This is a project specification document and general requirements manual for a federal construction contract to renovate the first floor kitchen at the Royal C. Johnson Veterans Memorial Medical Center in Sioux Falls, South Dakota (VA Project #438-21-403).

The project involves complete demolition, construction, and renovation of the first floor to create a new kitchen facility, including work across multiple building systems: structural steel framing and cast-in-place concrete; mechanical systems encompassing HVAC, plumbing, fire suppression, and medical gas; electrical distribution, lighting, and communications; and electronic safety and security systems featuring proprietary items from Johnson Controls (building automation, access control, fire detection/alarm) and Cooper Metalux (interior lighting). The contract requires phased execution with three distinct construction phases to maintain 24/7 medical center operations, necessitating coordinated utility management, interim life safety measures, and detailed scheduling. Critical deliverables include a fully resource-loaded Critical Path Method (CPM) schedule using Primavera P6 software with individual activities not exceeding 20 work days (except procurement and curing activities), cost loading reflecting total contract price distribution, and manpower loading by trade. The contractor must provide photographic documentation with digital indexing using interactive CAD drawings, as-built drawings, comprehensive testing and commissioning plans, maintenance and operations manuals with factory training, warranty management documentation, and compliance with strict VA security protocols including badge requirements, document control procedures, and key management. Design professionals include Stone Group Architects (architect), Ulteig Engineers (civil), Ericksen Roed & Associates (structural), Dunham Associates (mechanical and electrical), with construction oversight by a VA-retained architect-engineer providing advisory services throughout execution.

View the file

Other files

File Type Posted
438-21-403 Renovate First Floor Kitchen sign in.pdf PDF
438-21-403 Renovate First Floor Kitchen 2nd sign in.pdf PDF
36C26326B0020 0002.pdf PDF
36C26326B0020 0001.docx DOCX document
Plans 438-21-403 Renovate 1st Floor Kitchen_Part3.pdf PDF
Plans 438-21-403 Renovate 1st Floor Kitchen_Part6.pdf PDF
Plans 438-21-403 Renovate 1st Floor Kitchen_Part11.pdf PDF
Plans 438-21-403 Renovate 1st Floor Kitchen_Part12.pdf PDF
VHA ICRA-1.3 Jan 3 2025.pdf PDF
36C26326B0020.docx DOCX document
Final SOW 438-21-403 Renovate First Floor for New Kitchen 5.7.26.docx DOCX document
Plans 438-21-403 Renovate 1st Floor Kitchen_Part1.pdf PDF
Plans 438-21-403 Renovate 1st Floor Kitchen_Part9.pdf PDF
Plans 438-21-403 Renovate 1st Floor Kitchen_Part10.pdf PDF
Safety or Environmental Violations and EMR Information.pdf PDF
VAAR 852.219-75 Limitations on Subcontracting Cert of Compliance.pdf PDF
Wage Determination SD20260028 05.18.2026.pdf PDF
Plans 438-21-403 Renovate 1st Floor Kitchen_Part4.pdf PDF
Plans 438-21-403 Renovate 1st Floor Kitchen_Part7.pdf PDF
Plans 438-21-403 Renovate 1st Floor Kitchen_Part13.pdf PDF
Specs_Vol 2_2026-08-18.pdf PDF
Plans 438-21-403 Renovate 1st Floor Kitchen_Part2.pdf PDF
Plans 438-21-403 Renovate 1st Floor Kitchen_Part5.pdf PDF
Plans 438-21-403 Renovate 1st Floor Kitchen_Part8.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U. S. DEPARTMENT OF VETERAN’S AFFAIRS

ROYAL C. JOHNSON VETERANS MEMORIAL MEDICAL CENTER

RENOVATE FIRST FLOOR FOR NEW KITCHEN FOR THE

SIOUX FALLS VA MEDICAL CENTER

Sioux Falls, South Dakota

VA Project # 438-21-403

Project Specifications – Volume 1 August 18, 2026

DEPARTMENT OF VETERAN’S AFFAIRS

ON

RENOVATE 1ST FLOOR NEW KITCHEN

Sioux Falls, South Dakota

VA Project # 438-21-403

List of Proprietary Specified Items 100% Construction Documents – August 18, 2026

Section 23 09 23 – Direct-Digital Control System for HVAC

• Building Automation System – Johnson Controls

Section 26 51 00 – Interior Lighting

• General Office Lensed Troffer lighting – Cooper Metalux CZ Series

Section 28 13 00 – Physical Access Control System

• Access Control – Johnson Controls

Section 28 31 00 – Fire Detection and Alarm

• Fire alarm – Johnson Controls

RENOVATE 1ST FLOOR NEW KITCHEN 438-21-403

000107 - 1

Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "Stone Group Architects Inc." for "Moccasin Creek Country Club". A valid, current MasterSpec license is required for editing and use of this document for any other project.(17658)

SECTION 00 01 07

SEALS PAGE

1.1 DESIGN PROFESSIONALS OF RECORD

A. Architect:

Stone Group Architects

600 E. 7th Street, Sioux Falls, SD 57103

605-271-1144

Todd Randall Stone

Responsible for: Divisions 01-49 Sections except where indicated below as prepared by other design professionals of record.

B. Civil Engineer:

Ulteig Engineers, Inc.

5701 South Corporate Place, Sioux Falls, SD, 57108

605.323.2306

Corey S. Maynard

15125

Responsible for:

SECTION 02 21 13 - SITE SURVEYS

SECTION 02 41 00 - DEMOLITION

SECTION 31 20 00 - EARTHWORK

SECTION 32 05 23 – CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS

SECTION 32 90 00 – PLANTING

000107 - 2

Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "Stone Group Architects Inc." for "Moccasin Creek Country Club". A valid, current MasterSpec license is required for editing and use of this document for any other project.(17658)

C. Structural Engineer:

Ericksen, Roed and Associates, Inc.

2550 University Avenue West, Suite 423-S, St Paul, MN 55114

651-251-7570

Stephen Clark

16099

SECTION 03 30 00 – CAST IN PLACE CONCRETE

SECTION 05 12 00 - STRUCTURAL STEEL FRAMING

SECTION 05 31 00 – STEEL DECKING

SECTION 05 50 00 – METAL FABRICATIONS

D. Mechanical Engineer:

Dunham Associates, Inc.

50 South Sixth Street, Suite 1100, Minneapolis, MN 55402

612-465-7550

Jason R. Gottwalt

14944

DIVISION 21 - FIRE SUPPRESSION (ALL SECTIONS)

DIVISION 22 - PLUMBING (ALL SECTIONS)

DIVISION 23 - HEATING, VENTILATION, AND AIR-CONDITIONING (ALL

SECTIONS)

000107 - 3

Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "Stone Group Architects Inc." for "Moccasin Creek Country Club". A valid, current MasterSpec license is required for editing and use of this document for any other project.(17658)

E. Electrical Engineer:

Dunham Associates, Inc.

50 South Sixth Street, Suite 1100, Minneapolis, MN 55402

612-465-7550

Justin A. Thiner

13954

DIVISION 26 - ELECTRICAL (ALL SECTIONS)

DIVISION 27 - COMMUNICATIONS (ALL SECTIONS)

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY (ALL SECTIONS)

END OF DOCUMENT 000107

000107 - 4

Copyright © 2022 by the American Institute of Architects. Warning: This AIA MasterSpec-based document is protected by U.S. Copyright Law and International Treaties.

It was created by "Stone Group Architects Inc." for "Moccasin Creek Country Club". A valid, current MasterSpec license is required for editing and use of this document for any other project.(17658)

RENOVATE 1ST FLOOR NEW KITCHEN 438-21-403 05-01-20

00 01 15 - 1

SECTION 00 01 15

LIST OF DRAWING SHEETS

The drawings listed below accompanying this specification form a part of the contract.

Drawing No. Title

GENERAL

G-000 COVER SHEET

G-001 ACCESSIBILITY DETAILS

G-002 ICRA, ISLM

G-003 FIRST FLOOR CODE AND LIFE SAFETY

G-004 FIRST FLOOR PROGRAM SUMMARY PLAN

G-005 PHASE 1 DEMOLITION PLAN

G-006 PHASE 1 CONSTRUCTION PLAN

G-007 PHASE 2 DEMOLITION PLAN

G-008 PHASE 2 CONSTRUCTION PLAN

G-009 PHASE 3 PLANS

CIVIL

G-100 CIVIL/STRUCTURAL TITLE SHEET

V-100 CIVIL EXISTING SURVEY

C-100 CIVIL TRAFFIC CONTROL PLAN

C-200 CIVIL EROSION CONTROL PLAN

C-300 CIVIL DEMOLITION PLAN

C-400 CIVIL SITE PLAN

C-500 CIVIL PAVING JOINTING PLAN

C-600 CIVIL GRADING PLAN

STRUCTURAL

S-000 STRUCTURAL COVER SHEET

S-001 SCHEDULES/FOUNDATION DETAILS

S-101 1ST FLOOR FOUNDATION PLAN

S-102 2ND FLOOR FRAMING PLAN

S-300 FOUNDATION DETAILS

S-400 FRAMING DETAILS

ARCHITECTURAL

AD-101 FIRST FLOOR DEMOLITION PLAN

AD-102 SECOND FLOOR DEMOLITION PLAN

A-100 GROUND FLOOR PLAN

A-101 FIRST FLOOR PLAN

00 01 15 - 2

A-102 SECOND FLOOR AND ROOF PLAN

A-110 GROUND FLOOR REFLECTED CEILING PLAN

A-111 FIRST FLOOR REFLECTED CEILING PLAN

A-201 EXTERIOR ELEVATIONS, SECTIONS & DETAILS

A-310 WALL SECTIONS

A-450 INTERIOR ELEVATIONS

A-501 DETAILS

A-601 SCHEDULES

A-801 FINISH SCHEDS AND PLANS

A-901 3D IMAGES

AI-100 EQUIPMENT SCHEDULE

AI-101 EQUIPMENT PLAN

AZ-100 GROUND FLOOR FRAMING & FIREPROOFING PLAN

AZ-101 FIRST FLOOR ROOF FRAMING & FIREPROOFING PLAN

FOOD SERVICE – FOR REFERENCE/COORDINATION ONLY

FS100 FOODSERVICE EQUIPMENT PLAN - OVERALL

FS101 FOODSERVICE EQUIPMENT SCHEDULE - NFS

FS102 FOODSERVICE EQUIPMENT PLAN - NFS

FS103 FOODSERVICE EQUIPMENT SCHEDULE – VCS

FS104 FOODSERVICE EQUIPMENT PLAN - VCS

FS200 FOODSERVICE EQUIPMENT ELEVATIONS

FS201 FOODSERVICE EQUIPMENT ELEVATIONS

FS202 FOODSERVICE EQUIPMENT ELEVATIONS

FS203 FOODSERVICE EQUIPMENT ELEVATIONS

FS204 FOODSERVICE EQUIPMENT ELEVATIONS

FS205 FOODSERVICE EQUIPMENT ELEVATIONS

FS300 FOODSERVICE EQUIPMENT SPECIAL CONDITIONS

DETAILS

FS301 FOODSERVICE EQUIPMENT SPECIAL CONDITIONS PLAN –

NFS

FS302 FOODSERVICE EQUIPMENT SPECIAL CONDITIONS PLAN -

VCS

FS400 FOODSERVICE EQUIPMENT STANDARD DETAILS

FS401 FOODSERVICE EQUIPMENT STANDARD DETAILS

FS402 FOODSERVICE EQUIPMENT STANDARD DETAILS

FS403 FOODSERVICE EQUIPMENT STANDARD DETAILS

FSE100 FOODSERVICE EQUIPMENT ELECTRICAL SCHEDULE

00 01 15 - 3

FSE101 FOODSERVICE EQUIPMENT ELECTRICAL DETAILS

FSE102 FOODSERVICE EQUIPMENT ELECTRICAL PLAN - NFS

FSE103 FOODSERVICE EQUIPMENT ELECTRICAL PLAN - VCS

FSM100 FOODSERVICE EQUIPMENT MECHANICAL SCHEDULE

FSM101 FOODSERVICE EQUIPMENT MECHANICAL DETAILS

FSM102 FOODSERVICE EQUIPMENT MECHANICAL PLAN - NFS

FSM103 FOODSERVICE EQUIPMENT MECHANICAL PLAN - VCS

MECHANICAL/PLUMBING

M000 MECHANICAL TITLE SHEET

MHD101 FIRST FLOOR HVAC DEMOLITION PLAN

MHD201 SECOND FLOOR HVAC DEMOLITION PLAN

MPD101 FIRST FLOOR PIPING DEMOLITION PLAN

MPD201 SECOND FLOOR PIPING DEMOLITION PLAN

MP001 GROUND FLOOR PIPING PLAN

MH101 FIRST FLOOR HVAC PLAN

MP101 FIRST FLOOR PIPING PLAN

MH201 SECOND FLOOR AND ROOF HVAC PLAN

MP201 SECOND FLOOR PIPING PLAN

M300 PIPING FLOW DIAGRAM AND DETAILS

M301 AIRFLOW DIAGRAMS

M400 MECHANICAL DETAILS

M401 KITCHEN EXHAUST 3D VIEWS AND SECTION DETAILS

M402 KITCHEN EXHAUST HOOD DETAILS

M500 MECHANICAL SCHEDULES

M501 MECHANICAL/ELECTRICAL MAU SCHEDULES

M502 MECHANICAL/ELECTRICAL SCHEDULES

M600 SEQUENCE OF OPERATIONS

M601 SEQUENCE OF OPERATIONS

F101 FIRST FLOOR FIRE PROTECTION PLAN

F201 SECOND FLOOR FIRE PROTECTION PLAN

PD001 PIPE BASEMENT PLUMBING PHASE 3 DEMOLITION PLAN

PD002 GROUND FLOOR PLUMBING PHASE 2 DEMOLITION PLAN

PD003 GROUND FLOOR PLUMBING PHASE 3 DEMOLITION PLAN

PD101 FIRST FLOOR PLUMBING – PHASE 1 AND 2A

DEMOLITION PLAN

PD102 FIRST FLOOR PLUMBING – PHASE 2B DEMOLITION PLAN

PD201 SECOND FLOOR PLUMBING PHASE 2 DEMOLITION PLAN

PD202 SECOND FLOOR PLUMBING – PHASE 3 DEMOLITION

00 01 15 - 4

PGD101 FIRST FLOOR MEDICAL GAS PHASE 1 DEMOLITION PLAN

P001 GROUND FLOOR PLUMBING PLAN

P101 FIRST FLOOR PLUMBING PLAN

P201 SECOND FLOOR AND ROOF PLUMBING PLAN

P300 ENLARGED PLUMBING PLANS AND PLUMBING ELEVATIONS

P301 DOMESTIC WATER RISER DIAGRAM

P302 WASTE AND VENT RISER DIAGRAM

P400 PLUMBING DETAILS

P500 PLUMBING SCHEDULES

ELECTRICAL

E000 ELECTRICAL TITLE SHEET

ED101 FIRST FLOOR LIGHTING DEMOLITION PLAN

ED102 FIRST FLOOR POWER DEMOLITION PLAN

ED103 FIRST FLOOR SYSTEMS DEMOLITION PLAN

ED201 SECOND FLOOR LIGHTING DEMOLITION PLAN

ED202 SECOND FLOOR POWER DEMOLITION PLAN

ED203 SECOND FLOOR SYSTEMS DEMOLITION PLAN

ED300 ELECTRICAL DEMOLITION RISER DIAGRAM

EE001 GROUND FLOOR ELECTRICAL PLAN

EL101 FIRST FLOOR LIGHTING PLAN

EL201 SECOND FLOOR LIGHTING PLAN

EP101 FIRST FLOOR POWER PLAN

EP201 SECOND FLOOR AND ROOF POWER PLAN

EY101 FIRST FLOOR SYSTEMS PLAN

EY201 SECOND FLOOR SYSTEMS PLAN

EE300 ELECTRICAL RISER DIAGRAM

EE501 ELECTRICAL DETAILS

EE502 ELECTRICAL DETAILS

EE600 ELECTRICAL SCHEDULES

EE601 ELECTRICAL SCHEDULES

- - - END - - -

RENOVATE 1ST FLOOR NEW KITCHEN 438-21-403 11-01-21

01 00 00 -1

SECTION 01 00 00

GENERAL REQUIREMENTS

GENERAL

1.1 SAFETY REQUIREMENTS

A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.

1.2 GENERAL INTENTION

A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for Renovate 1st Floor for New

Kitchen for the Sioux Falls VA Medical Center – Project #438-21-112 as required by drawings and specifications.

B. Visits to the site by Bidders may be made only by appointment with the

. Contracting Officer’s Representative

C. Offices of Stone Group Architects, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.

D. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three workdays unless otherwise designated by the COR.

E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.

1.3 STATEMENT OF BID ITEM(S)

A. ITEM I, GENERAL CONSTRUCTION: BASE BID: Work includes general construction demolition; construction; alterations; loading dock and related roads, walks, grading, drainage; necessary removal of existing structures and construction and certain other items.

01 00 00 -2

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.

1.5 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.

B. Security Procedures:

1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.

2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer and COR so that arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.

3. No photography of VA premises is allowed without written permission of the Contracting Officer. Patients and staff are not to be photographed at any time.

4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.

C. Key Control:

1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) for the purpose of security inspections of every area of project including toolboxes and parked machines and take any emergency action.

2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation. See Section 08 71

00, DOOR HARDWARE and coordinate.

D. Document Control:

01 00 00 -3

1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of

“sensitive information”.

2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.

3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”.

Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.

4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting

Officer.

5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.

6. Notify Contracting Officer and COR immediately when there is a loss or compromise of “sensitive information”.

7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document

Management Software (EDMS).

Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the

EDMS system.

“Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.

1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)

A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer’s Representative. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the

Contracting Officer and shall be built with labor and materials

01 00 00 -4 furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the

Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting

Officer, the buildings and utilities may be abandoned and need not be removed.

C. The Contractor shall, under regulations prescribed by the Contracting

Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting

Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The

Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

D. Working space and space available for storing materials shall be as shown on the drawings.

E. Workers are subject to rules of Medical Center applicable to their conduct.

F. Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of construction materials, debris, standing construction equipment and vehicles at all times.

G. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.

1. Do not store materials and equipment in other than assigned areas.

2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of

Veterans Affairs in quantities sufficient for not more than five workdays. Provide unobstructed access to Medical Center areas required to remain in operation.

01 00 00 -5

3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.

H. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at the nearest main line; or, in absence of such indication, where directed by COR. All such actions shall be coordinated with the COR or Utility Company involved:

1. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.

I. Phasing:

1. The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks.

2. To ensure such executions, Contractor shall furnish the COR with a schedule of approximate phasing and dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such phasing dates to ensure accomplishment of this work in successive phases mutually agreeable to COR and Contractor. Refer to Drawing

Sheets G-005 – G-009 for Demolition and Construction Phasing Plans.

J. Building No.5 will be occupied during performance of work; but immediate areas of alterations will be vacated.

1. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and

01 00 00 -6 affected areas to be used in the Medical Centers operations will not be hindered. Contractor shall permit access to Department of

Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc. to facilitate patient and staff access.

Coordinate alteration work in areas occupied by Department of

Veterans Affairs so that Medical Center operations will continue during the construction period.

2. Immediate areas of alterations not mentioned in preceding

Subparagraph 1 will be temporarily vacated while alterations are performed.

K. Construction Fence: Before construction operations begin, Contractor shall provide a chain link construction fence, 2.1m (seven feet) minimum height, around the construction area indicated on the drawings.

Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum 375mm (15 inches). Bottom of fences shall extend to 25mm

(one inch) above grade. Provide a slats or a curtain for construction privacy Remove the fence when directed by COR.

L. When a building and/or construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:

1. Contractor shall maintain a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified.

2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from

Contractor's employee or watchman.

M. Utilities Services: Maintain existing utility services for Medical

Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services.

Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), 01 00 00 -7 they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.

1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized.

When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR

COMMUNICATIONS INSTALLATIONS and 28 05 00, COMMON WORK RESULTS FOR

ELECTRONIC SAFETY AND SECURITY for additional requirements.

2. Contractor shall submit a request to interrupt any such services to

COR, in writing, 7 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.

3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours (after hours or on weekends).

4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.

5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.

6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.

N. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, shall be removed back to their main line. Those which are indicated to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The

01 00 00 -8 lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.

O. To minimize interference of construction activities with flow of

Medical Center traffic, comply with the following:

1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles. Wherever excavation for new utility lines cross existing roads, at least one lane must be open to traffic at all times with approval. Where trenches could remain partially exposed during working hours, steel plates (capable of normal vehicle traffic) will be placed over and anchored in place so that normal traffic can remain during the day.

2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.

P. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.

1.7 ALTERATIONS

A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR, of buildings or areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by both, to the Contracting

Officer. This report shall list by rooms and spaces:

1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of building.

2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by drawings to be either reused or relocated, or both.

3. Shall note any discrepancies between drawings and existing conditions at site.

4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and COR.

01 00 00 -9

B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by Contractor with new items in accordance with specifications which will be furnished by Government.

Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR

52.243-4).

C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:

1. Re-survey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of

Contractor to restore damage caused by Contractor's workers in executing work of this contract.

D. Protection: Provide the following protective measures:

1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.

2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.

3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.

1.8 DISPOSAL AND RETENTION

A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:

1. Reserved items which are to remain property of the Government are noted on drawings or in specifications as items to be stored. Items

01 00 00 -10 that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COR.

2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.

3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.

4. PCB Transformers and Capacitors: The Contractor shall be responsible for disposal of the Polychlorinated Biphenyl (PCB) transformers and capacitors. The transformers and capacitors shall be taken out of service and handled in accordance with the procedures of the

Environmental Protection Agency (EPA) and the Department of

Transportation (DOT) as outlined in Code of Federal Regulation

(CFR), Titled 40 and 49 respectively. The EPA's Toxic Substance

Control Act (TSCA) Compliance Program Policy Nos. 6-PCB-6 and 6-PCB-

7 also apply. Upon removal of PCB transformers and capacitors for disposal, the "originator" copy of the Uniform Hazardous Waste

Manifest (EPA Form 8700-22), along with the Uniform Hazardous Waste

Manifest Continuation Sheet (EPA Form 8700-22A) shall be returned to the Contracting Officer who will annotate the contract file and transmit the Manifest to the COR.

a) Copies of the following listed CFR titles may be obtained from the Government Printing Office:

40 CFR 261........Identification and Listing of Hazardous Waste

40 CFR 262........Standards Applicable to Generators of Hazardous

Waste

40 CFR 263........Standards Applicable to Transporters of

Hazardous Waste

40 CFR 761........PCB Manufacturing, Processing, Distribution in

Commerce, and use Prohibitions

49 CFR 172........Hazardous Material tables and Hazardous

Material Communications Regulations

01 00 00 -11

49 CFR 173........Shippers - General Requirements for Shipments and Packaging

49 CRR 173........Subpart A General

49 CFR 173........Subpart B Preparation of Hazardous Material for

Transportation

49 CFR 173........Subpart J Other Regulated Material; Definitions and Preparation

TSCA..............Compliance Program Policy Nos. 6-PCB-6 and 6-

PCB-7//

1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND

IMPROVEMENTS (FAR 52.236-9)

A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workers, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.

B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the

Contractor fails or refuses to repair the damage promptly, the

Contracting Officer may have the necessary work performed and charge the cost to the Contractor.

C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils and the environment. Refer to Articles, "Alterations", "Restoration", and

"Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements.

D. Refer to FAR clause 52.236-7, "Permits and Responsibilities," which is included in General Conditions. A National Pollutant Discharge

01 00 00 -12

Elimination System (NPDES) permit is required for this project. The

Contractor is considered an "operator" under the permit and has extensive responsibility for compliance with permit requirements. VA will make the permit application available at the (appropriate medical center) office. The apparent low bidder, contractor and affected subcontractors shall furnish all information and certifications that are required to comply with the permit process and permit requirements.

Many of the permit requirements will be satisfied by completing construction as shown and specified. Some requirements involve the

Contractor's method of operations and operations planning and the

Contractor is responsible for employing best management practices. The affected activities often include, but are not limited to the following:

1. Designating areas for equipment maintenance and repair;

2. Providing waste receptacles at convenient locations and provide regular collection of wastes;

3. Locating equipment wash down areas on site, and provide appropriate control of wash-waters;

4. Providing protected storage areas for chemicals, paints, solvents, fertilizers, and other potentially toxic materials; and

5. Providing adequately maintained sanitary facilities.

1.10 RESTORATION

A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the

COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.

B. Upon completion of contract, deliver work complete and undamaged.

Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.

01 00 00 -13

C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workers to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or abandonment.

D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES"

(FAR 52.243-4) and "DIFFERING SITE CONDITIONS" (FAR 52.236-2).

1.11 PROFESSIONAL SURVEYING SERVICES

A. A registered professional land surveyor or registered civil engineer whose services are retained and paid for by the Contractor shall perform services specified herein and in other specification sections.

The Contractor shall certify that the land surveyor or civil engineer is not one who is a regular employee of the Contractor, and that the land surveyor or civil engineer has no financial interest in this contract.

1.12 AS-BUILT DRAWINGS

A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.

B. All variations shall be shown in the same general detail as used in the contract drawings. To ensure compliance, as-built drawings shall be made available for the COR review, as often as requested.

C. Contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR.

D. Paragraphs A, B, & C shall also apply to all shop drawings.

1.13 WARRANTY MANAGEMENT

A. Warranty Management Plan: Develop a warranty management plan which contains information relevant to FAR 52.246-21 Warranty of Construction at least 30 days before the planned pre-warranty conference, submit one set of the warranty management plan. Include within the warranty management plan all required actions and documents to assure that the

Government receives all warranties to which it is entitled. The plan must be in narrative form and contain sufficient detail to render it suitable for use by future maintenance and repair personnel, whether

01 00 00 -14 tradesman, or of engineering background, not necessarily familiar with this contract. The term “status” as indicated below must include due date and whether item has been submitted or was approved. Warranty information made available during the construction phase must be submitted to the Contracting Officer for approval prior to each monthly invoice for payment. Assemble approved information in a binder and turn over to the Government upon acceptance of the work. The construction warranty period will begin on the date of the project acceptance and continue for the product warranty period. A joint 4 month and 9 month warranty inspection will be conducted, measured from time of acceptance, by the Contactor and the Contracting Officer. Include in the warranty management plan, but not limited to, the following:

1. Roles and responsibilities of all personnel associated with the warranty process, including points of contact and telephone numbers within the company of the Contractor, subcontractors, manufacturers or suppliers involved.

2. Furnish with each warranty the name, address and telephone number of each of the guarantor’s representatives nearest project location.

3. Listing and status of delivery of all Certificates of Warranty for extended warranty items, to include roofs, HVAC balancing, pumps, motors, transformers and for all commissioned systems such as fire protection and alarm systems, sprinkler systems and lightning protection systems, etc.

4. A list for each warranted equipment item, feature of construction or system indicating:

a. Name of item.

b. Model and serial numbers.

c. Location where installed.

d. Name and phone numbers of manufacturers and suppliers.

e. Name and phone numbers of manufacturers or suppliers.

f. Names, addresses and phone numbers of sources of spare parts.

g. Warranties and terms of warranty. Include one-year overall warranty of construction, including the starting date of warranty of construction. Items which have extended warranties must be indicated with separate warranty expiration dates.

h. Starting point and duration of warranty period.

i. Summary of maintenance procedures required to continue the warranty in force.

01 00 00 -15

j. Cross-reference to specific pertinent Operation and Maintenance manuals.

k. Organizations, names and phone numbers of persons to call for warranty service.

l. Typical response time and repair time expected for various warranted equipment.

5. The plans for attendance at the 4 and 9-month post construction warranty inspections conducted by the government.

6. Procedure and status of tagging of all equipment covered by extended warranties.

7. Copies of instructions to be posted near selected pieces of equipment where operation is critical for warranty and/or safety reasons.

B. Performance & Payment Bonds: The Performance & Payment Bonds must remain effective throughout the construction period.

1. In the event the Contractor fails to commence and diligently pursue any construction warranty work required, the Contracting Officer will have the work performed by others, and after completion of the work, will charge the remaining construction warranty funds of expenses incurred by the Government while performing the work, including, but not limited to administrative expenses.

2. In the event sufficient funds are not available to cover the construction warranty work performed by the Government at the contractor’s expenses, the Contracting Officer will have the right to recoup expenses from the bonding company.

3. Following oral or written notification of required construction warranty repair work, the Contractor shall respond in a timely manner. Written verification will follow oral instructions. Failure to respond will be cause for the Contracting Officer to proceed against the Contractor.

C. Pre-Warranty Conference: Prior to contract completion, and at a time designated by the Contracting Officer, the Contractor shall meet with the Contracting Officer to develop a mutual understanding with respect to the requirements of this section. Communication procedures for

Contractor notification of construction warranty defects, priorities with respect to the type of defect, reasonable time required for

Contractor response, and other details deemed necessary by the

Contracting Officer for the execution of the construction warranty will

01 00 00 -16 be established/ reviewed at this meeting. In connection with these requirements and at the time of the Contractor’s quality control completion inspection, furnish the name, telephone number and address of a licensed and bonded company which is authorized to initiate and pursue construction warranty work action on behalf of the Contractor.

This point of contract will be located within the local service area of the warranted construction, be continuously available and be responsive to Government inquiry on warranty work action and status. This requirement does not relieve the Contractor of any of its responsibilities in conjunction with other portions of this provision.

D. Contractor’s Response to Construction Warranty Service Requirements:

E. Following oral or written notification by the Contracting Officer, the

Contractor shall respond to construction warranty service requirements in accordance with the “Construction Warranty Service Priority List” and the three categories of priorities listed below. Submit a report on any warranty item that has been repaired during the warranty period.

Include within the report the cause of the problem, date reported, corrective action taken, and when the repair was completed. If the

Contractor does not perform the construction warranty within the timeframe specified, the Government will perform the work and back charge the construction warranty payment item established.

1. First Priority Code 1. Perform onsite inspection to evaluate situation, and determine course of action within 4 hours, initiate work within 6 hours and work continuously to completion or relief.

2. Second Priority Code 2. Perform onsite inspection to evaluate situation, and determine course of action within 8 hours, initiate work within 24 hours and work continuously to completion or relief.

3. Third Priority Code 3. All other work to be initiated within 3 work days and work continuously to completion or relief.

4. The “Construction Warranty Service Priority List” is as follows:

a) Code 1-Life Safety Systems

Fire suppression systems.

Fire alarm system(s).

b) Code 1-Air Conditioning Systems

Air conditioning leak in part of the building, if causing damage.

Air conditioning system not cooling properly.

c) Code 1 Doors

01 00 00 -17

Overhead doors not operational, causing a security, fire or safety problem.

Interior, exterior personnel doors or hardware, not functioning properly, causing security, fire or safety problem.

d) Code 3-Doors

Overhead doors not operational.

Interior/exterior personnel doors or hardware not functioning properly.

e) Code 1-Electrical

Power failure (entire area or any building operational after

1600 hours).

Security lights.

Smoke detectors.

f) Code 2-Electrical

Power failure (no power to a room or part of building).

Receptacle and lights not operational (in a room or part of building).

g) Code 3-Electrical

Exterior lights not operational.

h) Code 1-Gas

Leaks and pipeline breaks.

i) Code 1-Heat

Power failure affecting heat.

j) Code 1-Plumbing

Hot water heater failure.

Leaking water supply pipes

k) Code 2-Plumbing

Flush valves not operating properly

Fixture drain, supply line or any water pipe leaking.

Toilet leaking at base.

l) Code 3- Plumbing

Leaky faucets.

m) Code 3-Interior

Floors damaged.

Paint chipping or peeling.

Casework damaged.

n) Code 1-Roof Leaks

01 00 00 -18

Damage to property is occurring.

o) Code 2-Water (Exterior)

No water to facility.

p) Code 2-Water (Hot)

No hot water in portion of building listed.

q) Code 3

All work not listed above.

r) Warranty Tags: At the time of installation, tag each warranted item with a durable, oil and water-resistant tag approved by the

Contracting Officer. Attach each tag with a copper wire and spray with a silicone waterproof coating. Also submit two record copies of the warranty tags showing the layout and design. The date of acceptance and the QC signature must remain blank until the project is accepted for beneficial occupancy. Show the following information on the tag.

Warranty Tags

Type of product/material

Model number

Serial number

Contract number

Warranty period from/to

Inspector’s signature

Construction Contractor

Address

Telephone number

Warranty Contact

Address

Telephone number

Warranty response time priority code

1.14 USE OF ROADWAYS

A. For hauling, use only established public roads and roads on Medical

Center property and, when authorized by the COR, such temporary roads which are necessary in the performance of contract work. Temporary roads shall be constructed and restoration performed by the Contractor at Contractor's expense. When necessary to cross curbing, sidewalks, or

01 00 00 -19 similar construction, they must be protected by well-constructed bridges.

B. When new permanent roads are to be a part of this contract, Contractor may construct them immediately for use to facilitate building operations. These roads may be used by all who have business thereon within zone of building operations.

C. When certain buildings (or parts of certain buildings) are required to be completed in advance of general date of completion, all roads leading thereto must be completed and available for use at time set for completion of such buildings or parts thereof.

1.15 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT

F. Use of new installed mechanical and electrical equipment to provide heat, ventilation, plumbing, light and power will be permitted subject to written approval and compliance with the following provisions:

1. Permission to use each unit or system must be given by COR in writing. If the equipment is not installed and maintained in accordance with the written agreement and following provisions, the

COR will withdraw permission for use of the equipment.

2. Electrical installations used by the equipment shall be completed in accordance with the drawings and specifications to prevent damage to the equipment and the electrical systems, i.e. transformers, relays, circuit breakers, fuses, conductors, motor controllers and their overload elements shall be properly sized, coordinated and adjusted.

Installation of temporary electrical equipment or devices shall be in accordance with NFPA 70, National Electrical Code, (2014

Edition), Article 590, Temporary Installations. Voltage supplied to each item of equipment shall be verified to be correct and it shall be determined that motors are not overloaded. The electrical equipment shall be thoroughly cleaned before using it and again immediately before final inspection including vacuum cleaning and wiping clean interior and exterior surfaces.

3. Units shall be properly lubricated, balanced, and aligned.

Vibrations must be eliminated.

4. Automatic temperature control systems for preheat coils shall function properly and all safety controls shall function to prevent coil freeze-up damage.

5. The air filtering system utilized shall be that which is designed for the system when complete, and all filter elements shall be

01 00 00 -20 replaced at completion of construction and prior to testing and balancing of system.

6. All components of heat production and distribution system, metering equipment, condensate returns, and other auxiliary facilities used in temporary service shall be cleaned prior to use; maintained to prevent corrosion internally and externally during use; and cleaned, maintained and inspected prior to acceptance by the Government.

G. Prior to final inspection, the equipment or parts used which show wear and tear beyond normal, shall be replaced with identical replacements, at no additional cost to the Government.

H. This paragraph shall not reduce the requirements of the mechanical and electrical specifications sections.

I. Any damage to the equipment or excessive wear due to prolonged use will be repaired replaced by the contractor at the contractor’s expense.

1.16 TEMPORARY USE OF EXISTING ELEVATORS

A. Use of existing elevator(s) for handling building materials and

Contractor's personnel will be permitted subject to following provisions:

1. Contractor makes all arrangements with the…