This is a Site Plan Submittal document for the Santa Rosa County Administration Building located at 6495 Caroline Street, Milton, Florida, prepared by Southern Site & Utility Design, Inc. The project encompasses 8.6 acres (374,790 square feet) on Parcel No. 09-1N-28-0000-02700-0000 and involves the redesign of existing parking infrastructure with sustainable stormwater management features. The proposed design replaces 202 existing parking spaces (13 handicapped and 189 standard) with 182 parking spaces (12 handicapped and 170 standard) while incorporating permeable pavement areas totaling approximately 30,570 square feet across multiple zones and nine bio-retention areas designed for stormwater filtration and management. The site plan includes detailed grading, drainage basin mapping across nine basins (A through I), landscape plantings featuring native species such as muhly grass, fakahatchee grass, pond cypress, and sweet bay trees, and multiple focal point islands with ornamental plantings. Construction documents consist of 22 sheets including site plans, drainage basin maps, existing conditions and demolition plans, landscaping and planting details, grading plans, bio-retention area specifications, permeable pavement layouts, alignment and profile drawings, and detailed construction specifications. The plans are sealed by Professional Engineers Alan M. Miller (FL License No. 58697) and Paul A. McLeod, Jr. (FL License No. 53577) and dated September 18, 2025.

The project specifications require contractors to comply with all governmental approvals and permits, notify the Engineer of Record at least 72 hours prior to beginning and completing each construction phase, verify all dimensions and grades in the field prior to construction, and prepare as-built record drawings showing all work completion details. Contractors must obtain a utility permit from Santa Rosa County Road & Bridge prior to work within the county right-of-way and contact Sunshine Utilities (1-800-432-4770) 48 hours before construction commencing. All excavated materials become the contractor's responsibility for off-site hauling. Density testing is required for various construction aspects including sub-grade preparation, base work, and paving, with a minimum of three density tests required for base material compaction to 98 percent of Modified Proctor per ASTM D 1557. All disturbed areas not paved must be stabilized with seeding, fertilizer, mulch, or sod, with sod recommended as the slope stabilization method. The project requires comprehensive erosion control measures including siltation fence installation, sediment control device placement prior to construction, and stormwater pollution prevention plan (SWPPP) compliance for disturbed areas equal to or greater than one acre. Asphalt and concrete work must conform to F.D.O.T. specifications with 3,000 PSI concrete for sidewalks and curbing and appropriate base material installation per F.D.O.T. standards.

View the file

Other files

File Type Posted
Portable_Toilet_and_Restroom_Trailer_Rental_(Addendum_#1_Revision).pdf PDF
Portable_Toilet_and_Restroom_Trailer_Rental_(Addendum_#1_Revision).pdf PDF
Term_Contract_Agreement_(General_or_Professional_Services)_.pdf PDF
Term_Contract_Agreement_(General_or_Professional_Services)_.pdf PDF
PAYMENT_BOND.pdf PDF
PERFORMANCE_BOND.pdf PDF
PERFORMANCE_BOND.pdf PDF
PAYMENT_BOND.pdf PDF
Santa_Rosa_County_Administration_Building_Green_Infrastructure_(Addendum_#5_Revision).pdf PDF
Santa_Rosa_County_Administration_Building_Green_Infrastructure_(Addendum_#5_Revision).pdf PDF
SRC_Admin_Complex_-_Submittal_2.pdf PDF
SRC_Admin_Complex_-_Submittal_2.pdf PDF
Alternate_Bid_Pricing_Table_Revision_2.6.26.xlsx XLSX spreadsheet
Alternate_Bid_Pricing_Table_Revision_2.6.26.xlsx XLSX spreadsheet
Base_Bid_Pricing_Table_Revision_2.6.26.xlsx XLSX spreadsheet
Base_Bid_Pricing_Table_Revision_2.6.26.xlsx XLSX spreadsheet
Santa_Rosa_County_Administration_Building_Green_Infrastructure.pdf PDF
Draft_Contract_Federal_Santa_Rosa_County_Administration_Building_Green_Infrastructure.pdf PDF
Draft_Contract_Federal_Santa_Rosa_County_Administration_Building_Green_Infrastructure.pdf PDF
Draft_Contract_Federal_Santa_Rosa_County_Administration_Building_Green_Infrastructure.pdf PDF
2022_EPA_MX-02D19622_SRC_Admin_Complex_Grant_Agreement.pdf PDF
2022_EPA_MX-02D19622_SRC_Admin_Complex_Grant_Agreement.pdf PDF
2022_EPA_MX-02D19622_SRC_Admin_Complex_Grant_Agreement.pdf PDF
Alternative_Bid_Pricing_Table_SRC_Administration_Building_GI_(3).xlsx XLSX spreadsheet
Alternative_Bid_Pricing_Table_SRC_Administration_Building_GI_(3).xlsx XLSX spreadsheet
Alternative_Bid_Pricing_Table_SRC_Administration_Building_GI_(3).xlsx XLSX spreadsheet
Base_Bid_Pricing_Table_SRC_Administration_Building_GI_(3)_Rev3.xlsx XLSX spreadsheet
Base_Bid_Pricing_Table_SRC_Administration_Building_GI_(3)_Rev3.xlsx XLSX spreadsheet
Base_Bid_Pricing_Table_SRC_Administration_Building_GI_(3)_Rev3.xlsx XLSX spreadsheet
SRC_Admin_Complex_Specs_Binder_rev1.pdf PDF
SRC_Admin_Complex_Specs_Binder_rev1.pdf PDF
SRC_Admin_Complex_Specs_Binder_rev1.pdf PDF
SRC_Admin_Complex_-_Alternate_Bid.pdf PDF
SRC_Admin_Complex_-_Alternate_Bid.pdf PDF
SRC_Admin_Complex_-_Alternate_Bid.pdf PDF
SRC_Admin_Complex_-_Submittal_1_(002).pdf PDF
SRC_Admin_Complex_-_Submittal_1_(002).pdf PDF
2024_USEPA_Grant_Agreement_Time_Extension.pdf PDF
2024_USEPA_Grant_Agreement_Time_Extension.pdf PDF
2024_USEPA_Grant_Agreement_Time_Extension.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

6495 CAROLINE ST.

MILTON, FLORIDA 32570

SRC ADMINISTRATION BUILDING

SITE PLAN

PROPOSED SITE DATA:

EXISTING SITE DATA:

OWNER:

PARCEL NO(s): 09-1N-28-0000-02700-0000

TOTAL AREA: ± 8.6 ACRES / +/- 374,790 S.F.

PROJECT AREA: ± 8.6

PARCEL ZONING: CITY

FUTURE LAND USE: CITY/TOWN

CURRENT LAND USE: CITY

SITE ADDRESS:

SHEET INDEX

SHEET 1

SHEET 2

SHEET 3

SHEET 4

SHEET 5

SHEET 6

SHEET 7

SHEET 8

SHEET 9

SHEET 10

SHEET 11

SHEET 12

SHEET 13

SHEET 14

SHEET 15

SHEET 16

SHEET 17

SHEET 18

SHEET 19

SHEET 20

SHEET 21

SHEET 22

.......... COVER SHEET

.......... DRAINAGE BASIN MAP

.......... EXISTING CONDITIONS/ DEMO PLAN

.......... LANDSCAPING PLAN

.......... LANDSCAPING PLAN NOTES/ DETAILS

.......... GRADING PLAN

.......... GRADING PLAN NOTES

.......... BIO RETENTION AREAS 1

BIO RETENTION AREAS 2

.......... BIO RETENTION AREAS 3

.......... PERMEABLE PAVEMENT AREA 1

.......... PERMEABLE PAVEMENT AREA 2

.......... ALIGNMENTS & PROFILES 1

.......... ALIGNMENTS & PROFILES 2

.......... ALIGNMENTS & PROFILES 3

.......... DETAILS

.......... DETAILS

.......... DETAILS

.......... DETAILS

.......... DETAILS

.......... DETAILS

.......... DETAILS

SANTA ROSA COUNTY BOCC

ATTN. PROPERTY INVENTORY CLERK

6495 CAROLINE ST. STE B

MILTON, FLORIDA 32570

for

SEPTEMBER, 2025

PER SANTA ROSA PROPERTY APPRAISER

PARCEL 09-1N-28-0000-02700-0000

*DESCRIPTION UPDATE FOR 2022* COM NE COR TH N 86*48'02"W 536 .44 FT TO POB TH CONT

537.30 FT TH S 03*11'48"W 135 FT TH N N 86*48'02"W 197.79 FT TO ELY R/W OF HWY 90 TH S 33*09'0 0"W 271.22 FT TH S 86*48'02" E 164.62 FT TH S 03*11'58"W 19 0 FT TH N 86*48'02"W 274.10 FT TO ELY R/W OF HWY 90 TH S 33*0 9'00"W 28.85 FT TH S 86*48'02" E 1038.69 FT TH N 03*11'58"E 1 81 FT TH N 86*48'02" W 34.31 FT TH N 03*11'58" E 404 FT TO POB AS DES IN OR 1586 PG 155 LESS PORT OF PROP DES IN OR 2230 PG 392 (BEING PORT OF #27.1 PER 2230/392 OWNERSHIP OF SRCFCU) LESS OR 3144

PG 711 (ADDED TO #27.02) ALL LYING IN SECTION 09 TOWNSHIP 1 NORTH RANGE 28 WEST

THE PROPOSED DESIGN REPLACES EXISTING PARKING WITH MULTIPLE

PERMEABLE PAVEMENT PARKING AREA. THE PROPOSED DESIGN

ELIMINATES 202 PARKING SPACES: 13 HC & 189 STANDARD &

REPLACES THEM WITH 182 PARKING SPACES: 12 HANDICAPPED, 170

STANDARD NEW BIO RETENTION LANDSCAPING AREAS.

SHEET

FL

LI

C

EN

S E

N O

D R A W

IN

G

N O

T V A

LI

D U

N

LE

S S S

IG

N

ED

A N D

S

EA

LE

D

B Y

EN

G

IN

EE

R O

F R

EC

O R D

FL

LI

C

EN

S E

N O

D A

TE

A

LA

N M

M

IL

LE

R

P.

E.

PA

U L

A M

C

LE

O D

JR

P

.E

2.

3.

4.

1.

R E

V

IS

IO

N

S:

D

R A

W N

B Y

D

A T

E

C A

R O

L

IN

E S

T R

E E

T

M

IL

T O

N , F

L O

R

ID

A

SO

U

T H

E R

N S

IT

E

U

T

IL

IT

Y

D E

SI

G

N , I

N C

PH

0)

-9

E

-M A

IL

: s su d@ be lls ou th

.n et

SI

T

E P

L A

N S

SU

B D

IV

IS

IO

N

S

ST

O

R M

W A

T E

R M

A N

A G

E M

E N

T E

R O

SI

O

N C

O N

T R

O L

P L

A N

S

PO

T

A B

L E

W A

T E

R

S A

N

IT

A R

Y S

E W

E R

FL

O

R

ID

A C

E R

T

IF

IC

A

T E

O F

A U

T H

O R

IT

Y

N O

. 8

SI

T E

P L

A N

F O

R

SA

N

T A

R O

SA

C

O U

N T

Y A

D M

IN

IS

T R

A T

IO

N

C O

M

PL

X

B A

H 9/

/2

1. ALL ELEVATIONS AND SLOPES PROVIDED IN THESE PLANS ARE TO BE STRICTLY ADHERED TO. THERE CAN BE NO MODIFICATIONS OR REVISIONS TO THESE PLANS WITHOUT PRIOR FIELD INSPECTION AND WRITTEN APPROVAL

FROM THE ENGINEER OF RECORD AND APPROVAL FROM ALL REGULATORY AGENCIES.

2. THE CONTRACTOR SHALL COMPLY WITH ALL PROVISIONS OF VARIOUS GOVERNMENTAL APPROVALS AND PERMITS.

3. ALL EXCAVATED MATERIAL IS TO BECOME THE CONTRACTORS RESPONSIBILITY & HAULED OFFSITE.

4. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF RECORD AT LEAST 72 HOURS PRIOR TO BEGINNING AND COMPLETING EACH PHASE OF CONSTRUCTION, I.E. RETENTION POND CONSTRUCTION, SUB-GRADE PREPARATION, BASE WORK, PAVING, CURBING, ETC. FAILURE TO COMPLY WILL CAUSE DELAY OF DISBURSEMENT OF FUNDS TO

THE CONTRACTOR AND DELAY OF FINAL CERTIFICATION BY THE ENGINEER OF RECORD.

5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF ANY EXISTING IMPROVEMENTS AND/OR FEATURES, INCLUDING PERMANENT SURVEY MARKERS AND BENCHMARKS, WHICH ARE NOT DESIGNATED TO BE REMOVED OR ALTERED ON THE PLANS. WHERE TREES ARE TO BE REMOVED THE CONTRACTOR SHALL ESTABLISH

NEW BENCHMARKS PRIOR TO ANY TREE REMOVAL.

6. ALL DIMENSIONS AND GRADES ON THESE PLANS SHALL BE FIELD VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. CONTRACTOR SHALL NOTIFY THE ENGINEER IF ANY DISCREPANCIES EXIST PRIOR TO PROCEEDING WITH CONSTRUCTION FOR NECESSARY PLAN OR GRADE CHANGES. NO EXTRA COMPENSATION SHALL BE PAID TO THE CONTRACTOR FOR WORK HAVING TO BE RE-DONE DUE TO DIMENSIONS OR GRADES SHOWN INCORRECTLY ON

THESE PLANS IF SUCH NOTIFICATION HAS NOT BEEN GIVEN.

7. ALL DISTURBED AREAS WHICH ARE NOT PAVED SHALL BE STABILIZED WITH SEEDING FERTILIZER AND MULCH, OR SOD. THE CONTRACTOR SHALL FURNISH TO THE ENGINEER (PRIOR TO INCORPORATION INTO THE PROJECT) A CERTIFICATION FROM THE FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES DIVISION OF PLANT INDUSTRY STATING THAT THE SOD/ HAY/STRAW/MULCH/SEED MATERIALS ARE FREE OF NOXIOUS WEEDS INCLUDING

TROPICAL SODA APPLE. SOD IS THE RECOMMENDED SLOPE STABILIZATION METHOD.

8. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING RECORD DRAWINGS DURING CONSTRUCTION WHICH SHOW "AS-BUILT" CONDITIONS OF ALL WORK INCLUDING PIPING, DRAINAGE STRUCTURES, TOPOGRAPHY OF POND, OUTLET STRUCTURES, DIMENSIONS, ELEVATIONS, GRADING, ETC. THESE DRAWINGS SHALL BE PROVIDED TO THE ENGINEER OF RECORD A MINIMUM OF 1 WEEK PRIOR TO THE REQUEST FOR FINAL INSPECTION.

9. THE ENGINEER OF RECORD TAKES ABSOLUTELY NO RESPONSIBILITY FOR ANY ITEM LABELED "BY OTHERS" OR FOR SUCH ITEMS AS RETAINING WALLS, BUILDINGS, SUB-SURFACE GEOTECHNICAL CONDITIONS, FOUNDATION DESIGN, OR ANY EXISTING WATER AND SEWER UTILITIES.

10. THE COUNTY, ITS' OFFICERS, AND EMPLOYEES SHALL BE HELD HARMLESS FROM ANY DAMAGES TO PERSONS OR PROPERTY WHICH MIGHT RESULT FROM WORK OR ACTIVITY UNDERTAKEN BY THE DEVELOPER AND AUTHORIZED

BY THE COUNTY.

11. CONTRACTOR IS ENCOURAGED TO SCHEDULE A PRE-CONSTRUCTION MEETING WITH THE ENGINEER TO DISCUSS SCOPE OF WORK, TESTING REQUIREMENTS, INSPECTION PERIODS, AND THE NOTES & CONDITIONS OUTLINED ON THESE PLANS AS WELL AS STANDARDS THAT MAY NOT BE ON THESE PLANS THAT ARE EXPECTED OF THE

CONTRACTOR.

12. DENSITY TESTING IS REQUIRED FOR VARIOUS ASPECTS OF CONSTRUCTION. THERE ARE NOTES THROUGHOUT THESE PLANS REFERRING TO THE TESTING REQUIREMENTS FOR EACH ASPECT. IF THERE ARE ANY QUESTIONS

PLEASE CONSULT THE ENGINEER PRIOR TO COVERING QUESTIONABLE SURFACE.

13. THE ENGINEER SUGGESTS THAT ITEMS SUCH AS RETENTION PONDS, INLETS, PIPES, LIFT STATIONS, CULVERTS, MANHOLES, GRAVITY SEWER LINES, AND ALL OTHER ITEMS THAT WILL BE COVERED BY A PERMANENT STRUCTURE OR MATERIAL (I.E. ASPHALT, SOD, ETC.) BE SCHEDULED BY THE CONTRACTOR FOR INSPECTION BY THE ENGINEER BEFORE PLACEMENT OF PERMANENT STRUCTURES/MATERIALS. FAILURE TO SCHEDULE AN INSPECTION PRIOR TO

PLACEMENT OF PERMANENT STRUCTURES/MATERIALS WILL RESULT IN REMOVAL OF PERMANENT

STRUCTURES/MATERIALS TO REPAIR/REPLACE UNDERLYING DEFECTS IF SUCH DEFECTS ARE FOUND TO EXIST.

14. A GEOTECHNICAL REPORT AND CONSTRUCTION SPECIFICATIONS SPECIFIC TO THIS PROJECT ARE AVAILABLE AND

SHALL BE CONSIDERED A PART OF THESE PLANS.

AutoCAD SHX Text

%%UVICINITY MAP

AutoCAD SHX Text

TO SCALE

AutoCAD SHX Text

.......... BIO RETENTION AREAS 2

AutoCAD SHX Text

APPROX. SITE LOCATION

AutoCAD SHX Text

LEGAL DESCRIPTION:

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

%%UGENERAL NOTES:

ONE-STORY

BUILDING

XX

XX

XX

XX

XX

XX

XX

PROPOSED PERMEABLE

PAVEMENT AREA

±3,300 SF

PROPOSED PERMEABLE

PAVEMENT AREA

±5,700 SF

PROPOSED PERMEABLE

PAVEMENT AREA

±5,700 SF

24 24

21 21

21 21

16 1

4 1 3 1

4 1

1 1

212123 22

3 2

24 23

1 2

21 21

BASIN "I"

64,036 SF

1.47 AC.

BASIN "H"

3,683 SF

0.09 AC.

BASIN "G"

87,700 SF

2.01 AC.

BASIN "F"

28,355 SF

0.65 AC.

BASIN "E"

25,257 SF

0.58 AC.

BASIN "D"

41,627 SF

0.96 AC.

BASIN "C"

69,840 SF

1.60 AC.

BASIN "B"

72,280 SF

1.66 AC.

BASIN "A"

52,818 SF

1.22 AC.

FOCAL POINT 2

(SEE DETAIL)

T-3 T-4

T-6 T-7

T-11 T-12

T-14 T-15

PROPOSED PERMEABLE

PAVEMENT AREA

±5,750 SF

PROPOSED PERMEABLE

PAVEMENT AREA

±5,770 SF

PROPOSED PERMEABLE

PAVEMENT AREA

±3,850 SF

T-5

T-8

T-10T-9

T-13

T-16

T-1 T-2

DRAINAGE BASIN MAP

CONTRACTOR MUST OBTAIN A UTILITY PERMIT FROM SANTA ROSA

COUNTY ROAD & BRIDGE PRIOR TO WORK WITHIN THE COUNTY

RIGHT-OF-WAY.

CONTRACTOR SHALL CONTACT SUNSHINE UTILITIES 48 HOURS PRIOR

TO CONSTRUCTION WITHIN THE RIGHT-OF-WAY.

SHEET

FL

LI

C

EN

S E

N O

D R A W

IN

G

N O

T V A

LI

D U

N

LE

S S S

IG

N

ED

A N D

S

EA

LE

D

B Y

EN

G

IN

EE

R O

F R

EC

O R D

FL

LI

C

EN

S E

N O

D A

TE

A

LA

N M

M

IL

LE

R

P.

E.

PA

U L

A M

C

LE

O D

JR

P

.E

E

V

IS

IO

N

S:

D

R A

W N

B Y

D

A T

E

C A

R O

L

IN

E S

T R

E

T O

N , F

L O

R

ID

A

SO

U

T H

E R

N S

IT

E

U

T

IL

IT

Y

D E

SI

G

N , I

N C

PH

0)

-9

E

-M A

IL

: s su d@ be lls ou th

.n et

SI

T

E P

L A

N S

SU

B D

IV

IS

IO

N

S

ST

O

R M

W A

T E

R M

A N

A G

E M

E N

T E

R O

SI

O

N C

O N

T R

O L

P L

A N

S

PO

T

A B

L E

W A

T E

R

S A

N

IT

A R

Y S

E W

E R

FL

O

R

ID

A C

E R

T

IF

IC

A

T E

O F

A U

T H

O R

IT

Y

N O

. 8

SI

T E

P L

A N

F O

R

SA

N

T A

R O

SA

C

O U

N T

Y A

D M

IN

IS

T R

A T

IO

N

C O

M

PL

H 9/

/2

1 inch = 40 feet

0 40 80 EXISTING DRAINAGE INLETS

x

LEGEND:

POC

POB

R/W (D) (C) O.R.

PG.

SEC.

TE

--- SANITARY SEWER MANHOLE

--- FOUND

--- RIGHT-OF-WAY

--- DEED

--- CALCULATED

--- OFFICIAL RECORDS

--- PAGE

--- SECTION

--- TOP ELEVATION

--- GENERATOR/CONCRETE SLAB

--- ELECTRICAL PANEL BOX

--- WATER VALVE

--- SANITARY SEWER MANHOLE

--- BACKFLOW PREVENTER

--- WATER METER

--- UTILITY VAULT

--- LIGHT POLE

--- POWER POLE

--- GUY ANCHOR

--- FIRE HYDRANT

--- TELEPHONE PEDESTAL

--- BOLLARD (WOOD OR METAL)

--- BURIED FIBER OPTIC CABLE MARKER

--- BURIED GAS MARKER

--- DELINEATOR POST

--- GROUND LIGHTING

--- SANITARY SEWER CLEANOUT

--- SERVICE POLE

--- LIFT STATION

--- DECORATIVE POLE

--- IRON GUARDRAIL

--- HOG WIRE FENCEXX

--- SIGN & POST

--- ASPHALT AREA

--- CONCRETE AREA

IE --- INVERT ELEVATION

RCP --- REINFORCED CONCRETE PIPE

FFE --- FINISH FLOOR ELEVATION

--- OAK TREE & SIZE

--- MAGNOLIA TREE & SIZE

--- CYPRESS TREE & SIZE

--- MAPLE TREE & SIZE

--- EXISTING CURB CUT

--- EXISTING SPOT ELEVATION

--- EXISTING CONTOUR

--- SPRINKLER HEAD

--- GUARDRAIL & POST

FND.

R/W

--- POINT OF COMMENCEMENT

--- POINT OF BEGINNING

C-C

--- BUSH OR SHRUB

--- PROPOSED PARKING LOT TREEST-#

--- PROPOSED FOCAL POINT ISLAND TREES

BASIN "A" 52,818 SF 1.22 AC.

BASIN "B" 72,280 SF 1.66 AC.

BASIN "C" 69,840 SF 1.60 AC.

BASIN "D" 41,627 SF 0.95 AC.

BASIN "E" 25,257 SF 0.58 AC.

BASIN "F" 28,355 SF 0.65 AC.

BASIN "G" 87,700 SF 2.01 AC.

BASIN "H" 3,683 SF 0.09 AC.

BASIN "I" 64,036 SF 1.47 AC.

