Plans 438-21-403 Renovate 1st Floor Kitchen_Part12.pdf
PDF 10 MB Posted
- Solicitation number
- 36C26326B0020
About this file
This document is a set of architectural plans for a medical facility renovation project at Fort Falls VA Medical Center located in Sioux Falls, South Dakota. The plans depict the first floor renovation and new construction for the facility.
The architectural drawings include: First Floor Power Plan (EP101) showing electrical power distribution; Second Floor and Roof Lower Plan (EP201) detailing electrical systems for the second floor and roof areas; First Floor Systems Plan (EY101) illustrating HVAC and mechanical systems; Second Floor Systems Plan (EY201) showing mechanical distribution on the upper level; Electrical Riser Diagram (EE300) depicting the electrical distribution from main service to individual floors; and multiple detailed sections (EE501) providing construction specifications for electrical installations, fire alarm systems, telecommunications, plumbing connections, and mechanical equipment mounting. The plans are prepared by ERA Architects with Ripple Associates as the architect of record, with Sterner-Gergloft serving as the project managing entity under the U.S. Department of Veterans Affairs. The documents contain general notes and key notes addressing construction requirements, code compliance, coordination with existing systems, and installation standards for all building systems including power distribution, HVAC, life safety, and communications infrastructure supporting the medical center operations.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .