This is an Alternative Bid Pricing Table for the Santa Rosa County Administration Building Green Infrastructure project in Florida. The pricing table outlines line items for construction work including site preparation, structural work, stormwater management infrastructure, and landscape installation. Key construction elements include clearing and grubbing, structure removal, pollution control, earthfill placement across multiple focal points, excavation for urban forest tree boxes, concrete structures (inlets and curbing), asphalt work, plastic piping (4-inch and 12-inch HDPE), rock riprap materials in varying quantities (100 to 1,000 tons), metal signage fabrication, geotextile installation, vegetative measures with sodding, underground storage tanks, and pervious pavers. Line items are referenced to specification numbers from a specifications binder and include quantities ranging from individual units to large material volumes, with most items priced on a lump sum basis. The pre-bid meeting was scheduled for January 12, 2026, at 10:00 a.m., with questions due by 12:00 p.m. on January 26, 2026, and sealed bid submissions due February 2, 2026, at 10:00 a.m. through the Santa Rosa County Procurement Portal.

The pricing table is structured as a template for bidders to submit unit costs for each line item, with all items marked as taxable. Specific quantities are identified for certain materials, including 316 linear feet of 4-inch HDPE pipe, 392 linear feet of 12-inch HDPE pipe, 100 tons of crushed aggregate beneath Class 1 riprap, 1,000 tons of crushed aggregate beneath pavers, 300 tons for drainage swales, 10 individual signs, 800 square yards of centipede sod, and 14,697 square feet of pervious pavers. The file contains a formatting error indicating "Lumjp Sum" for one mobilization line item. Santa Rosa County encourages participation from small businesses, minority and women-owned businesses, and disadvantaged business enterprises, with the Board retaining the right to waive irregularities, reject bids, and award based on the best interest determination.

View the file

Other files

File Type Posted
Portable_Toilet_and_Restroom_Trailer_Rental_(Addendum_#1_Revision).pdf PDF
Portable_Toilet_and_Restroom_Trailer_Rental_(Addendum_#1_Revision).pdf PDF
Term_Contract_Agreement_(General_or_Professional_Services)_.pdf PDF
Term_Contract_Agreement_(General_or_Professional_Services)_.pdf PDF
PAYMENT_BOND.pdf PDF
PERFORMANCE_BOND.pdf PDF
PERFORMANCE_BOND.pdf PDF
PAYMENT_BOND.pdf PDF
Santa_Rosa_County_Administration_Building_Green_Infrastructure_(Addendum_#5_Revision).pdf PDF
Santa_Rosa_County_Administration_Building_Green_Infrastructure_(Addendum_#5_Revision).pdf PDF
SRC_Admin_Complex_-_Submittal_2.pdf PDF
SRC_Admin_Complex_-_Submittal_2.pdf PDF
Alternate_Bid_Pricing_Table_Revision_2.6.26.xlsx XLSX spreadsheet
Alternate_Bid_Pricing_Table_Revision_2.6.26.xlsx XLSX spreadsheet
Base_Bid_Pricing_Table_Revision_2.6.26.xlsx XLSX spreadsheet
Base_Bid_Pricing_Table_Revision_2.6.26.xlsx XLSX spreadsheet
Santa_Rosa_County_Administration_Building_Green_Infrastructure.pdf PDF
Draft_Contract_Federal_Santa_Rosa_County_Administration_Building_Green_Infrastructure.pdf PDF
Draft_Contract_Federal_Santa_Rosa_County_Administration_Building_Green_Infrastructure.pdf PDF
Draft_Contract_Federal_Santa_Rosa_County_Administration_Building_Green_Infrastructure.pdf PDF
2022_EPA_MX-02D19622_SRC_Admin_Complex_Grant_Agreement.pdf PDF
2022_EPA_MX-02D19622_SRC_Admin_Complex_Grant_Agreement.pdf PDF
2022_EPA_MX-02D19622_SRC_Admin_Complex_Grant_Agreement.pdf PDF
Alternative_Bid_Pricing_Table_SRC_Administration_Building_GI_(3).xlsx XLSX spreadsheet
Alternative_Bid_Pricing_Table_SRC_Administration_Building_GI_(3).xlsx XLSX spreadsheet
Base_Bid_Pricing_Table_SRC_Administration_Building_GI_(3)_Rev3.xlsx XLSX spreadsheet
Base_Bid_Pricing_Table_SRC_Administration_Building_GI_(3)_Rev3.xlsx XLSX spreadsheet
Base_Bid_Pricing_Table_SRC_Administration_Building_GI_(3)_Rev3.xlsx XLSX spreadsheet
SRC_Admin_Complex_Specs_Binder_rev1.pdf PDF
SRC_Admin_Complex_Specs_Binder_rev1.pdf PDF
SRC_Admin_Complex_Specs_Binder_rev1.pdf PDF
SRC_Admin_Complex_-_Alternate_Bid.pdf PDF
SRC_Admin_Complex_-_Alternate_Bid.pdf PDF
SRC_Admin_Complex_-_Alternate_Bid.pdf PDF
SRC_Admin_Complex_-_Submittal_1_(002).pdf PDF
SRC_Admin_Complex_-_Submittal_1_(002).pdf PDF
SRC_Admin_Complex_-_Submittal_1_(002).pdf PDF
2024_USEPA_Grant_Agreement_Time_Extension.pdf PDF
2024_USEPA_Grant_Agreement_Time_Extension.pdf PDF
2024_USEPA_Grant_Agreement_Time_Extension.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pricing_Table_Template

Table 1Line ItemDescriptionConstruction Specification Number from Specs Binder AttachmentUnit of MeasureQuantityTaxableUnit Cost
1Clearing and Grubbing2Lump Sum1
2Structure Removal3Lump Sum1
3Pollution Control5Lump Sum1
4Construction Surveys7Lump Sum1
5Mobilization and Demobilization8Lumjp Sum1
6Traffic Control9Lump Sum1
6Water for Construction10Lump Sum1
7Removal of Water11Lump Sum1
7Excavation-Focal Point 1,2,3,4,9 Per Plans21Lump Sum1
7Earthfill-Placement of Earth Material23Lump Sum1
8Earthfill-Focal Point 1-Complete and In Place23Lump Sum1
9Earthfill-Focal Point 2-Complete and In Place23Lump Sum1
10Earthfill-Focal Point 3-Complete and In Place23Lump Sum1
11Earthfill-Focal Point 4-Complete and In Place23Lump Sum1
16Earthfill-Focal Point 9-provide and install23Lump Sum1
17Excavation-Urban Forest Tree Boxes Per Plans23Lump Sum1
17Earthfill-Urban Forest Tree Boxes-provide and install23Lump Sum1
17Drainfill-Within Focal Point and Urban Forest Systems24Lump Sum1
18Topsoiling26Lump Sum1
19Structure Concrete-Inlets,FDOT Type C(Doghouse/Cast in Place)32Lump Sum3
20Structure Concrete-Curbing-Replace Standup Curbs32Lump Sum1
21Structure Concrete-Ribbon Curb Border At Pervious Pavers And Riprap Channels32Linear Feet2400
22Asphalt-Subgrade, Base, and Asphalt Surface at New Pipe Crossings32-ALump Sum1
23Asphalt-Thermoplastic Striping32-ALump Sum1
23Steel Reinforcement-For Concrete Structures34Lump Sum1
24Plastic Pipe-4" Diam. HDPE Pipe45Linear Feet316
25Plastic Pipe-12" Diam. HDPE Pipe45Linear Feet392
26Rock Riprap-FDOT No. 57 Crushed Aggregate Beneath Class 1 Riprap61Ton100
27Rock Riprap-FDOT No. 57 Crushed Aggregate Beneath Pavers61Ton1000
28Rock Riprap-Drainage Swales within Landscape Islands61Ton300
29Metal Fabrication and Installation-Street Signs, Handicap Parking Signs, and Stop Signs81Each10
30Contractor Quality Control-Testing Etc.94Job1
30Geotextile-within Focal Point and Urban Forest Systems95Lump Sum1
31Vegetative Measures-Installation Focal Points 1-4 and 9-Per Plans(plants and trees will be supplied by county)440Job1
32Vegetative Measures-sodding-centipede440Square Yards800
32Excavation-R Tanks Per PlansLump Sum1
32Underground Storage Tanks-R-tanks as Specified by Manufacturer(or approved equal)Lump Sum1
33Excavation-PowerBlock Permeable Pavers Per PlansLump Sum1
33Pervious Pavers-PowerBlock as Specified by Manufacturer (or approved equal)Square Feet14697