BASIN SQ. FT. ACRES

AutoCAD SHX Text 23.97

AutoCAD SHX Text 24.14

AutoCAD SHX Text 23.97

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

GRASS

AutoCAD SHX Text MILTON 6501 LLC 440 MONTICELLO AVE, STE 1700 NORFOLK, VA 23510 Parcel No. 04-1N-28-0000-10001-0000 Zoned: CITY FLU: CITY/TOWN ELU: CITY

AutoCAD SHX Text PERRITT KAREN ELAINE ET AL* C/O BETSY PINKARD 4275 S. SPENCER FIELD RD. PACE, FL Parcel No. 09-1N-28-0000-06500-0000 Zoned: HCD FLU: COMM ELU: SIVICUL

AutoCAD SHX Text OWENS REAL INVESTMENTS LLC 1447 PENTON RD. MILTON, FL Parcel No. 09-1N-28-0000-02100-0000 Zoned: CITY FLU: CITY/TOWN ELU: CITY

AutoCAD SHX Text MCDONALDS RESTAURANTS OF FLORIDA INC P.O. BOX 182571 COLUMBUS, OH 43218-2571 BOX 182571 COLUMBUS, OH 43218-2571 OH 43218-2571 Parcel No. 09-1N-28-0000-02100-0000 Zoned: CITY FLU: CITY/TOWN ELU: CITY

AutoCAD SHX Text SANTA ROSA COUNTY FEDERAL CREDIT UNION P.O. BOX 841 MILTON, FL BOX 841 MILTON, FL Parcel No. 09-1N-28-0000-02701-0000 Zoned: CITY FLU: CITY/TOWN ELU: CITY

AutoCAD SHX Text

STOP

AutoCAD SHX Text

CALL SUNSHINE

AutoCAD SHX Text 800-432-4770

AutoCAD SHX Text

PRIOR TO CONSTRUCTION:

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EX. STRUCTURE

AutoCAD SHX Text 18.32'

AutoCAD SHX Text

GRATE

AutoCAD SHX Text

INVERT EL. (IN)

AutoCAD SHX Text 18.32'

AutoCAD SHX Text D1

AutoCAD SHX Text 21.68'

AutoCAD SHX Text D2

AutoCAD SHX Text 20.38'

AutoCAD SHX Text D3

AutoCAD SHX Text 20.21'

AutoCAD SHX Text D4

AutoCAD SHX Text 19.68'

AutoCAD SHX Text D5

AutoCAD SHX Text 19.57'

AutoCAD SHX Text

INVERT EL. (OUT)

AutoCAD SHX Text 18.06'

AutoCAD SHX Text 18.00'

AutoCAD SHX Text 17.84'

AutoCAD SHX Text 17.72'

AutoCAD SHX Text 17.40'

AutoCAD SHX Text 17.40'

AutoCAD SHX Text 17.31'

AutoCAD SHX Text 17.33'

AutoCAD SHX Text D6

AutoCAD SHX Text 19.57'

AutoCAD SHX Text N/A

AutoCAD SHX Text 20.29'

AutoCAD SHX Text 4"

AutoCAD SHX Text 5"

AutoCAD SHX Text 4"

AutoCAD SHX Text 2"

129.87

XX

XX

XX

XX

XX

XX

XX

ASPHALT TO BE

REMOVED ±3,420 SF

ASPHALT TO BE

REMOVED ±6,020 SF

ASPHALT TO BE

REMOVED ±6,060 SF

24 24

21 21

21 21

21 21

16 1

4 1 3 1

4 1

1 1

212123 22

3 22

24 23

1 2

21 21

EX. STRUCTURE - D1

EX. STRUCTURE - D2

EX. STRUCTURE - D3

EX. STRUCTURE - D4

EX. STRUCTURE - D5

EX. PIPE - 4

EX. PIPE - 5

REMOVE ALL TREES IN

THIS PARKING LOT ISLAND

REMOVE ALL TREES IN

THIS PARKING LOT ISLAND

REMOVE ALL TREES IN

THIS PARKING LOT ISLAND

REMOVE ALL TREES IN

THIS PARKING LOT ISLAND

REMOVE ALL TREES IN

THIS PARKING LOT ISLAND

EX. STRUCTURE - D6

MILL ASPHALT IN THIS

AREA STRIPING TBR

±2,450 SF

MILL ASPHALT IN THIS

AREA STRIPING TBR

±2,440 SF

MILL ASPHALT IN THIS

AREA STRIPING TBR

±575 SF

ASPHALT TO BE REMOVED

±120 SF

ASPHALT TO BE REMOVED

±285 SF

ASPHALT TO BE

REMOVED ±6,460 SF

ASPHALT TO BE

REMOVED ±6,475 SF

ASPHALT TO BE

REMOVED ±6,475 SF

MILL ASPHALT IN THIS

AREA STRIPING TBR

±1,920 SF

MILL ASPHALT IN THIS

AREA STRIPING TBR

±1,915 SF

10' WIDE SECTION OF ASPHALT

& SIDEWALK TO BE REMOVED

TO INSTALL PIPE. SAWCUT

SIDEWALK AND ASPHALT.

EX. PIPE - 3

EX. PIPE - 2

EX. PIPE - 1

REMOVE SECTION OF ASPHALT

AND CURB TO INSTALL PIPE.

SAWCUT CURB AND ASPHALT.

REMOVE STOP

SIGN & STOP BAR

REMOVE STOP

SIGN & STOP BAR

REMOVE SECTION OF ASPHALT

AND CURB TO INSTALL PIPE.

SAWCUT CURB AND ASPHALT.

REMOVE SECTION OF ASPHALT

AND CURB TO INSTALL PIPE.

SAWCUT CURB AND ASPHALT.

EX. STOP BAR &

SIGN TO REMAIN

REMOVE STOP BAR

REMOVE STOP

SIGN & STOP BAR

REMOVE STOP SIGN

EX. STOP BAR

TO REMAIN

EX. STOP BAR

TO REMAIN

EX. STOP BAR &

SIGN TO REMAIN

EX. STOP BAR &

SIGN TO REMAIN

REMOVE STOP BAR

REMOVE STOP BAR

EX. STOP BAR

TO REMAIN

EXISTING CONDITIONS/DEMO PLAN

CONTRACTOR MUST OBTAIN A UTILITY PERMIT FROM SANTA ROSA

COUNTY ROAD & BRIDGE PRIOR TO WORK WITHIN THE COUNTY

RIGHT-OF-WAY.

CONTRACTOR SHALL CONTACT SUNSHINE UTILITIES 48 HOURS PRIOR

TO CONSTRUCTION WITHIN THE RIGHT-OF-WAY.

SHEET

FL

LI

C

EN

S E

N O

D R A W

IN

G

N O

T V A

LI

D U

N

LE

S S S

IG

N

ED

A N D

S

EA

LE

D

B Y

EN

G

IN

EE

R O

F R

EC

O R D

FL

LI

C

EN

S E

N O

D A

TE

A

LA

N M

M

IL

LE

R

P.

E.

PA

U L

A M

C

LE

O D

JR

P

.E

E

V

IS

IO

N

S:

D

R A

W N

B Y

D

A T

E

C A

R O

L

IN

E S

T R

E

T O

N , F

L O

R

ID

A

SO

U

T H

E R

N S

IT

E

U

T

IL

IT

Y

D E

SI

G

N , I

N C

PH

0)

-9

E

-M A

IL

: s su d@ be lls ou th

.n et

SI

T

E P

L A

N S

SU

B D

IV

IS

IO

N

S

ST

O

R M

W A

T E

R M

A N

A G

E M

E N

T E

R O

SI

O

N C

O N

T R

O L

P L

A N

S

PO

T

A B

L E

W A

T E

R

S A

N

IT

A R

Y S

E W

E R

FL

O

R

ID

A C

E R

T

IF

IC

A

T E

O F

A U

T H

O R

IT

Y

N O

. 8

SI

T E

P L

A N

F O

R

SA

N

T A

R O

SA

C

O U

N T

Y A

D M

IN

IS

T R

A T

IO

N

C O

M

PL

H 9/

/2

1 inch = 40 feet

0 40 80 x

LEGEND:

POC

POB

R/W (D) (C) O.R.

PG.

SEC.

TE

--- SANITARY SEWER MANHOLE

--- FOUND

--- RIGHT-OF-WAY

--- DEED

--- CALCULATED

--- OFFICIAL RECORDS

--- PAGE

--- SECTION

--- TOP ELEVATION

--- GENERATOR/CONCRETE SLAB

--- ELECTRICAL PANEL BOX

--- WATER VALVE

--- SANITARY SEWER MANHOLE

--- BACKFLOW PREVENTER

--- WATER METER

--- UTILITY VAULT

--- LIGHT POLE

--- POWER POLE

--- GUY ANCHOR

--- FIRE HYDRANT

--- TELEPHONE PEDESTAL

--- BOLLARD (WOOD OR METAL)

--- BURIED FIBER OPTIC CABLE MARKER

--- BURIED GAS MARKER

--- DELINEATOR POST

--- GROUND LIGHTING

--- SANITARY SEWER CLEANOUT

--- SERVICE POLE

--- LIFT STATION

--- DECORATIVE POLE

--- IRON GUARDRAIL

--- HOG WIRE FENCEXX

--- SIGN & POST

--- ASPHALT AREA

--- CONCRETE AREA

IE --- INVERT ELEVATION

RCP --- REINFORCED CONCRETE PIPE

FFE --- FINISH FLOOR ELEVATION

--- OAK TREE & SIZE

--- MAGNOLIA TREE & SIZE

--- CYPRESS TREE & SIZE

--- MAPLE TREE & SIZE

--- EXISTING CURB CUT

--- EXISTING SPOT ELEVATION

--- EXISTING CONTOUR

--- SPRINKLER HEAD

--- GUARDRAIL & POST

FND.

R/W

--- POINT OF COMMENCEMENT

--- POINT OF BEGINNING

C-C

--- BUSH OR SHRUB

--- PROPOSED PARKING LOT TREEST-#

--- PROPOSED FOCAL POINT ISLAND TREES

BASIN "A" 52,818 SF 1.22 AC.

BASIN "B" 72,280 SF 1.66 AC.

BASIN "C" 69,840 SF 1.60 AC.

BASIN "D" 41,627 SF 0.95 AC.

BASIN "E" 25,257 SF 0.58 AC.

BASIN "F" 28,355 SF 0.65 AC.

BASIN "G" 87,700 SF 2.01 AC.

BASIN "H" 3,683 SF 0.09 AC.

BASIN "I" 64,036 SF 1.47 AC.

BASIN SQ. FT. ACRES

TREE PROTECTION DETAIL

ENCOMPASS DRIP LINE

AS REQUIRED TO

ENCOMPASS DRIP LINE

AS REQUIRED TO

N.T.S.

2" X 4" POSTS

1" X 4" RAIL

NORMAL PROTECTED TREES - MIN. 50% OF THE TREE DRIPLINE MUST BE PROTECTED

HERITAGE TREES - 100% OF THE TREE DRIPLINE MUST BE PROTECTED

EXISTING DRAINAGE INLETS

ASPHALT & CURB REMOVAL:

- SAWCUT ALONG REMOVAL BOUNDARIES

- REMOVE ASPHALT AND BASE MATERIALS

AutoCAD SHX Text 23.97

AutoCAD SHX Text 24.14

AutoCAD SHX Text 23.97

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

GRASS

AutoCAD SHX Text

GRASS

AutoCAD SHX Text MILTON 6501 LLC 440 MONTICELLO AVE, STE 1700 NORFOLK, VA 23510 Parcel No. 04-1N-28-0000-10001-0000 Zoned: CITY FLU: CITY/TOWN ELU: CITY

AutoCAD SHX Text PERRITT KAREN ELAINE ET AL* C/O BETSY PINKARD 4275 S. SPENCER FIELD RD. PACE, FL Parcel No. 09-1N-28-0000-06500-0000 Zoned: HCD FLU: COMM ELU: SIVICUL

AutoCAD SHX Text OWENS REAL INVESTMENTS LLC 1447 PENTON RD. MILTON, FL Parcel No. 09-1N-28-0000-02100-0000 Zoned: CITY FLU: CITY/TOWN ELU: CITY

AutoCAD SHX Text MCDONALDS RESTAURANTS OF FLORIDA INC P.O. BOX 182571 COLUMBUS, OH 43218-2571 BOX 182571 COLUMBUS, OH 43218-2571 OH 43218-2571 Parcel No. 09-1N-28-0000-02100-0000 Zoned: CITY FLU: CITY/TOWN ELU: CITY

AutoCAD SHX Text SANTA ROSA COUNTY FEDERAL CREDIT UNION P.O. BOX 841 MILTON, FL BOX 841 MILTON, FL Parcel No. 09-1N-28-0000-02701-0000 Zoned: CITY FLU: CITY/TOWN ELU: CITY

AutoCAD SHX Text

STOP

AutoCAD SHX Text

CALL SUNSHINE

AutoCAD SHX Text 800-432-4770

AutoCAD SHX Text

PRIOR TO CONSTRUCTION:

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 4"

AutoCAD SHX Text 5"

AutoCAD SHX Text 4"

AutoCAD SHX Text 2"

AutoCAD SHX Text 129.87

AutoCAD SHX Text

EX. STRUCTURE

AutoCAD SHX Text 18.32'

AutoCAD SHX Text

GRATE

AutoCAD SHX Text

INVERT EL. (IN)

AutoCAD SHX Text 18.32'

AutoCAD SHX Text D1

AutoCAD SHX Text 21.68'

AutoCAD SHX Text D2

AutoCAD SHX Text 20.38'

