This document is a comprehensive set of architectural construction plans for a kitchen renovation project at the Royal C. Johnson Veterans Memorial Medical Center in Sioux Falls, South Dakota, prepared by the U.S. Department of Veterans Affairs.

The project involves renovating the first floor of Building #5 to create a new kitchen facility (VA #438-21-403). The design was issued on August 19, 2026, and comprises 126 total sheets organized across multiple disciplines including general/architectural, civil/structural, mechanical/plumbing, electrical, and food service systems. Key architectural consultants include Dunham Associates for civil work, Rippe Associates for MEP systems, Stone Group Architects and Ulteig Engineers for food service design, and Ericksen Roed Associates for structural engineering. The renovation is organized into three distinct construction phases, with detailed demolition and construction plans provided for each phase. Phase 1 addresses the kitchen, receiving, and retail areas; Phase 2 includes dishwashing, cart wash, and administrative spaces; and Phase 3 covers second-floor demolition work. The project includes comprehensive accessibility details compliant with ADA standards, ICRA/ISLM infection control protocols, code and life safety plans, electrical systems, plumbing and medical gas systems, HVAC coordination, fire protection, food service equipment scheduling and specifications, and structural framing details with fireproofing requirements. Construction documents address occupancy classifications ranging from Assembly-Kitchen and Assembly-Less Combustible to Business, Mercantile, and Storage uses, with detailed square footage allocations for each functional space within the renovation scope.

View the file

Other files

File Type Posted
36C26326B0020 0002.pdf PDF
438-21-403 Renovate First Floor Kitchen 2nd sign in.pdf PDF
438-21-403 Renovate First Floor Kitchen sign in.pdf PDF
36C26326B0020 0001.docx DOCX document
Plans 438-21-403 Renovate 1st Floor Kitchen_Part2.pdf PDF
Plans 438-21-403 Renovate 1st Floor Kitchen_Part5.pdf PDF
Plans 438-21-403 Renovate 1st Floor Kitchen_Part8.pdf PDF
36C26326B0020.docx DOCX document
Final SOW 438-21-403 Renovate First Floor for New Kitchen 5.7.26.docx DOCX document
Plans 438-21-403 Renovate 1st Floor Kitchen_Part9.pdf PDF
Plans 438-21-403 Renovate 1st Floor Kitchen_Part10.pdf PDF
Safety or Environmental Violations and EMR Information.pdf PDF
VAAR 852.219-75 Limitations on Subcontracting Cert of Compliance.pdf PDF
Wage Determination SD20260028 05.18.2026.pdf PDF
Plans 438-21-403 Renovate 1st Floor Kitchen_Part3.pdf PDF
Plans 438-21-403 Renovate 1st Floor Kitchen_Part6.pdf PDF
Plans 438-21-403 Renovate 1st Floor Kitchen_Part11.pdf PDF
Plans 438-21-403 Renovate 1st Floor Kitchen_Part12.pdf PDF
VHA ICRA-1.3 Jan 3 2025.pdf PDF
Plans 438-21-403 Renovate 1st Floor Kitchen_Part4.pdf PDF
Plans 438-21-403 Renovate 1st Floor Kitchen_Part7.pdf PDF
Plans 438-21-403 Renovate 1st Floor Kitchen_Part13.pdf PDF
Specs_Vol 1_2026-08-18.pdf PDF
Specs_Vol 2_2026-08-18.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SYMBOLS LEGEND

RIGID INSULATION

WOOD ROUGH (CONTINUOUS)

WOOD ROUGH (SPACED)

EARTH

CONCRETE

BLOCK WALL/VENEER

GYPSUM BOARD

PLYWOOD

BATT INSULATION

NEW CONSTRUCTION

EXISTING CONSTRUCTION TO

BE REMOVED

DIMENSION LINE

BREAK LINE

DETAIL INDICATOR

X

X-XX

DETAIL INDICATOR

X

X-XX

X

X-XX

BUILDING SECTION INDICATOR

X

X-XX

X

X-XX

ELEVATION INDICATOR, EXTERIOR

ELEVATION INDICATOR

CENTER LINE

ELEVATION INDICATOR, INTERIOR,X-XX

X

X-XX

X

X

X

X

NORTH ARROW

CG

CORNER GUARD

FEC FIRE EXTINGUISHER CABINET

XX KEYNOTE

A GRID LINES

XXX

ROOM

ROOM NAME AND NUMBER

XX

FURNITURE, FIXTURE, & EQUIPMENT

INDICATOR

XXX

DOOR OPENING/BORROWED LIGHT

IDENTIFIER

XX DRAWING BLOCK TITLE,

TYPICAL

DRAWING TITLE

XX=XX

XX INTERIOR PARTITION TYPES

NORTH

COMMON ABBREVIATIONS

C CHANNEL/CELSIUS

CAB CABINET

CB CERAMIC BASE

CD CONSTRUCTION DOCUMENTS

CEM CEMENT

CF CUBIC FEET OR FOOT

CG CORNER GUARD

CIPC CAST-IN-PLACE CONCRETE

CJ CONTROL/CONSTRUCTION JOINT

CL CENTER LINE

CLG CEILING

CLKG CAULKING

CLR CLEAR, CLEARANCE

CMU CONCRETE MASONRY UNIT

CO CHANGE ORDER/CLEAN OUT

COL COLUMN

COMB COMBINATION

COMP COMPOSITE/COMPOSITION

CONC CONCRETE

CONN CONNECT (ION)

CONST CONSTRUCTION

CONT CONTINUOUS, CONTINUE

CONTR CONTRACT (OR)

COORD COORDINATE

CORR CORRUGATED/CORRIDOR

CPT CARPET

CPPT CARPET TILE

CSMT CASEMENT

CT CERAMIC TILE

CTB CARPET TILE BASE

CTR CENTER

D DEPTH

DBL DOUBLE

DEMO DEMOLITION, DEMOLISH

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DIA DIAMETER

DIAG DIAGONAL

DIM DIMENSION

DIV DIVIDE, DIVISION

DISP DISPENSER

DN DOWN

DR DOOR

DS DOWNSPOUT

DW DISHWASHER

DWG DRAWING (S)

DWR DRAWER

DWTR DUMBWAITER

SYMBOLS USED AS ABBREVIATIONS:

& AND

L ANGLE

LL DOUBLE ANGLE

@ AT

d PENNEY

# POUND OR NUMBER

Ø ROUND OR DIAMETER

ABBREVIATIONS:

A/E ARCHITECT/ENGINEER

AB ANCHOR BOLT/ROD

ABV ABOVE

AC ASPHALTIC CONCRETE/AIR CONDITIONER

ACC ACCESSIBLE

ACM ALUMINUM COMPOSITE MATERIAL

ACOUS ACOUSTICAL

ACT ACOUSTICAL CEILING TILE

ADA AMERICANS WITH DISABILITIES ACT

ADD ADDENDUM

ADH ADHESIVE

ADJ ADJUSTABLE, ADJACENT, ADJOINING

AFF ABOVE FINISH FLOOR

AFG ABOVE FINISH GRADE

AHJ AUTHORITY HAVING JURISDICTION

ALT ALTERNATE

ALUM ALUMINUM

ANSI AMERICAN NATIONAL STANDARDS

INSTITUTE

APC ACOUSTICAL PANEL CEILING

APPROX APPROXIMATE

ARCH ARCHITECT (URAL)

ASI ARCHITECTURAL SUPPLEMENTAL

INFORMATION

BD BOARD

BEV BEVELED

BFF BELOW FINISH FLOOR

BL BRICK LEDGE

BLDG BUILDING

BLKG BLOCK (ING)

BM BEAM

BOT BOTTOM

BO BOTTOM OF

BOC BOTTOM OF CONCRETE

BOF BOTTOM OF FOOTING

BRG BEARING

BRK BRICK

BSMT BASEMENT

BTWN BETWEEN

BUR BUILT-UP ROOFING

(E) EXISTING

E EAST

EA EACH

EF EACH FACE

EJ EXPANSION JOINT

EL ELEVATION

ELEC ELECTRICAL

ELEV ELEVATOR

ENL ENLARGED

EMER EMERGENCY

ENGR ENGINEER

EOP EDGE OF PAVEMENT

EPDM ETHYLENE PROPYLENE DIENE MONOMER

EPS EXPANDED POLYSTYRENE BOARD

EPT EPOXY PAINT

EQ EQUAL

EQUIP EQUIPMENT

ES EACH SIDE

EST ESTIMATE

ETC ETCETERA

ETR EXISTING TO REMAIN

EW EACH WAY

EXIST EXISTING

EXC EXCAVATE/EXCAVATION

EXH EXHAUST

EXP EXPANSION/EXPOSED

EXT EXTERIOR

EWC ELECTRIC WATER COOLER

FA FIRE ALARM

FAB FABRICATE/FABRICATION

FD FLOOR DRAIN

FDC FIRE DEPARTMENT CONNECTION

FDTN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FF FINISHED FLOOR

FFE FINISH FLOOR ELEVATION

FIN FINISH (ED)

FLOUR FLUORESCENT

FLR FLOOR (ING)

FO FACE OF

FOC FACE OF CONCRETE

FOM FACE OF MASONRY

FOS FACE OF STUD

FOF FACE OF FINISH

FR FIRE RESISTANT/FRAME

FRP FIBERGLASS REINFORCED PANEL

FS FLOOR SINK

FT FOOT, FEET/FIRE TREATED

FTG FOOTING

FURG FURRING

FUT FUTURE

T TREAD

T&B TOP AND BOTTOM

T&G TONGUE AND GROOVE

TB TOWEL BAR

TBD TO BE DETERMINED

TEMP TEMPORARY/TEMPERED

TER TERRAZZO

TFE TOP FOOTING ELEVATION

THD THREAD (ED) (S)

THK THICKNESS

THRU THROUGH

TKBD TACKBOARD

TL TILE

TO TOP OF

TOB TOP OF BEAM

TOC TOP OF CONCRETE/CURB

TOD TOP OF DECK

TOF TOP OF FOOTING (FOUNDATION)

