1605706_Dwgs_2of13.pdf
PDF 6 MB Posted
- Solicitation number
- N4008519R9103
About this file
This solicitation is for an indefinite delivery/indefinite quantity multiple award construction contract for facilities in the North Integrated Product Team area of responsibility. The Navy seeks to award multiple IDIQ contracts for construction, repair, alteration, and renovation projects with an aggregate ceiling of $995 million over 10 years. Offerors can submit proposals for one or more of 22 designated facility specialties. The solicitation includes detailed instructions on proposal submission requirements, evaluation criteria, and contract terms. The deadline for proposal submissions is July 22, 2019. Awards are expected to be made within 90 days thereafter.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPIKE W FACE PP
ELEV=93.03
BM #60
SPIKE W FACE PP
ELEV=92.08
BM #61
SPIKE E FACE PP
ELEV=93.95
BM #63
CP #3
5/8"x2' R
EBAR/ORANGE CONTROL CAP
GRATE OVER CHANNEL
RIM=92.53
MH176
STEPS
STEPS
RIM=92.24
MH373
RIM=92.48
MH381
RIM=92.22
MH575
RIM=92.12
MH576
RIM=92.00
MH577
RIM=92.16
MH578
GRASS
GRASS
GRAVEL
GRASS
GRASS
GRASS
ASPHALT
CONCRETE SIDEWALK
CONCRETE
C O
N C R E T E
S
ID
E W
A L K
C O N C R
ET
E S
ID
EW
A
LK
CO
N
CRETE SIDEW
A
LK
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
CONCRETE
ASPHALT
ASPHALT
ASPHALT
ASPHALT
ASPHALT
SHED
BUILDING C-72
BUILDING C-32B
SHED
GRASS
GRASS
GRASS
GRASS
CP #1
R
IM
.0
M
H
RIM=94.66
MH830
RIM=91.35
MH5292
LATH
LATH LATH
LATH
RIM=92.74
MH5339
ASPHALT
GRASS
BUILDING 573
TANK
TANKTANK
TANK
TANK
CONCRETECONCRETE
CONCRETE
CONCRETE
CONCRETE
A P P R
O X
E D
G E
B
IT
C O
N T A
IN
E R S
P
A R
K E D
H E R E
ASPHALT
ASPHALT
ASPHALT
ASPHALT
WOODS
WOODS
WOODS
WOODS
HEADWALL
HEADWALL
GRASS
GRASS
GRASS
GRASS
GRASS
GRAVEL
GRAVEL
GRASS
TANK
5/8"x2' R
EBAR/ORANGE CONTROL CAP
EQUIPMENT.
CHANNEL ELEV=83.99
CONCRETE
AREA NOT MAPPED
DUE TO INACCESSIBLE
EQUIPMENT
WALL WIDTH
GRATE ELEV 92.27
FOUNDATION NOT VISIBLE.
GRASS
CURB
CURB
CURB
C U R
BC
U R B
C U R B
C U R B
ASPHALT
GRASS
GRASS
UNOBSERVABLE
AREA COVERED
WALL WIDTH
UNOBSERVABLE
AREA COVERED
W
G
W
W
W
W
W
S1-112
W1-113
S1-114
W1-115
7' INC. 1' BARBED WIRE ON TOP CHAINLINK
GATE
GATE
G A T E
GATE
GATE
VALVE
VALVE
TOP WALL 95.48
VALVE
VALVE TOP WALL 95.48
VALVE
TOP WALL 94.12
TOP WALL 103.7
TO
P
W A
LL
.7
WI-120
SI-101
SI-201
W
W2-103
W2-104
W2-105
W2-106
W2-107
S1-107 S1-106
S1-105S1-104
S1-103
S1-102
S2-209
S2-208 S2-207
S2-206
W1-117
W1-118
W1-119
S2-102
S2-102S2-103
S2-104
C H
A
IN
L
IN
K
IN
C 1'
B
A R B E D
W
IR
E
D
IR
E C T E D
O
U T
GATE
PANEL BOX
PANEL BOX
VALVE
VALVE
VALVE VALVE
TOP WALL 103.7
6 TOP WALL 103.7
DOUBLE DOOR
PANEL
TOP TANK 99.44
ELEC LUG
VALVE
VALVE
PANEL
ELECT OUTLET
SUMP
W1-116 COULD NOT BE LOCATED
W E T L A
N D
D E L
IN
E A T
IO
N
L
IN
E
W E T L A
N D
D E L
IN
E A T
IO
N
L
IN
E
W E T
LA
N D
D E
LI
N E A T
IO
N
LI
N E
C H
A
IN
L
IN
K
IN
C 1'
B
A R B
IR
E
D
IR
E C T E D
O
U T
7' CHAINLINK INC. 1' BARBED WIRE DIRECTED OUT
AC
NO WIRES ON POLE
RIM=97.01
MH817
IE=89.76
IE=89.92
12" CMP
IE
.1
IE
.5
C M P
N A
V A
