This is a Base Bid Pricing Table for the Santa Rosa County Administration Building Green Infrastructure project in Florida, detailing construction line items and associated costs. The project encompasses a comprehensive green infrastructure scope of work including site clearing and grubbing, structure removal, pollution control, construction surveys, mobilization and demobilization, and traffic control. The work includes installation of biofilters, focal point systems, urban forest tree boxes, earthfill placement across nine focal points, drainage systems, topsoiling, concrete structures (inlets, curbing, and ribbon curbs), asphalt work, steel reinforcement, plastic HDPE piping (4-inch and 12-inch diameter), rock riprap materials, metal sign fabrication, geotextile materials, vegetative measures and sodding, underground R-tanks, and permeable pavers. Key quantities include 3 concrete inlets, 2,400 linear feet of ribbon curb border, 316 linear feet of 4-inch HDPE pipe, 392 linear feet of 12-inch HDPE pipe, 100 tons of crushed aggregate beneath class 1 riprap, 1,000 tons of crushed aggregate beneath pavers, 300 tons of drainage swales aggregate, 10 signs, 800 square yards of centipede sodding, and 30,150 square feet of permeable pavers. The Santa Rosa County Board of County Commissioners will receive sealed bids with a pre-bid meeting scheduled for January 12, 2026 at 10:00 a.m. at 6051 Old Bagdad Highway, Suite 301, Milton in the Engineering/Environmental Conference Room. Questions must be submitted through the procurement portal by 12:00 p.m. on Monday, January 26, 2026, with all proposals due by 10:00 a.m. on Monday, February 2, 2026, at which time bids will be publicly opened.
The pricing table provides a structured format for bidders to enter unit costs and taxable costs for each line item, with certain items designated as taxable and others as lump sum contracts. The document references a detailed Specifications Binder with numbered construction specifications corresponding to each line item. Santa Rosa County encourages participation from all segments of the business community, including small businesses, minority and women-owned businesses, and disadvantaged business enterprises. The Board reserves the right to waive irregularities in bids, reject any or all bids for sound documented reasons, and award the bid in the best interest of Santa Rosa County. No specific contract value, funding source, incumbent contractor, or renewal options are identified in this pricing table document.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing_Table_Template
| Table 1 | Line Item | Description | Construction Specification Number from Specs Binder Attachment | Unit of Measure | Quantity | Taxable | Unit Cost | SF | # 1-2 gall plants | $/SF material Cost | $/SF install cost | cost of install plantings |
| 1 | Clearing and Grubbing | 2 | Job | 1 | ||||||||
| 2 | Structure Removal | 3 | Job | 1 | ||||||||
| 3 | Pollution Control | 5 | Job | 1 | ||||||||
| 4 | Construction Surveys | 7 | Job | 1 | ||||||||
| 5 | Mobilization and Demobilization | 8 | Job | 1 | ||||||||
| 6 | Traffic Control | 9 | Job | 1 | ||||||||
| 6 | Water for Construction | 10 | Lump Sum | 1 | ||||||||
| 7 | Removal of Water | 11 | Lump Sum | 1 | ||||||||
| 7 | Biofilters-Focal Point 1-9 Complete and In Place | 21 | Lump Sum | |||||||||
| 7 | Excavation-Focal Point 1-9 Per Plans | 21 | Lump Sum | 1 | ||||||||
| 7 | Earthfill-Placement of Earth Material | 23 | Lump Sum | 1 | ||||||||
| 8 | Earthfill-Focal Point 1-Complete and In Place | 23 | Lump Sum | 1 | 39 | 5 to 8 | ||||||
| 9 | Earthfill-Focal Point 2-Complete and In Place | 23 | Lump Sum | 1 | 39 | 5 to 8 | ||||||
| 10 | Earthfill-Focal Point 3-Complete and In Place | 23 | Lump Sum | 1 | 77 | 8 to 10 | ||||||
| 11 | Earthfill-Focal Point 4-Complete and In Place | 23 | Lump Sum | 1 | 77 | 8 to 10 | ||||||
| 12 | Earthfill-Focal Point 5-Complete and In Place | 23 | Lump Sum | 1 | 62 | 6 to 8 | ||||||
| 13 | Earthfill-Focal Point 6-Complete and In Place | 23 | Lump Sum | 1 | 62 | 6 to 8 | ||||||
| 14 | Earthfill-Focal Point 7-Complete and In Place | 23 | Lump Sum | 1 | 32 | 4 to 6 | ||||||
| 15 | Earthfill-Focal Point 8-Complete and In Place | 23 | Lump Sum | 1 | 32 | 4 to 6 | ||||||
| 16 | Earthfill-Focal Point 9-Complete and In Place | 23 | Lump Sum | 1 | 24 | 4 to 5 | ||||||
| 17 | Earthfill-Urban Forest Tree Boxes-Complete and In Place | 23 | Lump Sum | 1 | ||||||||
| 17 | Excavation-Urban Forest Tree Boxes Per Plans | 23 | Lump Sum | 1 | ||||||||
| 17 | Drainfill-Within Focal Point and Urban Forest Systems | 24 | Lump Sum | 1 | ||||||||
| 18 | Topsoiling | 26 | Job | 1 | ||||||||
| 19 | Structure Concrete-Inlets,FDOT Type C(Doghouse/Cast in Place) | 32 | Each | 3 | ||||||||
| 20 | Structure Concrete-Curbing-Replace Standup Curbs | 32 | Job | 1 | ||||||||
| 21 | Structure Concrete-Ribbon Curb Border At Pervious Pavers And Riprap Channels | 32 | Linear Feet | 2400 | ||||||||
| 22 | Asphalt-Subgrade, Base, and Asphalt Surface at New Pipe Crossings | 32-A | Job | 1 | ||||||||
| 23 | Asphalt-Thermoplastic Striping | 32-A | Job | 1 | ||||||||
| 23 | Steel Reinforcement-For Concrete Structures | 34 | Lump Sum | 1 | ||||||||
| 24 | Plastic Pipe-4" Diam. HDPE Pipe | 45 | Linear Feet | 316 | ||||||||
| 25 | Plastic Pipe-12" Diam. HDPE Pipe | 45 | Linear Feet | 392 | ||||||||
| 26 | Rock Riprap-FDOT No. 57 Crushed Aggregate Beneath Class 1 Riprap | 61 | Ton | 100 | ||||||||
| 27 | Rock Riprap-FDOT No. 57 Crushed Aggregate Beneath Pavers | 61 | Ton | 1000 | ||||||||
| 28 | Rock Riprap-Drainage Swales within Landscape Islands | 61 | Ton | 300 | ||||||||
| 29 | Metal Fabrication and Installation-Street Signs, Handicap Parking Signs, and Stop Signs | 81 | Each | 10 | ||||||||
| 30 | Contractor Quality Control-Testing Etc. | 94 | Job | 1 | ||||||||
| 30 | Geotextile-within Focal Point and Urban Forest Systems | 95 | Lump Sum | 1 | ||||||||
| 31 | Vegetative Measures-Focal Point 1-9 Planting-Per Plans(plants and trees will be supplied by county) | 440 | Lump Sum | 1 | ||||||||
| 32 | Vegetative Measures-sodding-centipede | 440 | Square Yards | 800 | ||||||||
| 32 | Excavation-R-Tanks Per Plans | Lump Sum | 1 | |||||||||
| 32 | Underground Storage Tanks-R-tanks as Specified by Manufacturer(or approved equal)-Complete and In Place | Lump Sum | 1 | |||||||||
| 33 | Excavation-PowerBlock Permeable Pavers Per Plans | Lump Sum | 1 | |||||||||
| 33 | Pervious Pavers-PowerBlock as Specified by Manufacturer (or approved equal) Complete and In Place | Square Feet | 30150 |