Base_Bid_Pricing_Table_Revision_2.6.26.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
Santa Rosa County Administration Building Green Infrastructure
Solicitation number
26-010
Issued by
Santa Rosa County, Mount Carmel CDP, Florida

About this file

This Base Bid Pricing Table from Santa Rosa County, Florida details line item costs for the Santa Rosa County Administration Building Green Infrastructure project. The project encompasses site preparation, structural work, stormwater management systems, and landscaping improvements across 35 distinct line items with quantities ranging from single jobs to 30,150 square feet of pervious pavers. Key deliverables include clearing and grubbing, structure removal, nine focal point biofilter systems with earthfill and overflow components, six urban forest tree boxes, HDPE piping in three diameters totaling 792 linear feet, asphalt work, concrete structures including inlets and curbing, steel reinforcement, rock riprap aggregates totaling 1,400 tons, geotextile materials, underground storage tanks, and vegetative plantings. A pre-bid conference was scheduled for January 12, 2026, at 10:00 a.m. at 6051 Old Bagdad Highway, Suite 301, Milton in the Engineering/Environmental Conference Room. The proposal submission deadline is February 20, 2026, at 10:00 a.m. through the Santa Rosa County Procurement Portal, with questions accepted through February 13, 2026, at 12:00 p.m.

The pricing table does not display unit costs or total bid amounts, indicating this is a revision document pending cost entry by bidders. Santa Rosa County encourages participation from small businesses, minority-owned enterprises, women-owned enterprises, and disadvantaged business enterprises. The County reserves the right to waive bid irregularities, reject any or all bids for documented reasons, and award contracts based on the determination of best value to Santa Rosa County. Contract terms and renewal options are not specified in this pricing document.

View the file

Other files

File Type Posted
Portable_Toilet_and_Restroom_Trailer_Rental_(Addendum_#1_Revision).pdf PDF
Portable_Toilet_and_Restroom_Trailer_Rental_(Addendum_#1_Revision).pdf PDF
Term_Contract_Agreement_(General_or_Professional_Services)_.pdf PDF
Term_Contract_Agreement_(General_or_Professional_Services)_.pdf PDF
PAYMENT_BOND.pdf PDF
PAYMENT_BOND.pdf PDF
PERFORMANCE_BOND.pdf PDF
PERFORMANCE_BOND.pdf PDF
Santa_Rosa_County_Administration_Building_Green_Infrastructure_(Addendum_#5_Revision).pdf PDF
Santa_Rosa_County_Administration_Building_Green_Infrastructure_(Addendum_#5_Revision).pdf PDF
SRC_Admin_Complex_-_Submittal_2.pdf PDF
SRC_Admin_Complex_-_Submittal_2.pdf PDF
Alternate_Bid_Pricing_Table_Revision_2.6.26.xlsx XLSX spreadsheet
Alternate_Bid_Pricing_Table_Revision_2.6.26.xlsx XLSX spreadsheet
Base_Bid_Pricing_Table_Revision_2.6.26.xlsx XLSX spreadsheet
Santa_Rosa_County_Administration_Building_Green_Infrastructure.pdf PDF
Draft_Contract_Federal_Santa_Rosa_County_Administration_Building_Green_Infrastructure.pdf PDF
Draft_Contract_Federal_Santa_Rosa_County_Administration_Building_Green_Infrastructure.pdf PDF
Draft_Contract_Federal_Santa_Rosa_County_Administration_Building_Green_Infrastructure.pdf PDF
2022_EPA_MX-02D19622_SRC_Admin_Complex_Grant_Agreement.pdf PDF
2022_EPA_MX-02D19622_SRC_Admin_Complex_Grant_Agreement.pdf PDF
2022_EPA_MX-02D19622_SRC_Admin_Complex_Grant_Agreement.pdf PDF
Alternative_Bid_Pricing_Table_SRC_Administration_Building_GI_(3).xlsx XLSX spreadsheet
Alternative_Bid_Pricing_Table_SRC_Administration_Building_GI_(3).xlsx XLSX spreadsheet
Alternative_Bid_Pricing_Table_SRC_Administration_Building_GI_(3).xlsx XLSX spreadsheet
Base_Bid_Pricing_Table_SRC_Administration_Building_GI_(3)_Rev3.xlsx XLSX spreadsheet
Base_Bid_Pricing_Table_SRC_Administration_Building_GI_(3)_Rev3.xlsx XLSX spreadsheet
Base_Bid_Pricing_Table_SRC_Administration_Building_GI_(3)_Rev3.xlsx XLSX spreadsheet
SRC_Admin_Complex_Specs_Binder_rev1.pdf PDF
SRC_Admin_Complex_Specs_Binder_rev1.pdf PDF
SRC_Admin_Complex_Specs_Binder_rev1.pdf PDF
SRC_Admin_Complex_-_Alternate_Bid.pdf PDF
SRC_Admin_Complex_-_Alternate_Bid.pdf PDF
SRC_Admin_Complex_-_Alternate_Bid.pdf PDF
SRC_Admin_Complex_-_Submittal_1_(002).pdf PDF
SRC_Admin_Complex_-_Submittal_1_(002).pdf PDF
SRC_Admin_Complex_-_Submittal_1_(002).pdf PDF
2024_USEPA_Grant_Agreement_Time_Extension.pdf PDF
2024_USEPA_Grant_Agreement_Time_Extension.pdf PDF
2024_USEPA_Grant_Agreement_Time_Extension.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Untitled

Line ItemDescriptionQuantityUnit of MeasureUnit CostTotal
1Clearing and Grubbing1Job
2Structure Removal1Job
3Pollution Control1Job
4Construction Surveys1Job
5Mobilization and Demobilization1Job
6Traffic Control1Job
6Water for Construction1Lump Sum
7Removal of Water1Lump Sum
7Biofilters-Focal Point 1-9 Complete and In Place
1Lump Sum
7Excavation-Focal Point 1-9 Per Plans
1Lump Sum
7Earthfill-Placement of Earth Material1Lump Sum
8Earthfill-Focal Point 1-Complete and In Place (Domed Overflows are considered a part of the Focal Point system)1Lump Sum
9Earthfill-Focal Point 2-Complete and In Place (Domed Overflows are considered a part of the Focal Point system)1Lump Sum
10Earthfill-Focal Point 3-Complete and In Place (Domed Overflows are considered a part of the Focal Point system)1Lump Sum
11Earthfill-Focal Point 4-Complete and In Place (Domed Overflows are considered a part of the Focal Point system)1Lump Sum
12Earthfill-Focal Point 5-Complete and In Place (Domed Overflows are considered a part of the Focal Point system)1Lump Sum
13Earthfill-Focal Point 6-Complete and In Place (Domed Overflows are considered a part of the Focal Point system)1Lump Sum
14Earthfill-Focal Point 7-Complete and In Place (Domed Overflows are considered a part of the Focal Point system)1Lump Sum
15Earthfill-Focal Point 8-Complete and In Place (Domed Overflows are considered a part of the Focal Point system)1Lump Sum
16Earthfill-Focal Point 9-Complete and In Place (Domed Overflows are considered a part of the Focal Point system)1Lump Sum
17Earthfill-Urban Forest Tree Boxes-Complete and In Place6Each
17Excavation-Urban Forest Tree Boxes Per Plans
1Lump Sum
17Drainfill-Within Focal Point and Urban Forest Systems1Lump Sum
18Topsoiling1Job
19Structure Concrete-Inlets,FDOT Type C(Doghouse/Cast in Place)3Each
20Structure Concrete-Curbing-Replace Standup Curbs1Job
21Structure Concrete-Ribbon Curb Border At Pervious Pavers And Riprap Channels2400Linear Feet
22Structure Concrete-Mitered End Section1Each
23Asphalt-Subgrade, Base, and Asphalt Surface at New Pipe Crossings1Job
24Asphalt-Thermoplastic Striping1Job
23Steel Reinforcement-For Concrete Structures1Lump Sum
25Plastic Pipe-4" Diam. HDPE Pipe316Linear Feet
26Plastic Pipe-12" Diam. HDPE Pipe392Linear Feet
27Plastic Pipe-15" Diam. HDPE Pipe84Linear Feet
28Rock Riprap-FDOT No. 57 Crushed Aggregate Beneath Class 1 Riprap100Ton
29Rock Riprap-FDOT No. 57 Crushed Aggregate Beneath Pavers1000Ton
30Rock Riprap-Drainage Swales within Landscape Islands300Ton
31Metal Fabrication and Installation-Street Signs, Handicap Parking Signs, and Stop Signs33Each
32Contractor Quality Control-Testing Etc.1Job
30Geotextile-within Focal Point and Urban Forest Systems1Lump Sum
33Vegetative Measures-Focal Point 1-9 Planting-Per Plans(plants and trees will be supplied by county)
1Lump Sum
34Vegetative Measures-sodding-centipede800Square Yards
32Underground Storage Tanks-R-tanks as Specified by Manufacturer(or approved equal)-Complete and In Place
1Lump Sum
33Excavation-PowerBlock Permeable Pavers Per Plans
1Lump Sum
35Pervious Pavers-PowerBlock as Specified by Manufacturer (or approved equal) Complete and In Place
30150Square Feet
Total$0.00