Construction Documents Summary
This is a comprehensive set of construction documents for a kitchen renovation project at the Sioux Falls VA Medical Center in South Dakota. The project involves renovating the first floor to create a new kitchen facility and includes structural, civil, architectural, and MEP (mechanical, electrical, plumbing) design drawings prepared by multiple consulting firms: Dunham Associates (civil), ERA Structural Engineering (structural), Rippe Associates (MEP), and Stone Group Architects (food service). The documents are dated August 18, 2026, and include 100% construction document submittals with general structural notes, foundation details, framing plans, and extensive architectural floor plans, elevations, sections, and interior details.
The project scope encompasses demolition of existing kitchen equipment and structures, construction of a new concrete loading dock with stairs, installation of new structural steel beams and columns, construction of concrete walls and slabs-on-grade, metal deck flooring systems, mechanical equipment installations, new kitchen equipment including coolers and freezers, retail storefront systems with glass enclosures, multiple door and window types with fire ratings where required, and interior finishes including wall casework, lockers, and dining/serving areas. Critical design parameters include a Risk Category IV classification, basic design wind speed of 112 mph with 90 mph allowable, 40 psf ground snow load, seismic design category A, and various live load requirements for loading docks (125 psf). Traffic control, erosion control, and phasing requirements mandate maintained access to the existing loading dock throughout construction, with night-time work (4pm-7am) required in occupied areas. Construction must be completed in phases to allow ongoing facility operations.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
24TH STREET
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Revision# Description Date:
on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s i nc h on e fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot 6" on e in ch o ne fo ot 6" on e an d o ne h al f i nc he s = o ne fo ot 6" th re e in ch es o ne fo ot
6"
SIOUX FALLS, SOUTH DAKOTAFOR OFFICIAL USE ONLY
NORTH
KEYPLAN
NTS
CIVIL:
Dunham Asssociates, Inc.
50 South Sixth St Suite 1100 Minneapolis, MN 55402 Phone: 612-465-7550
MEP:
Rippe Associates 10400 Yellow Circle Dr Suite 100 Minneapolis, MN 55343 Phone: 952-933-0313
FOOD SERVICE:
Stone Group Architects, Inc.
600 East 7th Street Sioux Falls, SD 57103 Phone: 605-271-1144
Ulteig Engineers, Inc.
5701South Corporate Place Sioux Falls, SD 57108 Phone: 605-323-2306
Ericksen Roed Associates 2550 University Ave W Suite 423-S St. Paul, MN 55402 Phone: 651-251-7570
STRUCTURAL:
3/29/2235% CP Review
RENOVATE FIRST FLOOR FOR
NEW KITCHEN FOR THE SIOUX
FALLS VA MEDICAL CENTER 5
5-10-2022
PLANS FOR
CONSTRUCTION
SGA #201956
VA #438-21-112
CMAS
C-100
CIVIL TRAFFIC CONTROL
PLAN
0 10 20 40
N
E
S
W
TRAFFIC CONTROL
PLAN NOTES
GENERAL MAINTENANCE OF TRAFFIC
1. Installation of traffic control shall conform to the Manual on Uniform Traffic Control Devices (MUTCD) 2009 Edition unless otherwise modified in the plans.
2. Removing, relocating, salvaging, and resetting of existing traffic control devices, including delineation, shall be the responsibility of the Contractor. Any delineators or signs damaged or lost shall be replaced by the Contractor at no cost to the City.
Payment for removing, salvaging, installing, and/or resetting of signs shall be made using the applicable bid items.
3. Storage of vehicles and equipment shall be outside the clear zone and as near as possible to the right-of-way line. Contractor's employees should mobilize at a location off the right-of-way and arrive at the work sites in a minimum number of vehicles necessary to perform the work.
4. Indiscriminate driving and parking of vehicles outside of the project limit will not be permitted. Any damage to the vegetation, surfacing, embankment, delineators and existing signs resulting from such indiscriminate use shall be repaired and/or restored by the Contractor, at no expense to the City, and to the satisfaction of the Engineer.
5. All breakaway sign supports shall comply with FHWA NCHRP 350 crash-worthy requirements. The Contractor shall provide post installation details at the preconstruction meeting for all steel post breakaway sign support assemblies.
6. The Contractor or designated traffic control subcontractor shall ensure the adequacy, legibility, and reflectivity of each sign and device. Sign washing shall be considered incidental to Traffic Control and required as directed by the Engineer.
7. The Contractor is responsible for maintaining all traffic control devices throughout the project at all times in accordance with the plans and the latest edition of the MUTCD. The Contractor shall immediately take appropriate measures to remedy any traffic control devices that need to removed, replaced, etc. due to changes in phasing, sequencing, weather, or any other reason upon notification from the Engineer. Failure to correct any traffic control devices that are not in compliance with the plans or the latest edition of the MUTCD upon notification from the Engineer will result in a price adjustment to the contract. The minimum price adjustment to the contract will be $100 per day per occurrence. The Engineer may delay the issuance of the price adjustment(s) if the Engineer has determined all the following apply:
a. The Contractor has made a good faith effort to bring the items into compliance with the plans and latest edition of the MUTCD.
b. Compliance was not achieved due to weather conditions outside the Contractor's control and the conditions were severe enough to prevent the Contractor from bringing the item into compliance.
c. The Contractor brought the item into compliance as soon as possible after the weather and site conditions permit.
LONGITUDINAL PEDESTRIAN BARRICADE
Longitudinal pedestrian barricades should not be used to provide positive protection for pedestrians.
To prevent any tripping hazard to pedestrians, ballast will be located behind or internal to the device, and at no time shall impede into the pedestrian access route.
When longitudinal pedestrian barricades are combined in a series, the maximum gap between devices that do not interlock shall be one inch. Joints between devices that do interlock will be closed and flush to prevent canes or small wheels from being trapped and to facilitate safe hand trailing. When used as a sidewalk closure mechanism, longitudinal pedestrian barricades must run the entire width of the sidewalk. Longitudinal pedestrian barricade should provide a color contrasting pattern. Black should not be used to color any base on a device. The devices should comply with the general color and stripe pattern requirements of Section 6F.68 of the MUTCD.
Longitudinal pedestrian barricade will have continuous bottom and top surfaces. The top surface will be smooth to allow safe hand trailing. Both upper and lower surfaces will share a common vertical plane.
All costs will be incidental to the contract Lump Sum Bid Price
TEMPORARY CONSTRUCTION SIGNS
Installation of temporary traffic control shall conform to the Manual on Uniform Traffic Control Devices (MUTCD) 2009 Edition, Section 6F.03 Sign Placement, unless otherwise modified in the plans. Signs mounted on portable sign supports shall meet minimal requirements provided in Paragraphs 4 through 6 of Section 6F.03 Sign Placement if used for duration greater than 30 days.
The R9-8 through R9-11a series, R11 series, W1-6 through W1-8 series, M4-10, E5-1, or other similar type signs may be used on portable sign supports that do not meet the minimum mounting heights provided in Paragraphs 4 through 6 up to 30 days. All other signs must meet the minimum height requirements if used longer than 3 days.
TRAFFIC CONTROL PHASING
Contractor shall coordinate construction timing with adjacent project in such a way as to maintain access to existing loading dock at all time.
ITEMIZED LIST FOR TRAFFIC CONTROL
SIGN DETAIL
4/19/2022
6/28/22
NEW LOADING DOCK
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Revision# Description Date:
on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s i nc h on e fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot 6" on e in ch o ne fo ot 6" on e an d o ne h al f i nc he s = o ne fo ot 6" th re e in ch es o ne fo ot
6"
SIOUX FALLS, SOUTH DAKOTAFOR OFFICIAL USE ONLY
NORTH
KEYPLAN
NTS
CIVIL:
Dunham Asssociates, Inc.
50 South Sixth St Suite 1100 Minneapolis, MN 55402 Phone: 612-465-7550
MEP:
Rippe Associates 10400 Yellow Circle Dr Suite 100 Minneapolis, MN 55343 Phone: 952-933-0313
FOOD SERVICE:
Stone Group Architects, Inc.
600 East 7th Street Sioux Falls, SD 57103 Phone: 605-271-1144
Ulteig Engineers, Inc.
5701South Corporate Place Sioux Falls, SD 57108 Phone: 605-323-2306
Ericksen Roed Associates 2550 University Ave W Suite 423-S St. Paul, MN 55402 Phone: 651-251-7570
STRUCTURAL:
3/29/2235% CP Review
RENOVATE FIRST FLOOR FOR
NEW KITCHEN FOR THE SIOUX
FALLS VA MEDICAL CENTER 5
5-10-2022
PLANS FOR
CONSTRUCTION
SGA #201956
VA #438-21-112
CMAS
C-200
CIVIL EROSION CONTROL
PLAN
0 5 10 20
N
E
S
W
EROSION CONTROL:
THE CONTRACTOR SHALL INSTALL ANY
APPROPRIATE EROSION CONTROL THAT IS
DEEMED NECESSARY BY THE VA DURING THE
CONSTRUCTION. THIS INCLUDES BUT IS NOT
LIMITED TO INLET PROTECTION, SILT FENCE,
TRACKING CONTROL STATIONS, SEEDING,
MULCHING, ETC.
THE CONTRACTOR SHALL INSURE THAT NO
SEDIMENT OR SEDIMENT LADEN WATER LEAVES
THE PROJECT AREA WITHOUT EXPOSURE TO AN
EROSION OR SEDIMENT CONTROL DEVICE.
THE CONTRACTOR IS RESPONSIBLE TO REMOVE
ALL TEMPORARY EROSION CONTROL AND
SEDIMENT CONTROL DEVICES WHEN THE SITE
REACHES FINAL STABILIZATION.
SWEEPING OF ADJACENT STREETS SHALL BE
PERFORMED AS NEEDED TO REMOVE TRACKED
MUD FROM THE ROADWAY.
EROSION CONTROL LEGEND
INLET PROTECTION
VEHICLE TRACKING CONTROL
SILT FENCE
EROSION CONTROL NOTES
EROSION CONTROL DETAILS
D
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Revision# Description Date:
on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s i nc h on e fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot 6" on e in ch o ne fo ot 6" on e an d o ne h al f i nc he s = o ne fo ot 6" th re e in ch es o ne fo ot
6"
SIOUX FALLS, SOUTH DAKOTAFOR OFFICIAL USE ONLY
NORTH
KEYPLAN
NTS
CIVIL:
Dunham Asssociates, Inc.
50 South Sixth St Suite 1100 Minneapolis, MN 55402 Phone: 612-465-7550
MEP:
Rippe Associates 10400 Yellow Circle Dr Suite 100 Minneapolis, MN 55343 Phone: 952-933-0313
FOOD SERVICE:
Stone Group Architects, Inc.
600 East 7th Street Sioux Falls, SD 57103 Phone: 605-271-1144
Ulteig Engineers, Inc.
5701South Corporate Place Sioux Falls, SD 57108 Phone: 605-323-2306
Ericksen Roed Associates 2550 University Ave W Suite 423-S St. Paul, MN 55402 Phone: 651-251-7570
STRUCTURAL:
3/29/2235% CP Review
RENOVATE FIRST FLOOR FOR
NEW KITCHEN FOR THE SIOUX
FALLS VA MEDICAL CENTER 5
5-10-2022
PLANS FOR
CONSTRUCTION
SGA #201956
VA #438-21-112
CMAS
C-300
CIVIL DEMOLITION PLAN
0 5 10 20
N
E
S
W
REMOVAL LEGEND
REMOVE CURB & GUTTER
REMOVE CONCRETE PAVEMENT
NOTES:
1. ALL TREES REMOVED SHALL BE REPLACED IN
A MANNER AND IN LOCATIONS APPROVED BY
THE VA AND FOLLOWING VA
SPECIFICATIONS.
2. ALL AREAS DISTURBED DUE TO
CONSTRUCTION OF THE STEAM TUNNEL
SHALL BE SEEDED PER VA SPECIFICATIONS.
3. ULTEIG ENGINEERS, INC. DOES NOT CERTIFY
TO THE COMPLETENESS AND/OR ACCURACY
OF THESE LOCATIONS. PERSONS USING THIS
SURVEY SHOULD CONTACT EACH UTILITY
COMPANY TO VERIFY THAT ALL LINES ARE
SHOWN HEREON.
SANITARY SEWER PIPE (SIZE)
SANITARY SEWER MANHOLE
WATER MAIN PIPE (SIZE)
WATER VALVE
FIRE HYDRANT
WATER MANHOLE
STORM SEWER PIPE (SIZE)
STORM SEWER DRAIN
STORM SEWER JUNCTION BOX
UNDERGROUND COMMUNICATIONS
COMMUNICATIONS JUNCTION BOX
UNDERGROUND POWER
ELECTRICAL JUNCTION BOX
UNDERGROUND OXYGEN
UNDERGROUND GAS
UNDERGROUND FIBER OPTIC
CHAIN LINK FENCE
EXISTING LEGEND
REMOVE CHAIN LINK FENCE
BENCHMARK
EXISTING CONCRETE PAVEMENT
24TH STREET
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Revision# Description Date:
on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s i nc h on e fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot 6" on e in ch o ne fo ot 6" on e an d o ne h al f i nc he s = o ne fo ot 6" th re e in ch es o ne fo ot
6"
SIOUX FALLS, SOUTH DAKOTAFOR OFFICIAL USE ONLY
NORTH
KEYPLAN
NTS
CIVIL:
Dunham Asssociates, Inc.
50 South Sixth St Suite 1100 Minneapolis, MN 55402 Phone: 612-465-7550
MEP:
Rippe Associates 10400 Yellow Circle Dr Suite 100 Minneapolis, MN 55343 Phone: 952-933-0313
FOOD SERVICE:
Stone Group Architects, Inc.
600 East 7th Street Sioux Falls, SD 57103 Phone: 605-271-1144
Ulteig Engineers, Inc.
5701South Corporate Place Sioux Falls, SD 57108 Phone: 605-323-2306
Ericksen Roed Associates 2550 University Ave W Suite 423-S St. Paul, MN 55402 Phone: 651-251-7570
STRUCTURAL:
3/29/2235% CP Review
RENOVATE FIRST FLOOR FOR
NEW KITCHEN FOR THE SIOUX
FALLS VA MEDICAL CENTER 5
5-10-2022
PLANS FOR
CONSTRUCTION
SGA #201956
VA #438-21-112
CMAS
C-400
CIVIL SITE PLAN
SANITARY SEWER PIPE (SIZE)
SANITARY SEWER MANHOLE
WATER MAIN PIPE (SIZE)
WATER VALVE
FIRE HYDRANT
WATER MANHOLE
STORM SEWER PIPE (SIZE)
STORM SEWER DRAIN
STORM SEWER JUNCTION BOX
UNDERGROUND COMMUNICATIONS
COMMUNICATIONS JUNCTION BOX
UNDERGROUND POWER
ELECTRICAL JUNCTION BOX
UNDERGROUND OXYGEN
UNDERGROUND GAS
EXISTING CONCRETE PAVEMENT
UNDERGROUND FIBER OPTIC
CHAIN LINK FENCE
EXISTING LEGEND
PAVING LEGEND
BENCHMARK
NOTE: CONTRACTOR SHALL BE
RESPONSIBLE TO PROVIDE SUITABLE
SUBGRADE STABILIZATION
EXISTING PAVEMENT IS
ASSUMED TO BE 8"
REINFORCED
PROPOSED 8" CONCRETE PAVEMENT
0 5 10 20
N
E
S
W
NOTE:
GENERAL NOTES
GENERAL NOTES
STANDARD CURB AND GUTTER
DROP TYPE CURB AND GUTTER
S TYPE CURB AND GUTTER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Revision# Description Date:
on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s i nc h on e fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot 6" on e in ch o ne fo ot 6" on e an d o ne h al f i nc he s = o ne fo ot 6" th re e in ch es o ne fo ot
6"
SIOUX FALLS, SOUTH DAKOTAFOR OFFICIAL USE ONLY
NORTH
KEYPLAN
NTS
CIVIL:
Dunham Asssociates, Inc.
50 South Sixth St Suite 1100 Minneapolis, MN 55402 Phone: 612-465-7550
MEP:
Rippe Associates 10400 Yellow Circle Dr Suite 100 Minneapolis, MN 55343 Phone: 952-933-0313
FOOD SERVICE:
Stone Group Architects, Inc.
600 East 7th Street Sioux Falls, SD 57103 Phone: 605-271-1144
Ulteig Engineers, Inc.
5701South Corporate Place Sioux Falls, SD 57108 Phone: 605-323-2306
Ericksen Roed Associates 2550 University Ave W Suite 423-S St. Paul, MN 55402 Phone: 651-251-7570
STRUCTURAL:
3/29/2235% CP Review
RENOVATE FIRST FLOOR FOR
NEW KITCHEN FOR THE SIOUX
FALLS VA MEDICAL CENTER 5
5-10-2022
PLANS FOR
CONSTRUCTION
SGA #201956
VA #438-21-112
CMAS
C-500
CIVIL PAVING JOINTING
PLAN
0 1.25 2.5 5
N
E
S
W
CONTRACTOR SHALL SUBMIT
JOINT LAYOUT PLAN PRIOR TO
CONSTRUCTION
-THE CONTRACTOR SHALL CONSTRUCT THE
CONCRETE PAVEMENT IN PHASES SO THAT
ACCESS TO THE EXISTING LOADING DOCK IS
MAINTAINED AT ALL TIMES.
-THE JOINT PLAN SHOWN SHALL BE AN EXAMPLE
TO THE CONTRACTOR. FINAL JOINTING SHALL
BE DETERMINED AT THE TIME OF CONSTRUCTION
AND BE REPRESENTATIVE OF THE
CONTRACTORS CONSTRUCTION PROCESS.
NOTE:
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
Revision# Description Date:
on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s i nc h on e fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot 6" on e in ch o ne fo ot 6" on e an d o ne h al f i nc he s = o ne fo ot 6" th re e in ch es o ne fo ot
6"
SIOUX FALLS, SOUTH DAKOTAFOR OFFICIAL USE ONLY
NORTH
KEYPLAN
NTS
CIVIL:
Dunham Asssociates, Inc.
50 South Sixth St Suite 1100 Minneapolis, MN 55402 Phone: 612-465-7550
MEP:
Rippe Associates 10400 Yellow Circle Dr Suite 100 Minneapolis, MN 55343 Phone: 952-933-0313
FOOD SERVICE:
Stone Group Architects, Inc.
600 East 7th Street Sioux Falls, SD 57103 Phone: 605-271-1144
Ulteig Engineers, Inc.
5701South Corporate Place Sioux Falls, SD 57108 Phone: 605-323-2306
Ericksen Roed Associates 2550 University Ave W Suite 423-S St. Paul, MN 55402 Phone: 651-251-7570
STRUCTURAL:
3/29/2235% CP Review
RENOVATE FIRST FLOOR FOR
NEW KITCHEN FOR THE SIOUX
FALLS VA MEDICAL CENTER 5
5-10-2022
PLANS FOR
CONSTRUCTION
SGA #201956
VA #438-21-112
CMAS
C-600
CIVIL GRADING PLAN
0 2.5 5 10
N
E
S
W
SANITARY SEWER PIPE (SIZE)
SANITARY SEWER MANHOLE
WATER MAIN PIPE (SIZE)
WATER VALVE
FIRE HYDRANT
WATER MANHOLE
STORM SEWER PIPE (SIZE)
STORM SEWER DRAIN
STORM SEWER JUNCTION BOX
UNDERGROUND COMMUNICATIONS
COMMUNICATIONS JUNCTION BOX
UNDERGROUND POWER
ELECTRICAL JUNCTION BOX
UNDERGROUND OXYGEN
UNDERGROUND GAS
UNDERGROUND FIBER OPTIC
CHAIN LINK FENCE
EXISTING LEGEND
BENCHMARK
EXISTING CONCRETE PAVEMENT
D STAMP
GENERAL STRUCTURAL NOTES
1 DESIGN CRITERIA:
1.1 BUILDING CODES USED FOR DESIGN:
1.1.1 IBC 2021 with state amendments.
1.2 STRUCTURAL TESTS AND SPECIAL INSPECTIONS:
1.2.1 Special inspections shall be performed by an independent testing agency according to IBC Chapter 17.
Section 1704.2.5 - Fabricators Section 1705.2 and Table 1705.2.3 - Steel Construction
Table 1705.6 - Soils
Table 1705.3 - Post-installed Anchors
1.2.2 Qualifications of special inspectors and frequency of tests and inspections shall be as defined in CASE 962C - Guideline for International Building Code-Mandated
Special Inspections and Tests and Quality Assurance.
1.3 FUTURE CONSTRUCTION:
1.3.1 VERTICAL: None.
1.3.2 HORIZONTAL: None.
1.4 DESIGN LOADS:
1.4.1 Risk Category:
From IBC Table 1604.5
Risk Category . . . . . . . . . . . . . . . . . . . . . . . . IV
1.4.2 DESIGN LIVE LOADS:
Loading Dock . . . . . . . . . . . . . . . . . . . . . . 125 PSF
1.4.3 WIND LOAD:
Basic Design Wind Speed: . . . . . . . . . . 112 MPH
Allowable Design Wind Speed: . . . . . . . . 90 MPH Exposure Classification: . . . . . . . . . . . . . . B
Internal Pressure Coeff: . . . . . . . . +0.18, -0.18
Wind pressures used for the design of exterior components and cladding shall be calculated by a professional engineer registered in the state where the project is located. Calculations shall be submitted for review.
1.4.4 SNOW LOAD:
Ground Snow Load: . . . . . . . . . . . . . . . . . 40 PSF
Flat Roof Snow Load: . . . . . . . . . . . . . . . 34 PSF
Snow Exposure Factor: . . . . . . . . . . . . . . 1.0 Snow Load Importance Factor: . . . . . . . . 1.0
Roof Thermal Factor: . . . . . . . . . . . . . . . .1.2
Roof Slope Factor: . . . . . . . . . . . . . . . . . .1.0
See plans for snowdrift surcharge loads and widths.
1.4.5 RAIN LOAD:
Rain Intensity: . . . . . . . . . . . . . . . . . . . . . 3.5 IN/HR Roof Live Load: . . . . . . . . . . . . . . . . . . . . . 40 PSF
1.4.6 SEISMIC LOADS:
Importance Factor: . . . . . . . . . . . . . . . . . 1.5
Seismic Design Category: . . . . . . . . . . . . . A
Site Class: . . . . . . . . . . . . . . . . . . . . . . . . . D
Mapped Spectral Response Coefficients
SS: . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.094 g S1: . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.035 g
Design Spectral Response Coefficients
SDS: . . . . . . . . . . . . . . . . . . . . . . . . . . 0.1 g
SD1: . . . . . . . . . . . . . . . . . . . . . . . . . . 0.057 g
1.4.7 All special loads applicable to the design of the building, including the loads of machinery or equipment exceeding the live loads given above, are shown on the drawings.
1.5 DEFLECTION AND DRIFT
1.5.1 Horizontal framing members are designed for deflections as tabulated. Deflections of horizontal to horizontal framing members are additive. Subcontractors shall make allowance for installation and operation of their systems to accommodate these deflections.
TYPICAL FRAMING MEMBERS
Roof Live Load . . . . . . . . . . . . . . . . . . . . . span/360
Roof Total Load . . . . . . . . . . . . . . . . . . . . . . span/240
1.5.2 Story drifting criteria:
Wind: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . H/400 Seismic: . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.020 hx
2 DESIGN STRENGTHS:
2.1 CONCRETE:
2.1.1 All concrete shall be stone aggregate unless noted. See Specifications for additional durability requirements.
2.1.2 Minimum concrete 28-day compressive strength shall be as follows:
Class f'c Type Add'l Location
(PSI) Remarks
A 3000 NWT Footings and Piers
D 4500 NTW, Air Note 1 Exterior Slabs and Walls
Note 1: Limit Water to Cement Ratio to 0.45
2.2 CONCRETE REINFORCEMENT:
Deformed Bars: . . . . . . . . . . . . . . . .Fy = 60 KSI ASTM A615 Welded Wire Fabric: . . . . . . . . . . . Fy = 70 KSI ASTM A185
Micro/Macro Synthetic Fibers: . . . . . . . . . . . . . . . . . . ASTM C1116
2.3 STRUCTURAL STEEL:
Rect. Hollow Structural Shapes: . . Fy = 50 KSI ASTM A500 C
Other Shapes or Plates: . . . . . . . . . Fy = 36 KSI ASTM A36
Bolts: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ASTM F3125
(GR A325/A490)
Anchor Rods: . . . . . . . . . . . . . . . . . Fy = 36 KSI ASTM F1554
Welding Electrodes: . . . . . . . . . . . . Fy = 70 KSI E70XX (typical)
Non-Shrink Grout: . . . . . . . . . . . . . f'c = 8,000 PSI ASTM C1107
2.4 STEEL DECK:
Roof Deck: . . . . . . . . . . . . . . . . . . . Fy = 33 KSI ASTM A653
2.5 PARKING AREAS / STRUCTURE EXPOSED TO WEATHER:
2.5.1 All structural steel and embed plates exposed to weather or located in parking areas shall be hot-dip galvanized unless noted otherwise.
2.5.2 Field welds shall be touched up with 2 coats of zinc rich paint.
3 FOUNDATIONS AND EARTHWORK:
3.1.2 This report is for informational purposes only and shall not be considered part of the contract documents. Furthermore, no warranty is made by the owner with regard to the completeness and accuracy of the subsurface investigation data, soil test data, statements and interpretations given in the report.
3.2 GROUND WATER:
3.2.1 Water levels indicated on the boring logs are subject to seasonal annual variations. If necessary, a dewatering system of sufficient capacity shall be installed and operated to maintain the construction area free of water at all times.
3.3 EXCAVATIONS:
3.3.1 Should any questionable conditions be encountered during excavation, notify Owner's Representative immediately.
3.3.2 No engineered fill shall be placed until excavation bottoms have been inspected and approved by the Geotechnical Engineer.
3.3.3 Water shall not be permitted to accumulate in footing excavations.
3.3.4 The slab-on-grade design is based on a modulus of subgrade reaction of 150 PCI.
3.4 FOOTINGS:
3.4.1 The foundation design is based on a total load net soil pressure of:
Wall Footings: . . . . . . . . . . . . . . . . . . . 3000 PSF
3.4.2 Foundations are assumed to be supported on native material or properly compacted structural fill. All footing excavations shall be inspected, prior to concrete placement, by the Geotechnical Engineer to verify suitable bearing material of capacity as specified.
3.4.3 Notify the Owner's representative when additional excavation is required to reach suitable bearing material.
3.4.4 Footing steps shall be located generally where indicated on the plan, and shall be installed as detailed.
3.4.5 Bottom of exterior building footings surrounding heated areas are to be at least 42" below final outside grade unless dimensioned otherwise. Bottom of exterior building footings at stoops or other unheated areas are to be at least 60" below final outside grade unless dimensioned otherwise.
3.4.6 Contractor shall provide frost protection for all footings when footings may be exposed to freezing conditions. Frost protection may include insulating blankets or at least 60" of soil above the bottom of footing.
3.4.7 All continuous footings shall be centered under walls unless dimensioned otherwise.
3.5 NON-FROST SUSCEPTIBLE FILL
3.5.1 Where non-frost susceptible fill is required, fill should consist of clean, open graded crushed stone. See the geotechnical report for additional requirements.
3.5.2 Non-frost susceptible fill shall extend below the freeze zone.
3.6 RETAINING WALLS:
3.6.1 Unrestrained retaining wall design is based on an active equivalent fluid pressure of 45
PCF. See the Geotechnical Report and the backfilling section below for backfill materials and procedures.
3.6.2 Restrained retaining wall design is based on an at-rest equivalent fluid pressure of 65
PCF. See the Geotechnical Report and the backfilling section below for backfill materials and procedures.
3.6.3 The allowable passive pressure is based on an equivalent fluid pressure of 250 PCF.
3.6.4 The coefficient of friction due to sliding is 0.5.
3.7 BACKFILLING:
3.7.1 No backfilling and compacting of earth shall be permitted against retaining walls until walls and footings have reached 100% of their design strength, or unless adequate bracing is provided. Bracing must be reviewed by the Engineer.
3.7.2 No backfilling and compacting of earth shall be permitted against basement or other foundation walls until all slabs that support the wall against lateral earth pressure have been poured and have reached 75% of their design strength, or unless adequate bracing is provided. Bracing must be reviewed by the Engineer.
3.7.3 Material used for backfill shall be free draining engineered backfill unless noted otherwise. See the Geotechnical Report for additional information.
3.7.4 Both sides of foundation walls shall be backfilled simultaneously so as to prevent overturning or lateral movement of walls. All grade beams shall be adequately braced to prevent lateral movement during backfilling and compaction.
3.7.5 No fill or backfill shall be settled by the use of water.
3.8 FOUNDATION COMPLETION:
3.8.1 The Geotechnical Engineer or Special Inspector shall certify in writing that all foundations were placed and completed as specified.
4 CONCRETE:
4.1 REFERENCES:
ACI 315 ACI Detailing Manual
ACI 318 Building Code Requirements for Reinforced Concrete CRSI MSP Manual of Standard Practice
AWS D1.4 Structural Welding Code - Reinforcing Steel
CRSI Recommended Practice for Placing Reinforcing Bars
4.2 REINFORCING STEEL:
4.2.1 The reinforcing steel Contractor shall fabricate all reinforcement and furnish all accessories, chairs, spacer bars and supports necessary to secure the reinforcement unless shown otherwise on the plans and/or details.
4.2.2 Concrete reinforcement shall be placed according to ACI and CRSI "Recommended
Practice for Placing Reinforcing Bars".
4.2.3 Minimum Clear Cover For Concrete Reinforcement:
Footings . . . . . . . . . . . . . . . . . . . . . . . . . . 2" Sides, 3" Bottom, 2"
Top
Foundation Walls Exterior Face . . . . . . . . . . . . . . . . . . . . . . 2"
Interior Face . . . . . . . . . . . . . . . . . . . . . . 2" Against Soil
Slabs on Grade . . . . . . . . . . . . . . . . . . . . . . . . Center of Slab
4.2.4 See typical detail for required bar development lengths and lap splice lengths.
4.2.5 No welding of reinforcement shall be permitted unless specifically called for or reviewed by the Structural Engineer. Where welding is permitted, all welding of reinforcing bars shall conform to: "Structural Welding Code - Reinforcing Steel". A chemical analysis of the reinforcing bars to be welded shall be submitted for review.
4.3 ANCHORING TO CONCRETE
4.3.1 Post-installed anchors shall be installed by qualified personnel in accordance with the
Manufacturer’s Printed Installation Instructions.
4.3.2 Expansion anchors shall not be loaded until concrete has achieved a minimum age of 7 days. Adhesive anchors shall not be loaded until concrete achieved a minimum age of 21 days.
4.3.3 Expansion anchors shall be Hilti Kwik Bolt TZ2 or approved equal, unless noted otherwise. Embedment shall be as follows unless noted otherwise:
Diameter Embedment Diameter Embedment
3/8" 2" 5/8" 4"
1/2" 3 1/4" 3/4" 4 3/4"
4.3.4 Adhesive anchors shall be Hilti HIT-RE 500 V3 or HIT-HY 200 with HAS Standard rods or approved equal, unless noted otherwise. Embedment shall be as follows unless noted otherwise:
Diameter Embedment Diameter Embedment
3/8" 3 3/8" 5/8" 5 5/8"
1/2" 4 1/2" 3/4" 6 3/4"
4.3.5 Epoxy for dowels drilled into concrete shall be Hilti HIT-RE 500 V3, HIT-HY 200, or approved equal, unless noted otherwise. Embedment shall be as follows unless noted otherwise:
Bar Embedment Bar Embedment
#3 3 1/4" #5 5 3/4"
#4 4 3/8" #6 6"
4.3.6 Anchor capacity is dependent upon spacing between adjacent anchors and proximity of anchors to edge of concrete. Install anchors in accordance with spacing and edge clearances indicated on the drawings.
4.3.7 Contractor shall verify the location of reinforcing bars and/or prestressing tendons via
GPR, X-Ray, or other means before drilling anchor holes. Reinforcing steel shall not be damaged.
5 STEEL:
5.1 REFERENCES:
Steel Construction Manual, 14th Edition
5.2 STRUCTURAL STEEL:
5.2.1 All beams shall be marked and erected with natural camber upwards.
5.2.2 Do not prime structural steel members that will receive spray-applied fireproofing. Do not prime surfaces of structural steel members that will be in contact with poured concrete or will receive welded studs.
5.2.3 The top and bottom of all steel columns that are in bearing shall be finished to a common plane.
5.2.4 Fabricator shall submit complete fabrication and erection drawings for review, including profiles, sizes, spacing, locations of structural members, cambers, openings, attachments, fasteners, and connections not explicitly detailed in the construction documents. Direct reproductions of any portion of these construction documents, including plans and details, in the fabricator’s submittal will not be accepted.
5.3 CONNECTIONS:
5.3.1 Connections shall be as shown on the drawings. Where connections are not explicitly detailed, fabricator shall design the connections in accordance with AISC 360 using
LRFD methods.
5.3.2 The fabricator shall submit engineering calculations for all connections not explicitly detailed in the drawings to the Engineer for review. These submittals shall be signed and stamped by a professional engineer registered in the state where the project is located.
5.3.3 All bolts shall be either A325 or A490 high strength bolts. Use no more than two bolt diameters, one grade per diameter, skip one size between diameters.
5.3.4 All high strength bolts shall be installed in snug-tightened joints unless noted otherwise on the drawings. Fabricator may substitute ASTM F1852 N for A325 N bolts.
5.3.5 Weld metal used shall be 70 KSI.
5.3.6 All welding shall be performed by AWS qualified operators.
5.3.7 All welded joints shall be prequalified or qualified by testing.
5.3.8 When welded connections are shown in the drawings, it is not the intent to specify the specific process or preparation.
5.3.9 Do not prime surfaces of structural steel members in areas that will be welded.
5.4 STEEL DECK:
5.4.1 REFERENCE: Steel Deck Institute; "Design Manual for Composite Decks, Form Decks and
Roof Decks," latest edition
5.4.2 Roof and floor deck is designed to act as a diaphragm to brace other building components. No portion shall be removed unless separate bracing is designed and provided.
5.4.3 Any openings or holes larger than 12" not shown on the plans will not be permitted unless reviewed by the Architect/Engineer.
5.4.4 The deck supplier shall provide deck accessories such as pour stops, cell closure plates, deck supports at columns and other miscellaneous deck items as required, even if not specifically shown on the Contract Documents.
5.4.5 Roof deck end joints shall have 6" minimum end laps.
6 MISCELLANEOUS:
6.1 DEFERRED STRUCTURAL SUBMITTALS
6.1.1 The design and documentation of some components defined using performance-based specifications may be deferred until after a building permit is obtained.
6.1.2 Deferred submittals include, but are not limited to, the items listed below.
6.1.3 For the following deferred submittals, the Contractor shall submit shop drawings and calculations signed and stamped by a professional engineer registered in the state where components are installed. These shall be submitted for review prior to fabrication.
Stairs Guardrails and Handrails
6.1.4 In addition to the deferred submittals listed above, the Contractor shall engage a professional engineer registered in the state where the project is located for the design of any necessary shoring, bracing, underpinning, or any other portion of the
Contractor’s means & methods which could impact existing structure. Contractor shall submit certified calculations and shop drawings for review upon request.
6.2 CONSTRUCTION JOINTS:
6.2.1 The Contractor shall submit drawings showing the proposed construction and control joints for all areas. This includes walls, structural floor systems, slabs on grade, etc. This drawing shall be reviewed by the Architect /Engineer and returned to the Contractor prior to pouring any concrete. The construction joint drawing shall be furnished to the fabricators before their shop drawings are submitted.
6.2.2 If the construction joints are changed after being reviewed, revised drawings shall be submitted for review.
6.2.3 Construction joints shall be made as detailed on the drawings.
6.2.4 Construction joints and control joints in concrete foundation walls shall be located at a maximum of 40' center spacing.
6.3 NON LOAD BEARING PARTITION WALLS:
6.3.1 Non load bearing partition walls are generally not shown on the structural drawings. Care shall be taken by the Contractor to maintain a deflection space between the top of partition walls and floor or roof structure above.
6.3.2 See Typical Details and deflection requirements of horizontal framing members in Section
1 of these Notes for minimum deflection space between top of non load bearing partition walls and overhead structure.
6.4 VERIFICATIONS:
6.4.1 The General Contractor shall verify all openings sizes, pad sizes, and locations with the respective Subcontractors.
6.4.2 Structural steel supplier and erector are responsible for providing deck reinforcement or framing as shown on typical structural details for mechanical roof openings.
See mechanical drawings for quantities, sizes and locations. The cost of structural redesign fees shall be borne by the Mechanical Contractor for equipment and/or opening changes made after structural documents have been issued.
6.5 NEW WORK IN CONJUNCTION WITH EXISTING CONSTRUCTION:
6.5.1 VERIFICATION: The Contractor shall verify, by field check, all sizes, dimensions, elevations, locations, etc. of elements of the existing construction which are relative to the new construction.
6.5.2 DIMENSIONS: All dimensions involving new Work tying into or governed by existing construction shall be field checked by the Contractor and furnished to the
Subcontractors prior to fabrication of any Work. The verified dimensions shall appear and be noted as such on the first shop drawing submitted.
6.5.3 ASSUMPTIONS: The Engineer has made assumptions concerning the soundness of the existing buildings and these assumptions are that this building was designed and constructed in conformity with good design and construction practices. The Contractor shall take extraordinary precautions concerning preservation of the building during demolition and new construction Work. Further, the Contractor shall agree to assume all responsibility for the preservation of this property.
6.5.4 NOTIFICATION: The Contractor shall notify the Architect/Engineer immediately of any discrepancies between construction documents and actual field conditions.
6.5.5 HOLES: All holes through existing construction shall be core drilled or saw cut.
6.6 GENERAL:
6.6.1 These drawings do not include necessary components for construction safety.
6.6.2 The structural design is based only on the building in its completed state. Contractors and their subs shall take whatever precautions are necessary to withstand all horizontal and vertical loadings that may be encountered during the construction prior to completion of the building.
6.6.3 During construction, the Contractor may encounter existing conditions which are not now known or are at variance with project documentation (Discovery). Such conditions may interfere with new construction or required protection and/or support of existing Work during construction, or may consist of damage or deterioration to structural materials or components which could jeopardize the structural integrity of the building(s).
6.6.4 The Contractor shall notify the Engineer of all Discoveries that the Contractor believes may interfere with proper execution of the Work or jeopardize the structural integrity of the building(s) prior to proceeding with Work related to such
Discoveries.
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT OF RECORD
A/E:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10 o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s in c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e rs in c h o n e f o o t o n e in c h o n e f o o t o n e a n d o n e h a lf in c h e s o n e f o o t th re e in c h e s o n e f o o t
CONSTRUCTION
DOCUMENTS
RENOVATE FIRST FLOOR FOR
NEW KITCHEN FOR THE SIOUX
FALLS VA MEDICAL CENTER
SIOUX FALLS, SOUTH DAKOTA
VA# 438-21-403
SGA# 201956
STONE GROUP ARCHITECTS, INC.
1001 TWELVE OAKS CENTER DRIVE,
SUITE 1025
WAYZATA, MN 55391
952.476.5850 ERA Structural Engineering 2550 University Ave W Suite 423-S St. Paul, MN 55114 Phone: 651-251-7570
STRUCTURAL:
Dunham Asssociates, Inc.
50 South Sixth St Suite 1100 Minneapolis, MN 55402 Phone: 612-465-7550
MEP:
Rippe Associates 10400 Yellow Circle Dr Suite 100 Minneapolis, MN 55343 Phone: 952-933-0313
FOOD SERVICE:
C
R e v it L o c a l\ S h o rt
T e rm
L o c a l\ S
V
A -S io u x F a lls
K it c h e n m d o rn
E R
A .r v t
/1
/2
:4
:2
P
M
S000
STRUCTURAL COVER SHEET
CSF JDR / KLW08-18-2026
R INDICATES DRAWINGS ARE BEING ISSUED FOR REFERENCE ONLY (NOT FOR CONSTRUCTION)
▲ INDICATES DRAWINGS ARE BEING ISSUED ON SMALL SHEETS OR WRITE UP
●S INDICATES DRAWINGS ARE BEING ISSUED AND SIGNED FOR THE FIRST TIME
● INDICATES DRAWINGS ARE BEING ISSUED
STRUCTURAL SHEET INDEX
SHEET #
ISSUE
SHEET TITLE 2
2/
/1
D
E S
IG
N
D E
V E
LO
P
M E
N T
2/
/2
C
D S
U B
M
IT
T A
L
2/
/2
C
D S
U B
M
IT
T A
L
6/
/1
0% C
D S
U B
M
IT
T A
L
S000 ● ● ● ●S STRUCTURAL COVER SHEET
S001 ● ● ● ●S SCHEDULES / FOUNDATION DETAILS
S-101 ● ● ● ●S 1ST FLOOR FOUNDATION PLAN
S-102 ● ● ● ●S 2ND FLOOR FRAMING PLAN
S-300 ● ● ● ●S FOUNDATION DETAILS
S-400 ● ●S FRAMING DETAILS
Revision # Description Date:
08/18/202608/18/2026
08/18/2026
4S
SEE GSN
NOTES:
1. AT TOP OF PIER PROVIDE 3 - ADDITIONAL TIES AT 4" OC AROUND ANCHOR BOLTS UNO.
2. STANDARD HOOK ON VERTICAL REINFORCEMENT INTO FOOTING, DOWELS NOT REQUIRED UNO. #00600A
ANCHOR ROD
TYPE 1
TACK WELD NUT
TO ROD
ANCHOR ROD
(SEE SCHED)
3/8 PL WASHER & NUT
BASE PL (SEE SCHED)
WASHER &
LEVELING NUT
TOP OF FTG, PILE
CAP OR PIER
3/16
S E
E S
C H
E D
E M
B E
D A
S R
E Q
D P
R O
J
T H
R E
A D
G R
O U
T N
O N
-S H
R
IN
K
TYP
1 1/2"
STL COL
(SEE SCHED)
ANCHOR RODS
(SEE SCHED) 5/16
4 - SIDES
BASE PL
(SEE SCHED)
#02000A
2 - SIDES IF REQD
(SEE COL SCHED COMMENTS)
T Y
P
1/ 2"
EQ EQ
1/
2"
1/ 2"
TYPE 2
TYP
1 1/2"
STL COL
(SEE SCHED)
ANCHOR RODS
(SEE SCHED) 5/16
4 - SIDES
BASE PL
(SEE SCHED)
T Y
P
1/ 2"
3 1/2" 6 1/2"
1/
2"
1/ 2"
NOTE:
SAW CUTTING SHALL BE DONE AS SOON AS THE
CONCRETE HAS HARDENED SUFFICIENTLY TO PERMIT
CUTTING WITHOUT CHIPPING, SPALLING OR TEARING BUT
NOT MORE THAN 12 HOURS AFTER POURING
SOG (SEE PLAN) SAW CUT
1/2" 1/8"
/4
T /4
1/ 4"
M
IN
T
1/4" PLATE DOWEL AT 30"
OC MAX START FIRST DOWEL
6" FROM EDGE
CONTRACTOR MAY SUBSTITUTE
#4 X 2'-0" SMOOTH DWLS @ 24"
OC (GREASE ONE END & SUPPORT
DOWEL TO ENSURE ALIGNMENT)
CONST JOINT
(SEE PLAN)
SOG (SEE PLAN)
E Q
E Q
#5 HAIR PINS TO
MATCH HORIZ WALL REINF
VERT CORNER BAR TO MATCH
VERT BARS IN SAME FACE
Ld
Ld
Ld
Ld
NOTE:
CONC WALL
(SEE PLAN / SCHED)
OR RELATED DETAILS
DWLS TO MATCH
HORIZ WALL REINF
VERT CORNER BAR TO MATCH
VERT BARS IN SAME FACE
NOTE:
CONC WALL
(SEE PLAN / SCHED)
OR RELATED DETAILS
OPNG
(E) CL JOIST
OR BEAM
(E) CL JOIST
OR BEAM
(E) STL JOIST OR
STL BEAM
(SEE PLAN)
L4 X 4 X 1/4 FIELD WELD
TO HEADER ANGLES
(SPA 6'-0" MAX)
HEADER L4 X 4 X 1/4
(SPA 6'-0" MAX)
NOTES:
1. SEE STRUCTURAL PLANS FOR ROOF OPENING LOCATIONS KNOWN AT
TIME OF ISSUE.
2. SEE ARCH, MECH, AND ELECT DRAWINGS FOR QUANTITIES, SIZES,
AND LOCATIONS OF DECK OPENINGS.
3. METAL DECK OMITTED FOR CLARITY. SEE PLAN / SCHED FOR
WELDING PATTERNS. SEE O.S.H.A. FOR SAFETY REQUIREMENTS
L4 X 4 X 1/4 (TYP)
4"4"
3/16 2
TYP
NOTE:
NOT ALL OPENINGS ARE SHOWN
ON PLAN. VERIFY SIZE, NUMBER
& LOCATION OF ALL OPENINGS
W/ MECH, ELECT & GENERAL
CONTRACTOR. OPENINGS GREATER
THAN 6'-0" IN ANY DIRECTION
REQUIRE SPECIALLY DESIGNED
FRAMING. NOTIFY ENGINEER.
(SEE PLAN)
6'-0" MAX OPNG
6' -0
M
A X
DECK SPAN
' X '
WHERE DIM 'X' IS 10"
OR LESS ANGLE CAN
BE OMITTED
TOP CHORD
CONCENTRATED
LOAD
NEAREST BOTTOM
CHORD PANEL POINT
NEAREST TOP
CHORD PANEL POINT
3/16 2
TYP
BOTTOM CHORD
CONCENTRATED
LOAD
IF "L" IS GREATER THAN 3"
FIELD WELD EXTRA WEB
MEMBERS AT CONCENTRATED
LOAD LOCATIONS, USE
2 - L2 X 2 X 1/8
NOTES:
1. JOIST CHORDS ARE NOT DESIGNED FOR CONCENTRATED LOADS IN EXCESS OF
100 POUNDS. EITHER PLACE LOADS AT PANEL POINTS OR ADD EXTRA WEB MEMBERS
FROM POINT OF LOAD TO NEAREST PANEL POINT ON OPPOSITE CHORD.
2. CONTRACTOR TO VERIFY LOADS & LOCATION FOR EQUIPMENT SELECTED
WITH INFORMATION SHOWN ON PLAN. NOTIFY STRUCTURAL ENGINEER & JOIST
SUPPLIER OF ALL CHANGED CONDITIONS.
3. WELD REINFORCEMENT TO JOIST AFTER FULL DEAD LOAD IS IN PLACE.
"L"
"L"
(E) STL JOIST
(SEE PLAN)
(E) STL JOIST
(SEE PLAN)
(E) MTL DECK
(SEE PLAN)
(E) MTL DECK
(SEE PLAN)
3/16 2
TYP
CHANNEL CURB SUPPORT
CHANNEL CURB SUPPORT
STL BEAM OR JOIST
(SEE PLAN)
NOTE:
ALWAYS EXTEND
CHANNELS TO NEXT
SUPPORT BEYOND THE
LIMITS OF THE MECH UNIT
EXTENSION
3" MIN CHANNEL
S001
MECH UNIT (SEE PLAN)
(VERIFY SIZE & LOC W/ MECH)
UNIT PERPENDICULAR TO SUPPORTS
CHANNEL CURB SUPPORT
CHANNEL CURB SUPPORT
STL BEAM OR JOIST
(SEE PLAN)
NOTE:
ALWAYS EXTEND
CHANNELS TO NEXT
SUPPORT BEYOND THE
LIMITS OF THE MECH UNIT
EXTENSION
3" MIN CHANNEL
S001
MECH UNIT (SEE PLAN)
(VERIFY SIZE & LOC W/ MECH)
UNIT PARALELL TO SUPPORTS
CHANNEL CURB SUPPORT
'-0
M
A X
'-0
M
A X
'-0
M
A X
TYP @
DECK OPNG
BELOW
TYP @
DECK OPNG
BELOW
MECH UNIT (SEE PLAN)
(VERIFY SIZE & LOC W/ MECH)
(E) MTL DECK
(SEE PLAN / SCHED)
STL JOIST OR BEAM
(SEE PLAN)
(@ STL JOIST PROVIDE ADDL
REINF AT CONCENTRATED LOAD
SEE )
MECH CURB
(BY SUPPLIER)
3/16 2
EA SIDE OF
STL BEAM
MC12 X 14.3 CURB SUPPORT
(SEE RELATED DETAIL)
NOTE:
LOCATE CHANNEL
UNDER CURB AS REQD
FOR DUCT CLEARANCE
CURB SUPPORT FOR 1 1/2" DECK
/1
6" M
IN
L
A P
1' - 11 237 /256"
36" WIDE DECK
CL DECK TO DECK JOINT
WELD DECK TO SUPPORT
@ END LAPS
INTERIOR SUPPORT
LINE
FASTEN SIDE LAPS W/
#10 TEK SCREW
(SEE SCHED FOR QUANTITY)
WELD DECK @ INTERIOR
SUPPORTS (SEE SCHED
FOR WELD PATTERN)
INTERIOR SUPPORT
LINE
WELD DECK @ 6" OC
@ CONT PERIMETER
SUPPORTS
INTERIOR SUPPORT
LINE
PERIMETER
SUPPORT LINE
NOTES:
1. ALL WELDS SHALL BE 5/8" DIA PUDDLE WELDS (UNO).
2. ATTACH DECK @ 6" OC TO STEEL SUPPORTS AROUND PERIMETER OF ALL OPENINGS.
3. ENGINEER IS TO BE NOTIFIED IF 36" WIDE DECK IS NOT USED.
D E
C K
C O
N T
IN
U
O U
S O
V E
R A
M
IN
O F
S
P A
N S
1.5 (B, F, A, VL)
36" COVERAGE
36/7 PATTERN
TYPICAL FASTENER LAYOUT
36/5 PATTERN
36/4 PATTERN
36/3 PATTERN
CL DECK TO DECK JOINT
WELD DECK TO SUPPORT
@ END LAPS
INTERIOR SUPPORT
LINE
FASTEN SIDE LAPS W/
#10 TEK SCREWS
(SEE SCHED FOR QUANTITY)
WELD DECK @ INTERIOR
SUPPORTS (SEE SCHED
FOR WELD PATTERN)
INTERIOR SUPPORT
LINE
WELD DECK @ 8" OC
@ CONT PERIMETER
SUPPORTS
INTERIOR SUPPORT
LINE
PERIMETER
SUPPORT LINE
NOTES:
1. ALL WELDS SHALL BE 5/8" DIA PUDDLE WELDS (UNO).
2. ATTACH DECK @ 8"OC TO STEEL SUPPORTS AROUND PERIMETER OF ALL OPENINGS.
3. ENGINEER IS TO BE NOTIFIED IF 24" WIDE DECK IS NOT USED.
1' - 9 243/ 256"
24" WIDE DECK
/2
D E
C K
C O
N T
IN
U
O U
S O
V E
R A
M
IN
O F
S
P A
N S
6" M
IN
L
A P
24" COVERAGE
24/4 PATTERN
TYPICAL FASTENER LAYOUT
3N
3" ROOF DECK DIAGRAM 1 1/2" ROOF DECK DIAGRAM
DECK TYPE
Ip - in^4/ft Sp - in^3/ft In - in^4/ft Sn - in^3/ft
3N - 22 GA
3N - 20 GA
3N - 19 GA
3N - 18 GA
0.659 0.382 0.884 0.433
0.848 0.501 1.079 0.552
1.045 0.597 1.260 0.659
1.238 0.688 1.430 0.749
1.683 0.893 1.807 0.944
SECTION PROPERTIES
#02000D
3N - 16 GA
DECK TYPE
Ip - in^4/ft Sp - in^3/ft In - in^4/ft Sn - in^3/ft
1.5B - 24 GA
1.5B - 22 GA
1.5B - 20 GA
1.5B - 19 GA
0.107 0.120 0.135 0.131
0.155 0.186 0.183 0.192
0.201 0.234 0.222 0.247
0.246 0.277 0.260 0.289
0.289 0.318 0.295 0.327
SECTION PROPERTIES
1.5B - 18 GA
0.373 0.408 0.373 0.4111.5B - 16 GA
CONC FTG
(SEE PLAN / SCHED)
OR RELATED DETAILS
MATCH TOP OF EXIST
FTG EL (SEE PLAN)
SEE GSN Ld
THICKEN NEW FTG TO
MATCH BOT OF EXIST FTG
DRILL AND EPOXY #5 BARS
(MATCH SIZE & QTY OF NEW
FTG REINF)
EXIST WALL & FOOTING
MAX
CLEAN & ROUGHEN SURFACE
TO A 1/4" AMPLITUDE
CONCRETE REINFORCEMENT DEVELOPMENT LENGTHS & LAP SPLICE LENGTH TABLE
BAR SIZE
#3
#4
#5
#6
#7
#8
#9
#10
#11
Ld
17"
22"
28"
33"
48"
55"
62" f'c ≥ 3,000 PSI
Ls
70"
78"
22"
29"
36"
43"
62"
72"
81"
91"
101"
NOTES DETAILS
LAP SPLICE
CONTACT
LAP SPLICE
(PREFERRED)
NON-CONTACT
LAP SPLICE
LAP SPLICE
LE
S
S T
H A
N
C
LR
S P
A M
A X
/5
LA
P
S P
LI
C
E B
U T
12"
15"
19"
23"
27"
30"
34"
39"
43"
15"
19"
24"
29"
42"
48"
54"
61"
61"
20"
25"
31"
38"
55"
62"
70"
79"
87"
13"
17"
22"
26"
38"
43"
48"
54"
60"
17"
22"
29"
34"
49"
56"
62"
70"
78"
12"
16"
20"
24"
34"
39"
44"
50"
55"
16"
21"
26"
31"
44"
51"
57"
65"
72"
12"
15"
18"
22"
32"
36"
41"
46"
51"
16"
20"
23"
29"
42"
47"
53"
60"
66"
12"
14"
17"
21"
30"
34"
38"
43"
48"
16"
18"
22"
27"
39"
44"
49"
56"
62"
12"
13"
16"
19"
28"
32"
36"
41"
54"
16"
17"
21"
25"
36"
42"
47"
53"
59"
12"
12"
15"
18"
27"
30"
34"
39"
43"
16"
16"
20"
23"
35"
39"
44"
51"
56"
Ld f'c ≥ 4,000 PSI
Ls Ld f'c ≥ 5,000 PSI
Ls Ld f'c ≥ 6,000 PSI
Ls Ld f'c ≥ 7,000 PSI
Ls Ld f'c ≥ 8,000 PSI
Ls Ld f'c ≥ 9,000 PSI
Ls Ld f'c ≥ 10,000 PSI
Ls f'c = ALL
#00600F
Lc
Ld = CLASS 'A' LAP SPLICE / DEVELOPMENT LENGTH Ls = CLASS 'B' LAP SPLICE Lc = COMPRESSION LAP SPLICE db = BAR DIAMETER
1. WHERE SPLICES ARE NOT CALLED OUT ON THE DRAWINGS, PROVIDE CLASS A LAP SPLICE (Ld)
2. FOR LIGHT WEIGHT CONCRETE, MULTIPLY LENGTHS BY 1.3.
3. FOR EPOXY BARS, MULTIPLY LENGTHS BY 1.5.
4. FOR HORIZONTAL BARS WITH 12" OF FRESHLY PLACED CONCRETE BELOW, MULTIPLY LENGTHS BY 1.3.
5. WHERE NOTE 3 AND NOTE 4 BOTH APPLY, MULTIPLY LENGTHS BY 1.7.
6. MECHANICAL SPLICES WITH 125% OF BAR YIELD STRENGTH MAY BE USED IN LIEU OF LAPS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT OF RECORD
A/E:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10 o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s in c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e rs in c h o n e f o o t o n e in c h o n e f o o t o n e a n d o n e h a lf in c h e s o n e f o o t th re e in c h e s o n e f o o t
CONSTRUCTION
DOCUMENTS
RENOVATE FIRST FLOOR FOR
NEW KITCHEN FOR THE SIOUX
FALLS VA MEDICAL CENTER
SIOUX FALLS, SOUTH DAKOTA
VA# 438-21-403
SGA# 201956
STONE GROUP ARCHITECTS, INC.
1001 TWELVE OAKS CENTER DRIVE,
SUITE 1025
WAYZATA, MN 55391
952.476.5850 ERA Structural Engineering 2550 University Ave W Suite 423-S St. Paul, MN 55114 Phone: 651-251-7570
STRUCTURAL:
Dunham Asssociates, Inc.
50 South Sixth St Suite 1100 Minneapolis, MN 55402 Phone: 612-465-7550
MEP:
Rippe Associates 10400 Yellow Circle Dr Suite 100 Minneapolis, MN 55343 Phone: 952-933-0313
FOOD SERVICE:
C
R e v it L o c a l\ S h o rt
T e rm
L o c a l\ S
V
A -S io u x F a lls
K it c h e n m d o rn
E R
A .r v t
/1
/2
:4
:2
P
M
S001
SCHEDULES / FOUNDATION DETAILS
CSF JDR / KLW08-18-2026
STEEL COLUMN SCHEDULE
MARK SIZE
BASE PLATE
GROUT
ANCHORS
COMMENTSTHICKNESS WIDTH LENGTH TYPE QTY DIA EMBED
SC1 HSS4 X 4 X 1/4 3/4" 10" 10" 1 1 1/2" 4 3/4" 9" WELD WASHER
SC2 HSS4 X 4 X 1/4 3/4" 10" 10" 2 1 1/2" 4 3/4" 9" WELD WASHER
CONCRETE PIER SCHEDULE
MARK
SIZE REINFORCEMENT
TYPE COMMENTSWIDTH LENGTH VERTICAL TIES
CP14 1' - 2" 1' - 2" 4 - #5 #4 @ 12" OC 4S
NO SCALES001
1 SOG - CONTROL JOINT
NO SCALES001
2 SOG - CONSTRUCTION JOINT
NO SCALES001
4 CONCRETE - REINFORCING AT WALL INTERSECTIONS
NO SCALES001
5 ROOF FRAME FOR OPNG IN (E) MTL ROOF DECK
NO SCALES001
6 STEEL JST - REINF AT CONCENTRATED LOAD
1/4" = 1'-0"S001
7 STEEL - MECH UNIT CURB SUPPORT (PLAN VIEW)
3/4" = 1'-0"S001
8 STEEL - MECH UNIT CURB SUPPORT
METAL DECK SCHEDULE
MARK
DECK FASTENING
THICKNESS TYPE WELD PATTERN
D1 1 1/2" B 36/4
NO SCALES001
3 CONCRETE - NEW TO EXISTING FOUNDATION
Revision # Description Date:
AA
BB
CC
DD
EE
13121110987654321
DEMO (E) WALL
FROM 1ST FLOOR
TO 2ND FLOOR
(E) TUNNEL BELOW
(N) CONCRETE
STAIRS
S-300
S-300
CP14CP14
SC1SC2
S-300
(N) C10 X 15.3
(N
C
X
.2
(N) C12 X 20.7
(N
C
X
0.
7GRATING TO
MATCH (E)
GRATING TO
MATCH (E)
(E) C10 X 15.3
(N) HSS3 X 3 X 1/4
S-300
5" CONC SLAB-ON-GRADE REINF W/
#4 @ 18" OC (CENTERED)
TOP OF SLAB EL = 100'-0"
(SEE ARCH FOR FLOOR SLOPES
FINISHES & DEPRESSIONS REQD)
TFE = 93' - 6"
(N) HSS3 X 3 X 1/4
(N) MTL STAIR
(BY SUPPLIER) (SEE ARCH)
S-300
S-300
FIELD VERIFY
F
IE
LD
V
E R
IF
Y
F
IE
LD
V
E R
IF
Y
8'
1'
DASH PATTERN LINE
INDICATES FIRE RATED
WALL (SEE G002)
DASH PATTERN LINE
INDICATES FIRE RATED
WALL (SEE G002)
(N
C
X
5.
CP14
SC1
(E
C
X
.2
DRAIN
(SEE ARCH)
DRAIN
(SEE ARCH)
S-300
S-300
LT GAUGE SUPPLIER TO
PROVIDE MOMENT CONN
TO PAN JOIST SLAB SYSTEM
SUBMIT CALCULATIONS
FOR REVIEW
4" 26' - 11" 12' - 0" 5' - 4" 8"
TPE = 99' - 4" (TYP)
24' - 0"
62°
90°
/8
TFE = 93' - 6"
L3 X 3 X 1/4
(SEE 6 / S-400)
L3 X 3 X 1/4
(SEE 6 / S-400)
(E) PAN AND JOIST
SYSTEM ABOVE
L4 X 3 1/2 X 5/16 (LLV)
LINTEL TYP (GALV)
6" MIN BRG EA END
L4 X 3 1/2 X 5/16 (LLV)
LINTEL TYP (GALV)
6" MIN BRG EA END
C4 X C4.5 GIRT
(SEE 8/S400)
C4 X C4.5 GIRT
(SEE 8/S400)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT OF RECORD
A/E:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10 o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s in c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e rs in c h o n e f o o t o n e in c h o n e f o o t o n e a n d o n e h a lf in c h e s o n e f o o t th re e in c h e s o n e f o o t
CONSTRUCTION
DOCUMENTS
RENOVATE FIRST FLOOR FOR
NEW KITCHEN FOR THE SIOUX
FALLS VA MEDICAL CENTER
SIOUX FALLS, SOUTH DAKOTA
VA# 438-21-403
SGA# 201956
STONE GROUP ARCHITECTS, INC.
1001 TWELVE OAKS CENTER DRIVE,
SUITE 1025
WAYZATA, MN 55391
952.476.5850 ERA Structural Engineering 2550 University Ave W Suite 423-S St. Paul, MN 55114 Phone: 651-251-7570
STRUCTURAL:
Dunham Asssociates, Inc.
50 South Sixth St Suite 1100 Minneapolis, MN 55402 Phone: 612-465-7550
MEP:
Rippe Associates 10400 Yellow Circle Dr Suite 100 Minneapolis, MN 55343 Phone: 952-933-0313
FOOD SERVICE:
C
R e v it L o c a l\ S h o rt
T e rm
L o c a l\ S
V
A -S io u x F a lls
K it c h e n m d o rn
E R
A .r v t
/1
/2
:4
:0
P
M
S-101
1ST FLOOR FOUNDATION PLAN
CSF JDR / KLW08-18-2026
NORTH
KEYPLAN
NTS
1/8" = 1'-0"S-101
1 FOUNDATION PLAN
INFORMATION ON…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .