Amendment_0005_to_Solicitation_No._SPRDL1-18-R-0254.pdf

PDF 13 KB Posted

Attached to
Tank Assembly, Fabric, Collapsible
Solicitation number
SPRDL1-18-R-0254
Issued by

About this file

This amendment modifies a solicitation for collapsible fuel tank assemblies. The amendment changes the first article testing requirements to allow contractors to coordinate first article tests for fuel storage verification and tank overload procedures using diesel fuel with Southwest Research Institute, rather than requiring independent testing. Contractors must still conduct first article tests in accordance with MIL-PRF-32233 for air leakage, low temperature storage, and high temperature storage. The original solicitation sought proposals for a five-year firm fixed price indefinite delivery/indefinite quantity contract for collapsible fuel tank assemblies, as a total small business set-aside for the Department of the Army Materiel Command TACOM Life Cycle Management Command. Offerors were to provide quantities of 210K fuel tank assemblies per National Stock Numbers 5430-01-546-3725 and 5430-01-546-3726, with proposals originally due on July 10, 2018.

Amendment 0005 to Solicitation No. SPRDL1-18-R-0254

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of

2. Amendment/Modification No.

3. Effective Date

4. Requisition/Purchase Req No.

5. Project No. (If applicable)

6. Issued By Code 7. Administered By (If other than Item 6) Code

8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)

9A. Amendment Of Solicitation No.

9B. Dated (See Item 11)

10A. Modification Of Contract/Order No.

10B. Dated (See Item 13) Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting And Appropriation Data (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS

It Modifies The Contract/Order No. As Described In Item 14.

A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In

The Contract/Order No. In Item 10A.

B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set

Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).

C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.

14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name And Title Of Signer (Type or print)

16A. Name And Title Of Contracting Officer (Type or print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed

By (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITIONS UNUSABLE

30-105-02 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SEE SCHEDULE

X

Firm Fixed Price

0005 2018AUG21

SPRDL1

DLA LAND WARREN

WARREN, MI 48397-5000

JON MACHACEK

EMAIL: JON.A.MACHACEK.CIV@MAIL.MIL

SPRDL1-18-R-0254

2018JUN27

X

X

/SIGNED/

2 signed

SEE SECOND PAGE FOR DESCRIPTION

1 2

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: JON MACHACEK

Buyer Office Symbol/Telephone Number: ZGBB/(586)467-1179

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

*** End of Narrative A0000 ***

A. The purpose of this amendment is to modify the first paragraph of Section E.1.1., entitled 'First Article Testing.'

B. The first five sentences of the first paragraph of Section E.1.1. are changed to read as follows (added/changed verbiage underlined):

"E.1.1 First Article Testing: Within 60 days after contract award Contractor shall submit one (1) 210K Fuel Tank Assembly as first article collapsible tank assembly, packaged in accordance with applicable packaging requirements, to US Army TARDEC Fuels and Lubricants facility in San Antonio, TX. Contractor shall contact this facility at email gbessee@swri.org or telephone 220-522-6941 to determine costs associated with these required FAT events. Independent testers at this location will perform the Deployment test (Par. 4.5.1.4 of

MIL-PRF-32233), Fuel Storage verification (Par. 4.5.1.5 of MIL-PRF-32233) and the Tank Overload procedure (Par. 4.5.1.6 of MIL-PRF-

32233) on each first article tank provided (NOTE: Contractor shall be allowed to conduct tests coordinated with Southwest Research _________________________________________________________________________________________

Institute (SwRI) for the Fuel Storage verification and Tank Overload procedure on each first article tank provided using diesel fuel,______________________________________________________________________________________________________________________________________ which will be acquired by SwRI). The first article tanks shall be submitted for these tests after contractor successfully conducts first_______________________________ article tests in accordance with Table IV of MIL-PRF-32233 for sequence 1 thru 3 (Air Leakage, Low Temperature Storage, High Temperature

Storage). All other FAT requirements included in MIL-PRF-32233 shall be conducted by contractor as specified and with the designated ________________________ test fuel as specified."______________________

C. All other terms and conditions - including the proposal closing date - remain unchanged.

*** END OF NARRATIVE A0006 ***

2 2

SPRDL1-18-R-0254

SECTION A

File details come from the government source that posted it. Updated .