TOM TOP OF MASONRY

TOP TOP OF PIER

TOJ TOP OF JOIST

TOS TOP OF SLAB/STEEL

TOW TOP OF WALL

TPD TOILET PAPER DISPENSER

TPO THERMOPLASTIC POLYOLEFIN

TPTN TOILET PARTITION

TRANS TRANSVERSE

TS TUBE STEEL

TYP TYPICAL

UG UNDERGROUND

UH UNIT HEATER

UNFIN UNFINISHED

UNO UNLESS NOTED OTHERWISE

UON UNLESS OTHERWISE NOTED

UTIL UTILITY

V SHEAR

VAR VARIES

VB VAPOR BARRIER

VCT VINYL COMPOSITION TILE

VERT VERTICAL

VEST VESTIBULE

VIF VERIFY IN FIELD

VR VAPOR RETARDER

VWC VINYL WALL COVERING

R RADIUS/RISER

RB RUBBER BASE

RBR RUBBER

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

REBAR REINFORCING BAR

REC RECESSED

REF REFERENCE/REFRIGERATOR

REINF REINFORCE (D), (ING), (MENT)

REQ REQUIRE

REQD REQUIRED

RES RESILIENT FLOORING

RET RETURN

REV REVISION (S), REVISED

RFI REQUEST FOR INFORMATION

RFP REQUEST FOR PROPOSAL

RH RIGHT HAND

RL RIDGE LINE

RM ROOM

RO ROUGH OPENING

ROW RIGHT OF WAY

RVS REVERSE (SIDE)

RWL RAIN WATER LEADER

S SOUTH

SB SPLASH BLOCK

SC SOLID CORE

SCHED SCHEDULE

SCR SHOWER CURTAIN ROD

SCT SECTION

SD SOAP DISPENSER

SF SQUARE FOOT

SHT SHEET

SHTHG SHEATHING

SIM SIMILAR

SLDG SLIDING

SLNT SEALANT

SND SANITARY NAPKIN DISPENSER

SNX SANITARY NAPKIN DISPOSAL

SOG SLAB ON GRADE

SPEC SPECIFICATION (S)

SQ SQUARE

SSM SOLID SURFACE MATERIAL

SST STAINLESS STEEL

ST STREET

STC SOUND TRANSMISSION CLASS

STD STANDARD

STL STEEL

STOR STORAGE

STRUCT STRUCTURAL

SUSP SUSPENDED

SV SHEET VINYL

SW SHEARWALL

SYM SYMMETRICAL

MAS MASONRY

MATL MATERIAL

MAX MAXIMUM

MC MEDICINE CABINET

MECH MECHANICAL

MEMB MEMBRANE

MEZZ MEZZANINE

MFR MANUFACTURE (R)

MIN MINIMUM

MISC MISCELLANEOUS

MO MASONRY OPENING

MR MIRROR

MTL METAL

(N) NEW

N NORTH

NA NOT APPLICABLE

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER

OFCI OWNER FURNISHED / CONTRACTOR INSTALLED

OFOI OWNER FURNISHED / OWNER INSTALLED

OH OVERHEAD

OPP OPPOSITE

OPG OPENING

ORIG ORIGINAL

ORD OVERFLOW ROOF DRAIN

OZ OUNCE

PAR PARALLEL

PCF POUNDS PER CUBIC FOOT

PED PEDESTAL

PERF PERFORATED

PERP PERPENDICULAR

PL PLATE

PLAM PLASTIC LAMINATE

PLYWD PLYWOOD

PNL PANEL

PR PAIR/PROPOSAL REQUEST

PRCST PRECAST CONCRETE

PREFAB PREFABRICATE

PSI POUNDS PER SQUARE INCH

PSF POUNDS PER SQUARE FOOT

PT PAINT / PRESSURE TREATED

PTD PAPER TOWEL DISPENSER

PTN PARTITION

PTR PAPER TOWEL RECEPTACLE

PVC POLYVINYL CHLORIDE

PLBG PLUMBING

QT QUARRY TILE

GA GAGE, GAUGE

GB GRAB BAR

GALV GALVANIZED

GC GENERAL CONTRACTOR

GI GALVANIZED IRON

GL GLASS

GLU LAM GLUE LAMINATED (BEAM)

GWB GYPSUM WALL BOARD

GYP GYPSUM

HB HOSE BIB

HC HANDICAP / HOLLOW CORE

HD HEAVY DUTY

HDBD HARDBOARD

HDR HEADER

HDWD HARDWOOD

HDWR HARDWARE

HM HOLLOW METAL

HORIZ HORIZONTAL

HR HOUR

HT HEIGHT

HVAC HEATING, VENTILATION, AIR-CONDITIONING

IBC INTERNATIONAL BUILDING CODE

ICC INTERNATIONAL CODE COUNCIL

ID INSIDE DIAMETER/DIMENSION

IFC INTERNATIONAL FIRE CODE

IN INCH(ES)

INCL INCLUDE (D), INCLUDING

INFO INFORMATION

INSP INSPECTION

INSTR INSTRUCTION(S)

INSUL INSULATE (D), INSULATION

INT INTERIOR

JAN JANITOR

JST JOIST

JT JOINT

KCJ KEYED CONSTRUCTION JOINT

KO KNOCK OUT

L LENGTH / ANGLE

LAB LABORATORY

LAM LAMINATE (ED)

LAV LAVATORY

LB POUND

LF LINEAR FEET

LH LEFT HAND

LKR LOCKER

LOC LOCATION

LONG LONGITUDINAL

LT LIGHT

LVR LOUVER

LVT LUXURY VINYL TILE

W WEST/WIDTH

W/ WITH

W/O WITHOUT

WA WEDGE ANCHOR

WB WOOD BASE

WC WATER CLOSET

WD WOOD/WOODWORK

WDW WINDOW

WF (W) WIDE FLANGE

WG WALL GUARD

WH WATER HEATER

WI WROUGHT IRON

WL WIND LOAD

WP WATERPROOF (ING)

WR WATER RESISTANT

WSCT WAINSCOT

WT WEIGHT/WINDOW TREATMENT

WWF WELDED WIRE FABRIC

VICINITY MAP

VA MEDICAL CENTER

2501 W22ND ST

SIOUX FALLS, SD 57105

NORTH

NORTH

KEYPLAN

NTS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10 o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s in c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e rs in c h o n e f o o t o n e in c h o n e f o o t o n e a n d o n e h a lf in c h e s o n e f o o t th re e in c h e s o n e f o o t

SIOUX FALLS, SOUTH DAKOTA

CIVIL:

Dunham Asssociates, Inc.

50 South Sixth St Suite 1100 Minneapolis, MN 55402 Phone: 612-465-7550

MEP:

Rippe Associates 10400 Yellow Circle Dr Suite 100 Minneapolis, MN 55343 Phone: 952-933-0313

FOOD SERVICE:

Stone Group Architects, Inc.

600 East 7th Street Sioux Falls, SD 57103 Phone: 605-271-1144

Ulteig Engineers, Inc.

5701South Corporate Place Sioux Falls, SD 57108 Phone: 605-323-2306

Ericksen Roed Associates 2550 University Ave W Suite 423-S St. Paul, MN 55402 Phone: 651-251-7570

STRUCTURAL:

C U s e rs \M

.A lb e rt

\D o c u m e n ts \2

V

A S io u x F a lls

R e n o v a te N e w

K it c h e n A

M ic h a e lA lb

.r v t

/2

/2

:2

:1

A

M

G-000

COVER SHEET RENOVATE FIRST FLOOR FOR

NEW KITCHEN FOR THE SIOUX

FALLS VA MEDICAL CENTER 5

08-19-2026 BH JH/MA

SGA #201956

VA #438-21-403

SHEET INDEX

GENERAL

G-000 COVER SHEET

G-001 ACCESSIBILITY DETAILS

G-002 ICRA, ISLM

G-003 FIRST FLOOR CODE AND LIFE SAFETY

G-004 FIRST FLOOR PROGRAM SUMMARY PLAN

G-005 PHASE 1 DEMOLITION PLAN

G-006 PHASE 1 CONSTRUCTION PLAN

G-007 PHASE 2 DEMOLITION PLAN

G-008 PHASE 2 CONSTRUCTION PLAN

G-009 PHASE 3 PLANS

CIVIL

G-100 CIVIL/STRUCTURAL TITLE SHEET

V-100 CIVIL EXISTING SURVEY

C-100 CIVIL TRAFFIC CONTROL PLAN

C-200 CIVIL EROSION CONTROL PLAN

C-300 CIVIL DEMOLITION PLAN

C-400 CIVIL SITE PLAN

C-500 CIVIL PAVING JOINTING PLAN

C-600 CIVIL GRADING PLAN

STRUCTURAL

S000 STRUCTURAL COVER SHEET

S001 SCHEDULES / FOUNDATION DETAILS

S-101 1ST FLOOR FOUNDATION PLAN

S-102 2ND FLOOR FRAMING PLAN

S-300 FOUNDATION DETAILS

S-400 FRAMING DETAILS

U.S. DEPARTMENT OF VETERANS AFFAIRS

RENOVATE FIRST FLOOR FOR NEW KITCHEN FOR THE SIOUX FALLS VA MEDICAL CENTER

08-19-2026

SIOUX FALLS, SOUTH DAKOTA

VA #438-21-403

BUILDING #5

ROYAL C. JOHNSON VETERANS MEMORIAL MEDICAL CENTER

SHEET INDEX

ARCHITECTURAL

AD-101 FIRST FLOOR DEMOLITION PLAN

AD-102 SECOND FLOOR DEMOLITION PLAN

A-100 GROUND FLOOR PLAN

A-101 FIRST FLOOR PLAN

A-102 SECOND FLOOR AND ROOF PLAN

A-110 GROUND FLOOR REFLECTED CEILING PLAN

A-111 FIRST FLOOR REFLECTED CEILING PLAN

A-201 EXTERIOR ELEVATIONS, SECTIONS & DETAILS

A-310 WALL SECTIONS

A-450 INTERIOR ELEVATIONS

A-501 DETAILS

A-601 SCHEDULES

A-801 FINISH SCHEDS AND PLANS

A-901 3D IMAGES

AI-100 EQUIPMENT SCHEDULE

AI-101 EQUIPMENT PLAN

AZ-100 GROUND FLOOR FRAMING & FIREPROOFING PLAN

AZ-101 FIRST FLOOR ROOF FRAMING & FIREPROOFING PLAN

SHEET INDEX

FOODSERVICE

FS100 FOODSERVICE EQUIPMENT PLAN - OVERALL

FS101 FOODSERVICE EQUIPMENT SCHEDULE - NFS

FS102 FOODSERVICE EQUIPMENT PLAN - NFS

FS103 FOODSERVICE EQUIPMENT SCHEDULE - VCS

FS104 FOODSERVICE EQUIPMENT PLAN - VCS

FS200 FOODSERVICE EQUIPMENT ELEVATIONS

FS201 FOODSERVICE EQUIPMENT ELEVATIONS

FS202 FOODSERVICE EQUIPMENT ELEVATIONS

FS203 FOODSERVICE EQUIPMENT ELEVATIONS

FS204 FOODSERVICE EQUIPMENT ELEVATIONS

FS205 FOODSERVICE EQUIPMENT ELEVATIONS

FS300 FOODSERVICE EQUIPMENT SPECIAL CONDITIONS DETAILS

FS301 FOODSERVICE EQUIPMENT SPECIAL CONDITIONS PLAN - NFS

FS302 FOODSERVICE EQUIPMENT SPECIAL CONDITIONS PLAN - VCS

FS400 FOODSERVICE EQUIPMENT STANDARD DETAILS

FS401 FOODSERVICE EQUIPMENT STANDARD DETAILS

FS402 FOODSERVICE EQUIPMENT STANDARD DETAILS

FS403 FOODSERVICE EQUIPMENT STANDARD DETAILS

FSE100 FOODSERVICE EQUIPMENT ELECTRICAL SCHEDULE

FSE101 FOODSERVICE EQUIPMENT ELECTRICAL DETAILS

FSE102 FOODSERVICE EQUIPMENT ELECTRICAL PLAN - NFS

FSE103 FOODSERVICE EQUIPMENT ELECTRICAL PLAN - VCS

FSM100 FOODSERVICE EQUIPMENT MECHANICAL SCHEDULE

FSM101 FOODSERVICE EQUIPMENT MECHANICAL DETAILS

FSM102 FOODSERVICE EQUIPMENT MECHANICAL PLAN - NFS

FSM103 FOODSERVICE EQUIPMENT MECHANICAL PLAN - VCS

SHEET INDEX

MECHANICAL/PLUMBING

M000 MECHANICAL TITLE SHEET

MHD101 FIRST FLOOR HVAC DEMOLITION PLAN

MHD201 SECOND FLOOR HVAC DEMOLITION PLAN

MPD101 FIRST FLOOR PIPING DEMOLITION PLAN

MPD201 SECOND FLOOR PIPING DEMOLITION PLAN

MP001 GROUND FLOOR PIPING PLAN

MH101 FIRST FLOOR HVAC PLAN

MP101 FIRST FLOOR PIPING PLAN

MH201 SECOND FLOOR AND ROOF HVAC PLAN

MP201 SECOND FLOOR PIPING PLAN

M300 PIPING FLOW DIAGRAM AND DETAILS

M301 AIRFLOW DIAGRAMS

M400 MECHANICAL DETAILS

M401 KITCHEN EXHAUST 3D VIEWS AND SECTION DETAILS

M402 KITCHEN EXHAUST HOOD DETAILS

M500 MECHANICAL SCHEDULES

M501 MECHANICAL/ ELECTRICAL MAU SCHEDULES

M502 MECHANICAL/ ELECTRICAL SCHEDULES

M600 SEQUENCE OF OPERATIONS

M601 SEQUENCE OF OPERATIONS

F101 FIRST FLOOR FIRE PROTECTION PLAN

F201 SECOND FLOOR FIRE PROTECTION PLAN

PD001 PIPE BASEMENT PLUMBING PHASE 3 DEMOLITION PLAN

PD002 GROUND FLOOR PLUMBING PHASE 2 DEMOLITION PLAN

PD003 GROUND FLOOR PLUMBING PHASE 3 DEMOLITION PLAN

PD101 FIRST FLOOR PLUMBING - PHASE 1 AND 2A DEMOLITION PLAN

PD102 FIRST FLOOR PLUMBING - PHASE 2B DEMOLITION PLAN

PD201 SECOND FLOOR PLUMBING PHASE 2 DEMOLITION PLAN

PD202 SECOND FLOOR PLUMBING - PHASE 3 DEMOLITION

PGD101 FIRST FLOOR MEDICAL GAS PHASE 1 DEMOLITION PLAN

P001 GROUND FLOOR PLUMBING PLAN

P101 FIRST FLOOR PLUMBING PLAN

P201 SECOND FLOOR AND ROOF PLUMBING PLAN

P300 ENLARGED PLUMBING PLANS AND PLUMBING ELEVATIONS

P301 DOMESTIC WATER RISER DIAGRAM

P302 WASTE AND VENT RISER DIAGRAM

P400 PLUMBING DETAILS

P500 PLUMBING SCHEDULES

SHEET INDEX

ELECTRICAL

E000 ELECTRICAL TITLE SHEET

ED101 FIRST FLOOR LIGHTING DEMOLITION PLAN

ED102 FIRST FLOOR POWER DEMOLITION PLAN

ED103 FIRST FLOOR SYSTEMS DEMOLITION PLAN

ED201 SECOND FLOOR LIGHTING DEMOLITION PLAN

ED202 SECOND FLOOR POWER DEMOLITION PLAN

ED203 SECOND FLOOR SYSTEMS DEMOLITION PLAN

ED300 ELECTRICAL DEMOLITION RISER DIAGRAM

EE001 GROUND FLOOR ELECTRICAL PLAN

EL101 FIRST FLOOR LIGHTING PLAN

EL201 SECOND FLOOR LIGHTING PLAN

EP101 FIRST FLOOR POWER PLAN

EP201 SECOND FLOOR AND ROOF POWER PLAN

EY101 FIRST FLOOR SYSTEMS PLAN

EY201 SECOND FLOOR SYSTEMS PLAN

EE300 ELECTRICAL RISER DIAGRAM

EE501 ELECTRICAL DETAILS

EE502 ELECTRICAL DETAILS

EE600 ELECTRICAL SCHEDULES

EE601 ELECTRICAL SCHEDULES

TOTAL SHEET COUNT: 126

Revision# Description Date:

1 ISSUE SET 08-19-2026

Figure 302.2 Carpet Pile Height

Figure 303.2 Vertical Change in Level

Figure 303.3 Beveled Change in Level

Figure 304.3.1 Circular Turning Space

Figure 304.3.2 T-Shaped Turning Space

Figure 305.3 Clear Floor or Ground Space

Figure 305.5 Position of Clear Floor or Ground Space

Figure 305.7.1 Maneuvering Clearance in an

Alcove, Forward Approach

Figure 305.7.2 Maneuvering Clearance in an

Alcove, Parallel Approach

Figure 306.2 Toe Clearance

Figure 306.3 Knee Clearance

Figure 308.3.1 Unobstructed Side

Reach

Figure 308.3.2 Unobstructed High Side

Reach

Figure 308.2.2 Obstructed High Forward Reach

Figure 308.2.1 Unobstructed Forward Reach

Figure 307.2 Limits of Protruding Objects

Figure 307.4 Vertical Clearance

Figure 307.3 Post-Mounted Protruding Objects

Figure 302.3 Elongated Openings in Floor or

Ground Surfaces

Figure 403.5.1 Clear Width of an Accessible Route

Figure 404.2.4.3 Maneuvering Clearance at Recessed Doors and Gates

Figure 407.4.1 Elevator Car Door Sizes

Figure 404.2.4.1 Maneuvering Clearance at Manual Swinging Doors and Gates

Figure 404.2.3 Clear Width of Doorways

Figure 407.2.2.2 Visible Hall Signals

Figure 407.2.3.1 Floor Designations on Jambs of

Elevator Hoistway Entrances

Figure 407.2.3.2 Car Designations on Jambs of Destination-

Oriented Elevator Hoistway Entrances

Figure 407.2.1.1 Height of Elevator Call Buttons

A C

C E

S S

IB

L

E R

O U

T E

S B

U

IL

D

IN

G B

L O

C K

S

1/2 max

1/4 max

6.4

1/4

6.4

1/4

6.4 1/2

1/2

60 min

60 min m in m in

36 min

12 min

12 min

24 min ar m ar m base

48 min m in m in

30 min m in

48 min

36 min

60 min

X

X

6 max

17-25

430-635 m in

11 min

9 min

8 min m in m in

25 max

(b) plan

(a) elevation

(b) plan

(a) elevation m ax m in

10 max

>10 - 24 max

255 - 610 m ax m ax m ax

10 max m ax m ax

> 20 - 25 max

510 - 635

20 max m ax

(a) (b) (b)(a) m ax m in

X

4 max

X

X m ax m in m ax

4 max (typ.)

X > 12

X > 12

4 max

4 max

5-

(a) (b) dominant direction of travel long dimension perpendicular to dominant direction of travel

1/2 max

36 min

32 min

32 min

36 min m ax m ax m in m in

18 min

X > 8

X > 8

X > 8

12 min m in m in

60 min m in

36 min any door location m in m in m in m in

18 min

12 min*

36 min

42 min m in

(e) hinge approach, pull side

(j) latch approach, push side

(k) latch approach, push side

*48 min if door provided with closer

(i) latch approach, pull side

*54 min if door provided with closer

(h) latch approach, pull side

(f) hinge approach, push side

(g) hinge approach, push side

*if door provided with both closer and latch ** 48 min if both closer and latch provided

(b) front approach, push side

(c) front approach, push side

*if door provided with both closer and latch

(a) front approach, pull side

(a) hinged door

(b) sliding door

(c) folding door

(d) doorways without doors

(a) pull side

(b) push side

(c) push side, door provided with both closer and latch

(d) hinge approach, pull side

24 min

22 min

12 min* m in m in

24 min

2 1/2 min

2 1/2 min m in m in m in

-4

0-

36 min

32 min

32 min

32 min

90.

(a) forward

(b) parallel

Figure 504.2 Treads and Risers

Figure 504.5 Stair Nosings

Figure 505.4 Handrail Height

Figure 505.5 Handrail Clearance

Figure 505.6 Horizontal Projections Below

Gripping Surface

Figure 505.7.2 Handrail Non-Circular Cross

Section

Figure 505.10.2 Top Handrail Extension at

Stairs

Figure 505.10.3 Bottom Handrail Extension at

Stairs

GENERAL SITE AND BUILDING ELEMENTS

4 - 7

100 - 180

11 min radius 1/2 max

1 1/2 max

30 deg max

(a) radius of tread edge (typical for all profiles)

(b) angled riser

(c) curved nosing

(d) beveled nosing

(a) stairs

(b) ramps

(c) walking surfaces

1 1/2 min

1/ m in

1/ m ax

2 1/4 max

4 - 6 1/4 perimeter

100 - 160

12 min

X

X

Note: X = tread depth

1 1/2 max

Figure 703.2.5 Height of Raised

Characters

Figure 703.4.1 Height of Tactile Characters

Above Floor or Ground

Figure 703.4.2 Location of Tactile Signs at Doors

Figure 703.6.1 Pictogram Field

Figure 703.7.2.1 International Symbol of Accessibility m ax m in

AREA OF

REFUGE

18 min

18 min centered on tactile characters

AREA OF

REFUGE

m in

MEN not in pictogram field

5/

-5

LIBRARY

.00

C O

M M

U N

IC

A

T

IO

N E

L E

M E

N T

S A

N D

F E

A T

U R

E S

Figure 403.5.2 Clear Width at Turn m in

20 60 m in

42 min

42 min

X < 52

X < 52

36 min

36 min

(B) 180 degree turn

Option 2

(A) 180 degree turn

Option 1 m in

43 min

43 min

X < 52

(C)

180 degree turn Option 3

16 -18

Figure 604.2 Water Closet

Location

(a) wheelchair accessible water closets

Figure 604.3.1 Size of Clearance at

Water Closets

Figure 604.3.2 (exception) Overlap of Water Closet Clearance in Residential

Dwelling Units

Figure 604.5.1 Side Wall Grab Bar at

Water Closets

Figure 604.5.2 Rear Wall Grab Bar at

Water Closets

Figure 604.7 Dispenser Outlet

Location

P L

U M

B

IN

G E

L E

M E

N T

S A

N D

F A

C

IL

IT

IE

S

60 min.

m in m in

60 min.

18 min.

12 max.

39 - 41

54 min.

42 min.

m in

24 min.

36 min.

12 min.

36Transfer Side comply with section 609.3

7 - 9 m in m ax

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10 o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s in c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e rs in c h o n e f o o t o n e in c h o n e f o o t o n e a n d o n e h a lf in c h e s o n e f o o t th re e in c h e s o n e f o o t

SIOUX FALLS, SOUTH DAKOTA

CIVIL:

Dunham Asssociates, Inc.

50 South Sixth St Suite 1100 Minneapolis, MN 55402 Phone: 612-465-7550

MEP:

Rippe Associates 10400 Yellow Circle Dr Suite 100 Minneapolis, MN 55343 Phone: 952-933-0313

FOOD SERVICE:

Stone Group Architects, Inc.

600 East 7th Street Sioux Falls, SD 57103 Phone: 605-271-1144

Ulteig Engineers, Inc.

5701South Corporate Place Sioux Falls, SD 57108 Phone: 605-323-2306

Ericksen Roed Associates 2550 University Ave W Suite 423-S St. Paul, MN 55402 Phone: 651-251-7570

STRUCTURAL:

C U s e rs \M

.A lb e rt

\D o c u m e n ts \2

V

A S io u x F a lls

R e n o v a te N e w

K it c h e n A

M ic h a e lA lb

.r v t

/2

/2

:2

:1

A

M

G-001

ACCESSIBILITY DETAILS RENOVATE FIRST FLOOR FOR

NEW KITCHEN FOR THE SIOUX

FALLS VA MEDICAL CENTER 5

08-19-2026 BH JH/MA

SGA #201956

VA #438-21-403

1. ALL EXISTING DUCTWORK, ELECTRICAL OR PIPING IS NOT NECESSARILY SHOWN

ON THE DRAWINGS.

2. BEFORE CONTRACTOR(S) BID THE JOB, IT IS IMPERATIVE THEY VISIT THE JOBSITE

AND FIELD VERIFY THE EXACT LOCATION OF ALL EXISTING EQUIPMENT,

DUCTWORK, ETC. IT WILL BE PART OF THE CONTRACTOR'S RESPONSIBILITY AND

COST TO ENGINEER AND RELOCATE ANY EXISTING OBSTACLES WHICH WILL

INTERFERE WITH THE CONTRACTOR'S ABILITY TO INSTALL ALL NEW OR

RELOCATED WORK ON THE CONTRACT.

3. CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN FIELD AND NOTIFY PROJECT

ENGINEER OF ALL DISCREPANCIES IF ANY, FOUND PRIOR TO PLACEMENT OF ANY

COMPONENTS.

4. THE CONTRACTOR WILL TAKE ALL NECESSARY PRECAUTIONS INCLUDING THE

BUILDING AND MAINTENANCE OF DUST TIGHT PARTITIONS, DAILY VACUUMING,

SWEEPING, AND PROVISION OF CLEAN FLOOR MATS AT THE PROJECT

ENTRANCES, TO PREVENT THE INFILTRATION OF DIRT AND DUST FROM THE

CONSTRUCTION AREAS INTO THE OWNER OCCUPIED AREAS.

5. PATCH ALL FINISHES WHERE DISTURBED BY THE WORK AND WHERE UNFINISHED

SURFACES HAVE BEEN EXPOSED BY DEMOLITION. PATCHING MUST MATCH

ADJACENT MATERIALS, COLORS, AND FINISHES. WALL SURFACES THAT ARE

PATCHED SHALL HAVE THE FINISHES (PAINT, VINYL WALL COVERING, ETC.)

REPLACED FROM CORNER TO CORNER AND FLOOR TO CEILING.

6. UNLESS OTHERWISE INDICATED FINISH ALL NEW FRAMES AND PARTITIONS TO

MATCH SURROUNDING. NEW HOLLOW METAL DOORS SHALL BE PAINTED SAME

COLOR AS FRAMES. EXISTING PARTITIONS RECEIVING NEW DOOR FRAMES THAT

HAVE VINYL WALL COVERING (VWC) SHALL HAVE THE VWC COMPLETELY

REMOVED AND REPLACED WITH NEW VWC OF MATCHING TEXTURE AND COLOR.

7. PAINT ALL EXPOSED NEW AND EXISTING PIPING, CONDUIT, WIRE MOLD,

ELECTRICAL PANELS, ACCESS PANELS, ETC.,TO MATCH WALL FINISH UNLESS

OTHERWISE NOTED.

8. CORRIDOR WALLS AND PLUMBING PARTITIONS SHALL BE CONSIDERED 1 HOUR

FIRE RATED WALLS AND NEW OR EXISTING PENETRATIONS MUST BE SEALED

ACCORDINGLY WITH APPROVED FIRESTOPPING MATERIAL THE SAME DAY THE

PENETRATION IS MADE OR DISCOVERED. ALL FLOOR SLABS, VERTICAL SHAFTS

AND STAIRWELLS SHALL BE CONSIDERED 2 HOUR RATED PARTITIONS AND BE

SEALED ACCORDINGLY IN THE MANNER LISTED HEREIN. PENETRATIONS

THROUGH THE EXTERIOR WALLS SHALL BE SEALED WATERTIGHT.

9. ALL NEW VERTICAL AND HORIZONTAL DUCTS, PIPES, CONDUITS, ETC.,IN FINISHED

ROOMS OR AREAS THROUGHOUT BUILDING, NOT ENCASED IN MASONRY OR

CONCRETE CONSTRUCTION, SHALL BE FURRED IN, THE FURRING FINISHED TO

MATCH THE ROOM FINISH.

10. WHENEVER EXISTING EQUIPMENT, PIPING, DUCTS, ETC., ARE REQUIRED TO BE

REMOVED, SUCH REMOVAL SHALL INCLUDE ALL ANCHORS, HANGERS,

FOUNDATIONS, ETC., UNLESS NOTED OTHERWISE. AFTER REMOVAL; FLOORS,

WALLS, AND CEILINGS SHALL BE FINISHED TO MATCH ADJOINING SURFACES.

11. UTILITY WORK THAT WILL REQUIRE A SHUTDOWN OF EXISTING SERVICE(S) WILL

BE DONE AFTER NORMAL WORKING HOURS (NIGHTS, WEEKENDS, HOLIDAYS,

ETC.) AT NO ADDITIONAL COST TO THE GOVERNMENT. WORK MUST BE

SCHEDULED WITH THE COR.

12. WORK THAT MUST OCCUR IN OCCUPIED AREAS, SUCH AS PUBLIC CORRIDORS, OF

THE MEDICAL CENTER OR DISRUPT A MEDICAL CENTER FUNCTION WILL BE DONE

AT TIMES OTHER THAN NORMAL WORKING HOURS (NIGHTS, WEEKENDS,

HOLIDAYS, ETC.) AT NO ADDITIONAL COST TO THE GOVERNMENT. WORK MUST BE

SCHEDULED WITH THE COR.

13. ALL ELECTRICAL CIRCUITRY TO BE CONCEALED UNLESS OTHERWISE SPECIFIED.

CIRCUITING FOR ELECTRIC DOOR HOLD OPENS IN MASONRY WALLS SHALL BE

SURFACE RACEWAY.

14. COORDINATE ALL WORK WITH OTHER TRADES AND EXISTING CONDITIONS TO

ELIMINATE CONFLICTS AND/OR INTERFERENCES. THE CONTRACTOR SHALL

PROVIDE ALL OFFSETS, FITTINGS, TRANSITIONS, EXTENSIONS, ETC., REQUIRED

FOR A COMPLETE AND FUNCTIONAL SYSTEM.

15. DRAWINGS ARE DIAGRAMMATIC AND SHOW ONLY THE GENERAL ARRANGEMENT

OF EACH SYSTEM. BECAUSE OF SMALL SCALE OF DRAWINGS IT IS NOT POSSIBLE

TO SHOW OR INDICATE ALL BRANCHES, OFFSETS, FITTINGS, BOXES, AND

ACCESSORIES WHICH MAY BE REQUIRED. CONTRACTOR MUST CAREFULLY

INVESTIGATE STRUCTURAL AND FINISH CONDITIONS AFFECTING ALL WORK,

FURNISHING SUCH FITTINGS, TRAPS, VALVES, BOXES, ACCESSORIES, ETC., AS

MAY BE REQUIRED.

16. LOCATIONS OF NEW EQUIPMENT, PIPING, AND ASSOCIATED ITEMS SHOWN ON

THE DRAWINGS ARE SCHEMATIC ONLY. THE CONTRACTOR SHALL FIELD VERIFY

EXACT LOCATION AND ELEVATION FOR ALL WORK, INCLUDING CONNECTIONS TO

EXISTING WORK. ALL OFFSETS, FITTINGS, TRANSITIONS, EXTENSIONS, ETC.,

REQUIRED FOR A COMPLETE AND FUNCTIONAL SYSTEM SHALL BE PROVIDED AT

NO ADDITIONAL COST.

17. ALL EXISTING DUCTWORK, ELECTRICAL OR MECHANICAL PIPING, CABLE TRAYS,

ETC., IS NOT NECESSARILY SHOWN ON THE DRAWINGS. BEFORE CONTRACTOR

PLACES A BID IT IS IMPERATIVE THEY VISIT THE JOBSITE AND FIELD VERIFY THE

EXACT LOCATION OF ALL EXISTING EQUIPMENT, DUCTWORK, PIPING, ETC. IT WILL

BE PART OF THE CONTRACTOR'S RESPONSIBILITY AND THE CONTRACTOR WILL

BEAR THE COST TO ENGINEER AND RELOCATE ANY EXISTING OBSTACLES WHICH

WILL INTERFERE WITH THE CONTRACTOR'S ABILITY TO INSTALL ALL NEW OR

RELOCATED WORK IN THIS PROJECT.

18. CONTRACTOR SHALL NOT INSTALL CONDUIT, PIPING, LIGHTING, OR OTHER

OBSTRUCTIONS UNDER OR ADJACENT TO HVAC EQUIPMENT THAT WILL

ELIMINATE OR OBSTRUCT ACCESS TO COILS, MOTORS, VALVES, SWITCHES,

PANELS, ETC.

19. BEFORE THE CONTRACTOR BEGINS WORK ALL EXISTING SYSTEM INFORMATION

SHALL BE RECORDED SUCH AS TEMPERATURE, FLOW RATE, PRESSURE,

CURRENT, VOLTAGE, OR ANY OTHER INFORMATION NECESSARY FOR HIM TO

RETURN THE AFFECTED SYSTEM TO ORIGINAL OPERATING CONDITION. UNLESS

NOTED OTHERWISE IT IS ASSUMED THAT ALL SYSTEMS ( HVAC, ELECTRICAL,

PLUMBING, ETC.) ARE WORKING PROPERLY IN EVERY MANNER AT THE BEGINNING

OF THE PROJECT. THE CONTRACTOR'S RECORDED MEASUREMENTS MUST BE

SUBMITTED TO THE PROJECT ENGINEER FOR REVIEW AND ACCEPTANCE BEFORE

ANY DEMOLITION OR OTHER RELATED WORK CAN PROCEED.

20. FOR DOORS BEING REPLACED: IF THE EXISTING DOOR HAS SIGNAGE APPLIED TO

IT, THIS SIGNAGE SHOULD BE CAREFULLY REMOVED AND REAPPLIED TO THE

NEW DOOR. IF THE SIGNAGE IS DAMAGED DURING REMOVAL OR CANNOT

OTHERWISE BE REAPPLIED IT SHOULD BE REPLACED WITH NEW SIGNAGE OF

IDENTICAL TYPE.

21. THE CONTRACTOR WILL BE RESPONSIBLE FOR MAINTAINING ALL EXISTING

ACCESS DOORS TO CONSTRUCTION AREAS, EXISTING MECHANICAL AND

ELECTRICAL AREAS, ASSIGNED STORAGE AREAS, EQUIPMENT ACCESS AREAS,

ETC. DOORS MUST BE RESTORED TO THE CONDITION ENCOUNTERED AT

BEGINNING OF PROJECT. THIS INCLUDES DOOR REPLACEMENT, HARDWARE

REPLACEMENT, HARDWARE REPAIR, DOOR REPAIR, ETC.

22. IT IS IMPORTANT THAT ALL REPLACEMENT DOORS HAVE A GAP OF LESS THAN 3/4"

BETWEEN THE BOTTOM OF THE DOOR AND THE FLOOR AT ALL POINTS.

CONTRACTOR MUST COORDINATE INSTALLED DOOR FRAME HEIGHT OR MAKE

OTHER NECESSARY MODIFICATIONS TO MEET THIS REQUIREMENT AND KEEP FIRE

RATING OF DOOR AND FRAME. BOTTOM SWEEPS ARE NOT ACCEPTABLE UNLESS

SPECIFICALLY STATED ON DRAWING.

23. IF THERE IS ANY WORK TO BE DONE ON EXISTING ROOFS, SUCH AS ROOF

PENETRATIONS OR STANDS, OR ANYTHING THAT DAMAGES THE INTEGRITY OF

THE ROOF, THIS WORK MUST BE DONE BY A CONTRACTOR LICENSED BY THE

ROOFING MEMBRANE MANUFACTURER. HE MUST BE APPROVED BY THE

MEMBRANE MANUFACTURER SO AS TO NOT VOID OR INTERRUPT EXISTING

SINGLE PLY MEMBRANE ROOF WARRANTIES.

24. EXISTING CIRCUITRY (CONDUIT, BOXES, WIRE, ETC.) MAY BE REUSED AT THE

CONTRACTOR'S OPTION AS LONG AS IT MEETS THE SAME SPECIFICATIONS

REQUIRED FOR NEW CIRCUITRY. ALL WORK, NEW AND EXISTING, SHALL COMPLY

WITH THE LATEST NEC CODE.

25. WHERE DOOR AND HARDWARE ARE SHOWN TO BE REMOVED, THE DOOR STOPS

ARE TO REMAIN AND BE REUSED UNLESS NOTED OTHERWISE.

CONTRACTOR GENERAL NOTES

1. CONTRACTOR IS NOT AUTHORIZED TO SCALE CONSTRUCTION DOCUMENTS.

ARCHITECT IS TO BE NOTIFIED IN THE EVENT A DISCREPANCY IS FOUND IN EITHER

SPECIFICATIONS OR CONTRACT DOCUMENTS AT THE EARLIEST PRACTICAL

OPPORTUNITY.

2. GENERAL CONTRACTOR SHALL OBSERVE ALL REGULATIONS IMPOSED BY

GOVERNING BODIES.

3. CONSTRUCTION SHALL PROCEED IN AN ORDERLY AND CONTINUOUS FASHION IN

ACCORDANCE WITH THE INTERNATIONAL BUILDING CODES AND ALL OTHER

APPLICABLE CODES.

4. THE CONTRACTOR SHALL CONTAIN ALL CONSTRUCTION ACTIVITY, INCLUDING

STORAGE OF MATERIAL AND EQUIPMENT, WITHIN THE CONSTRUCTION LIMITS, AT ALL

TIMES BEING RESPONSIBLE FOR AND ABIDING BY RULES AND REGULATIONS OF THE

OWNER.

5. GENERAL CONTRACTOR TO BE RESPONSIBLE FOR REPAIRING ANY AND ALL

SURFACES DAMAGED BY HIMSELF OR SUBCONTRACTORS UNDER THEIR CONTROL.

REPAIRS ARE TO MATCH EXISTING MATERIALS AND MUST BE ACCEPTABLE TO

OWNER.

6. ADEQUATELY PATCH/REPAIR TO MATCH ADJACENT CONSTRUCTION, ALL BUILDING

STRUCTURES, COMPONENTS, AND UTILITIES WHICH ARE DISTURBED AND REQUIRE

REPAIR AS A RESULT OF WORK PERFORMED UNDER THIS CONTRACT.

7. ALL FLOOR TRANSITIONS BETWEEN DIFFERENT MATERIALS SHALL BE SMOOTH AND

FLUSH (MAXIMUM SLOPE = 1/8" PER FOOT).

8. GENERAL CONTRACTOR SHALL REMOVE ALL CONSTRUCTION DEBRIS FROM JOBSITE.

ALL CONSTRUCTION DEBRIS SHALL BE CONTAINED INSIDE CONSTRUCTION LIMITS.

9. ALL WALLS WITH ITEMS SUCH AS GRAB BARS, TOILET ACCESSORIES, WOOD TRIM,

SHELVING, CASEWORK, ETC. SHALL BE REINFORCED WITH CONCEALED, FIRE

TREATED WOOD BLOCKING OR METAL STUD BLOCKING. (GENERAL CONTRACTOR TO

INSTALL BLOCKING TYP.)

10. BUILDING 5 WILL REMAIN OCCUPIED THROUGHOUT THE CONSTRUCTION PERIOD. THE

CONTRACTOR SHALL TAKE EVERY NECESSARY PRECAUTION TO ENSURE THE

UNINTERRUPTED OPERATION OF THE FACILITY, STAFF, PATIENTS AND VISITORS.

DISRUPTION TO ADJACENT DEPARTMENTS AS WELL AS DEPARTMENTS ON FLOORS

ABOVE OR BELOW SHALL BE COORDINATED WITH THE FACILITY CONTRACT OFFICER.

THE CONTRACTOR SHALL COORDINATE ALL WORK, CONSTRUCTION, PATHWAYS,

ELEVATOR USAGE, AND UTILITY INTERRUPTION WITH THE OWNER.

11. CONTRACTOR TO EXERCISE ALL PRECAUTIONS TO PROVIDE FOR STAFF, PATIENTS,

VISITORS, AND WORKMEN'S SAFETY DURING THE PERFORMANCE OF THIS CONTRACT

PER EPA, OSHA, AND OTHER APPLICABLE CODES, STANDARDS, AND REGULATIONS.

12. THE CONTRACTOR SHALL MAINTAIN & KEEP BARRIER FREE THE EXISTING MEANS OF

EGRESS.

13. ALL GYPSUM BOARD TO BE MOISTURE/MOLD RESISTANT TYPE X.

14. THE CONTRACTOR IS RESPONSIBLE FOR CONSTRUCTION OF TEMPORARY

PARTITIONS AND TEMPORARY VENTILATION SYSTEMS AS REQUIRED TO PREVENT THE

SPREAD OF DUST FROM THE CONSTRUCTION AREA TO OCCUPIED AREAS OF THE

BUILDING. OCCUPIED AREAS SHALL REMAIN DUST FREE THROUGHOUT THE

CONSTRUCTION. THE CONTRACTOR SHALL MAINTAIN THE AFFECTED AREAS OF THE

BUILDING (INCLUDING MATERIAL TRANSPORT ROUTES) CLEAN AND DUST FREE. ALL 1-

HR FIRE BARRIERS ARE TO BE CONSTRUCTED USING STARC SYSTEMS

FIREBLOCKWALL CONTAINMENT WALL SYSTEM. OTHER FORMS OF 1-HR WALLS MUST

BE DISCUSSED WITH COR PRIOR TO INSTALLATION.

15. ALL WOOD USED IN WALL CONSTRUCTION SHALL BE FIRE-RETARDANT-TREATED

LUMBER.

16. ALL WRITTEN CORRESPONDENCE WILL BE TRANSMITTED FROM SUBCONTRACTOR

THROUGH GENERAL CONTRACTOR THROUGH ARCHITECT TO OWNER. ALL PARTIES

CORRESPONDENCE ARE TO RECEIVE WRITTEN AND SIGNED COPIES OF SUCH. NO

VERBAL AGREEMENTS AFFECTING COST OR ALTERNATIVE CONSTRUCTION METHODS

AND ARRANGEMENTS WILL BE CONSIDERED VALID OR BINDING, AND ARE

THEREFORE, DISALLOWED.

17. GENERAL CONTRACTOR SHALL COMPLY WITH ALL DIRECTIVES OF THE OWNER. IF

CONFLICTS BETWEEN DRAWINGS, SPECIFICATIONS AND REQUIREMENTS OF BUILDING

OWNER AND/OR OPERATORS ARISE, THEY SHALL BE BROUGHT TO THE ATTENTION OF

THE ARCHITECT IMMEDIATELY.

18. THE HVAC, PLUMBING AND ELECTRICAL CONTRACTORS SHALL COORDINATE THEIR

WORK WITH THE WORK OF OTHER TRADES TO ASSURE THAT THE WORK CAN BE

INSTALLED IN A WORKMAN-LIKE MANNER. EACH CONTRACTOR SHALL BE EXPECTED

TO COOPERATE WITH OTHER CONTRACTORS IN THE PLACEMENT OF WORK TO AVOID

CONFLICTS AND MAINTAIN JOB PROGRESS.

19. IT IS THE INTENT OF THESE DRAWINGS THAT A COMPLETE JOB IS TO BE

ACCOMPLISHED IN PREPARING THE BID. THE BIDDER SHALL MAKE ALLOWANCES FOR

DETAILS WHICH MIGHT HAVE BEEN INADVERTENTLY OMITTED FROM THE DRAWINGS.

20. ALL EXISTING DUCTWORK, ELECTRICAL OR PIPING IS NOT NECESSARILY SHOWN ON

THE DRAWINGS.

21. BEFORE CONTRACTOR(S) BID THE JOB, IT IS IMPERATIVE THEY VISIT THE JOBSITE

AND FIELD VERIFY THE EXACT LOCATION OF ALL EXISTING EQUIPMENT, DUCTWORK,

ETC. IT WILL BE PART OF THE CONTRACTOR'S RESPONSIBILITY TO DESIGN AND

RELOCATE ANY EXISTING OBSTACLES WHICH WILL INTERFERE WITH THE

CONTRACTOR'S ABILITY TO INSTALL ALL NEW OR RELOCATED WORK ON THE

CONTRACT.

22. ALL TEMPORARY PARTITIONS SHALL BE CONSTRUCTED WITH STARC SYSTEMS

FIREBLOCKWALL COMPONENTS TO CREATE 1-HOUR RATING WITH 45 MINUTE

OPENINGS BETWEEN CONSTRUCTION AREAS AND OCCUPIED AREAS. AY OTHER

FORMS OF TEMPORARY PARTITIONS SHALL BE PRESENTED TO AND REVIEWED BY

THE COR.

PROJECT GENERAL NOTES

NORTH

KEYPLAN

NTS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10 o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s in c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e rs in c h o n e f o o t o n e in c h o n e f o o t o n e a n d o n e h a lf in c h e s o n e f o o t th re e in c h e s o n e f o o t

SIOUX FALLS, SOUTH DAKOTA

CIVIL:

Dunham Asssociates, Inc.

50 South Sixth St Suite 1100 Minneapolis, MN 55402 Phone: 612-465-7550

MEP:

Rippe Associates 10400 Yellow Circle Dr Suite 100 Minneapolis, MN 55343 Phone: 952-933-0313

FOOD SERVICE:

Stone Group Architects, Inc.

600 East 7th Street Sioux Falls, SD 57103 Phone: 605-271-1144

Ulteig Engineers, Inc.

5701South Corporate Place Sioux Falls, SD 57108 Phone: 605-323-2306

Ericksen Roed Associates 2550 University Ave W Suite 423-S St. Paul, MN 55402 Phone: 651-251-7570

STRUCTURAL:

C U s e rs \M

.A lb e rt

\D o c u m e n ts \2

V

A S io u x F a lls

R e n o v a te N e w

K it c h e n A

M ic h a e lA lb

.r v t

/2

/2

:2

:1

A

M

G-002

ICRA, ISLM RENOVATE FIRST FLOOR FOR

NEW KITCHEN FOR THE SIOUX

FALLS VA MEDICAL CENTER 5

08-19-2026 BH JH/MA

SGA #201956

VA #438-21-403

CODE PLAN LEGEND

0.0"

0.0"

OCCUPANTS

REQUIRED WIDTH

PROVIDED WIDTH

OCCUPANT LOAD

1-HOUR FIRE BARRIER

2-HOUR FIRE BARRIER

FEC RADIUS (75'-0")

EXITING, PATH OF TRAVEL

CONSTRUCTION LIMITS

EX EXIT

COMMON PATH OF TRAVEL

SMOKE PARTITION

A. ANY DISCREPANCIES OR CONFLICTS FOUND IN THE VARIOUS PARTS OF THE CONSTRUCTION DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND THE OWNER BEFORE PROCEEDING WITH THE WORK.

B. SMOKE SEALS ON ALL RATED DOORS.

C. SEE MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.

GENERAL CODE PLAN NOTES:

6.0"

72.0"

9.0"

32.0"

10.40

10.40

24.0"

60.0"

75'-0"

75'-0"

75'-0"

LENGTH OF TRAVEL:46'-6"

LE

N

G T

H O

F T

R A

V E

L:

'-9

LE

N

G T

H O

F T

R A

V E

L:

'-9

LENGTH OF TRAVEL:135'-9"

EX

EX EX

EX

LENGTH OF TRAVEL:67'-6"

8.12 8.12 8.12 8.12 8.12 8.12 8.12 8.12 8.12

LENG

TH O

F TRAVEL:87'-9"

10.40

188A

RETAIL

RECEIVING /

STORAGE

RETAIL

CORRIDOR

DINING

SERVING /

GRAB & GO

141A

TRASH /

RECYCLING

HOLDING

RECEIVING

141C

CORRIDOR

WORKROOM

OFFICE

OFFICE

OFFICE

OFFICE

SHARED

OFFICE

LOUNGE/LOCKERS

194A

COOLER

194B

FREEZER

181A

DRY

STORAGE

ELEC RM

KITCHEN

HAC

PREP 189

COFFEE,

VENDING &

CATERING

STORAGE

DISHWASH /

POTS &

PANS

SOILED

CARTS

142A

CART WASH

KITCHEN

143A

DRY

STORAGE

143B

COOLER

143C

FREEZER

141B

MECH.

198B

STAFF

TOILET

198A

STAFF

TOILET 198C

STAFF

TOILET

144C

OFFICE

144B

SHARED

OFFICE

COMM.

144A

SHARED

OFFICE

EXISTING

TRASH &

RECYCLE

199A

BIO-HAZARD

COOLER

HALLWAY

HAC

OCCUPANT LOAD USE

A-K ASSEMBLY - KITCHEN

A-L ASSEMBLY - LESS CONCENTRATED

B BUSINESS

M MERCANTILE

S-M STORAGE - MERCANTILE

S-O STORAGE - OTHER

485 SF

S-O

3086 SF

A-K

968 SF

B

1124 SF

S-O

110 SF

S-O

1940 SF

B

843 SF

S-O

1932 SF

A-L

614 SF

S-M

667 SF

A-L

1248 SF

M

139 SF

S-O

998 SF

A-K

65 SF

S-O

188A

RETAIL

RECEIVING /

STORAGE

RETAIL

WORKROOM

OFFICE

OFFICE

OFFICE

OFFICE

SHARED

OFFICE

HAC

141C

CORRIDOR

LOUNGE/LOCKERS

198C

STAFF

TOILET

198B

STAFF

TOILET

198A

STAFF

TOILET

DISHWASH /

POTS &

PANS

ELEC RM

KITCHEN

HAC

194A

COOLER

194B

FREEZER

PREP

SERVING /

GRAB & GO

COFFEE,

VENDING &

CATERING

STORAGE

CORRIDOR

DINING

141A

TRASH /

RECYCLING

HOLDING

RECEIVING

141B

MECH.

181A

DRY

STORAGE

1C

C O

R R

ID

O

R

1C

C O

R R

ID

O

R

KITCHEN

143A

DRY

STORAGE

143B

COOLER

143C

FREEZER

142A

CART WASH

144B

SHARED

OFFICE

144C

OFFICE

COMM.144A

SHARED

OFFICE

HALLWAY

199A

BIO-HAZARD

COOLER

EXISTING

TRASH &

RECYCLE

• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER

GUIDANCE INFORMATION ON THE TECHNICAL INFORMATION LIBRARY (TIL)

• INTERNATIONAL BUILDING CODE (IBC) (ONLY WHEN SPECIFICALLY REFERENCED IN VA DESIGN DOCUMENTS)

• NFPA 101 LIFE SAFETY CODE

• NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900

• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS

• VA SEISMIC DESIGN REQUIREMENTS, H-18-8

• NATIONAL ELECTRICAL CODE (NEC)

• INTERNATIONAL PLUMBING CODE (IPC)

• ASME BOILER AND PRESSURE VESSEL CODE

• ASME CODE FOR PRESSURE PIPING

• ARCHITECTURAL BARRIER ACT ACCESSIBILITY STANDARDS (ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN

GUIDE (PG-18-13)

• BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318)

• MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL

BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)

• ENERGY POLICY ACT OF 2005 (EPACT)

• DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-

RISE RESIDENTIAL BUILDINGS AND NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434, AND 435.

• FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)

• EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENT, ENERGY, AND TRANSPORTATION MANAGEMENT.

• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIRMENTS SECTION 01010 IF THE VA

MASTER CONSTRUCTION SPECIFICATION.

• VENTILATION FOR THE ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1 – 2004.

• SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15 – 2007.

NOTE: ALL WORK IS TO BE PERFORMED TO THE LATEST EDITION OF THE FOLLOWING

CODES, ORDINANCES, AND LAWS WHICH INCLUDE, BUT ARE NOT LIMITED TO:

BUILDING CODES, GUIDES, MANUALS

PROJECT INFORMATION:

1. CONSTRUCTION PURPOSE: RENOVATION

2. REASON FOR SUBMITTAL: RENOVATION

3. I CERTIFY THAT TO THE BEST OF OUR KNOWLEDGE

THESUBMITTED PLANS FOR THE ABOVE-

REFERENCED PROJECT COMPLY WITH THE

REQUIREMENTS OF THE FOLLOWING:

NFPA 101-18 (AND ALL REFERENCED DOCUMENTS)

VA HOSPITAL BUILDING SYSTEM DESIGN

(INTERSTITIAL)

2018 INTERNATIONAL MECHANICAL CODE (IMC)

2015 UNIFORM PLUMBING CODE (UPC)

2017 NATIONAL ELECTRICAL CODE (NFPA-70)

2018 LIFE SAFETY CODE (NFPA-101)

2015 ABA ACCESSIBILITY STANDARDS

BARRIER FREE DESIGN

2018 IBC WITH LOCAL AMENDMENTS

ASHRAE STANDARD 90.1 (2007)

ASHRAE 62.1 (2007)

4. LOCATION OF ANY ANTICIPATED FUTURE

ADDITIONS: UNKNOWN

5. OWNER:

DEPARTMENT OF VETERANS AFFAIRS

OFFICE OF CONSTRUCTION AND FACILITIES

MANAGEMENT

ROYAL C. JOHNSON VETERANS MEMORIAL

MEDICAL CENTER

2501 W 22ND STREET

PO BOX 5046

SIOUX FALLS SD 57117-5046

6. DESIGN TEAM:

ARCHITECT:

STONE GROUP ARCHITECTS

600 E 7th STREET

SIOUX FALLS, SD 57103

605-271-1144

ARCHITECT: TODD STONE

CONTACT: TODD STONE

TODD.STONE@STONEGROUPARCH.COM

DESIGN CONSULTANTS:

ERICKSEN ROED & ASSOCIATES

2550 UNIVERSITY AVENUE WEST

SUITE 423-S

SAINT PAUL, MN 55114

651-251-7570

CONTACT:

STEVE CLAARK (STRUCTURAL)

SCLARK@ERAENG.COM

DUNHAM ASSOCIATES, INC.

50 SOUTH SIXTH STREET

MINNEAPOLIS, MN 55402

612-465-7550

CONTACT:

CURT BARLAGE (ELECTRICAL)

CURT.BARLAGE@DUNHAMENG.COM

JASON GOTTWALT (MCHANICAL)

JASON.GOTTWALT@DUNHAMENG.COM

RIPPE ASSOCIATES

10400 YELLOW CIRCLE DRIVE

SUITE 100

MINNEAPOLIS, MN 55343

952-933-03013

CONTACT:

CONNIE DICKSON

CDICKSON@RIPPEASSOCIATES.COM

JILL ANDERSON

JANDERSON@RIPPEASSOCIATES.COM

7. ARCHITECTS SEAL: SEE STAMP AT BOTTOM

8. FIRE SERVICE: CITY OF SIOUX FALLS FIRE DEPARTMENT

9. INSPECTION: VISN SAFETY OFFICER

10. OCCUPANCY GROUP TYPE:

OCCUPANCY - BUSINESS

11. CONSTRUCTION TYPE: TYPE II (222)

A. FLOOR AREA:

PROJECT AREA: 14,623 SF

EXISTING FLOOR: 80,674 SF

B. ALLOWABLE HEIGHT CALCULATIONS

OCCUPANCY - B BUSINESS

TYPE OF CONSTRUCTION: TYPE II (222)

ALLOWABLE STORIES: N/A

ALLOWABLE HEIGHT: N/A

ACTUAL STORIES: MULTIPLE (EXISTING)

ACTUAL HEIGHT: 75'-10" (EXISTING)

NO HEIGHT MODIFICATIONS REQUIRED

C. FIRE-RESISTANCE RATING FOR BUILDING ELEMENTS:

TYPE II (222)

BEARING WALLS (EXTERIOR): 2 HR

BEARING WALLS INTERIOR: 2 HR

NON-BEARING WALLS (EXTERIOR): 0 HR

PARTITIONS: 0 HR

SMOKE BARRIERS BETWEEN

SMOKE COMPARTMENTS: 1 HR

STRUCTURAL FRAME:

FLOOR AND FLOOR/CEILING: 2 HR

ROOF AND ROOF/CEILING: 1 HR

SHAFT ENCLOSURES: 2 HR

STAIRWAY CONSTRUCTION: 1 HR

12. ACTIVE FIRE SAFETY SYSTEMS

(a) SMOKE DETECTORS THROUGHOUT

(b) GENERATOR POWERED EMERGENCY LIGHTING

(c) BATTERY POWERED EXIT LIGHTING

(d) HOOD SUPPRESSION SYSTEM

(e) PORTABLE EXTINGUISHERS

(f) AUTOMATIC AIR-HANDLING SHUT-DOWN

(g) FIRE ALARM SYSTEM

13. WATER SUPPLY: CITY OF SIOUX FALLS

14. SEWAGE TREATMENT: CITY OF SIOUX FALLS

15. HANDICAP PROVISIONS:

ACCESSIBLE ROUTE, LAVATORIES AND SIGNAGE

16. OCCUPANT LOAD:

BUSINESS USE: 100 SF/PERSON GROSS: 30 OCCUPANTS

ASSEMBLY USE:

LESS CONCENTRATED: 15 SF/PERSON NET: 174 OCCUPANTS

KITCHEN: 100 SF/PERSON GROSS: 41 OCCUPANTS

MERCANTILE USE: 30 SF/PERSON GROSS: 42 OCCUPANTS

STORAGE USE:

MERCANTILE: 300 SF/PERSON GROSS: 3 OCCUPANTS

OTHER: 500 SF/PERSON GROSS: 6 OCCUPANTS

TOTAL OCCUPANTS: 296 OCCUPANTS

EGRESS CAPACITY:

STAIRWAY: .3 IN./PERSON

DOOR: .2 IN./PERSON

DEAD END CORRIDORS: NOT TO EXCEED 50 FT

COMMON PATH OF TRAVEL: NOT TO EXCEED 100'

TRAVEL DISTANCE TO EXIT: 300 FT

SMOKE COMPARTMENTS:

(USING HEALTHCARE OCCUPANCY BASIS)

(18.3.7.1(2)) AT LEAST 2 PER FLOOR

(18.3.7.1(3)) NOT TO EXCEED 22,500 SF EACH

CODE INFORMATION

NORTH

KEYPLAN

NTS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10 o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s in c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e rs in c h o n e f o o t o n e in c h o n e f o o t o n e a n d o n e h a lf in c h e s o n e f o o t th re e in c h e s o n e f o o t

SIOUX FALLS, SOUTH DAKOTA

CIVIL:

Dunham Asssociates, Inc.

50 South Sixth St Suite 1100 Minneapolis, MN 55402 Phone: 612-465-7550

MEP:

Rippe Associates 10400 Yellow Circle Dr Suite 100 Minneapolis, MN 55343 Phone: 952-933-0313

FOOD SERVICE:

Stone Group Architects, Inc.

600 East 7th Street Sioux Falls, SD 57103 Phone: 605-271-1144

Ulteig Engineers, Inc.

5701South Corporate Place Sioux Falls, SD 57108 Phone: 605-323-2306

Ericksen Roed Associates 2550 University Ave W Suite 423-S St. Paul, MN 55402 Phone: 651-251-7570

STRUCTURAL:

C U s e rs \M

.A lb e rt

\D o c u m e n ts \2

V

A S io u x F a lls

R e n o v a te N e w

K it c h e n A

M ic h a e lA lb

.r v t

/2

/2

:2

:2

A

M

G-003

FIRST FLOOR CODE AND LIFE

SAFETY

RENOVATE FIRST FLOOR FOR

NEW KITCHEN FOR THE SIOUX

FALLS VA MEDICAL CENTER 5

08-19-2026 BH JH/MA

SGA #201956

VA #438-21-403

3/32" = 1'-0" F1

FIRST LEVEL CODE PLAN

3/32" = 1'-0" C1

FIRST LEVEL AREA PLAN

SGA KEYNOTES

Key Value Keynote Text

8.12 SURFACE MOUNTED FIRE RATED COILING DOORS

10.40 RECESSED MOUNTED F.E.C.

NORTH

NORTH

432 SF

COMM.130 SF

SHARED

OFFICE

381 SF

COOLER

311 SF

FREEZER

608 SF

RECEIVING

151 SF

TRASH /

RECYCLING

HOLDING

58 SF

KITCHEN

HAC

410 SF

LOUNGE/LOCKERS 56 SF

HAC

138 SF

SHARED

OFFICE

93 SF

OFFICE

96 SF

OFFICE

90 SF

OFFICE

91 SF

OFFICE

157 SF

WORKROOM

545 SF

RETAIL

RECEIVING /

STORAGE

994 SF

RETAIL

1061 SF

SERVING /

GRAB & GO

553 SF

PREP149 SF

COOLER

166 SF

FREEZER

306 SF

DRY

STORAGE

1296 SF

DINING

68 SF

BIO-HAZARD

COOLER

78 SF

VENDING

724 SF

CORRIDOR

497 SF

CORRIDOR

139 SF

SHARED

OFFICE

134 SF

OFFICE

139 SF

COFFEE,

VENDING &

CATERING

STORAGE

KITCHEN

142A

CART WASH

DISHWASH /

POTS &

PANS

SOILED

CARTS

198A

STAFF

TOILET

198B

STAFF

TOILET 198C

STAFF

TOILET

ELEC RM

HALLWAY

143A

DRY

STORAGE

141A

EXISTING

STAIRS

141B

MECH.

C23

EXISTING

ELEV

EXISTING

TRASH &

RECYCLE

NOT IN SCOPE OF WORK

N O

T

IN

S C

O P

E O

F W

O R

K

NOT IN SCOPE OF WORK

NORTH

KEYPLAN

NTS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10 o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s in c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e rs in c h o n e f o o t o n e in c h o n e f o o t o n e a n d o n e h a lf in c h e s o n e f o o t th re e in c h e s o n e f o o t

SIOUX FALLS, SOUTH DAKOTA

CIVIL:

Dunham Asssociates, Inc.

50 South Sixth St Suite 1100 Minneapolis, MN 55402 Phone: 612-465-7550

MEP:

Rippe Associates 10400 Yellow Circle Dr Suite 100 Minneapolis, MN 55343 Phone: 952-933-0313

FOOD SERVICE:

Stone Group Architects, Inc.

600 East 7th Street Sioux Falls, SD 57103 Phone: 605-271-1144

Ulteig Engineers, Inc.

5701South Corporate Place Sioux Falls, SD 57108 Phone: 605-323-2306

Ericksen Roed Associates 2550 University Ave W Suite 423-S St. Paul, MN 55402 Phone: 651-251-7570

STRUCTURAL:

C U s e rs \M

.A lb e rt

\D o c u m e n ts \2

V

A S io u x F a lls

R e n o v a te N e w

K it c h e n A

M ic h a e lA lb

.r v t

/2

/2

:2

:3

A

M

G-004

FIRST FLOOR PROGRAM

SUMMARY PLAN

RENOVATE FIRST FLOOR FOR

NEW KITCHEN FOR THE SIOUX

FALLS VA MEDICAL CENTER 5

08-19-2026 BH JH/MA

SGA #201956

VA #438-21-403

NORTH

1/8" = 1'-0" F1

FIRST FLOOR PROGRAM SUMMARY

PLAN

PHASE 1

DEMOLITION

PHASE 1 EXTERIOR

DEMOLITION

PHASE 1

DEMOLITION

1.00A

1.00A

1.00A

1.00B

PHASE 1:

• INSTALL CONSTRUCTION LIMITS FENCE.

• INSTALL TEMPORARY BARRIER WALLS AND SEAL DOORS AND PENETRATIONS IN EXISTING WALLS TO REMAIN IN PLACE AS

CONSTRUCTION BARRIERS.

• REMOVE MED GAS ALARM PANEL.

• REMOVE AND REINSTALL EXISTING ELEVATOR HOISTWAY ENTRANCE.

• DEMOLITION OF FIRST FLOOR AREA WEST OF EXISTING FREIGHT ELEVATOR AS INDICATED IN DEMOLITION PLAN.

• CONSTRUCTION OF N.F.S. KITCHEN, COOLER, FREEZER, DISH AND CART WASHING, HOUSEKEEPING, AND RECIEVING AREAS.

• REROOF OF AREA ABOVE N.F.S. KITCHEN.

• CONSTRUCTION OF NEW OPEN LOADING DOCK, AND SITE IMPROVEMENTS.

• INSTALLATION OF INTUMESCENT FIRE PROTECTION IN GROUND FLOOR WAREHOUSE AREA.

• AT CONCLUSION OF PHASE 1 WORK, REMOVE CONSTRUCTION FENCE AND TEMPORARY BARRIER WALLS.

• AT CONCLUSION OF PHASE 1, N.F.S. TO MOVE TO NEW LOCATION AND SERVE HOSPITAL VIA FREIGHT ELEVATOR.

PHASING PLAN NOTES:

PHASE 2:

• INSTALL CONSTRUCTION LIMITS FENCE.

• INSTALL TEMPORARY BARRIER WALLS AND SEAL DOORS AND PENETRATIONS IN EXISTING WALLS TO REMAIN IN PLACE AS

CONSTRUCTION BARRIERS.

• DEMOLITION OF PHASE 2A AREA ON FIRST FLOOR AS INDICATED IN DEMOLITION PLAN

• EXISTING V.C.S. RETAIL TO REMAIN IN OPERATION IN REDUCED AREA UNTIL NEW RETAIL AREA CONSTRUCTED.

• EARLY COMPLETION OF PHASE 2A CONSTRUCTION AREA (V.C.S. RETAIL AND RECIEVING/STORAGE).

• V.C.S. RETAIL TO MOVE TO NEW LOCATION.

• DEMOLITION OF PHASE 2B AREA ON FIRST FLOOR AS INDICATED IN DEMOLITION PLANS.

• COMPLETION OF PHASE 2 CONSTRUCTION INCLUDING DINING ROOM FINISHES, EXISTING DOCK ENVELOPE CONSTRUCTION, AND RECYCLE BUILDING WORK. COMPLETION OF THE SECOND HALF OF THE SITE PAVEMENT IS ALSO COMPLETED

• DURING PHASE 2, EXISTING V.C.S. CANTEEN TO CONTINUE SERVICE ON SECOND FLOOR AND WILL UTILIZE ABANDONED N.F.S.

DRY STORAGE, COOLER, AND FREEZER ON SECOND FLOOR.

• THERE WILL BE A SHORT PERIOD OF TIME WHEN THE SECOND FLOOR V.C.S. CANTEEN WILL NEED TO BE SHUT DOWN BEFORE

FIRST FLOOR KITCHEN IS FUNCTIONAL WHILE SECOND FLOOR UNDERFLOOR PLUMBING IS REMOVED FROM FIRST FLOOR CEILING PLENUM AND FIRST FLOOR CEILINGS CAN BE INSTALLED. AT THIS SAME TIME THE V.C.S. KITCHEN HOOD EXHAUST

DUCTWORK AND CHASE ARE TO BE CONSTRUCTED

• AT CONCLUSION OF PHASE 2 V.C.S. CANTEEN TO MOVE TO NEW LOCATION ON FIRST FLOOR.

PHASE 3:

• INSTALL CONSTRUCTION LIMITS FENCE.

• INSTALL TEMPORARY BARRIER WALLS AND SEAL DOORS AND PENETRATIONS IN EXISTING WALLS TO REMAIN IN PLACE AS

CONSTRUCTION BARRIERS

• REMOVAL OF FOOD SERVICE EQUIPMENT ON SECOND FLOOR.

• DEMOLITION OF SECOND FLOOR AS INDICATED IN DEMOLITION PLANS.

1.20

1.20

1.20

1.25

NORTH

KEYPLAN

NTS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10 o n e e ig h th in c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s in c h o n e f o o t o n e h a lf in c h o n e f o o t th re e q u a rt e rs in c h o n e f o o t o n e in c h o n e f o o t o n e a n d o n e h a lf in c h e s o n e f o o t th re e in c h e s o n e f o o t

SIOUX FALLS, SOUTH DAKOTA

CIVIL:

Dunham Asssociates, Inc.

50 South Sixth St Suite 1100 Minneapolis, MN 55402 Phone: 612-465-7550

MEP:

Rippe Associates 10400 Yellow Circle Dr Suite 100 Minneapolis, MN 55343 Phone: 952-933-0313

FOOD SERVICE:

Stone Group Architects, Inc.

600 East 7th Street Sioux Falls, SD 57103 Phone: 605-271-1144

Ulteig Engineers, Inc.

5701South Corporate Place Sioux Falls, SD 57108 Phone: 605-323-2306

Ericksen Roed Associates 2550 University Ave W Suite 423-S St. Paul, MN 55402 Phone: 651-251-7570

STRUCTURAL:

C U s e rs \M

.A lb e rt

\D o c u m e n ts \2

V

A S io u x F a lls

R e n o v a te N e w

K it c h e n A

M ic h a e lA lb

.r v t

/2

/2

:2

:3

A

M

G-005

PHASE 1 DEMOLITION PLAN RENOVATE FIRST FLOOR FOR

NEW KITCHEN FOR THE SIOUX

FALLS VA MEDICAL CENTER 5

08-19-2026 BH JH/MA

SGA #201956

VA #438-21-403

1/16" = 1'-0" F2

1ST LEVEL_PHASE 1 DEMOLITION

PLAN

NORTH

SGA KEYNOTES

Key Value Keynote Text

1.00A TEMPORARY CONSTRUCTION FENCE

1.00B CONTRACTOR ACCESS GATE

1.20 EXISTING CLAY TILE WALL TO REMAIN IN PLACE AS CONSTRUCTION BARRIER TO MAINTAIN 1

HOUR CONSTRUCTION BARRIER. SEAL DOORS AND PENETRATIONS ABOVE CEILINGS

1.25 1 HOUR RATED "STAR SYSTEMS FIREBLOCK" TEMPORARY PARTITION

PHASE 1:

• INSTALL CONSTRUCTION LIMITS FENCE.

• INSTALL TEMPORARY BARRIER WALLS AND SEAL DOORS AND PENETRATIONS IN EXISTING WALLS TO REMAIN IN PLACE AS

CONSTRUCTION BARRIERS.

• REMOVE MED GAS ALARM PANEL.

• REMOVE AND REINSTALL EXISTING ELEVATOR HOISTWAY ENTRANCE.

• DEMOLITION OF FIRST FLOOR AREA WEST OF EXISTING FREIGHT ELEVATOR AS INDICATED IN DEMOLITION PLAN.

• CONSTRUCTION OF N.F.S. KITCHEN, COOLER, FREEZER, DISH AND CART WASHING, HOUSEKEEPING, AND RECIEVING AREAS.

• REROOF OF AREA ABOVE N.F.S. KITCHEN.

• CONSTRUCTION OF NEW OPEN LOADING DOCK, AND SITE IMPROVEMENTS.

• INSTALLATION OF INTUMESCENT FIRE PROTECTION IN GROUND FLOOR WAREHOUSE AREA.

• AT CONCLUSION OF PHASE 1 WORK, REMOVE CONSTRUCTION FENCE AND TEMPORARY BARRIER WALLS.

• AT CONCLUSION OF PHASE 1, N.F.S. TO MOVE TO NEW LOCATION AND SERVE HOSPITAL VIA FREIGHT ELEVATOR.

PHASING PLAN NOTES:

PHASE 2:

• INSTALL CONSTRUCTION LIMITS FENCE.

• INSTALL TEMPORARY BARRIER WALLS AND SEAL DOORS AND PENETRATIONS IN EXISTING WALLS TO REMAIN IN PLACE AS

CONSTRUCTION BARRIERS.

• DEMOLITION OF PHASE 2A AREA ON FIRST FLOOR AS INDICATED IN DEMOLITION PLAN

• EXISTING V.C.S. RETAIL TO REMAIN IN OPERATION IN REDUCED AREA UNTIL NEW RETAIL AREA CONSTRUCTED.

• EARLY COMPLETION OF PHASE 2A CONSTRUCTION AREA (V.C.S. RETAIL AND RECIEVING/STORAGE).

• V.C.S. RETAIL TO MOVE TO NEW LOCATION.

• DEMOLITION OF PHASE 2B AREA ON FIRST FLOOR AS INDICATED IN DEMOLITION PLANS.

• COMPLETION OF PHASE 2 CONSTRUCTION INCLUDING DINING ROOM FINISHES, EXISTING DOCK ENVELOPE CONSTRUCTION, AND RECYCLE BUILDING WORK. COMPLETION OF THE SECOND HALF OF THE SITE PAVEMENT IS ALSO COMPLETED

• DURING PHASE 2, EXISTING V.C.S. CANTEEN TO CONTINUE SERVICE ON SECOND FLOOR AND WILL UTILIZE ABANDONED N.F.S.

DRY STORAGE, COOLER, AND FREEZER ON SECOND FLOOR.

• THERE WILL BE A SHORT PERIOD OF TIME WHEN THE SECOND FLOOR V.C.S.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .