Attachment_3_-_Provisioning_Requirements.pdf
PDF 46 KB Posted
- Attached to
- Tank Assembly, Fabric, Collapsible Federal contract opportunity
- Solicitation number
- SPRDL1-18-R-0254
About this file
This document outlines provisioning requirements for a federal contract to supply collapsible fabric tank assemblies. The contractor will be required to provide Logistics Management Information data products including engineering drawings, provisioning lists, and tooling requirements in an electronic format. A provisioning/maintenance conference will be held within 15 days of award and every 45 days as needed to review requirements. The contractor must enter screening results into the Provisioning Management Repository. Repair kits, bulk materials, and tools and test equipment must be included. The related opportunity notice indicates this will be a five-year indefinite delivery/indefinite quantity contract set aside for small businesses to supply 210K fuel tank assemblies to the Department of the Army Materiel Command TACOM Life Cycle Management Command. Offers are due between May and July 2018.
Attachment 3 to Solicitation No. SPRDL1-18-R-0254
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0006_to_Solicitation_No._SPRDL1-18-R-0254.pdf | ||
| Amendment_0005_to_Solicitation_No._SPRDL1-18-R-0254.pdf | ||
| Amendment_0004_to_Solicitation_No._SPRDL1-18-R-0254.pdf | ||
| Amendment_0003_to_Solicitation_No._SPRDL1-18-R-0254.pdf | ||
| Amendment_0002_to_Solicitation_No._SPRDL1-18-R-0254.pdf | ||
| Amendment_0001_to_Solicitation_No._SPRDL1-18-R-0254.pdf | ||
| Solicitation_No._SPRDL1-18-R-0254.pdf | ||
| SPI_AK15463726_Revision_D.pdf | ||
| SPI_AK15463725_Revision_E.pdf | ||
| Attachment_1_-_Logistics_Product_Data.pdf | ||
| Attachment_2_-_Transaction_Format.pdf | ||
| Attachment_4_-_Maintenance_Analysis.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 3
Worksheet 1
SUMMARY TITLE: LMI Summary titles are as indicated below
SPECIFIC INSTRUCTIONS: Logistics Management Information Data Products (Drawings)/ Engineering Data for Provisioning (EDFP) (Formally known as: Supplementary Provisioning Technical Documentation (SPTD) are required for the purpose of assigning National Stock Numbers. The Government will review for acceptance each of the Contractor’s offered drawings.
DATA IN LMI SPECIFICATION (Please provide the data product title):
Media Format Delivery for all LMI Data Products:
• Electronic delivery (e-mail) attachment in ASCII Format.
• CD-ROM delivery in 1388-2A, 1388-2B, or 1552 Format.
LMI Summaries:
• Logistics Management Information Data Products (PPL)
DATA NOT IN LMI SPECIFICATION (Please provide the data product title, its definition and its format):
• Logistics Management Information Data Products Pre-procurement Screening: Screening of all part numbers used on system to identify National Stock Numbers (NSN)
• LMI Tools and Test Equipment. Peculiar support items required to support and maintain the system throughout its life.
Worksheet 2
DATA PRODUCT DELIVERABLE: Data product information required as stated below.
SELECT EXPLANATION
1 Data required for all piece parts and special tools identified on equipment 2 Data required for Repair Parts and Special Tools List (RPSTL)
3 Data required for part number changes only
DATA PRODUCT TITLE SELECT ADDITIONAL
INFORMATION
GOV’T
SUPPLIED
DATA
PROVISIONING CONTRACT CONTROL NUMBER
(PCCN)
1,3 LMI 0870 X
PROVISIONING LIST ITEM SEQUENCE NUMBER
(PLISN)
1,3 LMI 0890
INDENTURE CODE
- KITS AND HARDWARE
1 LMI 0370
COMMERCIAL GOVERNMENT ENTITY (CAGE)
CODE
1,3 LMI 0140
CAGE CODE – ADDITIONAL REFERENCE NUMBER
1,3 LMI 0140
REFERENCE NUMBER (Part Number)
1,3 LMI 1050
REFERENCE NUMBER CATEGORY CODE (RNCC)
1,3 LMI 1060
ITEM NAME
1 LMI 0480
QUANTITY PER ASSEMBLY
1 LMI 0930
QUANTITY PER END ITEM (QPEI)
1 LMI 0950
UNIT OF MEASURE (UM)
1 LMI 1510
SOURCE, MAINTENANCE AND RECOVERABILITY
(SMR) CODE
1 LMI 1220
DEMILITARIZATION CODE (DMIL)
1 LMI 0230
USABLE ON CODE (UOC)
1 LMI 1560 X
MAINTENANCE REPLACEMENT RATE 1 (MRR 1) 1 LMI 0560
(AKA FAILURE
FACTOR 1)
MAINTENANCE REPLACEMENT RATE 2 (MRR 2) 1 LMI 0570
FACTOR 2)
DATA PRODUCT TITLE SELECT ADDITIONAL
INFORMATION
GOV’T
SUPPLIED
DATA
MAINTENANCE REPLACEMENT RATE MODIFIER
(MMR MOD)
1 SEE DA PAM
700-25
FACTOR 3)
ESSENTIALITY CODE 1 LMI 0280
SHELF LIFE 1 LMI 1190
PRODUCTION LEADTIME (PLT) 1 LMI 0830
X
UNIT OF MEASURE PRICE (UM PRICE) 1 LMI 1500
NEXT HIGHER ASSY PROVISIONING LIST ITEM
SEQUENCE NUMBER (NHA PLISN)
1 LMI 0690
NEXT HIGHER ASSY PROVISIONING LIST ITEM
SEQUENCE NUMBER INDICATOR (NHA IND)
1 LMI 0700
OVERHAUL REPLACEMENT RATE (ORR)
1 LMI 0740
MAINTENANCE TASK DISTRIBUTION (MTD)
1 LMI 0580 X
REPLACEMENT TASK DISTRIBUTION (RTD)
1 LMI 1110 X
UNIT OF ISSUE (UI)
1 LMI 1470
UNIT OF ISSUE PRICE (UI PRICE)
1 LMI 1500
UNIT OF ISSUE CONVERSION FACTOR
1 LMI 1480
REPAIR CYCLE TIME (RCT)
1 LMI 1080
TECHNICAL MANUAL NUMBER (AND ASSOCIATED
TECHNICAL MANUAL CODE)
2 LMI 1370 X
FIGURE NUMBER
2 LMI 0300
ITEM NUMBER
2 LMI 0500
TECHNICAL MANUAL CHANGE NUMBER (TM CHG)
2 LMI 1350
TECHNICAL MANUAL INDENTURE CODE (TM IND)
2 LMI 1360
QUANTITY PER FIGURE
2 LMI 0960
FUNCTIONAL GROUP CODE
2 LMI 0330
PROVISIONING NOMENCLATURE
2 LMI 0900
GOVERNMENT SUPPLIED PROVISIONING DATA
PROVISIONING CONTRACT CONTROL NUMBER (PCCN) — LMI 0870
The PCCN is assigned by the government and will provided at the provisioning start of work meeting.
USEABLE ON CODE (UOC) — LMI 1560
The UOC is assigned by the government and will be provided at the provisioning start of work meeting.
Consumable Items = 1 month Repair Parts = 3 months Long Lead Time Items (i.e. Made to order) = 8 months
MAINTENANCE TASK DISTRIBUTION (MTD) — LMI 0580
MAINTENANCE TASK DISTRIBUTION (MTD) WILL BE IN COMPLIANCE WITH THE MOST
CURRENT VERSION OF AR 700-82, ‘JOINT REGULATION GOVERNING THE USE AND
APPLICATION OF UNIFORM SOURCE MAINTENANCE AND RECOVERABLITY CODES’,
ADSM 18-LEA-JBE-ZZZ-UM-06, ‘COMMODITY COMMAND STANDARD SYSTEM USERS
MANUAL – PROVISIONING SYSTEM’ AND COINCIDE WITH THE ARMY’S TWO-LEVEL
MAINTENANCE CONCEPT.
REPLACEMENT TASK DISTRIBUTION (RTD) – LMI 1110
REPLACEMENT TASK DISTRIBUTION (RTD) WILL BE IN COMPLIANCE WITH THE MOST
CURRENT VERSION OF AR 700-82, ‘JOINT REGULATION GOVERNING THE USE AND
APPLICATION OF UNIFORM SOURCE MAINTENANCE AND RECOVERABLITY CODES’,
ADSM 18-LEA-JBE-ZZZ-UM-06, ‘COMMODITY COMMAND STANDARD SYSTEM USERS
MANUAL – PROVISIONING SYSTEM’ AND COINCIDE WITH THE ARMY’S TWO-LEVEL
MAINTENANCE CONCEPT.
REPLACEMENT CYCLE TIME (RCT) — LMI 1080
REPLACEMENT CYCLE TIME (RCT) WILL BE IN COMPLIANCE WITH THE MOST CURRENT
VERSION OF AR 700-82, ‘JOINT REGULATION GOVERNING THE USE AND APPLICATION OF
UNIFORM SOURCE MAINTENANCE AND RECOVERABLITY CODES’,
ADSM 18-LEA-JBE-ZZZ-UM-06, ‘COMMODITY COMMAND STANDARD SYSTEM USERS
MANUAL – PROVISIONING SYSTEM’ AND COINCIDE WITH THE ARMY’S TWO-LEVEL
MAINTENANCE CONCEPT.
PROVISIONING REQUIREMENTS STATEMENT
Equipment Nomenclature: TANK, FABRIC, COLLAPSIBLE (3K, 20K, 50K Fuel Tank Assemblies) Model Number:
Contract Number:
Provisioning Activity (address and zip code): U.S. Army Tank-automotive and Armaments Command ATTN: AMSTA-LCC-JA/Mail Stop: 120 6501 E. 11 Mile Rd.
Warren, MI 48397-5000
Contractor (name, address and zip code): TBD
A. This Provisioning Requirements Statement (PRS) is furnished and will be prepared in accordance with
Statement of Work (SOW). The contractor shall annotate all EDFP with the PLISN and the PCCN.
The contractor shall furnish EDFP that is legible and representative of each part number and CAGE in accordance with SOW paragraph C.X.3.4.
PROVISIONING REQUIREMENTS
1. Provisioning/Maintenance/ Guidance Conference: Is Required
a. Location: TBD
b. Date: WITH-IN 15 DAYS OF CONTRACT AWARD, EVERY 45 DAYS AS REQUIRED, AND IN CONJUCTION WITH START OF WORK CONFERENCE
c. Time: TBD
d. Estimated number of days: As Required
2. Provisioning Conferences(s): Are Required
a. Location: TACOM Warren, MI or CONTRACTOR FACILITY
b. Date: Within 45 DAYS AFTER START OF WORK OR CONTRACT AWARD
c. Time: TBD
d. Estimated number of days: As Required
e. The Contractor shall not be required to have a sample of the component/end item at the
TACOM Warren, MI conference.
3. The sample article will not be disassembled at the conference.
4. A Provisioning Preparedness Review Conference is not required.
5. Incremental submission of PTD (LMI Data & Drawings) is authorized.
6. Provisioning Screening is required.
Screening results will be required to be entered into the PMR.
7. LMI Drawing Support will be sequenced by:
a. PLISN order for hard copy review at conference
b. Part Number order for electronic submission
8. Tools and Test Equipment will be included as part of the LMI Data Products (PPL).
9. Repair Kits and Repair Part Sets will be included in the LMI Data Products (PPL).
10. Repair Kits will be included in the LMI Data Products (PPL).
11. Bulk material that is required to fabricate items that are coded “M” (make) will also be listed on the
LMI Data Products (PPL).
| SELECT EXPLANATION |
| 3 Data required for part number changes only |
| DATA PRODUCT TITLE |
| GOVERNMENT SUPPLIED PROVISIONING DATA |
| PROVISIONING CONTRACT CONTROL NUMBER (PCCN) — LMI 0870 |
| USEABLE ON CODE (UOC) — LMI 1560 |
| PROVISIONING REQUIREMENTS STATEMENT |
| Warren, MI 48397-5000 |
| PROVISIONING REQUIREMENTS |
File details come from the government source that posted it. Updated .