About this file

This document contains a template for submitting construction and design experience on federal projects. The template requests information on past project experience including award and completion dates, types of work performed, contract values, descriptions of self-performed work, and sustainable or LEED certifications. It will be used to qualify offerors for indefinite delivery/indefinite quantity multiple award construction contracts from the Department of the Navy Naval Facilities Engineering Command for facilities in the North Integrated Product Team area of responsibility. Relevant experience on projects including new construction, renovation, repair, and alteration are to be detailed on the form for evaluation.

View the file

Other files

File Type Posted
Amendment 3 -- N4008519R9103.pdf PDF
AMENDMENT (3) ATTACHMENT 1 PPI LIST.doc DOC document
Amendment 3 - Attachment 3 N40085-19-R-9103_S91_Narrative.pdf PDF
Amendment 3 -- Attachment 2 Sewer Plant Disinfectant System_2009.pdf PDF
AMMENDMENT (2) ATTACHMENT 1 PPI LIST.doc DOC document
Amendment 2 - 19R91030002.pdf PDF
ATTACH 1 - Security Access Request SECNAV Form 5512-1 (new) EXP 2021.pdf PDF
Amendment 1 -- 19R91030001.pdf PDF
ATTACH 3 - Security Access Request ODP.xls XLS spreadsheet
ATTACH 2 - 1.A.1. CUSFF_NAVNORTH COVID-19 Screening Questionnairev2020.04.18.pdf PDF
1605706_Dwgs_13of13.pdf PDF
RFP N4008519R9103.pdf PDF
1605706_Dwgs_10of13.pdf PDF
1605706_dwgs_9of13.pdf PDF
1605706_Dwgs_6of13.pdf PDF
1605706_Dwgs_8of13.pdf PDF
Specification Amendment Work Restrictions.docx DOCX document
Attachment D - Price Proposal Form.rtf RTF text file
1605706_Dwgs_3of13.pdf PDF
1605706_Dwgs_1of13.pdf PDF
Attachment C - Pre-Proposal Inquiry Log.doc DOC document
1605706_dwgs_11of13.pdf PDF
1605706_Dwgs_4of13.pdf PDF
1605706_Dwgs_5of13.pdf PDF
1605706_Dwgs_2of13.pdf PDF
1605706_dwgs_12of13.pdf PDF
1605706_Dwgs_7of13.pdf PDF
Attachment B - Past Performance Questionnaire.docx DOCX document
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT C

CONSTRUCTION & DESIGN EXPERIENCE PROJECT DATA SHEET

Project No. (check one) : |_| CON #1 |_| CON #2 |_| CON #3 |_| CON #4 |_| CON #5

|_| DESIGN #1 |_| DESIGN #2 |_| DESIGN #3 |_| DESIGN #4 |_| DESIGN #5

1. Experience for: |_| Offeror |_| Joint-Venture |_| Other (Explain)

Firm Name:

Address:

Phone Number:

DUNS Number:

Point of Contact: Contact Phone Number:

2. Work Performed as: |_| Prime Contractor |_| Sub Contractor |_| Joint Venture |_| Other (Explain)

Percent of project work performed:

If subcontractor, who was prime (Name/Phone #):

3. Contract Number: Delivery/Task Order Number:

Title:

Location:

4. Award Date (mm/dd/yy): Completion Date (mm/dd/yy):

5. Type of work:

|_| New Construction |_| Renovation |_| Repair |_| Alteration |_| Other (explain):

6. Type of Contract/Task Order: (Check ALL that apply)

|_| Firm-Fixed Price |_| Cost/Time and Material |_| Other (explain):

Complete Block 7 for Construction Projects. Complete Block 8 for Design Projects.

7. Construction Project:

Award Amount: Final Price:

Type of Contract/Task Order: (Check ALL that apply)

|_| Design-Build |_| Design-Bid-Build |_| Delivery/Task Order (IDIQ) |_| Other (explain):

If Design-Build, identify the Lead Design Firm:______________________________________________

8. Design Project:

A/E Design Fee: Total Construction Value:

Type of Contract/Task Order: (Check ALL that apply)

|_| Design-Build |_| RFP Development |_| Designer of Record |_| Engineering Services |_| Full Plans & Specs

|_| Other (explain):

9. Provide a detailed description of the project and the relevancy to the project requirements of this RFP (i.e.: unique features, square footage, construction methods), including any sustainable features or USGBC LEED certifications. If design-build, include a description of the design-effort.

10. Provide a detailed description of what work your firm self-performed on this project:

11. Other Information:

File details come from the government source that posted it. Updated .