AutoCAD SHX Text D3

AutoCAD SHX Text 20.21'

AutoCAD SHX Text D4

AutoCAD SHX Text 19.68'

AutoCAD SHX Text D5

AutoCAD SHX Text 19.57'

AutoCAD SHX Text

INVERT EL. (OUT)

AutoCAD SHX Text 18.06'

AutoCAD SHX Text 18.00'

AutoCAD SHX Text 17.84'

AutoCAD SHX Text 17.72'

AutoCAD SHX Text 17.40'

AutoCAD SHX Text 17.40'

AutoCAD SHX Text 17.31'

AutoCAD SHX Text 17.33'

AutoCAD SHX Text D6

AutoCAD SHX Text 19.57'

AutoCAD SHX Text N/A

20.29'

XX

XX

XX

XX

XX

XX

XX

PROPOSED PERMEABLE

PAVEMENT AREA

±3,300 SF

PROPOSED PERMEABLE

PAVEMENT AREA

±5,700 SF

PROPOSED PERMEABLE

PAVEMENT AREA

±5,700 SF

FOCAL POINT 5

(SEE DETAIL)

FOCAL POINT 3

(SEE DETAIL)

FOCAL POINT 6

(SEE DETAIL)

FOCAL POINT 2

(SEE DETAIL)

FOCAL POINT 1

(SEE DETAIL) FOCAL POINT 4

(SEE DETAIL)

FOCAL POINT 8

(SEE DETAIL)

FOCAL POINT 7

(SEE DETAIL)

FOCAL POINT 9

(SEE DETAIL)

T-3 T-4

T-6 T-7

T-11 T-12

T-14 T-15

PROPOSED PERMEABLE

PAVEMENT AREA

±5,750 SF

PROPOSED PERMEABLE

PAVEMENT AREA

±5,770 SF

PROPOSED PERMEABLE

PAVEMENT AREA

±3,850 SF

T-5

T-8

T-10T-9

T-13

T-16

T-1 T-2

8" RIBBON

CURB

STAND UP

CURB

STAND UP

CURB

STAND UP

CURB

STAND UP

CURB

8" RIBBON

CURB

8" RIBBON

CURB

8" RIBBON

CURB

8" RIBBON

CURB

8" RIBBON

CURB

STAND UP

CURB

STAND UP

CURB

STAND UP

CURB

STAND UP

CURB

R10'

R10' (TYP.)

R4' (TYP.)

R10'(TYP.)

R10' (TYP.)

R4' (TYP.)

R10' (TYP.)

R4' (TYP.)

R10' (TYP.)

R4' (TYP.)

R4' (TYP.)

R10' (TYP.)

R4' (TYP.)

R10' (TYP.)

R10' (TYP)

R10' (TYP.)

R10' (TYP.)

24.76

24.93 23.88 22.84 22.84

23.4

23.96

22.84

24.06

22.62

22.16 21.7

22.17

23.82 22.75

21.68

21.68

21.84

22.58

22.01

22.18

21.1

20.17

20.1720.621.0

21.35 21.83

22.19

21.43

21.99

20.17

21.0

20.17

20.25

20.62

20.5

21.14

20.7 20.91

21.6 21.32

21.05

20.9

21.0 20.72 20.4

20.5

20.2 20.2 20.34

20.5

20.54

20.47 20.6

21.31

21.17

21.02

20.73

21.21

20.44 20.15

20.53

19.86 19.86

20.05

20.46

20.26

20.2

20.47 20.68

23.8

20.17

20.57

CONSTRUCT NEW

ASPHALT PER DETAILS

CONSTRUCT NEW

ASPHALT PER DETAILS

CONSTRUCT NEW

ASPHALT PER DETAILS

STAND UP

CURB

STAND UP

CURB

STOP SIGN &

STOP BAR

STOP SIGN &

STOP BAR

STOP SIGN &

STOP BAR

STOP SIGN &

STOP BAR

STOP SIGN &

STOP BAR

STOP SIGN &

STOP BAR

STOP SIGN &

STOP BAR

STOP SIGN &

STOP BAR

STOP SIGN &

STOP BAR

STOP SIGN &

STOP BAR

STOP SIGN &

STOP BAR

STOP SIGN &

STOP BAR

STOP SIGN &

STOP BAR

VERIFY EX, UTILITY DEPTHS,

CONTACT ENGINEER IF

ANY CONFLICT

TREE BOX URBAN

FORREST (TYP)

TREE BOX URBAN

FORREST (TYP)

TREE BOX URBAN

FORREST (TYP)

TREE BOX URBAN

FORREST (TYP)

TREE BOX URBAN

FORREST (TYP)

STOP SIGN &

STOP BAR

FOCAL POINT 3 -

SOD ISLAND & PLANT

186 MUHLY GRASS

186 FAKAHATCHEE

FOCAL POINT 5 -

SOD ISLAND & PLANT

500 MUHLY GRASS

500 FAKAHATCHEE

FOCAL POINT 6 -

SOD ISLAND & PLANT

400 MUHLY GRASS

400 FAKAHATCHEE

FOCAL POINT 1 & 2 -

SOD ISLAND & PLANT

850 MUHLY GRASS

850 FAKAHATCHEE

FOCAL POINT 7 & 8 -

SOD ISLAND & PLANT

771 MUHLY GRASS

771 FAKAHATCHEE

FOCAL POINT 3 -

SOD ISLAND & PLANT

267 MUHLY GRASS

267 FAKAHATCHEE

FOCAL POINT 9 -

SOD ISLAND & PLANT

48 CANNA LILY

48 BLUE FLAG IRIS

48 CARDINAL FLOWER

48 BLACK EYED SUSAN

48 SWAMP HIBISCUS

48 BLAZING STAR

1 FLORIDA MAPLE

SWEET

BAY TREE

SWEET

BAY TREE

SWEET

BAY TREE

POND

CYPRESS TREE

POND

CYPRESS TREE

POND

CYPRESS TREE

21.7

19.5

19.5

LANDSCAPING PLAN

CONTRACTOR MUST OBTAIN A UTILITY PERMIT FROM SANTA ROSA

COUNTY ROAD & BRIDGE PRIOR TO WORK WITHIN THE COUNTY

RIGHT-OF-WAY.

CONTRACTOR SHALL CONTACT SUNSHINE UTILITIES 48 HOURS PRIOR

TO CONSTRUCTION WITHIN THE RIGHT-OF-WAY.

SHEET

FL

LI

C

EN

S E

N O

D R A W

IN

G

N O

T V A

LI

D U

N

LE

S S S

IG

N

ED

A N D

S

EA

LE

D

B Y

EN

G

IN

EE

R O

F R

EC

O R D

FL

LI

C

EN

S E

N O

D A

TE

A

LA

N M

M

IL

LE

R

P.

E.

PA

U L

A M

C

LE

O D

JR

P

.E

E

V

IS

IO

N

S:

D

R A

W N

B Y

D

A T

E

C A

R O

L

IN

E S

T R

E

T O

N , F

L O

R

ID

A

SO

U

T H

E R

N S

IT

E

U

T

IL

IT

Y

D E

SI

G

N , I

N C

PH

0)

-9

E

-M A

IL

: s su d@ be lls ou th

.n et

SI

T

E P

L A

N S

SU

B D

IV

IS

IO

N

S

ST

O

R M

W A

T E

R M

A N

A G

E M

E N

T E

R O

SI

O

N C

O N

T R

O L

P L

A N

S

PO

T

A B

L E

W A

T E

R

S A

N

IT

A R

Y S

E W

E R

FL

O

R

ID

A C

E R

T

IF

IC

A

T E

O F

A U

T H

O R

IT

Y

N O

. 8

SI

T E

P L

A N

F O

R

SA

N

T A

R O

SA

C

O U

N T

Y A

D M

IN

IS

T R

A T

IO

N

C O

M

PL

H 9/

/2

1 inch = 40 feet

0 40 80 x

LEGEND:

POC

POB

R/W (D) (C) O.R.

PG.

SEC.

TE

--- SANITARY SEWER MANHOLE

--- FOUND

--- RIGHT-OF-WAY

--- DEED

--- CALCULATED

--- OFFICIAL RECORDS

--- PAGE

--- SECTION

--- TOP ELEVATION

--- GENERATOR/CONCRETE SLAB

--- ELECTRICAL PANEL BOX

--- WATER VALVE

--- SANITARY SEWER MANHOLE

--- BACKFLOW PREVENTER

--- WATER METER

--- UTILITY VAULT

--- LIGHT POLE

--- POWER POLE

--- GUY ANCHOR

--- FIRE HYDRANT

--- TELEPHONE PEDESTAL

--- BOLLARD (WOOD OR METAL)

--- BURIED FIBER OPTIC CABLE MARKER

--- BURIED GAS MARKER

--- DELINEATOR POST

--- GROUND LIGHTING

--- SANITARY SEWER CLEANOUT

--- SERVICE POLE

--- LIFT STATION

--- DECORATIVE POLE

--- IRON GUARDRAIL

--- HOG WIRE FENCEXX

--- SIGN & POST

--- ASPHALT AREA

--- CONCRETE AREA

IE --- INVERT ELEVATION

RCP --- REINFORCED CONCRETE PIPE

FFE --- FINISH FLOOR ELEVATION

--- OAK TREE & SIZE

--- MAGNOLIA TREE & SIZE

--- CYPRESS TREE & SIZE

--- MAPLE TREE & SIZE

--- EXISTING CURB CUT

--- EXISTING SPOT ELEVATION

--- EXISTING CONTOUR

--- SPRINKLER HEAD

--- GUARDRAIL & POST

FND.

R/W

--- POINT OF COMMENCEMENT

--- POINT OF BEGINNING

C-C

--- BUSH OR SHRUB

--- PROPOSED PARKING LOT TREEST-#

--- PROPOSED FOCAL POINT ISLAND TREES

PARKING LOT REQUIREMENTS

1 NEW TREE PER 12 PARKING SPACES = TOTAL NUMBER OF CANOPY TREES

181 TOTAL PARKING SPACES / 12 = 15.1 OR 16 CANOPY TREES REQUIRED.

- PROPOSED TREES: T-1 THRU T-16

EXISTING DRAINAGE INLETS

FOCAL POINT PLANTING GUIDE:

UTILIZE 1 GALLON OF MUHLY GRASS AND FAKAHATCHEE GRASS WITHIN FOCAL

POINT AREAS. PLANT @ THE RATES SHOWN BELOW AND EVENLY SPACED.

DISTRIBUTION SHALL ACHIEVE APPROX. 50% OF EACH SPECIES.

FOCAL POINT 1 = ±39 SF

- 15 SMALL PLANTS

FOCAL POINT 2 = ±39 SF

- 20 SMALL PLANTS

FOCAL POINT 3 = ±77 SF

- 30 SMALL PLANTS)

FOCAL POINT 4 = ±77 SF

- 30 SMALL PLANTS)

FOCAL POINT 5 = ±59 SF

- 25 SMALL PLANTS)

FOCAL POINT 6 = ±59 SF

- 25 SMALL PLANTS)

PLANTINGS SHALL BE SELECTED TO ACHIEVE AN EVEN

DISTRIBUTION OF MULTIPLE SPECIES.

PLANTINGS OTHER THAN TREES INDICATED SHALL BE A

50/50 MIXTURE OF 1 GALLON MUHLY GRASS AND 1

GALLON FAKAHATCHEE GRASS

ALL DISTURBED AREAS THAT DO NOT HAVE A

PERMANENT COVER SHALL BE SODDED WITH

CENTIPEDE GRASS.

FOCAL POINT PLANTING GUIDE:

UTILIZE 1 GALLON OF MUHLY GRASS AND FAKAHATCHEE GRASS WITHIN FOCAL

POINT AREAS. PLANT @ THE RATES SHOWN BELOW AND EVENLY SPACED.

DISTRIBUTION SHALL ACHIEVE APPROX. 50% OF EACH SPECIES.

FOCAL POINT 7 = ±32 SF

- 15 SMALL PLANTS

FOCAL POINT 8 = ±32 SF

- 15 SMALL PLANTS

FOCAL POINT 9 = ±24 SF

- 10 SMALL PLANTS)

AutoCAD SHX Text 23.97

AutoCAD SHX Text 24.14

AutoCAD SHX Text 23.97

AutoCAD SHX Text MILTON 6501 LLC 440 MONTICELLO AVE, STE 1700 NORFOLK, VA 23510 Parcel No. 04-1N-28-0000-10001-0000 Zoned: CITY FLU: CITY/TOWN ELU: CITY

AutoCAD SHX Text PERRITT KAREN ELAINE ET AL* C/O BETSY PINKARD 4275 S. SPENCER FIELD RD. PACE, FL Parcel No. 09-1N-28-0000-06500-0000 Zoned: HCD FLU: COMM ELU: SIVICUL

AutoCAD SHX Text OWENS REAL INVESTMENTS LLC 1447 PENTON RD. MILTON, FL Parcel No. 09-1N-28-0000-02100-0000 Zoned: CITY FLU: CITY/TOWN ELU: CITY

AutoCAD SHX Text MCDONALDS RESTAURANTS OF FLORIDA INC P.O. BOX 182571 COLUMBUS, OH 43218-2571 BOX 182571 COLUMBUS, OH 43218-2571 OH 43218-2571 Parcel No. 09-1N-28-0000-02100-0000 Zoned: CITY FLU: CITY/TOWN ELU: CITY

AutoCAD SHX Text SANTA ROSA COUNTY FEDERAL CREDIT UNION P.O. BOX 841 MILTON, FL BOX 841 MILTON, FL Parcel No. 09-1N-28-0000-02701-0000 Zoned: CITY FLU: CITY/TOWN ELU: CITY

AutoCAD SHX Text

STOP

AutoCAD SHX Text

CALL SUNSHINE

AutoCAD SHX Text 800-432-4770

AutoCAD SHX Text

PRIOR TO CONSTRUCTION:

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 4"

AutoCAD SHX Text 5"

AutoCAD SHX Text 4"

AutoCAD SHX Text 2"

AutoCAD SHX Text 129.87

AutoCAD SHX Text

PARKING AREA LANDSCAPE PLANTING

AutoCAD SHX Text

EX. STRUCTURE

AutoCAD SHX Text 18.32'

AutoCAD SHX Text

GRATE

AutoCAD SHX Text

INVERT EL. (IN)

AutoCAD SHX Text 18.32'

AutoCAD SHX Text D1

AutoCAD SHX Text 21.68'

AutoCAD SHX Text D2

AutoCAD SHX Text 20.38'

AutoCAD SHX Text D3

AutoCAD SHX Text 20.21'

AutoCAD SHX Text D4

AutoCAD SHX Text 19.68'

AutoCAD SHX Text D5

AutoCAD SHX Text 19.57'

AutoCAD SHX Text

INVERT EL. (OUT)

AutoCAD SHX Text 18.06'

AutoCAD SHX Text 18.00'

AutoCAD SHX Text 17.84'

AutoCAD SHX Text 17.72'

AutoCAD SHX Text 17.40'

AutoCAD SHX Text 17.40'

AutoCAD SHX Text 17.31'

AutoCAD SHX Text 17.33'

AutoCAD SHX Text D6

AutoCAD SHX Text 19.57'

AutoCAD SHX Text N/A

SITE / LANDSCAPING NOTES / DETAILS

VEGETATIVE MEASURES:

1. DIVERSITY OF PLANTINGS SHOULD BE STRIVED FOR IN ALL REQUIRED LANDSCAPE PLANTINGS, AND IN NO CASE SHOULD ONE SPECIES CONSTITUTE MORE THAN 50% OF TOTAL PLANTING ON SITE. LANDSCAPING SHALL LARGELY UTILIZE NATIVE OR NON-COMPETING EXOTIC PLANT SPECIES. LANDSCAPING SHALL NOT UTILIZE ANY EXOTIC VEGETATION WHICH IS LIKELY TO OUT-COMPETE OR OTHERWISE DISPLACE NATIVE VEGETATION.

2. ALL LANDSCAPING SHALL BE INSTALLED IN A SOUND WORKMANSHIP MANNER AND ACCORDING TO ACCEPTED GOOD PLANTING PROCEDURES CONSISTENT WITH THE DETAILS OF THE APPROVED SITE PLAN. ADEQUATE WIND AND WATER EROSION CONTROL MEASURES SHALL BE PUT INTO EFFECT PRIOR TO COMMENCING SITE ALTERATION ON

EACH INCREMENT OF A PROJECT.

3. PLANTS WHOSE PHYSICAL CHARACTERISTICS MAY BE INJURIOUS TO THE PUBLIC SHALL NOT BE SPECIFIED OR

INSTALLED IN AREAS SUCH AS PARKING LOTS, ALONG WALKWAYS, ETC.

4. NOXIOUS AND/OR INVASIVE PLANT SPECIES SUCH AS (BUT NOT LIMITED TO) KUDZU AND POPCORN TREES SHALL

NOT BE PLANTED/INSTALLED.

5. AT COMPLETION OF CONSTUCTION, ALL EXPOSED DIRT SHALL BE STABILIZED W/ SOD, HYDRO-SEED, OR HAY/SEED.

SHEET

FL

LI

C

EN

S E

N O

D R A W

IN

G

N O

T V A

LI

D U

N

LE

S S S

IG

N

ED

A N D

S

EA

LE

D

B Y

EN

G

IN

EE

R O

F R

EC

O R D

FL

LI

C

EN

S E

N O

D A

TE

A

LA

N M

M

IL

LE

R

P.

E.

PA

U L

A M

C

LE

O D

JR

P

.E

E

V

IS

IO

N

S:

D

R A

W N

B Y

D

A T

E

C A

R O

L

IN

E S

T R

E

T O

N , F

L O

R

ID

A

SO

U

T H

E R

N S

IT

E

U

T

IL

IT

Y

D E

SI

G

N , I

N C

PH

0)

-9

E

-M A

IL

: s su d@ be lls ou th

.n et

SI

T

E P

L A

N S

SU

B D

IV

IS

IO

N

S

ST

O

R M

W A

T E

R M

A N

A G

E M

E N

T E

R O

SI

O

N C

O N

T R

O L

P L

A N

S

PO

T

A B

L E

W A

T E

R

S A

N

IT

A R

Y S

E W

E R

FL

O

R

ID

A C

E R

T

IF

IC

A

T E

O F

A U

T H

O R

IT

Y

N O

. 8

SI

T E

P L

A N

F O

R

SA

N

T A

R O

SA

C

O U

N T

Y A

D M

IN

IS

T R

A T

IO

N

C O

M

PL

H 9/

/2

5TREE PLANTING DETAIL

3" MULCH

EXISTING SOIL

WITHIN THE SOIL MIX.

PREPARED LOAM PLANTING SOIL.

CONSTRUCTION BACKFILL IS NOT

ACCEPTABLE. NO PARTICLE OVER

1" DIAMETER SHALL BE FOUND

6" SAUCER

WOODY SHRUB WITH

MINIMUM HEIGHT OF 12"

FROM FINISHED GRADE.

SHRUB PLANTING DETAIL

N.T.S.

$100.00 FINE

PERMIT

DISABLED

PARKING BY

ONLY

HANDICAP SIGN DETAIL

WHITE REFLECTIVE SYMBOL

AND BORDER WITH REFLECTIVE

BLUE BACKGROUND

AND BORDER WITH REFLECTIVE

BLUE REFLECTIVE TEXT AND

WHITE BACKGROUND

7'- 0"

A

BO

VE

GR

AD

E

TYPICAL PARKING SPACE

TYPICAL STOP SIGN DETAIL

7' M

IN

FDOT STANDARDS

EDGE OF PAVEMENT

ALUMINUM POST TO MEET

6' MIN. TO 12' MAX

4' M

IN

IM

UM

N.T.S.

STOP 24"

GRADE

24"

ALL SIGN MOUNT HARDWARE SHALL BE EITHER

GALVANIZED, ALUMINUM OR STAINLESS STEEL.

3" WIDE UNFS

PAINTED WHITE

RESERVED

HANDICAPPED

H.C. PARKING SIGN MOUNTED

NOTE:

PAINT SOLID

BLUE LINE

CITY OF MILTON STANDARDS.

SIGN SHALL ALSO INCLUDE INFORMATION

REGARDING PENALTY FOR ILLEGAL USE.

R.=1.0'

AT ALL HANDICAPPED SPACES

NATIONAL STD.

(WHITE REFLECTIVE)

12" HIGH LETTERS

PAINTED ON PAVEMENT

H.C. SYMBOL PAINTED

ON PVMT.

CONFORM WITH F.D.O.T., ANSI, AND

84" ABOVE GRADE. H.C. SIGN SHALL

(WHITE REFLECTIVE)

SLOPE NOT TO EXCEED 2% IN ANY DIRECTION.

NOT TO SCALE

WHITE LINE

PAINT SOLID

@ 1'-0" 0.C. AND AT

4" PAINTED STRIPES

45° (WHITE REFLECTIVE)

HANDICAPPED PARKING DETAIL

PAINT SYMBOL ON PAVING

5'12'

20' 3'

3'

6"

2"

6"

APPROVED PARKING BUMPER

(SEE PLAN)

5'

MIN.

(SEE PLAN)

12'

MIN.

(SEE PLAN)

20' MIN.

(SEE PLAN)

(SEE PLAN)

6'

FLAT

RAMP UP

FLAT

HANDICAPPED SIDEWALK RAMP DETAIL

N.T.S.

CONCRETE

SIDEWALK

RESERVED

HANDICAPPED

MAX. SLOPE NOT TO

EXCEED 2%.

MAX. 1:12 SLOPE

@ RAMP

6'

RAMP UP

FLAT

AutoCAD SHX Text

%%ULANDSCAPING NOTES:

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

LEADER SHALL BE UNDAMAGED

AutoCAD SHX Text

AND HEALTHY

AutoCAD SHX Text

FULL BRANCHING.

AutoCAD SHX Text

TREES GROWN TOO CLOSE

AutoCAD SHX Text

TOGETHER IN THE NURSERY

AutoCAD SHX Text

SET CROWN OF ROOT BALL

AutoCAD SHX Text

1" ABOVE SURROUNDING

AutoCAD SHX Text

FINISHED GRADE BEFORE

AutoCAD SHX Text

6" SAUCER

AutoCAD SHX Text

PIT SHALL BE 2 TIMES

AutoCAD SHX Text

THE ROOT BALL DIAMETER

AutoCAD SHX Text

CONSUMER SERVICES.

AutoCAD SHX Text

LOOSEN BURLAP OR

AutoCAD SHX Text

CUT WIRE BASKET

AutoCAD SHX Text

3" MULCH LAYER

AutoCAD SHX Text

PREPARED LOAM PLANTING SOIL.

AutoCAD SHX Text

CONSTRUCTION BACKFILL IS NOT

AutoCAD SHX Text

ACCEPTABLE. NO PARTICLE OVER

AutoCAD SHX Text

1" DIAMETER SHALL BE FOUND

AutoCAD SHX Text

WITHIN THE SOIL MIXTURE.

AutoCAD SHX Text

EXISTING SOIL

AutoCAD SHX Text N.T.S.

AutoCAD SHX Text N.T.S.

AutoCAD SHX Text

WILL BE REJECTED.

AutoCAD SHX Text

MULCHING.

AutoCAD SHX Text

ALL TREES TO BE FLORIDA ONE

AutoCAD SHX Text

OR FLORIDA PRETTY ACCORDING

AutoCAD SHX Text

TO "GRADES AND STANDARDS FOR

AutoCAD SHX Text

NURSERY PLANTS" BY THE FLORIDA

AutoCAD SHX Text

DEPARTMENT OF AGRICULTURE AND

AutoCAD SHX Text

3/4" REINFORCED RUBBER HOSE

AutoCAD SHX Text

FOUR WOOD STAKES 3" MINIMUM

AutoCAD SHX Text

DIAMETER NOTCHED FOR WIRE

AutoCAD SHX Text

EDGE OF PARKING

AutoCAD SHX Text

4" WIDE WHITE

AutoCAD SHX Text N.T.S.

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

PARKING BUMPER

AutoCAD SHX Text 20'-0"

AutoCAD SHX Text 9'-0"

AutoCAD SHX Text 2.5'

AutoCAD SHX Text

(SEE PLAN)

LINE

XX

XX

XX

XX

XX

XX

XX

PROPOSED PERMEABLE

PAVEMENT AREA

±3,300 SF

PROPOSED PERMEABLE

PAVEMENT AREA

±5,700 SF

PROPOSED PERMEABLE

PAVEMENT AREA

±5,700 SF

24 24

21 21

21 21

21 21

16 1

4 1 3 1

4 1

1 1

212123 22

3 2

24 23

1 2

21 21

C-C

C-C

C-C

C-C

C-C

C-C

C-CC-CC-C

C-C C-C C-C

C-C

C-CC-C C-CC-C

C-C

C-C

C-CC-C

C-C

C-C

C-C C-CC-C

C-C C-C

C-C

C-C

C-C

C-C

EX. STRUCTURE - D1

EX. STRUCTURE - D2

EX. STRUCTURE - D3

EX. STRUCTURE - D4

EX. STRUCTURE - D5

EX. PIPE - 1A

EX. PIPE - 2A

EX. PIPE - 3A

EX. PIPE - 4

EX. PIPE - 5

FOCAL POINT 5

(SEE DETAIL)

FOCAL POINT 3

(SEE DETAIL)

FOCAL POINT 6

(SEE DETAIL)

FOCAL POINT 2

(SEE DETAIL)

FOCAL POINT 1

(SEE DETAIL) FOCAL POINT 4

(SEE DETAIL)

FOCAL POINT 8

(SEE DETAIL)

FOCAL POINT 7

(SEE DETAIL)

FOCAL POINT 9

(SEE DETAIL)

4" R-TANK CONNECTION

4" R-TANK CONNECTION

4" R-TANK CONNECTION

4" R-TANK CONNECTION

4" R-TANK CONNECTION

4" R-TANK CONNECTION

4" R-TANK CONNECTION

12" CONNECTION

12" CONNECTION

12" CONNECTION

4" R-TANK CONNECTION

T-3 T-4

T-6 T-7

T-11 T-12

T-14 T-15

EX. STRUCTURE - D6

PROPOSED PERMEABLE

PAVEMENT AREA

±5,750 SF

PROPOSED PERMEABLE

PAVEMENT AREA

±5,770 SF

PROPOSED PERMEABLE

PAVEMENT AREA

±3,850 SF

T-5

T-8

T-10T-9

T-13

T-16

T-1 T-2

DOMED OVERFLOW STRUCTURE

DOMED OVERFLOW STRUCTURE

DOMED OVERFLOW STRUCTURE

DOMED OVERFLOW STRUCTURE DOMED OVERFLOW STRUCTURE

4" R-TANK CONNECTION

DOMED OVERFLOW STRUCTURE

15" CPP

CONC. M.E.S. - INV: 16.0

NEW TYPE "C"

DOGHOUSE INLET

NEW TYPE "C"

DOGHOUSE INLET

NEW TYPE "C"

DOGHOUSE INLET

4" R-TANK CONNECTION

EX. PIPE - 1B

EX. PIPE - 2B

EX. PIPE - 3B

CONSTRUCT NEW

ASPHALT PER DETAILS

CONSTRUCT NEW

ASPHALT PER DETAILS

CONSTRUCT NEW

ASPHALT PER DETAILS

VERIFY EX, UTILITY DEPTHS,

CONTACT ENGINEER IF

ANY CONFLICT

TREE BOX URBAN

FORREST (TYP)

TREE BOX URBAN

FORREST (TYP)

TREE BOX URBAN

FORREST (TYP)

TREE BOX URBAN

FORREST (TYP)

TREE BOX URBAN

FORREST (TYP)

GRADING PLAN

CONTRACTOR MUST OBTAIN A UTILITY PERMIT FROM SANTA ROSA

COUNTY ROAD & BRIDGE PRIOR TO WORK WITHIN THE COUNTY

RIGHT-OF-WAY.

CONTRACTOR SHALL CONTACT SUNSHINE UTILITIES 48 HOURS PRIOR

TO CONSTRUCTION WITHIN THE RIGHT-OF-WAY.

SHEET

FL

LI

C

EN

S E

N O

D R A W

IN

G

N O

T V A

LI

D U

N

LE

S S S

IG

N

ED

A N D

S

EA

LE

D

B Y

EN

G

IN

EE

R O

F R

EC

O R D

FL

LI

C

EN

S E

N O

D A

TE

A

LA

N M

M

IL

LE

R

P.

E.

PA

U L

A M

C

LE

O D

JR

P

.E

E

V

IS

IO

N

S:

D

R A

W N

B Y

D

A T

E

C A

R O

L

IN

E S

T R

E

T O

N , F

L O

R

ID

A

SO

U

T H

E R

N S

IT

E

U

T

IL

IT

Y

D E

SI

G

N , I

N C

PH

0)

-9

E

-M A

IL

: s su d@ be lls ou th

.n et

SI

T

E P

L A

N S

SU

B D

IV

IS

IO

N

S

ST

O

R M

W A

T E

R M

A N

A G

E M

E N

T E

R O

SI

O

N C

O N

T R

O L

P L

A N

S

PO

T

A B

L E

W A

T E

R

S A

N

IT

A R

Y S

E W

E R

FL

O

R

ID

A C

E R

T

IF

IC

A

T E

O F

A U

T H

O R

IT

Y

N O

. 8

SI

T E

P L

A N

F O

R

SA

N

T A

R O

SA

C

O U

N T

Y A

D M

IN

IS

T R

A T

IO

N

C O

M

PL

H 9/

/2

1 inch = 40 feet

0 40 80 x

LEGEND:

POC

POB

R/W (D) (C) O.R.

PG.

SEC.

TE

--- SANITARY SEWER MANHOLE

--- FOUND

--- RIGHT-OF-WAY

--- DEED

--- CALCULATED

--- OFFICIAL RECORDS

--- PAGE

--- SECTION

--- TOP ELEVATION

--- GENERATOR/CONCRETE SLAB

--- ELECTRICAL PANEL BOX

--- WATER VALVE

--- SANITARY SEWER MANHOLE

--- BACKFLOW PREVENTER

--- WATER METER

--- UTILITY VAULT

--- LIGHT POLE

--- POWER POLE

--- GUY ANCHOR

--- FIRE HYDRANT

--- TELEPHONE PEDESTAL

--- BOLLARD (WOOD OR METAL)

--- BURIED FIBER OPTIC CABLE MARKER

--- BURIED GAS MARKER

--- DELINEATOR POST

--- GROUND LIGHTING

--- SANITARY SEWER CLEANOUT

--- SERVICE POLE

--- LIFT STATION

--- DECORATIVE POLE

--- IRON GUARDRAIL

--- HOG WIRE FENCEXX

--- SIGN & POST

--- ASPHALT AREA

--- CONCRETE AREA

IE --- INVERT ELEVATION

RCP --- REINFORCED CONCRETE PIPE

FFE --- FINISH FLOOR ELEVATION

--- OAK TREE & SIZE

--- MAGNOLIA TREE & SIZE

--- CYPRESS TREE & SIZE

--- MAPLE TREE & SIZE

--- EXISTING CURB CUT

--- EXISTING SPOT ELEVATION

--- EXISTING CONTOUR

--- SPRINKLER HEAD

--- GUARDRAIL & POST

FND.

R/W

--- POINT OF COMMENCEMENT

--- POINT OF BEGINNING

C-C

--- BUSH OR SHRUB

--- PROPOSED PARKING LOT TREEST-#

--- PROPOSED FOCAL POINT ISLAND TREES

BASIN "A" 52,818 SF 1.22 AC.

BASIN "B" 72,280 SF 1.66 AC.

BASIN "C" 69,840 SF 1.60 AC.

BASIN "D" 41,627 SF 0.95 AC.

BASIN "E" 25,257 SF 0.58 AC.

BASIN "F" 28,355 SF 0.65 AC.

BASIN "G" 87,700 SF 2.01 AC.

BASIN "H" 3,683 SF 0.09 AC.

BASIN "I" 64,036 SF 1.47 AC.

BASIN SQ. FT. ACRES

EXISTING DRAINAGE INLETS

NOTE:

- SPOT ELEVATIONS SHOWN WITHIN EXISTING PARKING

AREAS (PERMEABLE PAVERS AND RESTRIPED AREAS) ARE

INTENTED TO MATCH EXISTING ELEVATIONS AND ALLOW

FOR A FLUSH FINISH AT TIE-INS.

(SEE ADDITIONAL SHEETS FOR MORE DETAIL)

RIBBON CURB

SAWCUT LINE

TOP OF CURB FLUSH

W/ EX. ASPHALT

8" X 8" CONC.

RIBBON CURB

PAVERS

AutoCAD SHX Text 23.97

AutoCAD SHX Text 24.14

AutoCAD SHX Text 23.97

AutoCAD SHX Text MILTON 6501 LLC 440 MONTICELLO AVE, STE 1700 NORFOLK, VA 23510 Parcel No. 04-1N-28-0000-10001-0000 Zoned: CITY FLU: CITY/TOWN ELU: CITY

AutoCAD SHX Text PERRITT KAREN ELAINE ET AL* C/O BETSY PINKARD 4275 S. SPENCER FIELD RD. PACE, FL Parcel No. 09-1N-28-0000-06500-0000 Zoned: HCD FLU: COMM ELU: SIVICUL

AutoCAD SHX Text OWENS REAL INVESTMENTS LLC 1447 PENTON RD. MILTON, FL Parcel No. 09-1N-28-0000-02100-0000 Zoned: CITY FLU: CITY/TOWN ELU: CITY

AutoCAD SHX Text MCDONALDS RESTAURANTS OF FLORIDA INC P.O. BOX 182571 COLUMBUS, OH 43218-2571 BOX 182571 COLUMBUS, OH 43218-2571 OH 43218-2571 Parcel No. 09-1N-28-0000-02100-0000 Zoned: CITY FLU: CITY/TOWN ELU: CITY

AutoCAD SHX Text SANTA ROSA COUNTY FEDERAL CREDIT UNION P.O. BOX 841 MILTON, FL BOX 841 MILTON, FL Parcel No. 09-1N-28-0000-02701-0000 Zoned: CITY FLU: CITY/TOWN ELU: CITY

AutoCAD SHX Text

STOP

AutoCAD SHX Text

CALL SUNSHINE

AutoCAD SHX Text 800-432-4770

AutoCAD SHX Text

PRIOR TO CONSTRUCTION:

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 4"

AutoCAD SHX Text 5"

AutoCAD SHX Text 4"

AutoCAD SHX Text 2"

AutoCAD SHX Text 129.87

AutoCAD SHX Text

EX. STRUCTURE

AutoCAD SHX Text 18.32'

AutoCAD SHX Text

GRATE

AutoCAD SHX Text

INVERT EL. (IN)

AutoCAD SHX Text 18.32'

AutoCAD SHX Text D1

AutoCAD SHX Text 21.68'

AutoCAD SHX Text D2

AutoCAD SHX Text 20.38'

AutoCAD SHX Text D3

AutoCAD SHX Text 20.21'

AutoCAD SHX Text D4

AutoCAD SHX Text 19.68'

AutoCAD SHX Text D5

AutoCAD SHX Text 19.57'

AutoCAD SHX Text

INVERT EL. (OUT)

AutoCAD SHX Text 18.06'

AutoCAD SHX Text 18.00'

AutoCAD SHX Text 17.84'

AutoCAD SHX Text 17.72'

AutoCAD SHX Text 17.40'

AutoCAD SHX Text 17.40'

AutoCAD SHX Text 17.31'

AutoCAD SHX Text 17.33'

AutoCAD SHX Text D6

AutoCAD SHX Text 19.57'

AutoCAD SHX Text N/A

AutoCAD SHX Text 20.29'

NOT TO SCALE

GRADING / DRAINAGE / UTILITY NOTES & DETAILS

GENERAL UTILITY NOTES:

1. CONTRACTOR IS RESPONSIBLE FOR NOTIFYING SUNSHINE UTILITIES 48-HOURS PRIOR TO CONSTRUCTION COMMENCEMENT FOR EXISTING UTILITY LOCATION. (SUNSHINE UTILITIES: 1-800-432-4770) EXISTING UTILITIES, WHICH MAY OR MAY NOT BE INDICATED ON THESE PLANS, ARE SHOWN IN THEIR APPROXIMATE HORIZONTAL LOCATION

ONLY. VERTICAL LOCATION HAS NOT BEEN PERFORMED.

2.CONTRACTOR SHALL VERIFY SIZE, LOCATION, AND DEPTH OF ALL UTILITIES PRIOR TO CONSTRUCTION. ANY DAMAGE TO EXISTING UTILITIES SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE WITH NO ADDITIONAL COMPENSATION.

3.UTILITY SYSTEM PERSONNEL SHALL BE PRESENT FOR ALL TAPS TO EXISTING UTILITIES. CONTRACTOR SHALL CONTACT THE APPROPRIATE UTILITY SYSTEM AT LEAST 48 HOURS PRIOR TO CONNECTION OF PROPOSED FACILITIES

TO EXISTING FACILITIES.

4.ALL UTILITY WORK SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE UTILITY SYSTEM.

5.CONTRACTOR IS RESPONSIBLE FOR ADJUSTMENT OF EXISTING UTILITIES IF PROPOSED IMPROVEMENTS IMPACT

EXISTING UTILITIES.

6. A SEPARATE UTILITY PERMIT MAY BE REQUIRED AND SHALL BE OBTAINED BY THE SITE CONTRACTOR PRIOR TO

COMMENCEMENT OF CONSTRUCTION.

APPROVED BACKFILL

TAMPED 6" LAYERS

TO 1'-0" ABOVE PIPE

BOTTOM QUADRANT OF PIPE

BEDDED FULL LENGTH OF BARREL

90°

6" O.D. 6"

12 GAGE TRACER WIRE

TYPICAL PIPE BEDDING DETAIL

N.T.S.

1. CONTRACTOR SHALL PREPARE THE SUB-GRADE TO LINE AND GRADES REQUIRED FOR FINISHED ELEVATIONS AS INDICATED ON THESE PLANS. ORGANIC MATERIALS, HARD PANS, AND OTHER UN-SUITABLE SOILS IN THE SUB-GRADE SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER OF RECORD. COMPACT THE SUB-GRADE TO 95% OF THE

MODIFIED PROCTOR AS DETERMINED BY A.S.T.M. D 1557.

2.SEED, FERTILIZE, AND MULCH OR SOD SHOULDERS AND UN-PAVED AREAS. ALL WORK SHALL CONFORM TO THE F.D.O.T. SPECIFICATIONS SECTION 570 AND TO THE SPECIFICATIONS, WHICHEVER IS MORE STRINGENT.

3.SIDEWALKS AND CURBING SHALL BE CONSTRUCTED WITH 3,000 P.S.I. CONCRETE (28-DAY BREAK) AND SHALL HAVE A FULL DEPTH, ONE-HALF INCH EXPANSION JOINT AT 50 FOOT INTERVALS OR LESS. EXPANSION JOINT MATERIAL SHALL BE A PREFORMED BITUMINOUS EXPANSION MATERIAL. CONTRACTION JOINTS SHALL BE CUT OR TOOLED, 1/4" WIDE x

1/3 THE CONCRETE DEPTH AND PLACED AT 10 FOOT INTERVALS.

4.COMPACT THE BASE TO 98% OF THE MODIFIED PROCTOR AS DETERMINED BY A.S.T.M. D 1557. MATERIAL SHALL MEET THE REQUIREMENTS OF THE F.D.O.T. STANDARD SPECIFICATIONS FOR THE SELECTED BASE MATERIAL.

INSTALLATION SHALL BE IN ACCORDANCE WITH F.D.O.T. SPECIFICATIONS, SECTION 240. A MIN. OF 3 DENSITY TESTS

SHALL BE PROVIDED TO THE ENGINEER.

5.DRIVING SURFACE SHALL BE CONSTRUCTED PER THE DETAILS.

6.ALL F.D.O.T. INDEX NUMBERS ARE FROM THE F.D.O.T. ROADWAY AND TRAFFIC DESIGN STANDARDS MANUAL.

7. ALL ROADWAY, PARKING LOT, AND TRAFFIC MARKINGS / STRIPING SHALL COMPLY WITH THE APPLICABLE SECTIONS

OF THE F.D.O.T. STANDARD SPECIFICATION FOR ROAD AND BRIDGE CONSTRUCTION.

8.TEMPORARY TRAFFIC CONTROL THROUGH THE WORK ZONE SHALL BE IN ACCORDANCE WITH THE F.D.O.T. MANUAL

ON UNIFORM TRAFFIC CONTROL DEVICES.

SHEET

FL

LI

C

EN

S E

N O

D R A W

IN

G

N O

T V A

LI

D U

N

LE

S S S

IG

N

ED

A N D

S

EA

LE

D

B Y

EN

G

IN

EE

R O

F R

EC

O R D

FL

LI

C

EN

S E

N O

D A

TE

A

LA

N M

M

IL

LE

R

P.

E.

PA

U L

A M

C

LE

O D

JR

P

.E

E

V

IS

IO

N

S:

D

R A

W N

B Y

D

A T

E

C A

R O

L

IN

E S

T R

E

T O

N , F

L O

R

ID

A

SO

U

T H

E R

N S

IT

E

U

T

IL

IT

Y

D E

SI

G

N , I

N C

PH

0)

-9

E

-M A

IL

: s su d@ be lls ou th

.n et

SI

T

E P

L A

N S

SU

B D

IV

IS

IO

N

S

ST

O

R M

W A

T E

R M

A N

A G

E M

E N

T E

R O

SI

O

N C

O N

T R

O L

P L

A N

S

PO

T

A B

L E

W A

T E

R

S A

N

IT

A R

Y S

E W

E R

FL

O

R

ID

A C

E R

T

IF

IC

A

T E

O F

A U

T H

O R

IT

Y

N O

. 8

SI

T E

P L

A N

F O

R

SA

N

T A

R O

SA

C

O U

N T

Y A

D M

IN

IS

T R

A T

IO

N

C O

M

PL

H 9/

/2

4' WIDE

8" RIBBON CURB8" RIBBON CURB

12"

3"

12" THICK CLASS 1

RIP RAP 4" THICK NO. 57

CRUSHED AGGREGATE

RIP RAP SWALE DETAIL

8" THICK 3,000 P.S.I.

CONCRETE

MIRAFI FW 700 OR

APPROVED EQUAL GEOTEXTILE

1.PRIOR TO COMMENCING CONSTRUCTION, CONTRACTOR SHALL PLACE SILTATION FENCE ON THE SUBJECT PROPERTY WHERE APPLICABLE OR WHERE INDICATED ON THE PLANS. SILTATION FENCE IS TO REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETE

AND ALL DISTURBED AREAS ARE STABILIZED.

2.CONTRACTOR IS TO ENSURE THAT ALL SEDIMENT CONTROL MEASURES ARE FULLY FUNCTIONAL DURING RAINFALL EVENTS. ALL HAY-BALES AND SILT FENCES SHALL REMAIN INTACT UNTIL CONSTRUCTION IS COMPLETE. SHOULD A PORTION FAIL, THAT PORTION SHALL BE REPAIRED PRIOR TO THE NEXT STORM EVENT IN ACCORDANCE WITH THE DETAILS SHOWN ON THESE PLANS.

3.CONTRACTOR SHALL BE RESPONSIBLE FOR ADDITIONAL TEMPORARY EROSION CONTROL MEASURES AS REQUIRED TO ENSURE NO

SEDIMENTS ARE TRANSPORTED OFF-SITE VIA STORMWATER RUN-OFF.

4.CONTRACTOR SHALL CLEAN OUT ACCUMULATED SILT IN BASINS AND ROADS AT THE END OF CONSTRUCTION WHEN ALL DISTURBED

AREAS HAVE BEEN STABILIZED.

5.AREAS CONTAINING BLOCK SOD SHALL BE PINNED.

6.ON ALL CLEARED AREAS WHICH WILL NOT HAVE ACTIVE CONSTRUCTION UNDERTAKEN FOR A PERIOD OF 90 DAYS OR MORE, A GROUND COVER SHALL BE PLANTED OR OTHER FORMS OF STABILIZATION UTILIZED WITHIN 10 WORKING DAYS.

7.FOR DISTURBED AREAS EQUAL TO OR GREATER THAN 1 ACRE, A STORMWATER POLLUTION PREVENTION PLAN (SWPPP) SHALL BE PREPARED AND SUBMITTED TO FDEP FOR NPDES PERMITTING. THE SWPPP SHALL BE CONSIDERED A PART OF THESE PLANS AND SHALL BE STRICTLY ADHERED TO. INSPECTIONS ARE REQUIRED ACCORDING TO THIS PERMIT. CONTACT ENGINEER TO ARRANGE

INSPECTIONS.

8.AT THE COMPLETION OF CONSTRUCTION, ALL EXPOSED DIRT SHALL BE STABILIZED WTIH SOD, A HAY/SEED MIX OR HYDRO-SEED.

9.CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING SEDIMENT CONTROL DEVICES (i.e. SILT FENCES) PRIOR TO CONSTRUCTION.

PROVIDE SILTATION FENCES AS SHOWN ALONG THE PROPERTY LINES. SEE DETAIL FOR PROPER INSTALLATION.

15. ALL STOCKPILES ARE TO BE PROTECTED AGAINST DUST AND EROSION AND SHALL BE LOCATED TO NOT TO OBSTRUCT NATURAL DRAINAGE PATTERNS. STOCKPILES SHALL NOT BE GREATER THAN 20-FEET HEIGHT AT ITS PEAK AND SHALL NOT EXCEED 2:1 SLOPE.

10.NO CLEARING, GRADING, EXCAVATING, FILLING, OR OTHER DISTURBANCE OF THE NATURAL TERRAIN SHALL OCCUR UNTIL EROSION AND SEDIMENTATION CONTROL MEASURES HAVE BEEN INSTALLED, EXCEPT THOSE OPERATIONS NEEDED TO IMPLEMENT THESE

MEASURES.

11. ALL CONTROL MEASURES SHALL COMPLY WITH THE MANAGEMENT PRACTICES CONTAINED IN THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION'S "EROSION & SEDIMENT CONTROL DESIGNER AND REVIEWER'S MANUAL" LATEST EDITION.

12. ANY SEDIMENT OR DEBRIS THAT LEAVES THE DEVELOPMENT SITE SHALL BE PROPERLY RECOVERED BY THE CONTRACTOR.

13. CONTRACTOR IS TO MINIMIZE THE EXTENT OF THE AREA EXPOSED AT ONE TIME, THE DISTURBANCE OF STEEP SLOPES, AND THE DURATION OF EXPOSURE DURING CONSTRUCTION. THIS INCLUDES AVOIDING, CLEARING, GRUBBING, AND GRADING THE ENTIRETY OF THE SITE AT ONCE. THE PERMITTEE SHALL SUBMIT A PHASED CONSTRUCTION SCHEDULE PRIOR TO THE START OF CONSTRUCTION WHICH INCLUDES A DESCRIPTION OF CONSTRUCTION TECHNIQUES, SEQUENCING, AND EQUIPTMENT.

PLEASE REFER TO SUBSECTION 11.1.2 OF ERP APPLICANT'S HANDBOOK VOLUME 1 AND PART 3 OF SECTION E OF THE ERP

APPLICATION FORM 62-330.060(1) FOR MORE INFORMATION.

14. IT IS THE CONTRACTOR'S RESPONSIBLITY TO MANAGE ALL SEDIMENT CONTROL MEASURES AS REQUIRED BY

REGULATORY AGENCIES.

16. INSTALL SILT FENCE OR OTHER STOCKPILE PROTECTIONS TO ENSURE THE STOCKPILE IS CONTAINED.

AutoCAD SHX Text

%%UUTILITY GENERAL NOTES:

AutoCAD SHX Text N.T.S.

AutoCAD SHX Text

%%UGRADING / DRIVEWAY & PARKING AREA NOTES:

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NOT TO SCALE

%%UEROSION CONTROL / EXISTING CONDITIONS NOTES:

FOCAL POINT 6

(SEE DETAIL)

FOCAL POINT 5

(SEE DETAIL)

FOCAL POINT 3

(SEE DETAIL)

4" R-TANK CONNECTION

(HDPE PIPE)

4" R-TANK CONNECTION

(HDPE PIPE)

4" R-TANK CONNECTION

(HDPE PIPE)

DOMED OVERFLOW STRUCTURE

TOP: 22.17

INV: 19.11

12" CONNECTION

(HDPE PIPE)

12" CONNECTION

(HDPE PIPE)

12" CONNECTION

(HDPE PIPE)

DOMED OVERFLOW STRUCTURE

TOP: 23.96

INV: 20.5

DOMED OVERFLOW STRUCTURE

TOP: 22.18

INV: 19.3

24.76

24.93 23.88 22.84 22.84

23.4

23.96

22.84

24.06

22.62

22.16 21.7

22.17

23.82 22.75

21.68

21.68

21.84

22.58

22.01

22.18

23.8

21.7

BIO RETENTION AREAS

CONTRACTOR MUST OBTAIN A UTILITY PERMIT FROM SANTA ROSA

COUNTY ROAD & BRIDGE PRIOR TO WORK WITHIN THE COUNTY

RIGHT-OF-WAY.

CONTRACTOR SHALL CONTACT SUNSHINE UTILITIES 48 HOURS PRIOR

TO CONSTRUCTION WITHIN THE RIGHT-OF-WAY.

SHEET

FL

LI

C

EN

S E

N O

D R A W

IN

G

N O

T V A

LI

D U

N

LE

S S S

IG

N

ED

A N D

S

EA

LE

D

B Y

EN

G

IN

EE

R O

F R

EC

O R D

FL

LI

C

EN

S E

N O

D A

TE

A

LA

N M

M

IL

LE

R

P.

E.

PA

U L

A M

C

LE

O D

JR

P

.E

E

V

IS

IO

N

S:

D

R A

W N

B Y

D

A T

E

C A

R O

L

IN

E S

T R

E

T O

N , F

L O

R

ID

A

SO

U

T H

E R

N S

IT

E

U

T

IL

IT

Y

D E

SI

G

N , I

N C

PH

0)

-9

E

-M A

IL

: s su d@ be lls ou th

.n et

SI

T

E P

L A

N S

SU

B D

IV

IS

IO

N

S

ST

O

R M

W A

T E

R M

A N

A G

E M

E N

T E

R O

SI

O

N C

O N

T R

O L

P L

A N

S

PO

T

A B

L E

W A

T E

R

S A

N

IT

A R

Y S

E W

E R

FL

O

R

ID

A C

E R

T

IF

IC

A

T E

O F

A U

T H

O R

IT

Y

N O

. 8

SI

T E

P L

A N

F O

R

SA

N

T A

R O

SA

C

O U

N T

Y A

D M

IN

IS

T R

A T

IO

N

C O

M

PL

H 9/

/2

1 inch = 10 feet

0 10 20 x

LEGEND:

POC

POB

R/W (D) (C) O.R.

PG.

SEC.

TE

--- SANITARY SEWER MANHOLE

--- FOUND

--- RIGHT-OF-WAY

--- DEED

--- CALCULATED

--- OFFICIAL RECORDS

--- PAGE

--- SECTION

--- TOP ELEVATION

--- GENERATOR/CONCRETE SLAB

--- ELECTRICAL PANEL BOX

--- WATER VALVE

--- SANITARY SEWER MANHOLE

--- BACKFLOW PREVENTER

--- WATER METER

--- UTILITY VAULT

--- LIGHT POLE

--- POWER POLE

--- GUY ANCHOR

--- FIRE HYDRANT

--- TELEPHONE PEDESTAL

--- BOLLARD (WOOD OR METAL)

--- BURIED FIBER OPTIC CABLE MARKER

--- BURIED GAS MARKER

--- DELINEATOR POST

--- GROUND LIGHTING

--- SANITARY SEWER CLEANOUT

--- SERVICE POLE

--- LIFT STATION

--- DECORATIVE POLE

--- IRON GUARDRAIL

--- HOG WIRE FENCEXX

--- SIGN & POST

--- ASPHALT AREA

--- CONCRETE AREA

IE --- INVERT ELEVATION

RCP --- REINFORCED CONCRETE PIPE

FFE --- FINISH FLOOR ELEVATION

--- OAK TREE & SIZE

--- MAGNOLIA TREE & SIZE

--- CYPRESS TREE & SIZE

--- MAPLE TREE & SIZE

--- EXISTING CURB CUT

--- EXISTING SPOT ELEVATION

--- EXISTING CONTOUR

--- SPRINKLER HEAD

--- GUARDRAIL & POST

FND.

R/W

--- POINT OF COMMENCEMENT

--- POINT OF BEGINNING

C-C

--- BUSH OR SHRUB

--- PROPOSED PARKING LOT TREEST-#

--- PROPOSED FOCAL POINT ISLAND TREES

BASIN "A" 52,818 SF 1.22 AC.

BASIN "B" 72,280 SF 1.66 AC.

BASIN "C" 69,840 SF 1.60 AC.

BASIN "D" 41,627 SF 0.95 AC.

BASIN "E" 25,257 SF 0.58 AC.

BASIN "F" 28,355 SF 0.65 AC.

BASIN "G" 87,700 SF 2.01 AC.

BASIN "H" 3,683 SF 0.09 AC.

BASIN "I" 64,036 SF 1.47 AC.

BASIN SQ. FT. ACRES

EXISTING DRAINAGE INLETS

FOCAL POINT PLANTING GUIDE:

UTILIZE 1 GALLON OF MUHLY GRASS AND FAKAHATCHEE GRASS WITHIN FOCAL

POINT AREAS. PLANT @ THE RATES SHOWN BELOW AND EVENLY SPACED.

DISTRIBUTION SHALL ACHIEVE APPROX. 50% OF EACH SPECIES.

FOCAL POINT 1 = ±39 SF

- 15 SMALL PLANTS

FOCAL POINT 2 = ±39 SF

- 20 SMALL PLANTS

FOCAL POINT 3 = ±77 SF

- 30 SMALL PLANTS)

FOCAL POINT 4 = ±77 SF

- 30 SMALL PLANTS)

FOCAL POINT 5 = ±59 SF

- 25 SMALL PLANTS)

FOCAL POINT 6 = ±59 SF

- 25 SMALL PLANTS)

FOCAL POINT PLANTING GUIDE:

UTILIZE 1 GALLON OF MUHLY GRASS AND FAKAHATCHEE GRASS WITHIN FOCAL

POINT AREAS. PLANT @ THE RATES SHOWN BELOW AND EVENLY SPACED.

DISTRIBUTION SHALL ACHIEVE APPROX. 50% OF EACH SPECIES.

FOCAL POINT 7 = ±32 SF

- 15 SMALL PLANTS

FOCAL POINT 8 = ±32 SF

- 15 SMALL PLANTS

FOCAL POINT 9 = ±24 SF

- 10 SMALL PLANTS)

AutoCAD SHX Text

STOP

AutoCAD SHX Text

CALL SUNSHINE

AutoCAD SHX Text 800-432-4770

AutoCAD SHX Text

PRIOR TO CONSTRUCTION:

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 4"

AutoCAD SHX Text 5"

AutoCAD SHX Text 4"

AutoCAD SHX Text 2"

AutoCAD SHX Text 129.87

AutoCAD SHX Text

EX. STRUCTURE

AutoCAD SHX Text 18.32'

AutoCAD SHX Text

GRATE

AutoCAD SHX Text

INVERT EL. (IN)

AutoCAD SHX Text 18.32'

AutoCAD SHX Text D1

AutoCAD SHX Text 21.68'

AutoCAD SHX Text D2

AutoCAD SHX Text 20.38'

AutoCAD SHX Text D3

AutoCAD SHX Text 20.21'

AutoCAD SHX Text D4

AutoCAD SHX Text 19.68'

AutoCAD SHX Text D5

AutoCAD SHX Text 19.57'

AutoCAD SHX Text

INVERT EL. (OUT)

AutoCAD SHX Text 18.06'

AutoCAD SHX Text 18.00'

AutoCAD SHX Text 17.84'

AutoCAD SHX Text 17.72'

AutoCAD SHX Text 17.40'

AutoCAD SHX Text 17.40'

AutoCAD SHX Text 17.31'

AutoCAD SHX Text 17.33'

AutoCAD SHX Text D6

AutoCAD SHX Text 19.57'

AutoCAD SHX Text N/A

T-10T-9

FOCAL POINT 2

(SEE DETAIL)

FOCAL POINT 1

(SEE DETAIL)

FOCAL POINT 4

(SEE DETAIL)

FOCAL POINT 8

(SEE DETAIL)

FOCAL POINT 7

(SEE DETAIL)

12" CONNECTION

(HDPE PIPE)

DOMED OVERFLOW STRUCTURE

TOP: 20.2

INV: 17.7

12" CONNECTION

(HDPE PIPE)

4" R-TANK CONNECTION

(HDPE PIPE)

DOMED OVERFLOW STRUCTURE

TOP: 20.2

INV: 17.7

EX. PIPE 3B

EX. PIPE 3A

EX. PIPE 2B

EX. PIPE 2A

EX. PIPE 1B

EX. PIPE 1A

4" R-TANK CONNECTION

(HDPE PIPE)

4" R-TANK CONNECTION

(HDPE PIPE)

EX. STRUCTURE - D1

EX. STRUCTURE - D2

EX. STRUCTURE - D3

TEE

TEE

TEE

POND CYPRESS TREE BOX

TOP EL: 21.1

PIPE INV @ EDGE OF

TREE BOX: 18.6

4" PIPE

(HDPE PIPE)

4" PIPE (HDPE PIPE)

4" PIPE

4" PIPE

4" PIPE

(HDPE PIPE)

4" PIPE

(HDPE PIPE)

21.1

20.17

20.1720.621.0

21.35 21.83

22.19

21.43

21.99

20.17

21.0

20.17

20.25

20.62

20.5

21.14

20.7 20.91

21.6 21.32

21.05

20.9

21.0 20.72 20.4

20.5

20.2 20.2 20.34

20.5

20.54

20.47 20.6

21.31

21.17

21.02

20.73

21.21

20.44 20.15

20.53

19.86 19.86

20.05

20.46

20.26

20.2

20.47 20.68

20.17

20.57

SWEET BAY TREE BOX

TOP EL: 21.4

PIPE INV @ EDGE OF

TREE BOX: 18.9

POND CYPRESS TREE BOX

TOP EL: 21.53

PIPE INV @ EDGE OF

TREE BOX: 19.03

SWEET BAY TREE BOX

TOP EL: 21.37

PIPE INV @ EDGE OF

TREE BOX: 18.87

POND CYPRESS TREE BOX

TOP EL: 21.12

PIPE INV @ EDGE OF

TREE BOX: 18.62

SWEET BAY TREE BOX

TOP EL: 20.7

PIPE INV @ EDGE OF

TREE BOX: 18.2

4" R-TANK CONNECTION

(HDPE PIPE)4" R-TANK CONNECTION

(HDPE PIPE)

NEW TYPE "C"

DOGHOUSE INLET

TOP@ LOWEST

CURB CUT: 20.5

INV IN:17.934

INV OUT:17.926

NEW TYPE "C"

DOGHOUSE INLET

TOP@ LOWEST

CURB CUT: 20.57

INV IN:18.196

INV OUT:18.182

NEW TYPE "C"

DOGHOUSE INLET

TOP@ LOWEST

CURB CUT: 20.2

INV IN:17.702

INV OUT:17.697

BIO RETENTION AREAS CONTRACTOR MUST OBTAIN A UTILITY PERMIT FROM SANTA ROSA

COUNTY ROAD & BRIDGE PRIOR TO WORK WITHIN THE COUNTY

RIGHT-OF-WAY.

CONTRACTOR SHALL CONTACT SUNSHINE UTILITIES 48 HOURS PRIOR

TO CONSTRUCTION WITHIN THE RIGHT-OF-WAY.

SHEET

FL

LI

C

EN

S E

N O

D R A W

IN

G

N O

T V A

LI

D U

N

LE

S S S

IG

N

ED

A N D

S

EA

LE

D

B Y

EN

G

IN

EE

R O

F R

EC

O R D

FL

LI

C

EN

S E

N O

D A

TE

A

LA

N M

M

IL

LE

R

P.

E.

PA

U L

A M

C

LE

O D

JR

P

.E

E

V

IS

IO

N

S:

D

R A

W N

B Y

D

A T

E

C A

R O

L

IN

E S

T R

E

T O

N , F

L O

R

ID

A

SO

U

T H

E R

N S

IT

E

U

T

IL

IT

Y

D E

SI

G

N , I

N C

PH

0)

-9

E

-M A

IL

: s su d@ be lls ou th

.n et

SI

T

E P

L A

N S

SU

B D

IV

IS

IO

N

S

ST

O

R M

W A

T E

R M

A N

A G

E M

E N

T E

R O

SI

O

N C

O N

T R

O L

P L

A N

S

PO

T

A B

L E

W A

T E

R

S A

N

IT

A R

Y S

E W

E R

FL

O

R

ID

A C

E R

T

IF

IC

A

T E

O F

A U

T H

O R

IT

Y

N O

. 8

SI

T E

P L

A N

F O

R

SA

N

T A

R O

SA

C

O U

N T

Y A

D M

IN

IS

T R

A T

IO

N

C O

M

PL

H 9/

/2

1 inch = 10 feet

0 10 20 x

LEGEND:

POC

POB

R/W (D) (C) O.R.

PG.

SEC.

TE

--- SANITARY SEWER MANHOLE

--- FOUND

--- RIGHT-OF-WAY

--- DEED

--- CALCULATED

--- OFFICIAL RECORDS

--- PAGE

--- SECTION

--- TOP ELEVATION

---…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .