SRC_Admin_Complex_-_Alternate_Bid.pdf

PDF 2 MB Posted

Attached to
Santa Rosa County Administration Building Green Infrastructure
Solicitation number
26-010
Issued by
Santa Rosa County, Mount Carmel CDP, Florida

About this file

This is a site plan and landscaping design document for the Santa Rosa County Administration Complex prepared by Southern Site & Utility Design, Inc., featuring an alternate bid configuration for green infrastructure improvements in Milton, Florida. The project encompasses the development of a parking area with permeable pavement totaling approximately 30,720 square feet distributed across multiple zones, along with comprehensive landscaping that includes 16 proposed canopy trees (meeting the requirement of one tree per 12 parking spaces for 181 total parking spaces), nine focal point islands with ornamental plantings including muhly grass, fakahatchee grass, canna lilies, blue flag iris, cardinal flowers, black-eyed susans, swamp hibiscus, and blazing star, and four specimen trees consisting of Florida maple, sweet bay, and pond cypress varieties. The site plan details asphalt and concrete construction areas, parking lot configuration with ribbon and stand-up curbs, drainage inlets with specified invert elevations, utility infrastructure including water valves, sanitary sewer cleanouts, and electrical components, and permeable pavement areas designed for stormwater management. All disturbed areas without permanent cover are to be sodded with centipede grass. The document requires contractors to obtain utility permits from Santa Rosa County Road & Bridge prior to work in the county right-of-way and to contact Sunshine Utilities at 800-432-4770 a minimum of 48 hours before construction commences.

The site plan is sealed and valid only when signed by the engineers of record—Alan M. Miller, P.E. (Florida License No. 58697) and Paula A. McLeod, Jr., P.E. (Florida License No. 53577)—dated October 30, 2025. The design includes detailed grading with spot elevations, existing and proposed drainage infrastructure with measured invert elevations ranging from 17.31 to 21.68 feet, and landscape specifications requiring even distribution of plant species within focal point areas containing between 10 and 30 small plants depending on the focal point size. The document identifies multiple adjacent property owners including Milton 6 LLC, Perritt Karen Elaine, Owens Real Investments LLC, McDonald's Restaurants of Florida Inc., and Santa Rosa County Federal Credit Union, indicating the project's location within a mixed-use area. The site plan was drawn at a scale of 1 inch equals 40 feet and contains comprehensive utility marking legends, parking lot requirements calculations, and detailed invert elevation data for drainage design.

View the file

Other files

File Type Posted
Portable_Toilet_and_Restroom_Trailer_Rental_(Addendum_#1_Revision).pdf PDF
Portable_Toilet_and_Restroom_Trailer_Rental_(Addendum_#1_Revision).pdf PDF
Term_Contract_Agreement_(General_or_Professional_Services)_.pdf PDF
Term_Contract_Agreement_(General_or_Professional_Services)_.pdf PDF
PAYMENT_BOND.pdf PDF
PERFORMANCE_BOND.pdf PDF
PERFORMANCE_BOND.pdf PDF
PAYMENT_BOND.pdf PDF
Santa_Rosa_County_Administration_Building_Green_Infrastructure_(Addendum_#5_Revision).pdf PDF
Santa_Rosa_County_Administration_Building_Green_Infrastructure_(Addendum_#5_Revision).pdf PDF
SRC_Admin_Complex_-_Submittal_2.pdf PDF
SRC_Admin_Complex_-_Submittal_2.pdf PDF
Alternate_Bid_Pricing_Table_Revision_2.6.26.xlsx XLSX spreadsheet
Alternate_Bid_Pricing_Table_Revision_2.6.26.xlsx XLSX spreadsheet
Base_Bid_Pricing_Table_Revision_2.6.26.xlsx XLSX spreadsheet
Base_Bid_Pricing_Table_Revision_2.6.26.xlsx XLSX spreadsheet
Santa_Rosa_County_Administration_Building_Green_Infrastructure.pdf PDF
Draft_Contract_Federal_Santa_Rosa_County_Administration_Building_Green_Infrastructure.pdf PDF
Draft_Contract_Federal_Santa_Rosa_County_Administration_Building_Green_Infrastructure.pdf PDF
Draft_Contract_Federal_Santa_Rosa_County_Administration_Building_Green_Infrastructure.pdf PDF
2022_EPA_MX-02D19622_SRC_Admin_Complex_Grant_Agreement.pdf PDF
2022_EPA_MX-02D19622_SRC_Admin_Complex_Grant_Agreement.pdf PDF
2022_EPA_MX-02D19622_SRC_Admin_Complex_Grant_Agreement.pdf PDF
Alternative_Bid_Pricing_Table_SRC_Administration_Building_GI_(3).xlsx XLSX spreadsheet
Alternative_Bid_Pricing_Table_SRC_Administration_Building_GI_(3).xlsx XLSX spreadsheet
Alternative_Bid_Pricing_Table_SRC_Administration_Building_GI_(3).xlsx XLSX spreadsheet
Base_Bid_Pricing_Table_SRC_Administration_Building_GI_(3)_Rev3.xlsx XLSX spreadsheet
Base_Bid_Pricing_Table_SRC_Administration_Building_GI_(3)_Rev3.xlsx XLSX spreadsheet
Base_Bid_Pricing_Table_SRC_Administration_Building_GI_(3)_Rev3.xlsx XLSX spreadsheet
SRC_Admin_Complex_Specs_Binder_rev1.pdf PDF
SRC_Admin_Complex_Specs_Binder_rev1.pdf PDF
SRC_Admin_Complex_Specs_Binder_rev1.pdf PDF
SRC_Admin_Complex_-_Alternate_Bid.pdf PDF
SRC_Admin_Complex_-_Alternate_Bid.pdf PDF
SRC_Admin_Complex_-_Submittal_1_(002).pdf PDF
SRC_Admin_Complex_-_Submittal_1_(002).pdf PDF
SRC_Admin_Complex_-_Submittal_1_(002).pdf PDF
2024_USEPA_Grant_Agreement_Time_Extension.pdf PDF
2024_USEPA_Grant_Agreement_Time_Extension.pdf PDF
2024_USEPA_Grant_Agreement_Time_Extension.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ONE-STORY

BUILDING

XX

XX

XX

XX

XX

XX

XX

PROPOSED PERMEABLE

PAVEMENT AREA

±3,300 SF

PROPOSED PERMEABLE

PAVEMENT AREA

±5,700 SF

PROPOSED PERMEABLE

PAVEMENT AREA

±5,700 SF

FOCAL POINT 5

(SEE DETAIL)

FOCAL POINT 3

(SEE DETAIL)

FOCAL POINT 6

(SEE DETAIL)

FOCAL POINT 2

(SEE DETAIL)

FOCAL POINT 1

(SEE DETAIL) FOCAL POINT 4

(SEE DETAIL)

FOCAL POINT 8

(SEE DETAIL)

FOCAL POINT 7

(SEE DETAIL)

FOCAL POINT 9

(SEE DETAIL)

T-3 T-4

T-6 T-7

T-11 T-12

T-14 T-15

PROPOSED PERMEABLE

PAVEMENT AREA

±5,750 SF

PROPOSED PERMEABLE

PAVEMENT AREA

±5,770 SF

PROPOSED PERMEABLE

PAVEMENT AREA

±3,850 SF

T-5

T-8

T-10T-9

T-13

T-16

T-1 T-2

8" RIBBON

CURB

STAND UP

CURB

STAND UP

CURB

STAND UP

CURB

STAND UP

CURB

8" RIBBON

CURB

8" RIBBON

CURB

8" RIBBON

CURB

8" RIBBON

CURB

8" RIBBON

CURB

STAND UP

CURB

STAND UP

CURB

STAND UP

CURB

STAND UP

CURB

R10'

R10' (TYP.)

R4' (TYP.)

R10'(TYP.)

R10' (TYP.)

R4' (TYP.)

R10' (TYP.)

R4' (TYP.)

R10' (TYP.)

R4' (TYP.)

R4' (TYP.)

R10' (TYP.)

R4' (TYP.)

R10' (TYP.)

R10' (TYP)

R10' (TYP.)

R10' (TYP.)

24.76

24.93 23.88 22.84 22.84

23.4

23.96

22.84

24.06

22.62

22.16 21.7

22.17

23.82 22.75

21.68

21.68

21.84

22.58

22.01

22.18

21.1

20.17

20.1720.621.0

21.35 21.83

22.19

21.43

21.99

20.17

21.0

20.17

20.25

20.62

20.5

21.14

20.7 20.91

21.6 21.32

21.05

20.9

21.0 20.72 20.4

20.5

20.2 20.2 20.34

20.5

20.54

20.47 20.6

21.31

21.17

21.02

20.73

21.21

20.44 20.15

20.53

19.86 19.86

20.05

20.46

20.26

20.2

20.47 20.68

23.8

20.17

20.57

CONSTRUCT NEW

ASPHALT PER DETAILS

CONSTRUCT NEW

ASPHALT PER DETAILS

CONSTRUCT NEW

ASPHALT PER DETAILS

STAND UP

CURB

STAND UP

CURB

STOP SIGN &

STOP BAR

STOP SIGN &

STOP BAR

STOP SIGN &

STOP BAR

STOP SIGN &

STOP BAR

STOP SIGN &

STOP BAR

STOP SIGN &

STOP BAR

STOP SIGN &

STOP BAR

STOP SIGN &

STOP BAR

STOP SIGN &

STOP BAR

STOP SIGN &

STOP BAR

STOP SIGN &

STOP BAR

STOP SIGN &

STOP BAR

STOP SIGN &

STOP BAR

VERIFY EX, UTILITY DEPTHS,

CONTACT ENGINEER IF

ANY CONFLICT

TREE BOX URBAN

FORREST (TYP)

TREE BOX URBAN

FORREST (TYP)

TREE BOX URBAN

FORREST (TYP)

TREE BOX URBAN

FORREST (TYP)

TREE BOX URBAN

FORREST (TYP)

STOP SIGN &

STOP BAR

FOCAL POINT 3 -

SOD ISLAND & PLANT

186 MUHLY GRASS

186 FAKAHATCHEE

FOCAL POINT 5 -

SOD ISLAND & PLANT

500 MUHLY GRASS

500 FAKAHATCHEE

FOCAL POINT 6 -

SOD ISLAND & PLANT

400 MUHLY GRASS

400 FAKAHATCHEE

FOCAL POINT 1 & 2 -

SOD ISLAND & PLANT

850 MUHLY GRASS

850 FAKAHATCHEE

FOCAL POINT 7 & 8 -

SOD ISLAND & PLANT

771 MUHLY GRASS

771 FAKAHATCHEE

FOCAL POINT 3 -

SOD ISLAND & PLANT

267 MUHLY GRASS

267 FAKAHATCHEE

FOCAL POINT 9 -

SOD ISLAND & PLANT

48 CANNA LILY

48 BLUE FLAG IRIS

48 CARDINAL FLOWER

48 BLACK EYED SUSAN

48 SWAMP HIBISCUS

48 BLAZING STAR

1 FLORIDA MAPLE

SWEET

BAY TREE

SWEET

BAY TREE

SWEET

BAY TREE

POND

CYPRESS TREE

POND

CYPRESS TREE

POND

CYPRESS TREE

21.7

19.5

19.5

LANDSCAPING PLAN

CONTRACTOR MUST OBTAIN A UTILITY PERMIT FROM SANTA ROSA

COUNTY ROAD & BRIDGE PRIOR TO WORK WITHIN THE COUNTY

RIGHT-OF-WAY.

CONTRACTOR SHALL CONTACT SUNSHINE UTILITIES 48 HOURS PRIOR

TO CONSTRUCTION WITHIN THE RIGHT-OF-WAY.

SHEET

FL

LI

C

EN

S E

N O

D R A W

IN

G

N O

T V A

LI

D U

N

LE

S S S

IG

N

ED

A N D

S

EA

LE

D

B Y

EN

G

IN

EE

R O

F R

EC

O R D

FL

LI

C

EN

S E

N O

D A

TE

A

LA

N M

M

IL

LE

R

P.

E.

PA

U L

A

M C

LE

O

D

JR

P .E

2.

3.

4.

1.

R E

V

IS

IO

N

S:

D

R A

W N

B Y

D

A T

E

C A

R O

L

IN

E S

T R

E E

T

M

IL

T O

N , F

L O

R

ID

A

SO

U

T H

E R

N S

IT

E

U

T

IL

IT

Y

D E

SI

G

N , I

N C

PH

0)

-9

E

-M A

IL

: s su d@ be lls ou th

.n et

SI

T

E P

L A

N S

SU

B D

IV

IS

IO

N

S

ST

O

R M

W A

T E

R M

A N

A G

E M

E N

T E

R O

SI

O

N C

O N

T R

O L

P L

A N

S

PO

T

A B

L E

W A

T E

R

S A

N

IT

A R

Y S

E W

E R

FL

O

R

ID

A C

E R

T

IF

IC

A

T E

O F

A U

T H

O R

IT

Y

N O

. 8

SI

T E

P L

A N

F O

R

SA

N

T A

R O

SA

C

O U

N T

Y A

D M

IN

IS

T R

A T

IO

N

C O

M

PL

E X

B A

H

/3 0/

1 inch = 40 feet

0 40 80 x

LEGEND:

POC

POB

R/W (D) (C)

O.R.

PG.

SEC.

TE

--- SANITARY SEWER MANHOLE

--- FOUND

--- RIGHT-OF-WAY

--- DEED

--- CALCULATED

--- OFFICIAL RECORDS

--- PAGE

--- SECTION

--- TOP ELEVATION

--- GENERATOR/CONCRETE SLAB

--- ELECTRICAL PANEL BOX

--- WATER VALVE

--- SANITARY SEWER MANHOLE

--- BACKFLOW PREVENTER

--- WATER METER

--- UTILITY VAULT

--- LIGHT POLE

--- POWER POLE

--- GUY ANCHOR

--- FIRE HYDRANT

--- TELEPHONE PEDESTAL

--- BOLLARD (WOOD OR METAL)

--- BURIED FIBER OPTIC CABLE MARKER

--- BURIED GAS MARKER

--- DELINEATOR POST

--- GROUND LIGHTING

--- SANITARY SEWER CLEANOUT

--- SERVICE POLE

--- LIFT STATION

--- DECORATIVE POLE

--- IRON GUARDRAIL

--- HOG WIRE FENCEXX

--- SIGN & POST

--- ASPHALT AREA

--- CONCRETE AREA

IE --- INVERT ELEVATION

RCP --- REINFORCED CONCRETE PIPE

FFE --- FINISH FLOOR ELEVATION

--- OAK TREE & SIZE

--- MAGNOLIA TREE & SIZE

--- CYPRESS TREE & SIZE

--- MAPLE TREE & SIZE

--- EXISTING CURB CUT

--- EXISTING SPOT ELEVATION

--- EXISTING CONTOUR

--- SPRINKLER HEAD

--- GUARDRAIL & POST

FND.

R/W

--- POINT OF COMMENCEMENT

--- POINT OF BEGINNING

C-C

--- BUSH OR SHRUB

--- PROPOSED PARKING LOT TREEST-#

--- PROPOSED FOCAL POINT ISLAND TREES

PARKING LOT REQUIREMENTS

1 NEW TREE PER 12 PARKING SPACES = TOTAL NUMBER OF CANOPY TREES

181 TOTAL PARKING SPACES / 12 = 15.1 OR 16 CANOPY TREES REQUIRED.

- PROPOSED TREES: T-1 THRU T-16

EXISTING DRAINAGE INLETS

FOCAL POINT PLANTING GUIDE:

UTILIZE 1 GALLON OF MUHLY GRASS AND FAKAHATCHEE GRASS WITHIN FOCAL

POINT AREAS. PLANT @ THE RATES SHOWN BELOW AND EVENLY SPACED.

DISTRIBUTION SHALL ACHIEVE APPROX. 50% OF EACH SPECIES.

FOCAL POINT 1 = ±39 SF

- 15 SMALL PLANTS

FOCAL POINT 2 = ±39 SF

- 20 SMALL PLANTS

FOCAL POINT 3 = ±77 SF

- 30 SMALL PLANTS)

FOCAL POINT 4 = ±77 SF

- 30 SMALL PLANTS)

FOCAL POINT 5 = ±59 SF

- 25 SMALL PLANTS)

FOCAL POINT 6 = ±59 SF

- 25 SMALL PLANTS)

PLANTINGS SHALL BE SELECTED TO ACHIEVE AN EVEN

DISTRIBUTION OF MULTIPLE SPECIES.

PLANTINGS OTHER THAN TREES INDICATED SHALL BE A

50/50 MIXTURE OF 1 GALLON MUHLY GRASS AND 1

GALLON FAKAHATCHEE GRASS

ALL DISTURBED AREAS THAT DO NOT HAVE A

PERMANENT COVER SHALL BE SODDED WITH

CENTIPEDE GRASS.

FOCAL POINT PLANTING GUIDE:

UTILIZE 1 GALLON OF MUHLY GRASS AND FAKAHATCHEE GRASS WITHIN FOCAL

POINT AREAS. PLANT @ THE RATES SHOWN BELOW AND EVENLY SPACED.

DISTRIBUTION SHALL ACHIEVE APPROX. 50% OF EACH SPECIES.

FOCAL POINT 7 = ±32 SF

- 15 SMALL PLANTS

FOCAL POINT 8 = ±32 SF

- 15 SMALL PLANTS

FOCAL POINT 9 = ±24 SF

- 10 SMALL PLANTS)

ALTERNATE BID SITE

ALTERNATE BID SITE

AutoCAD SHX Text 23.97

AutoCAD SHX Text 24.14

AutoCAD SHX Text 23.97

AutoCAD SHX Text MILTON 6501 LLC 440 MONTICELLO AVE, STE 1700 NORFOLK, VA 23510 Parcel No. 04-1N-28-0000-10001-0000 Zoned: CITY FLU: CITY/TOWN ELU: CITY

AutoCAD SHX Text PERRITT KAREN ELAINE ET AL* C/O BETSY PINKARD 4275 S. SPENCER FIELD RD. PACE, FL Parcel No. 09-1N-28-0000-06500-0000 Zoned: HCD FLU: COMM ELU: SIVICUL

AutoCAD SHX Text OWENS REAL INVESTMENTS LLC 1447 PENTON RD. MILTON, FL Parcel No. 09-1N-28-0000-02100-0000 Zoned: CITY FLU: CITY/TOWN ELU: CITY

AutoCAD SHX Text MCDONALDS RESTAURANTS OF FLORIDA INC P.O. BOX 182571 COLUMBUS, OH 43218-2571 BOX 182571 COLUMBUS, OH 43218-2571 OH 43218-2571 Parcel No. 09-1N-28-0000-02100-0000 Zoned: CITY FLU: CITY/TOWN ELU: CITY

AutoCAD SHX Text SANTA ROSA COUNTY FEDERAL CREDIT UNION P.O. BOX 841 MILTON, FL BOX 841 MILTON, FL Parcel No. 09-1N-28-0000-02701-0000 Zoned: CITY FLU: CITY/TOWN ELU: CITY

AutoCAD SHX Text

STOP

AutoCAD SHX Text

CALL SUNSHINE

AutoCAD SHX Text 800-432-4770

AutoCAD SHX Text

PRIOR TO CONSTRUCTION:

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 4"

AutoCAD SHX Text 5"

AutoCAD SHX Text 4"

AutoCAD SHX Text 2"

AutoCAD SHX Text 129.87

AutoCAD SHX Text

PARKING AREA LANDSCAPE PLANTING

AutoCAD SHX Text

EX. STRUCTURE

AutoCAD SHX Text 18.32'

AutoCAD SHX Text

GRATE

AutoCAD SHX Text

INVERT EL. (IN)

AutoCAD SHX Text 18.32'

AutoCAD SHX Text D1

AutoCAD SHX Text 21.68'

AutoCAD SHX Text D2

AutoCAD SHX Text 20.38'

AutoCAD SHX Text D3

AutoCAD SHX Text 20.21'

AutoCAD SHX Text D4

AutoCAD SHX Text 19.68'

AutoCAD SHX Text D5

AutoCAD SHX Text 19.57'

AutoCAD SHX Text

INVERT EL. (OUT)

AutoCAD SHX Text 18.06'

AutoCAD SHX Text 18.00'

AutoCAD SHX Text 17.84'

AutoCAD SHX Text 17.72'

AutoCAD SHX Text 17.40'

AutoCAD SHX Text 17.40'

AutoCAD SHX Text 17.31'

AutoCAD SHX Text 17.33'

AutoCAD SHX Text D6

AutoCAD SHX Text 19.57'

AutoCAD SHX Text N/A

AutoCAD SHX Text 20.29'

Sheets and Views
Landscaping Plan

File details come from the government source that posted it. Updated .