
PERMIT(S)/ENVIRONMENTAL ACTIONS
REQUIRED PRIOR TO CONSTRUCTION
ERP/STORMWATER
ERP/WETLANDS/DREDGE & FILL
FDEP/DRINKING WATER
FDEP/DOM. WASTE WATER ARCHEO./HISTORICAL
SURVEY/WILDLIFE
SLD45 RISH ASSESSMENT
NONE
FDEP/IND. WASTE WATER
IRP
FDEP/FUEL TANK
NOI/SWPPP
SX
H
T
-1
ASBESTOS
NOTE: IF IT IS SUSPECTED THAT ANY HAZARDOUS MATERIAL NOT
IDENTIFIED ON THESE DRAWINGS IS REQUIRED TO BE DISTURBED IN
ORDER TO PERFORM THE CONTRACT WORK, LEAVE MATERIAL
UNDISTURBED AND IMMEDIATELY INFORM THE CONTRACTING OFFICER.
HEAVY METALS
YES NO
LEAD
PCB
NOT
VERIFIEDHAZARDOUS MATERIALS
GROUNDWATER CONTAMINATION
A
B
2 3
C
D
1 2 3
4 5 6
4 5
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
SHEET
IDENTIFICATION
C
D
A
B
PA
TR
IC
K
SP
AC
E
FO
R C
E
BA
SE
R
EP
LA
C
E W
AT
ER
L
IN
ES
, V
AR
IO
U S
DRAWN BY:
DESIGNED BY:
SUBMITTED BY:
REVIEWED BY:
DATE:
U N
IT
EDSTATESSPACE FO
RCE
EM
N OF TH AIR
FORC
D E
E
E
AP RT
T M M X I X
U
SS
F
TH
C
IV
IL
E N
G
IN
EE
R
S Q
U
AD
R O
N
C
N
TR
AC
T
N O
FA
-2 4-
D
SP
AC
E
SP
AC
EP
O R
T
AR
C H
IT
EC
TU
R
E C
IV
IL
E N
G
IN
EE
R
IN
G
G-001
7/18/2025
VI
C
IN
IT
Y M
AP
L
O C
AT
IO
N P
LA
N
A N
D D
R
AW
IN
G
IN
D
EX
PS
FB
, F L
S. V. HOUGHTALING
S. V. HOUGHTALING
P. CHOSA
K. BROWN
FOR CONSTRUCTION
PATRICK SPACE FORCE BASE
FLORIDA SXHT 09-1000
REPLACE WATER LINES VARIOUS,
PSFB, FLORIDA
DRAWING INDEX
SHEET ID DESCRIPTION
G-001 VICINITY MAP LOCATION PLAN AND DRAWING INDEX
CIVIL
C-100A PROJECT CONSTRUCTION KEYNOTES
FDEP-01 APRON 750 - FIRE HYDRANTS AND WATER DISTRIBUTION PIPE
FAC 820 APRON FIRE HYDRANTS
FAC 986 APRON FIRE HYDRANTS
G-003 STORMWATER POLLUTION PREVENTION PLAN
HANGAR BEACH, PINEDA BEACH, FAC 1399 WATER SERVICE
S.R. A1A STA 422+64 TO 415+37 AND O'MALLEY RD. WATER LINE REPLACEMENT
G-002 KEY MAP, ABBREVIATIONS, AND LEGEND
FDEP-02
FDEP-03
FDEP-04
FDEP-05
FDEP-06
FDEP-07
FDEP-08
FDEP-09
FDEP-10
FDEP-11
FDEP-12
FDEP-13
FDEP-14
FDEP-15
FDEP-16
FDEP-17
S.R. A1A STA 415+37 TO 408+20 WATER LINE REPLACEMENT
S.R. A1A STA 408+20 TO 393+84 WATER LINE REPLACEMENT
S.R. A1A STA 393+84 TO 372+54 WATER LINE REPLACEMENT
S.R. A1A STA 372+54 TO 347+15 WATER LINE REPLACEMENT
S.R. A1A STA 347+15 TO 334+82 WATER LINE REPLACEMENT
S.R. A1A STA 330+58 TO 323+41 WATER LINE REPLACEMENT
S.R. A1A STA 323+41TO 309+06 WATER LINE REPLACEMENT
S.R. A1A STA 309+06 TO 294+71 WATER LINE REPLACEMENT
S.R. A1A STA 294+71 TO 285+07 WATER LINE REPLACEMENT
S.R. A1A STA 285+07 TO 282+16, MASE AND KENNEL RD. WATER LINE REPLACEMENT
S.R. A1A STA 282+16 TO 275+82 WATER LINE REPLACEMENT
DETAILS 4
FDEP-18
FDEP-19
FDEP-20
FDEP-21
C-501 C-502
C-504
FAC 1392 AND 1401 WATER CONNECTION
FAC 1365 AND FAMCAMP WATER SYSTEM
CONTROL ROAD - FAC 981, AND FAC 986 APRON
RESCUE ROAD - FAC 605 & 632
DETAILS 1
DETAILS 2
S.R. A1A STA 334+82 TO 330+58 WATER LINE REPLACEMENT
TRUCK INSPECTION GATE S.R. A1A STA 322+50 WATER LINE REPLACEMENT
FDEP-22
C-100B PROJECT CONSTRUCTION KEYNOTES CONTINUED AND FDEP KEYNOTES
C-101 C-102 C-103 C-104 C-105 C-106 C-107 C-108 C-109 C-110 C-111 C-112 C-113 C-114 C-115 C-116
C-117 C-118 C-119
C-120 C-121
C-122
FDOT-01 KEY MAP AND MOT
FDOT-02 SRA1A UTILITY WORK 1
FDOT-03 SRA1A UTILITY WORK 2
FDOT-04 SRA1A UTILITY WORK 3
FDOT-05 SRA1A UTILITY WORK 4
C-503 DETAILS 3
PROJECT AREA
PROJECT AREA
PROJECT AREA
PROJECT AREA
PROJECT AREA
PROJECT AREA
FDOT-06 SRA1A UTILITY WORK 5
FDOT-07 SRA1A UTILITY WORK 6
FDOT-08 SRA1A UTILITY WORK 7
AutoCAD SHX Text 100%%%
PL
PL PL PL PL PL PL
PL PL PL PL PL PL
PL PL PL PL PL PL
PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL
PL PL PL
PL PL PL PL
PL PL PL PL
PL PL PL
PL PL PL PL
PL PL PL
PL PL PL PL
PL PL PL PL
PL PL PL
PL PL PL PL
PL PL PL
PL PL PL PL
PL PL PL
PL PL PL PL
PL PL PL PL
PL PL PL
PL PL PL PL
PL PL PL
PL PL PL PL
PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL
PL PL PL
PL PL PL PL PL
PL PL PL PL PL
PL PL PL PL
PL PL PL PL PL
PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL
PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL
PL PL
PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL
PL PL PL PL PL PL PL PL PL PL PL PL PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PLPL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PLPL
PLPL
PL
PLPL
PL
PLPL
PL
PLPL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PLPL
PL
PLPL
PLPL
PL
PL
PL
PL
PL
PLPL
PL
PL
PLPL
PL
PL
PL
PL
PL
PL
PL
PLPL
PL
PL
PL
PL
PL
PL
PLPL
PL
PL
PL
PL
PL
PL
PL
PL
PLPLPL
PL
PL
PL
PL
PL
PL
PLPL
PL
PLPL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PLPLPLPLPL
PL
PL
PL
PL
PLPL
PL
PL
PL
PL
PL
PL
PL
PLPL
PL
PL
PL
PLPLPL
PL
PLPL
PL
PL
PL
PL
PL
PLPLPL
PLPLPL
PLPL
PL
PLPLPLPLPLPL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PLPL
PL
PL
PL
PLPL
PLPL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PLPLPL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PLPL
PL
PL
PL
PL
PL
PL
PLPL
PLPL
PLPL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PLPL
PLPL
PL
PLPL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PLPL
PLPLPLPLPLPL
PL
PL
PLPL
PL
PLPLPLPLPL
PLPL
PL
PL
PLPL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PLPL
PL
PLPL
PL
PL
PL
PLPLPLPL
PL
PL
PLPL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PLPL
PL
PLPL
PL
PL
PL
PLPL
PL
PL
PL
PL
PL
PL
PLPL
PL
PL
PLPL
PL
PLPL
PL
PLPLPLPLPL
PLPLPL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PLPLPL
PL
PL
PL
PLPL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PLPL
PL
PLPL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PLPLPL
PLPLPL
PL
PL
PL
PL
PL
PL
PL
PLPL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PLPL
PLPLPLPLPL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
PL
FO
C
FO
C
FO
C
FO
C
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
FOC
X
X
X X
X
X
X
X
X
X
X
X X
X X
X X
X
X
X
X
X
X
X
X X
X X
X
X X
X X X
X
X
X
X x x
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
E E
E
E E
E
E E
E E
E E
E E
6' ' W
2' ' W
2' ' W
2' ' W
2' ' W
SS
SS
SS
SS
SS
SS
E E
E E
E
6'' W
E E
E E
E
PR
O
PO
SE
D
TR
U C
K
IN
SP
EC
TI
O
N
PS
S-
1 PS
S-
PS
S-
PS
S-
PS
S-
PS
S-
PS
S-
PS
S-
PS
S-
PS
S-
PS
S-
SP#12
SP#15A
SP#13
SX
H
T
-1
A
B
2 3
C
D
1 2 3
4 5 6
4 5
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
SHEET
IDENTIFICATION
C
D
A
B
PA
TR
IC
K
SP
AC
E
FO
R C
E
BA
SE
R
EP
LA
C
E W
AT
ER
L
IN
ES
, V
AR
IO
U S
DRAWN BY:
DESIGNED BY:
SUBMITTED BY:
REVIEWED BY:
DATE:
U N
IT
EDSTATESSPACE FO
RCE
EM
N OF TH AIR
FORC
D E
E
E
AP RT
T M M X I X
U
SS
F
TH
C
IV
IL
E N
G
IN
EE
R
S Q
U
AD
R
N
TR
AC
T
N O
FA
-2 4-
D
E
SP
AC
EP
O R
T
AR
C H
IT
EC
TU
R
E C
IV
IL
E N
G
IN
EE
R
IN
G
G-002
7/21/2025
KE
Y
M
AP
, A
BB
R
EV
IA
TI
O N
S, A
N D
L
EG
EN
D
PS
FB
, F L
S. V. HOUGHTALING
S. V. HOUGHTALING
P. CHOSA
K. BROWN
HB
DEFINITION DEPICTION
TO BE ABANDONED
8" FIRE WATER
2" POTABLE WATER
4" POTABLE WATER
ABANDONED IN PLACE
EX UG ELECTRIC
EX AERIAL ELECTRIC
EX COMMUNICATION
EX SANITARY SEWER
EX NATURAL GAS
EX STORM DRAIN
SILT FENCE
POST-INDICATOR VALVE
VALVE (EXISTING/PROPOSED)
BACKFLOW PREVENTER
FIRE HYDRANT (EXISTING/PROPOSED)
BEND FITTINGS 90° 45° 22.5°
TEE
REDUCER
PIPE PLUG
LINE STOP
GROUT PLUG
HOSE BIB
AC TO PVC PIPE COUPLING
POTABLE WATER METER
SAMPLE POINT
E E
E/OH
C
SS
NG
SD
SF
2'' W
8'' F
4'' W
AIP
CIVIL LEGEND:
(BOLD NOTES NEW ITEMS)
M
AB - AUGER BORE
AC - ASBESTOS CEMENT
ADPM - AIRFIELD DRIVER TRAINING MANAGER
AG - ABOVE GROUND
AIP - ABANDON IN PLACE
ALUM - ALUMINUM
ARV - AIR RELEASE VALVE
AWWA - AMERICAN WATER WORKS ASSOCIATION
BFP - BACKFLOW PREVENTER
BO - BLOW-OFF
BST - BELLSOUTH TELEPHONE
C&G - CURB & GUTTER
CES - CIVIL ENGINEERING SQUADRON
CEVP - CIVIL ENGINEERING ENVIRONMENTAL PLANNING
CEVR - CIVIL ENGINEERING ENVIRONMENTAL RESTORATION
CCSFS - CAPE CANAVERAL SPACE FORCE STATION
CI - CAST IRON
CLDI - CEMENT-LINED DUCTILE IRON
CLF - CHAIN LINK FENCE
COC - CERTIFICATE OF COMPLETION
CONC - CONCRETE
COMM - COMMUNICATION
CU. FT. - CUBIC FEET
DCVA - DOUBLE CHECK VALVE ASSEMBLY
DI - DUCTILE IRON
DIA - DIAMETER
DIP - DUCTILE IRON PIPE
DR - DIMENSIONAL RATIO
E - EAST
EL - ELEVATION
ELEC - ELECTRIC
EOP - EDGE OF PAVEMENT
EX - EXISTING
FAC - FACILITY
FL - FLANGE
FDC - FIRE DEPARTMENT CONNECTION
FDEP - FLORIDA DEPARTMENT ENVIRONMENTAL PROTECTION
FDOT - FLORIDA DEPARTMENT OF TRANSPORTATION
FM - FORCE MAIN
FO - FIBER OPTIC
FP&L - FLORIDA POWER & LIGHT
FT - FOOT/FEET
FW - FIRE WATER
G - GROUND OR GAS MARKER
GALV - GALVANIZED
GV - GATE VALVE
INV - INVERT
IP - IRON PIPE
IRP - INSTALLATION RESTORATION PROGRAM
IV - ISOLATION VALVE
J#00 - JUMPER & NUMBER
LBS - POUNDS
LF - LINER FEET
SCALE:
PSFB - PROJECT KEY MAP
1" = 400'
N 1200'800'400'0'400'
GRAPHIC SCALE 1" = 400'
MH - MANHOLE
MIN - MINIMUM
MJ - MECHANICAL JOINT
MW - MONITORING WELL
N - NORTH
NA - NOT APPLICABLE
NFPA - NATIONAL FIRE PROTECTION ASSOCIATION
N&D - NAIL & DISK
OD - OUTSIDE DIAMETER
OH - OVERHEAD UTILITY
OHE - OVERHEAD ELECTRIC
OS&Y - OUTSIDE SCREW AND YOKE
PAIP - PREVIOUSLY ABANDONED IN PLACE
PE - PLANE END
PIV - POST INDICATOR VALVE
POC - POINT OF CONNECTION
POD - POINT OF DISCONNECTION
PP - POWER POLE
PROP - PROPOSED
PSF - POUNDS PER SQUARE FOOT
PSI - POUNDS PER SQUARE INCH
PVC - POLYVINYL CHLORIDE
PVMT - PAVEMENT
PW - POTABLE WATER
RED - REDUCER
RS - RESILIENT SEAT
R/W - RIGHT OF WAY
S - SOUTH
SD - STORM DRAIN
SJRWMD - ST. JOHN'S RIVER WATER MANAGEMENT DISTRICT
SPEC - SPECIFICATIONS
SQ - SQUARE
SQ FT - SQUARE FEET
STA - STATION
STSTL - STAINLESS STEEL
SS - SANITARY SEWER
SR - STATE ROAD
SWPPP - STORM WATER POLLUTION PREVENTION PERMIT
SY - SQUARE YARD
TEL - TELEPHONE
TH - TEST HOLE
TYP - TYPICAL
UE - UNDERGROUND ELECTRIC
UG - UNDERGROUND
UON - UNLESS OTHERWISE NOTED
W - WEST
WP - WOOD UTILITY POLE
WTR - WATER
WWF - WELDED WIRE FABRIC
CIVIL ABREVATIONS:
W
SP#43B
PAVEMENT
CONCRETE
SOD
C-104 C-105 C-106 C-118 C-107
C-108 C-109 C-110 C-111 C-112 C-114 C-115 C-117 C-118
C-116
C-120
C-119
C-103
C-121
C-120
C-101
C-122
C-122
C-102
C-118
PROJECT ENVIRONMENTAL KEYNOTES:
1. THE AREA DEPICTED ON SHEET C-101, C-107 (FACILITY 802 AREA), WEST OF C-108, C-117 (1399/1401 AREA), C-118, C-119 (FACILITY 605 AREA) AND C-121 ARE WITHIN AREAS OF GROUNDWATER CONTAMINATION AND IN SOME CASES (HANGAR 750, HANGARS 630/647 AND RESCUE ROAD AREA WEST OF THESE AREAS) ELEVATED CONCENTRATIONS OF PERFLUORINATED COMPOUNDS IN GROUNDWATER. IF DIGGING TO THE GROUNDWATER TABLE, ADDITIONAL COORDINATION IS NEEDED WITH THE CONTRACTING OFFICER AND 45 CES TO ENSURE COMPLIANCE WITH LAND USE CONTROLS AND TO ENSURE WORKER PROTECTION AND SAFETY. ANY DEWATERING ACTIVITIES REQUIRE THE SUBMISSION OF A
DEWATERING MANAGEMENT PLAN TO IRP/CEIE PRIOR TO ANY DEWATERING EFFORTS.
2. MONITORING WELLS ARE PRESENT WITHIN THE PROJECT AREAS AND MUST BE PROTECTED FROM DAMAGE/DESTRUCTION (TWO MONITORING WELLS ARE PRESENT AS INDICATED ON DRAWING C-107). ANY WELLS DAMAGED/DESTROYED AS PART OF THE PROJECT MUST BE REPLACED AT PROJECT COST. PLEASE CONSIDER THE LOCATION OF WELLS WHEN
PLANNING EQUIPMENT, PARKING, AND LAYDOWN AREAS.
3. ANY NIGHT WORK REQUIRING EXTERIOR LIGHTING FROM 1 MAY TO 31 OCTOBER (2100-0600) WILL NEED A LIGHT MANAGEMENT PLAN (LMP) APPROVED THROUGH SLD 45 CONSERVATION AND USFWS AT LEAST 65 DAYS PRIOR TO COMMENCEMENT. TO THE MAXIMUM EXTENT POSSIBLE, AVOID ALL NIGHT WORK ALONG THE BEACH DURING SEA
TURTLE SEASON (1 MAY TO 31 OCTOBER)
4. ALL REGULATORY SUBMITTALS MUST BE COORDINATED THROUGH THE 45 CES/CEIE OFFICE, INCLUDING FDEP PERMIT APPLICATION AND CLEARANCE/PLACE INTO SERVICE
REQUESTS. PLEASE COORDINATE THROUGH 45 CES/CEIE WATER PROGRAM MANAGER.
5. DISPOSAL OF ASBESTOS MATERIALS SHALL BE IN ACCORDANCE WITH 40 CFR 61 SUBPART M AND FLORIDA ADMINISTRATIVE CODE 62-257. PROVIDE COPIES OF DISPOSAL TICKETS
OF ASBESTOS WASTE TO 45 CES/CEIE.
6. APPLICABLE ON SHEET C-101 - THERE IS THE POTENTIAL FOR IMPACT TO BURROWING OWLS ALONG THE SOUTH SIDE OF THE 750 RAMP. COORDINATION WITH 45 CES/CEIE, CONSERVATION AGENCIES IS REQUIRED A MONTH PRIOR TO ANY EXCAVATIONS AT THIS LOCATION TO DETERMINE IF PERMITS ARE REQUIRED TO RELOCATE THE OWLS.
FUTURE STARCOM FACILITY
FUTURE TRUCK
INSPECTION GATE
FDEP ABBREVIATIONS:
J# - JUMPER ASSEMBLY No. SP# - SAMPLE POINT No.
FN# - FLAG NOTE No. IV - ISOLATION VALVE
LS# - LINE STOP No. - FDEP KEYNOTE PLAN CALL OUTX
CIVIL HATCH PATTERNS
SX
H
T
-1
A
B
2 3
C
D
1 2 3
4 5 6
4 5
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
SHEET
IDENTIFICATION
C
D
A
B
PA
TR
IC
K
SP
AC
E
FO
R C
E
BA
SE
R
EP
LA
C
E W
AT
ER
L
IN
ES
, V
AR
IO
U S
DRAWN BY:
DESIGNED BY:
SUBMITTED BY:
REVIEWED BY:
DATE:
U N
IT
EDSTATESSPACE FO
RCE
EM
N OF TH AIR
FORC
D E
E
E
AP RT
T M M X I X
U
SS
F
TH
C
IV
IL
E N
G
IN
EE
R
S Q
U
AD
R
N
TR
AC
T
N O
FA
-2 4-
D
E
SP
AC
EP
O R
T
AR
C H
IT
EC
TU
R
E C
IV
IL
E N
G
IN
EE
R
IN
G
G-003
7/18/2025
ST
O
R M
W
AT
ER
P
O
LL
U
TI
O N
PR
EV
EN
TI
O N
P
LA
N G
U
ID
E
PS
FB
, F L
S. V. HOUGHTALING
S. V. HOUGHTALING
P. CHOSA
K. BROWN
SITE DESCRIPTION
OWNER AND ADDRESS: UNITED STATES SPACE FORCE
1224 JUPITER STREET, BUILDING 534
PATRICK A.F.B., FLORIDA 32925
LOCATION: PATRICK SPACE FORCE BASE
LATITUDE: 28° 13' 17" N LONGITUDE: 80° 36' 22" W
SECTION / TOWNSHIP / RANGE: S 02, 03, 10, 11, 14, 15, 22, & 23 / T 26 / R 37
PROJECT NAME: REPAIR WATER LINES, VARIOUS
PROJECT DESCRIPTION: THIS PROJECT WILL CONSIST OF EXCAVATION WORK
FOR THE INSTALLATION OF NEW UNDERGROUND UTILITIES.
SITE MAPS:
* CONSULT ASSOCIATED PLANS FOR EROSION AND SEDIMENT CONTROLS,
STORMWATER DISCHARGE POINTS LOCATION OF SURFACE WATER AND
CONSTRUCTION IMPACT.
SITE AREA:
1. TOTAL AREA OF SITE = 2000 AC
2. TOTAL AREA DISTURBANCE = 5.0 AC
3. WETLAND AREA = NONE
4. RECEIVING WATER = BANANA RIVER & ATLANTIC OCEAN
CERTIFICATION OF COMPLIANCE WITH FEDERAL, STATE AND LOCAL
REGULATIONS
IN AN EFFORT TO ENSURE COMPLIANCE WITH FEDERAL, STATE AND LOCAL
LAWS REGARDING EROSION AND TURBIDITY CONTROLS, THE FOLLOWING
PERMITS HAVE BEEN OBTAINED AND ARE AVAILABLE ON-SITE:
D.E.P. PERMIT: DRINKING WATER
C.O.E. PERMIT: NONE
S.J.R.W.M.D. E.R.PERMIT: NONE
D.E.P. N.O.I.: TO BE SUBMITTED BY CONTRACTOR
SEQUENCE OF MAJOR ACTIVITIES
THE ORDER OF ACTIVITIES WILL BE AS FOLLOWS:
1. SUBMIT NOTICE OF INTENT (N.O.I.);
2. FLAG THE WORK LIMITS & MARK TREE OR PROTECTED AREA BUFFER, IF
APPLICABLE;
3. COORDINATE PRE-CONSTRUCTION MEETING WITH DESIGNATED SITE
SUPERINTENDENT AND INSPECTOR(S) IN CHARGE OF SWPPP REQUIREMENTS;
4. INSTALL REQUIRED PERIMETER CONTROLS;
5. PERFORM DEMOLITION OPERATIONS, IF APPLICABLE;
6. INSTALL STRUCTURES;
7. STABILIZE DENUDED AREAS AND STOCKPILES AS SOON AS PRACTICABLE;
8. INSTALL PERMANENT SEEDING/SODDING AND PLANTING AND WATER AS
REQUIRED UNTIL PERMANENTLY ESTABLISHED;
9. WHEN ALL CONSTRUCTION ACTIVITY IS COMPLETE AND THE SITE IS
STABILIZED, COORDINATE INSPECTION OF ALL WORK AREAS;
10. REMOVE ANY EROSION CONTROL DEVICES AND RESEED/SOD AS REQUIRED;
AND
11. SUBMIT NOTICE OF TERMINATION (N.O.T.).
CONSTRUCTION CONTRACTOR REQUIREMENTS
IN ADDITION TO THE RESPONSIBILITIES OUTLINED IN THE ABOVE SECTIONS, IT IS
ALSO THE CONSTRUCTION CONTRACTOR'S RESPONSIBILITY TO ENSURE THE
FOLLOWING IS CONDUCTED:
* N.O.I. FORM IS COMPLETED AND SUBMITTED WITH APPROPRIATE FEE AT LEAST
48 HOURS PRIOR TO INITIATING ANY LAND CLEARING ACTIVITY
* CONSTRUCTION CONTRACTOR AND ALL CONSTRUCTION SUB-CONTRACTORS
COMPLETE CERTIFICATION SIGNIFYING THAT THEY ARE AWARE OF TERMS AND
CONDITIONS OF THE GENERIC PERMIT
* CHANGES TO SWPPP ARE COMPLETED, AS NEEDED, TO ENSURE COMPLIANCE
WITH FEDERAL, STATE AND LOCAL REQUIREMENTS AND THE REPORT FORM
FOR CHANGES TO SWPPP IS COMPLETED, WHEN NECESSARY.
* SITE INSPECTIONS ARE PERFORMED AND THE INSPECTION REPORT FORM
COMPLETED AS INDICATED BY PLAN BY CONSTRUCTION CONTRACTOR'S
QUALIFIED INSPECTOR.
* MAINTENANCE ON BMPs AND MAINTENANCE RECORD COMPLETED AS
INDICATED BY PLAN.
* N.O.T. FORM IS COMPLETED AND SUBMITTED AS INDICATED BY PLAN.
IT IS THE CONSTRUCTION CONTRACTOR'S RESPONSIBILITY TO IMPLEMENT THE
BEST MANAGEMENT PRACTICES (BMPs) AS SHOWN ON THE SITE PLAN AND AS
CONTAINED IN THIS SWPPP. IT IS ALSO THE CONSTRUCTION CONTRACTOR'S
RESPONSIBILITY TO ENSURE THESE BMPs ARE PROPERLY INSTALLED, MAINTAINED AND FUNCTIONING PROPERLY TO PREVENT TURBID OR POLLUTED
WATER FROM LEAVING THE PROJECT SITE. THE CONSTRUCTION CONTRACTOR
SHALL ADJUST THE EROSION AND TURBIDITY CONTROLS SHOWN ON THE SITE
PLAN AND ADD ADDITIONAL CONTROL MEASURES, AS REQUIRED TO ENSURE
THE SITE MEETS ALL FEDERAL, STATE AND LOCAL EROSION AND TURBIDITY
CONTROL REQUIREMENTS. BEST MANAGEMENT PRACTICES SHALL BE
IMPLEMENTED BY THE CONSTRUCTION CONTRACTOR AS REQUIRED TO MEET
THE SEDIMENT AND TURBIDITY REQUIREMENTS IMPOSED ON THE PROJECT SITE
BY THE REGULATORY AGENCIES.
THE CONSTRUCTION CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFICATION,
MITIGATION, & REPAIR COSTS ASSOCIATED WITH NON-COMPLIANCE. IT IS THE
CONSTRUCTION CONTRACTOR'S RESPONSIBILITY TO INSTALL ADDITIONAL
MEASURES TO ATTAIN IMMEDIATE COMPLIANCE, SHOULD VIOLATIONS BE
IDENTIFIED.
EROSION AND SEDIMENT CONTROLS
PERIMETER CONTROLS:
1. SILT FENCE: FILTER FABRIC BARRIERS CAN BE USED BELOW DISTURBED
AREAS SUBJECT TO SHEET AND RILL EROSION WITH THE FOLLOWING
LIMITATIONS:
A. WHERE THE MAXIMUM DRAINAGE AREA IS 1/4 ACRE PER 100 FEET OF LENGTH.
B. USE 4"x4" TRENCH & 8" FABRIC EXTENDED INTO GROUND BEFORE BACKFILL &
COMPACTION.
C. MAXIMUM USEFUL LIFE 6 MONTHS.
SWALE / LIVE STREAM SILT / SEDIMENT CONTAINMENT:
1. SEE FDOT INDEX 102, CHART 1, SHEET 1 FOR SPACING REQUIREMENTS FOR
TYPE I AND II SYNTHETIC BALE BARRIERS & SILT FENCES.
2. TURBIDITY CURTAINS SHALL BE LOCATED PARALLEL TO FLOW OF A MOVING
BODY OF WATER & SHALL NOT BE PLACED ACROSS THE MAIN FLOW OF A
SIGNIFICANT BODY OF MOVING WATER.
3. SOIL PARTICLES SHALL BE ALLOWED TO SETTLE A MINIMUM OF 6-12 HOURS
BEFORE REMOVAL OF TURBIDITY CURTAIN.
4. LAND DISTURBING ACTIVITY SHALL NOT CREATE VIOLATIONS OF WATER
QUALITY STANDARDS. MONITORING OF TURBIDITY LEVELS SHALL OCCUR IN
ACCORDANCE WITH PERMIT CONDITIONS.
STOCKPILING MATERIAL:
1. NO EXCAVATED MATERIAL SHALL BE STOCKPILED IN SUCH A MANNER AS TO
DIRECT RUNOFF DIRECTLY OFF THE PROJECT SITE INTO ANY ADJACENT WATER
BODY OR STORM WATER COLLECTION FACILITY.
VEGETATION:
1. TEMPORARY STABILIZATION SHALL BE APPLIED TO AREAS OPENED BY
CONSTRUCTION OPERATIONS AND THAT ARE NOT ANTICIPATED TO BE
RE-DISTURBED AND RECEIVE FINAL STABILIZING TREATMENT WITHIN 14 DAYS.
IF, AFTER 14 DAYS FROM TIME OF STABILIZATION, THE TEMPORARY GRASSED
AREAS HAVE NOT ATTAINED A MINIMUM OF 70% GOOD GRASS COVER, THE
AREA WILL BE REWORKED AND ADDITIONAL MEASURES APPLIED SUFFICIENT TO
ESTABLISH THE DESIRED VEGETATIVE COVER.
2. PERMANENT STABILIZATION SHALL BE PERFORMED IN ALL AREAS THAT HAVE
BEEN DISTURBED BY CONSTRUCTION ACTIVITY UNLESS OTHERWISE DIRECTED
BY THE CONTRACTING OFFICER TO PRESERVE THE FUNCTION OF CRITICAL
SCRUB HABITAT. FINAL STABILIZATION MUST BE INITIATED NO MORE THAN 7
DAYS AFTER LAND DISTURBING ACTIVITIES HAVE CEASED IN THAT AREA.
UNDER NO CIRCUMSTANCES WILL THE CONTRACTOR BE PERMITTED TO CAUSE
A DEGRADATION OF OFFSITE WATER QUALITY. IF SEED IS USED THE SEEDING
MIX MUST PROVIDE BOTH LONG-TERM VEGETATION AND RAPID GROWTH
SEASONAL VEGETATION. SLOPES STEEPER THAN 4:1 SHALL BE SODDED.
3. DISTURBED SIDE SLOPES OF DRAINAGE CONVEYANCE SWALES OR SURFACE
WATERS SHALL BE IMMEDIATELY SODDED. SOD SHALL BE PEGGED OR STAPLED
TO RESIST WASHOUT.
4. CONSTRUCTION CONTRACTOR SHALL STABILIZE COMPLETED PORTIONS OF
THE PROJECT AS WORK PROGRESSES TO PROTECT AGAINST EROSION UNLESS
OTHERWISE DIRECTED BY THE CONTRACTING OFFICER TO PRESERVE THE
FUNCTION OF CRITICAL SCRUB HABITAT. CONSTRUCTION CONTRACTOR SHALL
IMMEDIATELY REPAIR, FILL AND SOD ERODED AREAS OF THE PROJECT THAT
RESULT FROM THE CONSTRUCTION LAND ALTERATIONS.
5. ALL AREAS THAT ARE SEEDED/SODDED SHALL BE INSTALLED AND WATERED
UNTIL THE GROUND COVER IS FULLY ESTABLISHED
POLLUTANT SOURCE CONTROLS:
WASTE DISPOSAL:
WASTE MATERIALS AND RUBBISH SHALL BE COLLECTED AND STORED IN
CONTAINERS OR, IF APPROPRIATE, IN PILES. SEPARATE, SELF-CLOSING,
NONFLAMMABLE, NON-REACTIVE CONTAINERS SHALL BE USED FOR GARBAGE.
OILY FLAMMABLE AND DANGEROUS WASTES, NON-SALVAGE MATERIAL AND
DEBRIS SHALL BE REMOVED FROM WORK AREAS AND DISPOSED OF DAILY.
ASBESTOS WASTE SHALL BE DISPOSED OF OFF BASE UNLESS OTHERWISE
DIRECTED BY THE CONTRACTING OFFICER.
REFER TO SPECIFICATIONS FOR FURTHER WASTE AND DISPOSAL AND RECORD
KEEPING REQUIREMENTS.
HAZARDOUS / NON HAZARDOUS:
ALL HAZARDOUS WASTE SHALL BE MANAGED IN ACCORDANCE WITH STATE AND
FEDERAL REGULATIONS BY THE CONSTRUCTION CONTRACTOR AND SHALL BE
TURNED OVER TO THE AIR FORCE FOR DISPOSAL UNDER THE AIR FORCE'S EPA
IDENTIFICATION NUMBER.
AT THE PRE-CONSTRUCTION CONFERENCE, THE CONSTRUCTION CONTRACTOR
SHALL PROVIDE THE CONTRACTING OFFICER WITH A LIST OF ALL HAZARDOUS
MATERIALS TO BE INCORPORATED INTO THE PROJECT INCLUDING THE
MATERIAL SAFETY DATA SHEET IN ACCORDANCE WITH DFARS 52.223-3,
HAZARDOUS WASTE MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA
AND PROJECT SPECIFICATIONS. THE CONSTRUCTION CONTRACTOR SHALL
SUBMIT COPIES OF SIGNED INTERNAL MANIFESTS TO THE CONTRACTING
OFFICER MONTHLY.
THE CONSTRUCTION CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER
IMMEDIATELY IF ANY CONTAMINATED SOIL, GROUND WATER OR SUSPECT
DEBRIS IS ENCOUNTERED DURING EXCAVATION, DEMOLITION OR
CONSTRUCTION OF THE PROJECT.
SANITARY WASTE:
ALL SANITARY WASTE SHALL BE COLLECTED FROM THE PORTABLE UNITS AS
NEEDED TO PREVENT POSSIBLE SPILLAGE. THE WASTE SHALL BE COLLECTED
AND DISPOSED OF IN ACCORDANCE WITH STATE AND LOCAL WASTE DISPOSAL
REGULATIONS FOR SANITARY SEWER.
OFFSITE VEHICLE TRACKING:
A STABILIZED CONSTRUCTION ENTRANCE SHALL BE PROVIDED, WHERE
NECESSARY, TO HELP REDUCE VEHICLE TRACKING OF SEDIMENT. THE PAVED
STREET ADJACENT TO THE SITE ACCESS SHALL BE SWEPT DAILY TO REMOVE
ANY EXCESS MUD, DIRT OR ROCK TRACKED FROM THE SITE. DUMP TRUCKS
HAULING MATERIAL FROM THE CONSTRUCTION SITE SHALL BE COVERED
WITH A TARPAULIN.
FERTILIZERS, PESTICIDES, HERBICIDES:
THE SPECIFIED REQUIREMENT FOR FERTILIZERS, PESTICIDES, AND HERBICIDES
SHALL BE IDENTIFIED. THE QUANTITIES AND METHODS OF APPLICATION SHALL
BE CHECKED TO ASCERTAIN THEY ARE APPROPRIATE AND CONSISTENT WITH
LOCAL GUIDELINES.
GOOD HOUSEKEEPING:
THE FOLLOWING GOOD HOUSEKEEPING PRACTICES SHALL BE FOLLOWED
ONSITE DURING THE CONSTRUCTION PROJECT:
ALL CONSTRUCTION EQUIPMENT SHALL BE IN PROPER WORKING ORDER AND
INSPECTED REGULARLY. ALL EQUIPMENT SHALL HAVE THE BUILT-IN CAPACITY,
STABILITY, AND NECESSARY SAFETY FEATURES TO FULLY COMPLY WITH THE
PROJECT SPECIFICATIONS AND REQUIREMENTS, WITHOUT SHOWING EVIDENCE
OF UNDUE STRESS OR FAILURE. CONSTRUCTION CONTRACTOR PERSONNEL
SHALL BE IN SUFFICIENT NUMBER OF COMPETENT WORKERS ON THE JOB AT
ALL TIMES TO INSURE WORK IS MADE A TIMELY AND SATISFACTORY MANNER. A
COMPETENT AND EXPERIENCED SUPERVISOR, REPRESENTING THE
CONSTRUCTION CONTRACTOR, SHALL BE IN DIRECT CHARGE AND CONTROL OF
OPERATIONS AT ALL TIMES. EQUIPMENT BREAKDOWNS OR OTHER
UNFORESEEN WORK STOPPAGES SHALL IMMEDIATELY CONSIDER THE
PROTECTION OF SURFACE WATERS FROM POTENTIAL POLLUTION.
DRIP PANS SHALL CONTAIN LEAKS OR SPILLS WHENEVER NECESSARY FOR
MAINTENANCE ACTIVITIES. ALL SPILLS SHALL BE CLEANED UP IMMEDIATELY IN
ACCORDANCE WITH THE PROJECT SPECIFICATIONS.
AN EFFORT SHALL BE MADE TO STORE ONLY ENOUGH PRODUCTS REQUIRED TO
DO THE JOB.
ALL MATERIALS STORED ONSITE SHALL BE STORED IN NEAT, ORDERLY MANNER
IN THEIR APPROPRIATE CONTAINERS AND, IF POSSIBLE, UNDER A ROOF OR
OTHER ENCLOSURE.
PRODUCTS SHALL BE KEPT IN THEIR ORIGINAL CONTAINERS WITH THE
ORIGINAL MANUFACTURER'S LABEL.
SUBSTANCES SHALL NOT BE MIXED WITH ONE ANOTHER UNLESS
RECOMMENDED BY THE MANUFACTURER.
WHENEVER POSSIBLE, ALL OF A PRODUCT SHALL BE USED UP BEFORE
DISPOSING OF THE CONTAINER.
MANUFACTURER'S RECOMMENDATIONS FOR PROPER USE AND DISPOSAL
SHALL BE FOLLOWED.
INSPECTION AND MAINTENANCE PLAN
INSPECTION AND MAINTENANCE REPORTS:
THE CONSTRUCTION CONTRACTOR'S QUALIFIED INSPECTOR SHALL INSPECT
ALL POINTS OF DISCHARGE INTO SURFACE WATERS, ALL DISTURBED AREAS OF
CONSTRUCTION THAT HAVE NOT BEEN FINALLY STABILIZED, AREAS OF
STORAGE MATERIALS THAT ARE EXPOSED TO PRECIPITATION, STRUCTURAL
CONTROLS AND LOCATIONS WHERE VEHICLES ENTER OR EXIT THE SITE AT
LEAST ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN 24 HOURS OF THE
END OF A STORM THAT IS 0.50 INCHES OR GREATER. WHEN THE SITE HAS BEEN
FINALLY STABILIZED, THE INSPECTION SHALL OCCUR AT LEAST MONTHLY. ALL
INSPECTIONS SHALL BE DOCUMENTED IN THE SWPPP USING THE SWPPP
INSPECTION REPORT FORM.
THE EROSION CONTROL SHALL BE MAINTAINED IN GOOD AND EFFECTIVE
OPERATING CONDITIONS, AND REPAIR TO IMPACTED SYSTEMS SHALL BE
INITIATED AND COMPLETED IMMEDIATELY. WHERE EROSION CONTROL
MEASURES ARE DEEMED INEFFECTUAL BY THE CONSTRUCTION CONTRACTOR,
THE GOVERNMENT ENVIRONMENTAL REPRESENTATIVE OR THE CONTRACTING
OFFICER, THE CONSTRUCTION CONTRACTOR SHALL IMMEDIATELY COORDINATE
CORRECTIVE MEASURES FOR REPAIR AND REPLACEMENT. ALL REGULAR AND
SPECIAL MAINTENANCE SHALL BE RECORDED IN THE SWPPP ON THE
MAINTENANCE REPORT FORM. ALTERNATIVE MEASURES, REPAIRS, AND
REPLACEMENT SHALL BE IMMEDIATELY IMPLEMENTED AND RECORDED WITH
THE FORM FOR CHANGES TO THE SWPPP. IN NO CASE SHALL IMPLEMENTATION
OF THE REPAIR OR REPLACEMENT OCCUR MORE THAN 7 CALENDAR DAYS
FOLLOWING THE INSPECTION.
THE GOVERNMENT ENVIRONMENTAL REPRESENTATIVE'S QUALIFIED
INSPECTORS SHALL PERIODICALLY REVIEW THE CONSTRUCTION
CONTRACTOR'S INSPECTION REPORTS FOR ADEQUACY, COMPLETION. REPORT,
IN WRITING, TO THE CONTRACTING OFFICER ANY DEFICIENCIES IN THE
REPORTING. THE CONSTRUCTION CONTRACTOR SHALL ADJUST THE
REPORTING REQUIREMENTS TO THE SATISFACTION OF THE CONTRACTING
OFFICER. THE GOVERNMENT ENVIRONMENTAL REPRESENTATIVE REPORTS
SHALL ALSO BE MADE A RECORD OF THE SWPPP.
ALL REPORTS, PLANS, AND AMENDMENTS SHALL BE MADE PART OF THE SWPPP.
SUCH REPORTS SHALL IDENTIFY ANY INCIDENTS OF NON-COMPLIANCE. WHEN
A REPORT DOES NOT IDENTIFY ANY INCIDENCES OF NONCOMPLIANCE, THE
REPORT SHALL CONTAIN A CERTIFICATION THAT THE FACILITY IS IN
COMPLIANCE WITH THE SWPPP AND GENERIC PERMIT. THE REPORT SHALL BE
SIGNED IN ACCORDANCE WITH THE GENERIC PERMIT.
NON-STORM WATER DISCHARGES
DEWATERING DISCHARGES:
DEWATERING ACTIVITIES ARE SUBJECT TO REVIEW OF THE JURISDICTIONAL
STATE AGENCIES, THE CONTRACTING OFFICER AND UNITED STATES SPACE
FORCE ENVIRONMENTAL AND IRP OFFICES. DISCHARGES SHALL PROVIDE
PROVISIONS SO THAT NO UPSTREAM FLOODING OR IMPOUNDMENT OCCURS
AND NO SILTATION, EROSION, OR TURBID DISCHARGES OCCURS IN VIOLATION
OF STATE WATER QUALITY STANDARDS. ALL TEMPORARY WORKS SHALL BE
COMPLETELY REMOVED AND ALL AREAS RESTORED TO GRADES, ELEVATIONS
AND CONDITIONS THAT OCCURRED BEFORE CONSTRUCTION AS SOON AS
POSSIBLE:
A DEWATERING PLAN SHALL BE PROVIDED TO THE CONTRACTING OFFICER FOR
REVIEW AND APPROVAL PRIOR TO ANY DEWATERING OPERATIONS.
IT IS NOTED HERE THAT GROUNDWATER DEWATERING ACTIVITIES AT
CONSTRUCTION SITES CANNOT BE CONDUCTED UNDER THE GENERIC PERMIT
FOR STORMWATER DISCHARGE FROM LARGE AND SMALL CONSTRUCTION
ACTIVITIES. PURSUANT TO SECTION 62-621.300(2), FAC, A SEPARATE PERMIT,
ENTITLED, GENERIC PERMIT FOR THE DISCHARGE OF PRODUCED GROUND
WATER FROM ANY NON-CONTAMINATED SITE ACTIVITY, MUST BE APPLIED FOR
TO CONDUCT GROUND WATER DEWATERING ACTIVITIES, IF NECESSARY.
TERMINATION PLAN
WHEN THE SITE HAS BEEN FINALLY STABILIZED AND ALL STORMWATER
DISCHARGES FROM CONSTRUCTION SITES ELIMINATED, THE CONSTRUCTION
CONTRACTOR SHALL SUBMIT A NOTICE OF TERMINATION (N.O.T.) WITHIN 14
DAYS OF FINAL STABILIZATION WITH A SUFFICIENT AMOUNT OF ESTABLISHED
PERMANENT VEGETATION.
AFTER FILING N.O.T., THE CONSTRUCTION CONTRACTOR SHALL SUBMIT THE
FINAL SWPPP, INCLUDING ALL REPORTS AND RECORDS, TO THE CONTRACTING
OFFICER. THE OWNER SHALL THEN BE RESPONSIBLE TO RETAIN A COPY OF
THE POLLUTION PREVENTION PLAN FOR A PERIOD OF THREE YEARS FROM THE
DATE THE SITE IS FINALLY STABILIZED.
CERTIFICATION:
"I CERTIFY UNDER PENALTY OF LAW THAT I UNDERSTAND, AND SHALL COMPLY
WITH, THE TERMS AND CONDITIONS OF THE STATE OF FLORIDA GENERIC
PERMIT FOR STORMWATER DISCHARGE FROM LARGE AND SMALL
CONSTRUCTION ACTIVITIES AND THIS STORMWATER POLLUTION PREVENTION
PLAN PREPARED THEREUNDER."
SIGNATURE
BUSINESS NAME AND ADDRESS
OF CONSTRUCTION CONTRACTOR RESPONSIBLE FOR/
DUTIES
GENERAL CONTRACTOR
AND ALL SUBS
SILT FLOW
18" MIN
FILTER FABRIC
ELEVATIONSECTION
WOOD POST @ 10' O.C.
MIN 1" X 2" X 3'
TRENCH MIN 4" X 4"
BURY MIN 8" OF FABRIC IN TRENCH
GEOTEXTILE SILT SCREEN
STAPLE TO POST
SCALE:
EROSION CONTROL MEASURES
NONE
G-002
THIS METHOD OF INLET PROTECTION IS APPLICABLE WHERE THE INLET DRAINS A RELATIVELY FLAT AREA (SLOPES NO GREATER THAN 5 PERCENT) WHERE SHEET OR OVERLAND FLOWS (NOT EXCEEDING 0.5 cfs) ARE TYPICAL. THE METHOD SHALL NOT APPLY TO INLETS RECEIVING CONCENTRATED FLOWS. SUCH AS
IN STREET OR HIGHWAY MEDIANS.
FABRIC SEDIMENT FILTER
SPECIFIC APPLICATION
BURLAP FABRIC
STAKES
BURIED BURLAP
FABRIC
RUNOFF WATER
WITH SEDIMENT
FILTERED WATER
CATCH BASIN INLET SEDIMENT TRAP
SILT FENCE
NOTES:
1. AFTER EACH STORM EVENT, THE SILT FENCE SHALL BE INSPECTED. SEDIMENT DEPOSITS SHALL BE REMOVED
AND WASHOUTS/STRUCTURAL FAILURES SHALL BE REPAIRED IMMEDIATELY.
2. TWO SILT FENCES SHALL BE ATTACHED BY PLACING THE END POST OF THE SECOND FENCE INSIDE THE END POST OF THE FIRST FENCE. BOTH POSTS SHALL BE ROTATED AT LEAST 180° IN A CLOCKWISE DIRECTION TO CREATE A TIGHT SEAL WITH THE FABRIC MATERIAL DRIVE BOTH POSTS 18" INTO THE GROUND & BURY FLAP.
3. SILT FENCES SHALL BE REMOVED ONLY AFTER DISTURBED AREAS HAVE BEEN 70% STABILIZED.
4. DEPICTED EROSION CONTROL MEASURES ARE A MINIMUM LEVEL ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED AND IMPLEMENTED BY THE CONTRACTOR IN ACCORDANCE WITH FDEP FLORIDA STORMWATER, EROSION, AND SEDIMENTATION CONTROL INSPECTOR TRAINING & CERTIFICATE PROGRAM
T
-1
A
B
2 3
C
D
1 2 3
4 5 6
4 5
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AP
PR
SHEET
IDENTIFICATION
C
D
A
B
PA
TR
IC
K
SP
AC
E
FO
R C
E
BA
SE
R
EP
LA
C
E W
AT
ER
L
IN
ES
, V
AR
IO
U S
DRAWN BY:
DESIGNED BY:
SUBMITTED BY:
REVIEWED BY:
DATE:
U N
IT
EDSTATESSPACE FO
RCE
EM
N OF TH AIR
FORC
D E
E
E
AP RT
T M M X I X
U
SS
F
TH
C
IV
IL
E N
G
IN
EE
R
S Q
U
AD
R
N
TR
AC
T
N O
FA
-2 4-
D
E
SP
AC
EP
O R
T
AR
C H
IT
EC
TU
R
E C
IV
IL
E N
G
IN
EE
R
IN
G
C-100 A
7/22/2025
PR
O
JE
C
T C
O N
ST
R
U C
TI
O
N K
EY
N
O
TE
S
PS
FB
, F L
S. V. HOUGHTALING
S. V. HOUGHTALING
P. CHOSA
K. BROWN
GENERAL CIVIL NOTES:
THE FOLLOWING CONSTRUCTION FLAG NOTES ARE A RECOMMENDED SEQUENCE OF CONSTRUCTION
NOTING MATERIALS PROVIDED AND SPECIFIC TASKS. THE CONTRACTOR MAY PRESENT AN
ALTERNATIVE SEQUENCE TO THE CONTRACTING OFFICER FOR REVIEW AND ACCEPTANCE PRIOR TO
VARYING FROM THE RECOMMENDED SEQUENCE OF CONSTRUCTION.
NEW WATER LINES 4' AND LARGER ARE TO BE INSTALLED WITH A MINIMUM OF 36” OF COVER. NEW
WATER LINES 3” AND SMALLER ARE TO BE INSTALLED WITH A MINIMUM OF 24” OF COVER.
MAINTENANCE OF TRAFFIC WITHIN 40' OF ACTIVE ROADWAY IS TO BE PROVIDE ON EASTERN SIDE OF PSFB FENCE AND WALL. WORK ON WESTERN SIDE OF PSFB FENCE AND WALL, NOT WITHIN 40' OF
BASE ACTIVE ROADWAY DOES NOT REQUIRE MAINTENANCE OF TRAFFIC.
PROJECT DISTURBANCE AREA IS GREATER THAN ONE ACRE. DEPICTED EROSION CONTROL
MEASURE ARE MINIMUM LEVEL TO PROTECT NEARBY STORMWATER, PONDS, AND OR WETLAND
ADJACENT TO THE PROJECT AREA. CONTRACTOR IS TO PREPARE, IMPLEMENT, AND MAINTAIN A
STORMWATER POLLUTION PREVENTION PLAN FOR THE PROJECT. CONTRACTOR IS TO PREPARE
AND SUBMIT TO FDEP A NPDES NOTICE OF INTENT (NOI) WITH THE PERMIT FEE. UPON COMPLETION OF THE PROJECT EROSION CONTROL MEASURES ARE TO BE REMOVED AND THE FDEP - NPDES NOI IS
TO BE CLOSED WITH THE AGENCY.
ALL DEMOLITION WORK SHALL BE COORDINATED WITH CONSTRUCTION FLAG NOTES, PROJECT
SEQUENCE, AND OUTAGE REQUEST.
ALL OPEN CUTS OF VEHICULAR PAVEMENT ARE TO BE BACKFILLED & COMPACTED IN PLACE AT THE
END OF EACH WORKDAY. TEMPORARY PAVEMENT RESTORATION WITH MAINTENANCE OF TRAFFIC
SHALL BE IMPLEMENTED AND MAINTAINED WITH FINAL PAVEMENT SURFACE RESTORATION
COMPLETED WITHIN 45 DAYS.
DEMOLITION AND RESTORATION KEYNOTES:
NOTED IN CONSTRUCTION FLAG NOTES
1. EXISTING WATER OR SEWER PIPE, REMOVE PORTION AS NECESSARY TO MAKE NEW SYSTEM
CONNECTION, GROUT PLUG ABANDON OPEN END PIPE.
2. EXISTING TRANSITE WATER PIPE, PROVIDE ASBESTOS ABETMENT PROCEDURES TO CUT,
REMOVE, ENCAPSULATE & DISPOSE OF ASBESTOS MATERIALS.
3. REMOVE FIRE HYDRANT AND RETURN TO GOVERNMENT AND ON WATER MAIN TO BE ABANDON
GROUT PLUG ABANDON OPEN END HYDRANT LEAD PIPE.
4. REMOVE ABOVEGROUND ASSEMBLY COMPONENTS.
5. EXISTING WATER VALVE TO BE ABANDON, CLOSE VALVE, & REMOVE VALVE BOX IN EARTHEN
AREA OR FILL FLUSH TO GRADE WITH CONCRETE GROUT IN PAVED AREAS.
6. SAW CUT, REMOVE, AND REPLACE CONCRETE ON GRADE TRENCH ROUTE.
7. SAW CUT, REMOVE, AND REPLACE FULL DEPTH ASPHALT PAVEMENT TRENCH ROUTE.
8. SAW CUT, REMOVE FULL DEPTH ASPHALT, LEVEL GRADE, SOD RESTORATION.
9. CLEAR AND GRUB TRENCH ROUTE.
10. DISTURBED EARTHEN AREA SOD RESTORATION.
11. REMOVE OUT OF SERVICE BEACH SHOWER BACKFLOW ASSEMBLY.
12. FROM PROJECT ABANDON PIPE NOTED ISOLATION VALVES CLOSE VALVE, IN EARTHEN AREAS
REMOVE VALVE BOXES, AND IN PAVEMENT AREA FILL VALVE BOX TO GRADE WITH CONCRETE.
FDEP KEYNOTES: NOTED ON SHEETS FDEP 01 THROUGH FDEP 23
A. EXISTING WATER DISTRIBUTION AND SERVICE PIPE TO BE DISCONNECTED, REMOVED FROM
SERVICE, AND ABANDON IN PLACE.
B. EXISTING WATER DISTRIBUTION AND SERVICE PIPE TO REMAIN IN SERVICE.
C. NEW POTABLE WATER DISTRIBUTION OR SERVICE PIPE W/ TEMPORARY SAMPLE POINTS AND
JUMPERS.
D. NEW POTABLE WATER DISTRIBUTION OR SERVICE PIPE INSTALLED BY HORIZONTAL DIRECTIONAL
DRILLING METHOD.
E. NEW WATER SYSTEM CONNECTION TO EXISTING WATER SYSTEM BY CUT IN METHOD WITH
ISOLATION VALVES TO ISOLATE EXISTING SYSTEM.
F. NEW WATER SYSTEM CONNECTION TO EXISTING WATER SYSTEM BY CUT IN METHOD WITH PIPE
LINE STOP TO ISOLATE EXISTING WATER SYSTEM.
G. NEW WATER SYSTEM CONNECTION TO EXISTING WATER SYSTEM BY TAP CONNECTION.
H. REMOVAL OF PORTION OF EXISTING TRANSITE WATER PIPE WITH ABATEMENT REMOVAL,
DISPOSAL, AND PERSONAL PROTECTION EQUIPMENT.
I. EXISTING FIRE HYDRANT TO BE REMOVED AND REPLACED WITH NEW FIRE HYDRANT, NEW
HYDRANT LEAD PIPES GREATER THAN 10 FEET, PRESSURE & BACTERIA TEST NEW WATER
SYSTEM.
J. EXISTING FIRE HYDRANT SERVICED BY WATER SYSTEM TO BE TAKEN OUT OF SERVICE, REMOVE
FIRE HYDRANT & GROUT PLUG ABANDON OPEN END BURIED PIPE.
K. NEW POTABLE WATER REDUCED PRESSURE BACKFLOW & METER ASSEMBLY.
L. NEW POTABLE WATER METER ASSEMBLY.
M. REMOVE AND PROVIDE NEW FIRE DOUBLE CHECK BACKFLOW ASSEMBLY.
N. PROVIDE FDEP PRESCRIBED UTILITY VERTICAL & HORIZONTAL SEPARATION.
O. EXISTING GRAVITY SEWER REMOVED AND REINSTALLED TO MEET HORIZONTAL SEPARATION.
FDEP KEYNOTE DETAILS:
CONSTRUCTION KEYNOTES:
20. C-101, C-104, C-106, C-107, C109, C-111, C-112, C-116, C-118, C-119, C-120, & C-121 HDD PIPE INSTALLATION - PROVIDE MAINTENANCE OF TRAFFIC FOR WORK WITHIN 40' OF ACTIVE ROADWAY PAVEMENTS, HORIZONTAL DIRECTIONAL DRILL OF 14”, 10”, 2” C-901, SDR 11, SEE SHEET C-504 FOR TABLE, REMOVE HDD DRILLING MUD FROM PUSH, RECEIVING PITS TO 3' BELOW GRADE, AND
DISPOSE OF REMOVED MATERIALS OFF BASE, AND IMPLEMENT FN# 10.
21. C-101, C-102, & C-103 - FIRE HYDRANT REPLACEMENT - COORDINATE OUTAGE, IMPLEMENT FN# 4 & #14, REMOVE 12 FIRE HYDRANTS, PROVIDE 12 AIRFIELD LOW PROFILE 5.25” MJ WET BARREL
FIRE HYDRANT (MAX 30” ABOVE GRADE), REPLACE 8 FIRE HYDRANT IN PREVIOUS LOCATION
MINIMUM 3' AND MAXIMUM 7' FROM EDGE OF PAVEMENT, PROVIDE EXTENSION OF 2 HYDRANT 6” C-900 BLUE PVC PIPE LEADS, RESTRAINED JOINTS, THRUST BLOCK ALL NEW FIRE HYDRANTS, NEW HYDRANT LEADS SANITIZE, PRESSURE TEST, & BACTERIA SAMPLE, AND TEMPORARY
SAMPLE POINTS #3 THRU #5, AND AWAIT FDEP CLEARANCE PRIOR TO PLACING INTO SERVICE, REMOVING SAMPLE POINTS, FAC 985 & 986 REMOVE PORTION OF 3” PIPE, PROVIDE SANITIZED
MATERIALS, 3” COMPOUND METER ASSEMBLY, MAKE CONNECTION BETWEEN NEW & EXISTING
PIPES, FLUSH, PLACE INTO SERVICE, AND ALL OPEN TRENCH WORK SHALL BE CLOSED END OF
EACH DAY.
22. C-101 - 12” WATER SYSTEM - 2 LOCATIONS FIELD VERIFY PIPE CONNECTION POINTS & EXISTING PIPE MATERIAL, COORDINATE OUTAGE, IMPLEMENT FN#1, & #10, PROVIDE 2-12" & 2-8" LINE STOPS, SANITIZED MATERIALS, 12” MJ COUPLING, 12”, 8”, & 6” C-900 BLUE PVC PIPE, 3-12” & 2-8” MJ
RS GATE VALVE & VALVE BOX, 2-12”X12” MJ TEE, 12"X6" MJ REDUCER W/ FIRE HYDRANT
ASSEMBLY, 12”X6” MJ TEE W/ FIRE HYDRANT ASSEMBLY, 12” MJ 45 BEND, 2-12" MJ 22.5 BEND, 2-14”X12” & 2-12”X8” MJ REDUCER, 2 FIRE HYDRANT TO BE AIRFIELD LOW PROFILE 5.25” MJ WET
BARREL (MAX 30” ABOVE GRADE), MJ ANCHOR FOLLOWER GLAND, RESTRAINED JOINTS
LENGTHS, THRUST BLOCK ALL NEW FIRE HYDRANTS, MAKE NORTHEAST & SOUTHERN EXITING
TO NEW CONNECTION EACH END & FN#20 HDD INSTALLED 14" PIPE, FLUSH, & RESTORE EXISTING WATER MAINS TO SERVICE, MAKE NEW & HDD INSTALLED PIPES, TEMPORARY SAMPLE POINTS #1
& #2, FLUSH, SANITIZE, PRESSURE & BACTERIA TEST NEW WATER SYSTEM, AND AWAIT FDEP
CLEARANCE PRIOR TO PLACING INTO SERVICE, AND REMOVING SAMPLE POINTS.
23. C-104, C-105, & C-106 - A1A STA 420+84 THRU 406+62, 12” WATER SYSTEM - FIELD VERIFY PIPE CONNECTION POINTS, EXISTING PIPE MATERIAL & COORDINATE OUTAGE, IMPLEMENT FN#1, #4, &
#6, PROVIDE MAINTENANCE OF TRAFFIC FOR WORK WITHIN 40' OF ACTIVE ROADWAY
PAVEMENTS, TEMPORARY PAVEMENT RESTORATION, 8” LINE STOP, REMOVE PORTION OF 8”
PIPE, PROVIDE SANITIZED MATERIALS, PROVIDE 12”X12” MJ TEE, 4-12” & 8” MJ RS GATE VALVE & VALVE BOX, 8” MJ COUPLING, 12” & 8” C-900 BLUE PVC PIPE, 2-12”X8” & 2-14”X12” MJ REDUCER, 2-12” MJ 45 BEND, 12” MJ 90 BEND, TEMPORARY 2-12” & 8” MJ PLUG, MJ ANCHOR FOLLOWER
GLAND, RESTRAINED JOINTS LENGTHS OR THRUST BLOCKS, MAKE EXITING TO NEW
CONNECTION EACH END & FN#20 HDD INSTALLED PIPES, TEMPORARY JUMPER #01 & SAMPLE
POINTS #7, #9, & #10, FLUSH, SANITIZE, PRESSURE & BACTERIA TEST NEW WATER SYSTEM, AWAIT FDEP CLEARANCE PRIOR TO PLACING INTO SERVICE, AND REMOVING SAMPLE POINTS.
24. C-104, C-105, & C-106 - TAKE OUT OF SERVICE 8” CI & AC PIPE DISCONNECT & ABANDONMENT A1A STA 420+84 THRU 406+51 & O'MALLEY, - FIELD VERIFY PIPE CONNECTION POINTS, EXISTING PIPE MATERIAL & COORDINATE OUTAGE, IMPLEMENT FN#1, #7, & #10, REMOVE PORTION OF ACTIVE
WATER PIPES AT LOCATION A THRU C;
A. 8” CI O'MALLEY RD NORTH - PROVIDE 8” MJ PRESSURE PLUG MJ ANCHOR FOLLOWER GLAND AND
GROUT PLUG ABANDON OPEN END PIPE;
B. 8” CI O'MALLEY SOUTH - PROVIDE 2-8” MJ PRESSURE PLUG MJ ANCHOR FOLLOWER GLAND; AND
C. 12” PVC S PATRICK DR - PROVIDE 12” MJ PRESSURE PLUG MJ ANCHOR FOLLOWER GLAND, TAKE DEPICTED 8” & 12” WATER SYSTEM IN SEQUENCE A THRU C, OUT OF SERVICE AND ABANDON IN
PLACE.
25. C-106 & C-107 - A1A STA 406+62 THRU 383+53, 12” WATER SYSTEM - FIELD VERIFY PIPE CONNECTION POINTS & EXISTING PIPE MATERIAL, COORDINATE OUTAGE, ISOLATE EXISTING 12”
WATER PIPE, IMPLEMENT FN#01, #6, & #12, REMOVE TEMPORARY 12” PLUG, PROVIDE
MAINTENANCE OF TRAFFIC FOR WORK WITHIN 15' OF ACTIVE ROADWAY PAVEMENTS, PAVEMENT
RESTORATION, 12” C-900 BLUE PVC PIPE, 12"X2" TAPPING SADDLE & 2" RS GATE VALVE W/ VALVE BOX, 2" RP BACKFLOW / METER ASSEMBLY, 12” MJ TEE, 12" MJ 45 BEND, 2-12" MJ 22.5 BEND, 4-14”X12” MJ REDUCER, 4 LOCATIONS MAKE CONNECTION TO 2-FN#20 HDD INSTALLED 14" PIPE, 2
TEMPORARY 12" MJ PLUG, RESTRAINED JOINTS LENGTHS OR THRUST BLOCKS, TEMPORARY
SAMPLE POINTS #10, #11, #12, & #13, FLUSH, SANITIZE, PRESSURE & BACTERIA TEST NEW WATER SYSTEM, AWAIT FDEP CLEARANCE PRIOR FLUSHING & PLACING TO PLACING INTO SERVICE, AND
REMOVING SAMPLE POINTS.
26. 12" WATER CONNECTIONS & FACILITY SERVICE CONNECTION
A. C-106 & C-107 - PROVIDE 12" LINE STOP, 2 LOCATIONS REMOVE PORTION OF 12" WATER PIPE &
2-12" TEMPORARY MJ PLUG, PROVIDE 12” C-900 BLUE PVC PIPE, 12" MJ 90 BEND, MAKE
CONNECTION TO EXISTING 12" WESTERN WATER PIPE, 12" MJ 22.5 BEND, MAKE CONNECTION TO EXISTING 12" SOUTHERN WATER PIPE, RESTRAINED JOINTS LENGTHS, ROAD RESTORATION, AND
REMOVE OUT OF SERVICE WATER FOUNTAIN ON BIKE PATH.
B. C-107 - FAC 802 & BIKE PATH - PROVIDE SANITIZED MATERIALS, ISOLATE 6" WATER SYSTEM, 12"X6" & 12"X 3/4" TAPPING SADDLE & 6" TAPPING VALVE W/ VALVE BOX & 3/4" CORP STOP, MAKE 2-TAPPING ASSEMBLIES, PRESSURE TEST, & 6" AND 3/4" TAP, REMOVE PORTION OF 6" WATER PIPE & VALVE, GROUT PLUG ABANDON UNDERGROUND WATER PIPE, PROVIDE BLUE 6" C-900 PVC PIPE, 6" MJ 90 BEND W/ THRUST BLOCK, RESTRAINED JOINTS, 3/4" TYPE K COPPER, WATER FOUNTAIN ASSEMBLY, MAKE CONNECTION TO EXISTING 6" FIRE SERVICE AND WATER FOUNTAIN, FLUSH & PLACE INTO SERVICE.
27. C-107 - WATER SYSTEM DISCONNECTION & ABANDONMENT - COORDINATE AIRFIELD ACCESS & OUTAGE, FIELD VERIFY EXISTING PIPE LOCATIONS & MATERIALS, TAKE 12" WATER SYSTEM OUT OF SERVICE 386+81 THRU 388+86 OFFSET WEST 420' TO 355', IMPLEMENT FN# 1 & #10, PROVIDE
12" MJ PLUG, ANCHOR FOLLOWER GLAND W/ THRUST BLOCK, REMOVE J FILL STAND, 3 BELOW
GRADE FIRE HYDRANTS, ABANDON VALVE VALVE BOXES, AND GROUT PLUG ABANDON OPEN END
UNDERGROUND PIPES.
28. C-104, C-107, C-117 2ND LIGHT BEACH & HANGAR BEACH - 2 LOCATIONS, FIELD VERIFY PIPE CONNECTION POINTS, IMPLEMENT FN#1, #7, #10, & #11, PROVIDE MAINTENANCE OF TRAFFIC, 12”X2” WATER SERVICE BRANCH, 2” BACKFLOW W/METER ASSEMBLY, 2” SCH 80 PVC PIPE &
FITTINGS, MAKE 2 CONNECTION TO FN#20 2” HDD INSTALLED PIPE, 3-2” RS IPT GATE VALVE &
VALVE BOX, 2”X2” SCH 80 PVC TEE, SAW CUT AND REMOVE ASPHALT PAVEMENT, EXCAVATE
TRENCH, EXTEND SERVICE PIPE TO SHOWER CONNECTION POINT, TEMPORARY SAMPLE POINTS,
SANITIZE, PRESSURE & BACTERIA TEST #08A, 08B, 08C 15A, 15B, & 15C NEW WATER SYSTEM, AWAIT FDEP CLEARANCE, USE AVAILABLE EXISTING BACKFLOWS AS ISOLATION VALVE, MAKE
CONNECTION BETWEEN NEW WATER SYSTEM & EXISTING SHOWER, FLUSH, REMOVING SAMPLE
POINTS, PLACE WATER SYSTEM INTO SERVICE, AND BACKFILL PAVEMENT TRENCH WITH
CONCRETE TO GRADE.
29. C-109 - 12” WATER DISTRIBUTION A1A STA 343+80 THRU 330+86 - FIELD VERIFY PIPE CONNECTION POINTS & EXISTING PIPE MATERIAL, ISOLATE EXISTING WATER SYSTEM, IMPLEMENT FN #1, #6, #7, #10, & #12, PROVIDE 12” LINE STOP, REMOVE PORTION 12” & 8” WATER PIPE, 4-12” MJ RS GATE VALVE & VALVE BOX, 12” & 8” MJ PLUG, 12”, 8”, & 6” C-900 BLUE PVC PIPE, 4-12” MJ 45 BEND, 4-12”X8” MJ TEE EACH W/ 8” MJ RS GATE VALVE, VALVE BOX, & 8” MJ PLUG W/SAMPLE PORT, 12”x8” MJ TEE, 8” MJ 90 BEND, MAKE NORTH 12” & N TECH RD 8” CONNECTION BETWEEN EXISTING & NEW WATER PIPES, 1” BRANCH FAC 987 - 12”X1” TAPPING SADDLE, 1” CORP STOP, MAKE 1” TAP, 1” SCH 80 PVC PIPE, 1” PLUG W/ SAMPLE PORT, 12”X6” MJ TEE W/ FIRE HYDRANT ASSEMBLY, MJ
ANCHOR FOLLOWER GLAND, TEMPORARY 12” MJ PLUG, RESTRAINED JOINTS LENGTHS OR
THRUST BLOCKS, TEMPORARY SAMPLE POINTS #16, #17A, #17B, #18A, #19A, #20, #21, & JUMPER #02A, #02B, FLUSH, SANITIZE, PRESSURE & BACTERIA TEST NEW WATER SYSTEM, AWAIT FDEP
CLEARANCE PRIOR TO PLACING INTO SERVICE & REMOVING SAMPLE POINTS.
30. C-109 - A1A STA 342+92 - TIDES CLUB NORTH WATER SERVICE - FIELD VERIFY PIPE CONNECTION
POINTS & EXISTING PIPE MATERIAL, REMOVE TEMPORARY 8” PLUG, EACH END MAKE
CONNECTION TO FN#20 8” HDD INSTALLED PIPE, IMPLEMENT FN#1, #4, & #6, PROVIDE
MAINTENANCE OF TRAFFIC FOR WORK WITHIN 40' OF ACTIVE ROADWAY PAVEMENTS,
TEMPORARY PAVEMENT RESTORATION, 8” & 6” C-900 BLUE PVC PIPE, 8”X6” MJ TEE W/ FIRE HYDRANT ASSEMBLY, 6” MJ REDUCER, 2-6” MJ 90 BEND, 6”X6” MJ TEE ROLLED UP, 6” FIRE SERVICE BACKFLOW ASSEMBLY, 6” MJ PLUG W/ 2" TAP, 2" IPT RS GATE VALVE & VALVE BOX, 2" RP BACKFLOW/METER ASSEMBLY, 2” SCH 80 PVC PIPE, EXTENDS BOTH NEW WATER SERVICE PIPES JUST SHORT OF BUILDING 6” FIRE & 2” POTABLE WATER CONNECTION, TEMPORARY 6” MJ PLUG
W/ 2” TAP FOR BLOW OFF, TEMPORARY 2” PLUG, USE FAC 987 RP BACKFLOW AS JUMPER, MJ
ANCHOR FOLLOWER GLAND, RESTRAINED JOINTS LENGTHS OR THRUST BLOCKS, TEMPORARY
SAMPLE POINTS #18A & #18B, FLUSH, SANITIZE, PRESSURE & BACTERIA TEST NEW WATER
SYSTEM, AWAIT FDEP CLEARANCE, COORDINATE FINAL SERVICE CONNECTION IN FN32.
31. C-109 - A1A STA 399+81 - TIDES CLUB SOUTH WATER SERVICE - FIELD VERIFY PIPE CONNECTION POINTS & EXISTING PIPE MATERIAL, IMPLEMENT FN#1, #6, & #10, REMOVE TEMPORARY 8” PLUG, PROVIDE MAINTENANCE OF TRAFFIC FOR WORK WITHIN…