This is an Alternate Bid Pricing Table for the Santa Rosa County Administration Building Green Infrastructure project in Florida. The project encompasses comprehensive site development and stormwater management infrastructure improvements, with Santa Rosa County Board of County Commissioners serving as the procuring agency. The scope of work includes clearing and grubbing, structure removal, pollution control, construction surveys, mobilization and demobilization, traffic control, water management, excavation and earthfill operations for five focal points and urban forest tree boxes, concrete structures including inlets and curbing, asphalt work, steel reinforcement, plastic drainage piping in multiple diameters totaling 651 linear feet, rock riprap installation across various applications totaling 620 tons, metal fabrication for signage, quality control testing, geotextile installation, vegetative measures and sodding covering 800 square yards, underground storage tanks, and 14,700 square feet of permeable pavers. The bid pricing table lists 34 line items with quantities specified in lump sum, each, linear feet, tons, square yards, and job unit measures. The pre-bid meeting is scheduled for January 12, 2026, at 10:00 a.m. at 6051 Old Bagdad Highway, Suite 301, Milton in the Engineering/Environmental Conference Room. Questions must be submitted through the procurement portal by 12:00 p.m. on Friday, February 13, 2026, with sealed bid submissions due by 10:00 a.m. on Friday, February 20, 2026, through the Santa Rosa County Procurement Portal at https://procurement.opancov.com/portal/santarosafl, at which time bids will be publicly opened.
The pricing table does not display completed unit costs or total pricing, as all cost fields remain blank with a total of $0.00, indicating this is a template document for bidders to complete with their pricing proposals. Santa Rosa County encourages participation from small businesses, minority and women-owned businesses, and disadvantaged business enterprises. The County reserves the right to waive bid irregularities, reject any or all bids for documented reasons, and award contracts determined to be in the best interest of Santa Rosa County. No specific contract term, renewal options, incumbent information, funding sources, or budget parameters are detailed in this pricing table document.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Untitled
| Line Item | Description | Quantity | Unit of Measure | Unit Cost | Total |
| 1 | Clearing and Grubbing | 1 | Lump Sum | ||
| 2 | Structure Removal | 1 | Lump Sum | ||
| 3 | Pollution Control | 1 | Lump Sum | ||
| 4 | Construction Surveys | 1 | Lump Sum | ||
| 5 | Mobilization and Demobilization | 1 | Lump Sum | ||
| 6 | Traffic Control | 1 | Lump Sum | ||
| 6 | Water for Construction | 1 | Lump Sum | ||
| 7 | Removal of Water | 1 | Lump Sum | ||
| 7 | Excavation-Focal Point 1,2,3,4,9 Per Plans | ||||
| 1 | Lump Sum | ||||
| 7 | Earthfill-Placement of Earth Material | 1 | Lump Sum | ||
| 8 | Earthfill-Focal Point 1-Complete and In Place (Domed Overflows are considered a part of the Focal Point system) | 1 | Lump Sum | ||
| 9 | Earthfill-Focal Point 2-Complete and In Place (Domed Overflows are considered a part of the Focal Point system) | ||||
| 1 | Lump Sum | ||||
| 10 | Earthfill-Focal Point 3-Complete and In Place | ||||
| 1 | Lump Sum | ||||
| 11 | Earthfill-Focal Point 4-Complete and In Place | ||||
| 1 | Lump Sum | ||||
| 16 | Earthfill-Focal Point 9-Complete and In Place | ||||
| 1 | Lump Sum | ||||
| 17 | Excavation-Urban Forest Tree Boxes Per Plans | ||||
| 1 | Lump Sum | ||||
| 17 | Earthfill-Urban Forest Tree Boxes-provide and install | 4 | Each | ||
| 17 | Drainfill-Within Focal Point and Urban Forest Systems | 1 | Lump Sum | ||
| 18 | Topsoiling | 1 | Job | ||
| 19 | Structure Concrete-Inlets,FDOT Type C(Doghouse/Cast in Place) | 1 | Lump Sum | ||
| 20 | Structure Concrete-Curbing-Replace Standup Curbs | 1 | Lump Sum | ||
| 21 | Structure Concrete-Ribbon Curb Border At Pervious Pavers And Riprap Channels | 1600 | Linear Feet | ||
| 22 | Structure Concrete-Mitered End Section | 1 | Each | ||
| 23 | Asphalt-Subgrade, Base, and Asphalt Surface at New Pipe Crossings | 1 | Lump Sum | ||
| 24 | Asphalt-Thermoplastic Striping | 1 | Lump Sum | ||
| 23 | Steel Reinforcement-For Concrete Structures | 1 | Lump Sum | ||
| 25 | Plastic Pipe-4" Diam. HDPE Pipe | 175 | Linear Feet | ||
| 25 | Plastic Pipe-12" Diam. HDPE Pipe | 392 | Linear Feet | ||
| 26 | Plastic Pipe-15" Diam. HDPE Pipe | 84 | Linear Feet | ||
| 27 | Rock Riprap-FDOT No. 57 Crushed Aggregate Beneath Class 1 Riprap | 30 | Ton | ||
| 28 | Rock Riprap-FDOT No. 57 Crushed Aggregate Beneath Pavers | 500 | Ton | ||
| 29 | Rock Riprap-Drainage Swales within Landscape Islands | 90 | Ton | ||
| 30 | Metal Fabrication and Installation-Street Signs, Handicap Parking Signs, and Stop Signs | 10 | Each | ||
| 31 | Contractor Quality Control-Testing Etc. | 1 | Job | ||
| 30 | Geotextile-within Focal Point and Urban Forest Systems | 1 | Lump Sum | ||
| 32 | Vegetative Measures-Installation Focal Points 1-4 and 9-Per Plans(plants and trees will be supplied by county) | ||||
| 1 | Job | ||||
| 33 | Vegetative Measures-sodding-centipede | 800 | Square Yards | ||
| 32 | Underground Storage Tanks-R-tanks as Specified by Manufacturer(or approved equal) | 1 | Lump Sum | ||
| 33 | Excavation-PowerBlock Permeable Pavers Per Plans | ||||
| 1 | Lump Sum | ||||
| 34 | Pervious Pavers-PowerBlock as Specified by Manufacturer (or approved equal) | 14700 | Square Feet | ||
| Total | $0.00 |