About this file

This document amends specifications for a construction project at Naval Weapons Station Earle in Colts Neck, New Jersey. The amendments require general construction and finish work to be performed by U.S. firms using U.S. citizens. General construction includes activities such as site work, utilities, foundations, structure, and enclosure work. Finish work includes insulation, floor/partition/ceiling systems, cabinet work, conveyor systems, specialties, furnishings, fixtures, equipment, and mechanical/electrical services. The amendments also specify security requirements for contractor and subcontractor personnel, including providing personnel information at least 15 working days prior to start of work, proof of U.S. citizenship, criminal history checks, and responsibility for ensuring employees obey station regulations.

View the file

Other files

File Type Posted
Amendment 3 -- N4008519R9103.pdf PDF
AMENDMENT (3) ATTACHMENT 1 PPI LIST.doc DOC document
Amendment 3 - Attachment 3 N40085-19-R-9103_S91_Narrative.pdf PDF
Amendment 3 -- Attachment 2 Sewer Plant Disinfectant System_2009.pdf PDF
AMMENDMENT (2) ATTACHMENT 1 PPI LIST.doc DOC document
Amendment 2 - 19R91030002.pdf PDF
ATTACH 1 - Security Access Request SECNAV Form 5512-1 (new) EXP 2021.pdf PDF
Amendment 1 -- 19R91030001.pdf PDF
ATTACH 3 - Security Access Request ODP.xls XLS spreadsheet
ATTACH 2 - 1.A.1. CUSFF_NAVNORTH COVID-19 Screening Questionnairev2020.04.18.pdf PDF
1605706_Dwgs_13of13.pdf PDF
RFP N4008519R9103.pdf PDF
1605706_Dwgs_10of13.pdf PDF
1605706_dwgs_9of13.pdf PDF
1605706_Dwgs_6of13.pdf PDF
1605706_Dwgs_8of13.pdf PDF
Attachment D - Price Proposal Form.rtf RTF text file
1605706_Dwgs_3of13.pdf PDF
1605706_Dwgs_1of13.pdf PDF
Attachment C - Pre-Proposal Inquiry Log.doc DOC document
1605706_dwgs_11of13.pdf PDF
1605706_Dwgs_4of13.pdf PDF
1605706_Dwgs_5of13.pdf PDF
1605706_Dwgs_2of13.pdf PDF
1605706_dwgs_12of13.pdf PDF
Attachment A - Construction Design Exp.docx DOCX document
1605706_Dwgs_7of13.pdf PDF
Attachment B - Past Performance Questionnaire.docx DOCX document
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Specifications Section 01 14 00, WORK RESTRICTIONS, for the above project needs to be amended for the solicitation.

After Paragraph “1.4.1.2 Installation Access”, Insert Sub-Paragraph “1.4.1.2.a, Additional Personnel Requirements” and the following:

“1.4.1.2.a.1 General Construction General Construction must be performed by U.S. firms using U.S. citizens. General construction includes construction activities such as building Sitework, Utilities, Foundations, Structure, and Enclosure or Shell, including doors, windows and façade work. Utility work that penetrates the secure area and installation of doors in these areas are not general construction.

1.4.1.2.a.2 Finish Work Finish Work must be accomplished by U.S. firms using U.S. citizens. Finish Work includes construction activities such as insulation, floor/partition/ceiling systems, cabinet work, conveyor systems, specialties, building furnishings/fixtures/equipment, mechanical/electrical services and equipment including those specialized for fire protection, security, communication, control, energy conservation, safety, comfort, convenience, and similar purposes.

1.4.1.2.b. SECURITY REQUIREMENTS Naval Weapons Station Earle, Colts Neck, NJ

1.4.1.2.b.1 Personnel Information. A minimum of 15 working days prior to start of work, the Contractor will furnish to the Naval Weapons Station (NWS), Earle, Security Office/Department Pass & ID Office, via the Contracting Officer, the following information for Contractor and subcontractor personnel required to enter the station:

(1) Name of company

(2) Name of the employee

(3) Social Security Number

(4) Proof of U.S. citizenship

(5) Completed Contractor/Vendor Criminal History Record Request

(6) Completed application for gate badge

1.4.1.2.b.2. Proof of Citizenship. Proof of citizenship must consist of copies of birth certificate, military dependent identification card (ID), or naturalization papers, which will be returned once entered into the security computer system. The Security Office/Department will run a criminal history check on Contractor/Subcontractor employees and, as a condition of employment, each employee must willingly sign an authorization form allowing the Security Department to conduct the criminal history check. Subject authorization form must be maintained on file by the Security Officer. Based on proof of U.S. citizenship and results of the criminal history check, the Security Officer will or will not grant entry to the station. If entry is denied, the Contractor will be immediately notified.

1.4.1.2.b.3. Contractor Responsibility for Employees. The Contractor is responsible for employees under his employment. Ensure that employees are familiar with and obey station traffic, safety, and security regulations.”