Alternative_Bid_Pricing_Table_SRC_Administration_Building_GI_(3).xlsx
XLSX spreadsheet 12 KB Posted
- Solicitation number
- 26-010
- Issued by
- Santa Rosa County, Mount Carmel CDP, Florida
About this file
This is an Alternative Bid Pricing Table for the Santa Rosa County Administration Building Green Infrastructure project in Florida. The pricing table outlines line items for construction work including site preparation, structural work, stormwater management infrastructure, and landscape installation. Key construction elements include clearing and grubbing, structure removal, pollution control, earthfill placement across multiple focal points, excavation for urban forest tree boxes, concrete structures (inlets and curbing), asphalt work, plastic piping (4-inch and 12-inch HDPE), rock riprap materials in varying quantities (100 to 1,000 tons), metal signage fabrication, geotextile installation, vegetative measures with sodding, underground storage tanks, and pervious pavers. Line items are referenced to specification numbers from a specifications binder and include quantities ranging from individual units to large material volumes, with most items priced on a lump sum basis. The pre-bid meeting was scheduled for January 12, 2026, at 10:00 a.m., with questions due by 12:00 p.m. on January 26, 2026, and sealed bid submissions due February 2, 2026, at 10:00 a.m. through the Santa Rosa County Procurement Portal.
The pricing table is structured as a template for bidders to submit unit costs for each line item, with all items marked as taxable. Specific quantities are identified for certain materials, including 316 linear feet of 4-inch HDPE pipe, 392 linear feet of 12-inch HDPE pipe, 100 tons of crushed aggregate beneath Class 1 riprap, 1,000 tons of crushed aggregate beneath pavers, 300 tons for drainage swales, 10 individual signs, 800 square yards of centipede sod, and 14,697 square feet of pervious pavers. The file contains a formatting error indicating "Lumjp Sum" for one mobilization line item. Santa Rosa County encourages participation from small businesses, minority and women-owned businesses, and disadvantaged business enterprises, with the Board retaining the right to waive irregularities, reject bids, and award based on the best interest determination.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing_Table_Template
| Table 1 | Line Item | Description | Construction Specification Number from Specs Binder Attachment | Unit of Measure | Quantity | Taxable | Unit Cost |
| 1 | Clearing and Grubbing | 2 | Lump Sum | 1 | |||
| 2 | Structure Removal | 3 | Lump Sum | 1 | |||
| 3 | Pollution Control | 5 | Lump Sum | 1 | |||
| 4 | Construction Surveys | 7 | Lump Sum | 1 | |||
| 5 | Mobilization and Demobilization | 8 | Lumjp Sum | 1 | |||
| 6 | Traffic Control | 9 | Lump Sum | 1 | |||
| 6 | Water for Construction | 10 | Lump Sum | 1 | |||
| 7 | Removal of Water | 11 | Lump Sum | 1 | |||
| 7 | Excavation-Focal Point 1,2,3,4,9 Per Plans | 21 | Lump Sum | 1 | |||
| 7 | Earthfill-Placement of Earth Material | 23 | Lump Sum | 1 | |||
| 8 | Earthfill-Focal Point 1-Complete and In Place | 23 | Lump Sum | 1 | |||
| 9 | Earthfill-Focal Point 2-Complete and In Place | 23 | Lump Sum | 1 | |||
| 10 | Earthfill-Focal Point 3-Complete and In Place | 23 | Lump Sum | 1 | |||
| 11 | Earthfill-Focal Point 4-Complete and In Place | 23 | Lump Sum | 1 |
| 16 | Earthfill-Focal Point 9-provide and install | 23 | Lump Sum | 1 |
| 17 | Excavation-Urban Forest Tree Boxes Per Plans | 23 | Lump Sum | 1 |
| 17 | Earthfill-Urban Forest Tree Boxes-provide and install | 23 | Lump Sum | 1 |
| 17 | Drainfill-Within Focal Point and Urban Forest Systems | 24 | Lump Sum | 1 |
| 18 | Topsoiling | 26 | Lump Sum | 1 |
| 19 | Structure Concrete-Inlets,FDOT Type C(Doghouse/Cast in Place) | 32 | Lump Sum | 3 |
| 20 | Structure Concrete-Curbing-Replace Standup Curbs | 32 | Lump Sum | 1 |
| 21 | Structure Concrete-Ribbon Curb Border At Pervious Pavers And Riprap Channels | 32 | Linear Feet | 2400 |
| 22 | Asphalt-Subgrade, Base, and Asphalt Surface at New Pipe Crossings | 32-A | Lump Sum | 1 |
| 23 | Asphalt-Thermoplastic Striping | 32-A | Lump Sum | 1 |
| 23 | Steel Reinforcement-For Concrete Structures | 34 | Lump Sum | 1 |
| 24 | Plastic Pipe-4" Diam. HDPE Pipe | 45 | Linear Feet | 316 |
| 25 | Plastic Pipe-12" Diam. HDPE Pipe | 45 | Linear Feet | 392 |
| 26 | Rock Riprap-FDOT No. 57 Crushed Aggregate Beneath Class 1 Riprap | 61 | Ton | 100 |
| 27 | Rock Riprap-FDOT No. 57 Crushed Aggregate Beneath Pavers | 61 | Ton | 1000 |
| 28 | Rock Riprap-Drainage Swales within Landscape Islands | 61 | Ton | 300 |
| 29 | Metal Fabrication and Installation-Street Signs, Handicap Parking Signs, and Stop Signs | 81 | Each | 10 |
| 30 | Contractor Quality Control-Testing Etc. | 94 | Job | 1 |
| 30 | Geotextile-within Focal Point and Urban Forest Systems | 95 | Lump Sum | 1 |
| 31 | Vegetative Measures-Installation Focal Points 1-4 and 9-Per Plans(plants and trees will be supplied by county) | 440 | Job | 1 |
| 32 | Vegetative Measures-sodding-centipede | 440 | Square Yards | 800 |
| 32 | Excavation-R Tanks Per Plans | Lump Sum | 1 | |
| 32 | Underground Storage Tanks-R-tanks as Specified by Manufacturer(or approved equal) | Lump Sum | 1 | |
| 33 | Excavation-PowerBlock Permeable Pavers Per Plans | Lump Sum | 1 | |
| 33 | Pervious Pavers-PowerBlock as Specified by Manufacturer (or approved equal) | Square Feet | 14697 |