L F
A C
IL
IT
IE
S E
N G
IN
E E
R
IN
G C
O M
M A
N D M
ID
-A
T L
A N
T
IC
P U
B L
IC
O
R K
S
P A
R T
M E
N T
A
R L E
N
R L
C
L
C K
N E
W
J E
R S
Y
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
S
T E
W A
T E
R T
R E
A T
M E
N T P
L A
R
P
A
IR
B
Y R
E P
L A
C E
M E
N T S
N A
V
A P
O
A T
IO
R L E
C O
L
C K
N E
W
J E
R S
E
1605706
P A
R T
M E
F
H
V Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N A
V
C
IL
IT
IE
G
IN
E E
R
IN
G
M M
A N
D
DES DRW
S Y
M D
E S
C R
IP
T
IO
N D
A T E
A P
P R
DRAWFORM REVISION: 12 APRIL 2018
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
UNCLASSIFIED
U N
C L
A S
S
IF
IE
D
UNCLASSIFIED
ARLINGTON,VA 22201
SUITE 500
1100 N GLEBE ROAD,
APRIL 2020
AS
DM
AZ
ML
RMAM CC
P
O T D
A T
E
P L
O T T
IM
E
-A
P R -2
:4
F
IL
E N
A M
0100-XC101
B L
D G
-1
-X
C .d g n
E1
E2
E3
E4
E5
E6
E7
E8
E9
E10
E10
E11
E11
E12
EXISTING FACILITIES E
E13
E14
20' 40'0
E15
P L
A N
E15
W E
T L
A N
D B
U F F E
R
150' WETLAND BUFFER
N
D E
M O
L
IT
IO
N
C
IV
IL
007 134
SIDEWALK
CONCRETE
DEMOLISH
12795298
LINE (TYP)
WETLAND
DELINEATED
E17 E16
SLUDGE PUMP STATIONE17
TRICKLING FILTER PUMP STATIONE16
SHIPPING CONTAINER STORAGEE15
HEADWORKSE14
SPLITTER BOXE13
RAPID SAND FILTER PUMP STATIONE12
TRICKLING FILTERSE11
SECONDARY CLARIFIERSE10
FILTER BUILDING (B573)E9
BACKFLOW PREVENTERE8
ROTATING DRUM SCREENSE7
GENERATOR AND TRANSFORMERE6
INFLUENT PUMP STATIONE5
IMHOFF TANKSE4
SLUDGE HOLDING TANKE3
FORMER SLUDGE DRYING BEDSE2
PLANT OFFICE, BUILDING C-72E1
ELECTRIC
FOR YARD PIPE AND
DEMOLISH ASPHALT
DEMOLISH FENCE
POTABLE WATER PIPING
CUT AND CAP EXISTING
CONCRETE VAULT
DEMOLISH BELOW-GRADE
OF ASPHALT (TYP)
MILL AND RESTORATION
* ADDITIVE BID ITEM
(SEE DWG 0100-XD101)
AND INFRASTRUCTURE
DEMOLISH EXISTING TANKS
ANIL
ORAC HTRO
N
L A
NOISSEF
O
R P
REENIGN
E
GILES .A TTERR
AJ
040068
SEAL
ANIL
ORAC HTRO
N
L A
NOISSEF
O
R P
REENIGN
E
GILES .A TTERR
AJ
040068
SEAL
V A
L F
A C
IL
IT
IE
S E
N G
IN
E E
R
IN
G C
O M
M A
N D M
ID
-A
T L
A N
T
IC
P U
B
R
P A
R T
M E
R L E
N
R L
L
C K
N E
W
J E
R S
S
T E
W A
T E
R T
R E
A T
M E
N T P
L A
P
A
IR
B
Y R
E P
L A
C E
M E
N T S
N A
V
A P
O
A T
R L E
C O
L
C K
N E
W
J E
R S
E
P A
R T
M E
V Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N A
V
C
IL
IT
G
IN
E E
R
M M
A N
D
DES DRW
S Y
M D
E S
C R
IP
T
IO
N D
A T E
A P
P R
DRAWFORM REVISION: 12 APRIL 2018
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
UNCLASSIFIED
U N
C L
A S
S
IF
IE
D
UNCLASSIFIED
ARLINGTON,VA 22201
SUITE 500
1100 N GLEBE ROAD,
APRIL 2020
AS
DM
JSMM NP
O T D
A T
E
P L
O T T
IM
E
-A
P R -2
:3
F
IL
E N
A M
E
B L
D G
-1
-X
D .d g n
0100-XD101
NTS
SHEET KEYNOTES
DEMOLITION SYMBOLS
0100-XD801
-X
D
0100-XD801
A2
0100-XD801
0100-XD801
A4
0100-XD801
A3
0100-XD802
A4
-X
D
0100-XD801
0100-XD802
C1
-X
D
-X
D
C
0100-X D
0100-XD802
B4
A1
0100-XD802
0100-
XD802
A3
0100-XD802
C3
0100-XD802
C4
-X
D
B
0100-XD802
B2
0100-XD802
B1
M O
L
IT
C1
-X
D
C
0100-XD801
C4 B
B
B3
B
A1
A2
0100-XD802
GENERAL SHEET NOTES
22 23
O V
E R
A L L S
IT
E P
R O
C E
S S D
E M
O L
IT
IO
N P
L A
N
008 134
12795299
OF WASTE GENERATED FROM THE WORK.
RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH THE DISPOSAL
CHARACTERIZED AS HAZARDOUS. CONTRACTOR IS
DETERMINE IF THE ANTICIPATED WASTE STREAM IS
CONTRACTOR SHALL COORDINATE THE WORK PROCEDURES TO 8.
DWG 0100-XC101.
FOR PAVEMENT, CURB AND SIDEWALK DEMOLITION LIMITS, SEE 7.
DEMOLITION, SEE DEMOLITION SPECIFICATION.
FOR GENERAL DEMOLITION REQUIREMENTS AND SEQUENCE OF 6.
ALL DISTURBED AREAS.
TO FINISH GRADES AS INDICATED ON DWG 0100-CG-101. SEED
DEMOLITION SHALL BE REMOVED IN THEIR ENTIRETY. BACKFILL
FACILITIES AND BURIED INFRASTRUCTURE IDENTIFIED FOR 5.
FIELD VERIFY FACILITY CONFIGURATION.
COMPLETE FACILITY CONFIGURATION. CONTRACTOR SHALL
PHOTOS PROVIDED FOR CLARITY AND MAY NOT REFLECT 4.
OPERATIONAL.
DURING CONSTRUCTION UNTIL THE NEW PLANT IS
THE EXISTING PLANT SHALL REMAIN IN SERVICE AT ALL TIMES 3.
WATER SERVICING FACILITIES IDENTIFIED FOR DEMOLITION.
UTILITIES, SUCH AS CONDUIT, DUCT BANKS, AND POTABLE
PROCESS TO BE DEMOLISHED. DEMOLISH UNDERGROUND
FOR ADDITIONAL UNDERGROUND UTILITIES IN VICINITY OF UNIT
EXISTING YARD PIPING AND HISTORICAL REFERENCE DRAWINGS
WATER PIPING, AND UNIT PROCESS FACILITIES. REFER TO
SITE PLAN DEPICTS EXISTING PROCESS PIPING, POTABLE 2.
OTHER WORK SHALL BE PROVIDED AS PART OF THE BASE BID.
ADDITIVE BID ITEMS ARE NOTED WITH AN ASTERISK *. ALL 1.
PRIOR TO REMOVING ANY MATERIAL.
NOTIFY THE CONTRACTING OFFICER IMMEDIATELY AND
A WASTE CHARACTERIZATION DIFFERENT FROM INDICATED,
SPECIFICATION SECTION 01 57 19. IF TEST REPORTS INDICATE
SLUDGE AND GRIT, TEST MATERIAL IN ACCORDANCE WITH
NON-HAZARDOUS CLASS 1 WASTE. PRIOR TO REMOVING ANY
FOR BIDDING PURPOSES, ASSUME ALL SLUDGE AND GRIT IS 10.
DEWATERING.
ALL FACILITIES, STRUCTURES AND PIPING AFTER
SLUDGE, AND GRIT WILL BE PRESENT ON THE SURFACE OF
GRIT, ASSUME TRACE RESIDUALS OF WASTEWATER SOLIDS,
IN ADDITION TO THE QUANTITIES OF REMAINING SLUDGE AND
TANKS
SLUDGE PUMP STATION: 12-INCHES ON BOTTOM OF e.
BOTTOM OF TANKS
SECONDARY CLARIFIERS NO. 1 & NO. 2: 6-INCHES ON d.
OF TANK
TRICKLING FILTER NO. 1 & NO. 2: 12-INCHES ON BOTTOM c.
BOTTOM OF TANK
TRICKLING FILTER PUMP STATION: 12-INCHES ON b.
IMHOFF TANK: 43,100 GALLONSa.
RESIDUALS/VOLUME:
REMOVED ON THE FOLLOWING ASSUMED DEPTH OF
PURPOSES, BASE QUANTITIES OF SLUDGE AND GRIT TO BE
TO PROPERLY REMOVE AND DISPOSE. FOR BIDDING
SLUDGE AND GRIT WILL REMAIN IN TANKS FOR CONTRACTOR
WASTEWATER STRUCTURES TO BE DEMOLISHED, BUT
GOVERNMENT WILL DRAIN WASTEWATER FROM EXISTING 9.
TO BE DEMOLISHED
OVERALL SITE PROCESS/MECHANICAL DEMOLITION
SAND FILTER BLDG
13 14
10*
11 12 15 16
13 14
ACTIVITIES.
NOTIFY GOVERNMENT 45 DAYS PRIOR TO INITIATING DEMOLITION 18.
PUMP TO NEARBY SWALE, DITCH OR STORM WATER SYSTEM.
ACTIVITIES SHALL BE CONTAINED ON SITE. CONTRACTOR SHALL NOT
SITE IS SUBJECT TO LAND USE RESTRICTIONS, DE-WATERING 17.
ACCORDANCE WITH APPLICABLE REGULATIONS.
TRAINED AND EQUIPPED WITH PERSONAL PROTECTIVE EQUIPMENT IN
CONTAMINATED MATERIALS, INCLUDING SOILS, ARE 40-HR HAZWOPER
CONTRACTOR SHALL ENSURE ALL WORKERS IN DIRECT CONTACT WITH 16.
ENCOUNTERED PRIOR TO BACKFILLING EXCAVATED AREAS.
SHALL NOTIFY THE GOVERNMENT WHEN CONTAMINATED SOILS ARE
CONTAMINATED SOILS SHALL REMAIN ON THE SITE. CONTRACTOR
HAZARDOUS WASTE MANAGEMENT PROGRAM MANAGER. DISTURBED
EXISTING FACILITY, COORDINATE WITH THE NWS EARLE EAD SOLID AND
PRIOR TO DISTURBING ANY EXISTING SOILS IN VICINITY OF THE 15.
NTS
REMOVE CHAINLINK FENCE, POSTS, AND GATE.26.
DEMOLISH MANHOLE.25.
DEMOLISH YARD HYDRANT AND VALVE.24.
PIPE TO REMAIN IN SERVICE.23.
CUT AND CAP PIPING.22.
COMMISSIONING OF THE 10"-PD. (BASE BID)
AND CAP 4"-PD DISCHARGE AT MH-1H UPON COMPLETION AND
4"-PD DISCHARGE TO REMAIN IN SERVICE DURING CONSTRUCTION. CUT 21.
BID)
INSTALLATION AND COMMISSIONING OF NEW 10"-PD IS COMPLETE. (BASE
PROTECT EXISTING 4"-PD DURING CONSTRUCTION. ABANDON WHEN 20.
PIPING. REFER TO DWG 0100-DP-101 FOR YARD PIPING MODIFICATIONS.
CUT AND SELECTIVELY DEMOLISH PIPING TO MAKE CONNECTION TO NEW 19.
DEMOLISH PIPING AND VALVES. (ADDITIVE BID ITEM)18.
BETWEEN EXISTING MANHOLE AND CONNECTION AT NEW MANHOLE MH-6.
DEMOLISH 10-INCH DIAMETER DUCTILE IRON PLANT EFFLUENT PIPING 17.
DIMENSIONS. (ADDITIVE BID ITEM)
REFERENCE DRAWINGS FOR MATERIALS OF CONSTRUCTION AND
AND ASSOCIATED CONTROL PANEL IN ITS ENTIRETY. REFER TO ATTACHED
IN LIEU OF ABANDONING IN PLACE, DEMOLISH SLUDGE PUMP STATION (S-2) 16.
DEPTH OF 1’-0” ABOVE THE BOTTOM OF THE SUMP.
NON-WOVEN GEOTEXTILE AND BACKFILL EACH SUMP WITH GRAVEL TO A
DIAMETER HOLES AT 18-INCHES ON CENTER. COVER BOTTOM SLAB WITH
DRILLING. TO PROVIDE DRAINAGE OF RAINWATER, CORE DRILL 2-INCH
TO EXPOSE BOTTOM OF THE EXISTING CONCRETE SUMP FOR CORE
INTERIOR. SELECTIVELY DEMOLISH EQUIPMENT AND PIPING AS REQUIRED
REMOVE FROM SERVICE. REMOVE RESIDUALS AND PRESSURE WASH
ABANDON SLUDGE PUMP STATION (S-2) IN PLACE. DECOMMISSION AND 15.
(ADDITIVE BID ITEM)
DRAWINGS FOR MATERIALS OF CONSTRUCTION AND DIMENSIONS.
AND NO. 2 IN THEIR ENTIRETY. REFER TO ATTACHED REFERENCE
IN LIEU OF ABANDONING IN PLACE, DEMOLISH SECONDARY CLARIFIER NO. 1 14.
RAINWATER FROM CLARIFERS TO PUMP STATION.
TO THE SLUDGE PUMP STATION (S-2) SHALL REMAIN IN SERVICE TO DRAIN
PRESSURE WASH INTERIOR. EXISTING 6-INCH DIAMETER SLUDGE PIPING
DECOMMISSION AND REMOVE FROM SERVICE. REMOVE RESIDUALS AND
ABANDON SECONDARY CLARIFIER NO. 1 AND NO. 2 IN PLACE. 13.
OF CONSTRUCTION AND DIMENSIONS. (ADDITIVE BID ITEM)
ENTIRETY. REFER TO ATTACHED REFERENCE DRAWINGS FOR MATERIALS
IN LIEU OF ABANDONING IN PLACE, DEMOLISH SPLITTER BOX IN ITS 12.
DEPTH OF 1’-0”ABOVE THE BOTTOM OF THE TANK.
BOTTOM WITH NON-WOVEN GEOTEXTILE AND BACKFILL WITH GRAVEL TO A
BOTTOM WITH 2-INCH DIAMETER HOLES AT 18-INCHES ON CENTER. COVER
DRILLING. TO PROVIDE DRAINAGE OF RAINWATER, CORE DRILL STEEL
SELECTIVELY DEMOLISH AS REQUIRED TO EXPOSE BOTTOM FOR CORE
SERVICE. REMOVE RESIDUALS AND PRESSURE WASH INTERIOR.
ABANDON SPLITTER BOX IN PLACE. DECOMMISSION AND REMOVE FROM 11.
DIMENSIONS. (ADDITIVE BID ITEM)
REFERENCE DRAWINGS FOR MATERIALS OF CONSTRUCTION AND
NO. 2 IN THEIR ENTIRETY, INCLUDING FILTER MEDIA. REFER TO ATTACHED
IN LIEU OF ABANDONING IN PLACE, DEMOLISH TRICKLING FILTER NO. 1 AND 10.
NON-HAZARDOUS CLASS 1 WASTE.
PURPOSES, ASSUME TRICKLING FILTER MEDIA ARE COATED WITH
CODES. CONTRACTOR SHALL NOT STOCKPILE MEDIA ONSITE. FOR BIDDING
MEDIA IN ACCORDANCE WITH ALL APPLICABLE SPECIFICATIONS AND
ACCORDANCE WITH SPECIFICATION SECTION 01 57 19 AND DISPOSE OF
AND WASTEWATER SOLIDS. CONTRACTOR SHALL TEST RESIDUALS IN
DOCUMENTS. TRICKLING FILTER MEDIA CONTAINS RESIDUAL SLUDGE, GRIT
AND LIQUIDS RESIDUALS IN ACCORDANCE WITH THE CONTRACT
IN SERVICE TO DRAIN RAINWATER FROM FILTERS. DISPOSE OF ALL SOLIDS
EFFLUENT PIPING FROM THE FILTERS TO THE SPLITTER BOX SHALL REMAIN
RESIDUALS, AND PRESSURE WASH INTERIOR. EXISTING 10-INCH DIAMETER
TOTAL FOR BOTH FILTERS). REMOVE AND DISPOSE OF MEDIA AND
APPROXIMATELY 8,300 CUBIC FEET OF MEDIA (TOTAL OF 16,600 CUBIC FEET
AND REMOVE FROM SERVICE. EACH FILTER IS ESTIMATED TO CONTAIN
ABANDON TRICKLING FILTER NO. 1 AND NO. 2 IN PLACE. DECOMMISSION 9.
AND DIMENSIONS. (ADDITIVE BID ITEM)
TO ATTACHED REFERENCE DRAWINGS FOR MATERIALS OF CONSTRUCTION
STATION (S-1) AND ASSOCIATED CONTROL PANEL IN ITS ENTIRETY. REFER
IN LIEU OF ABANDONING IN PLACE, DEMOLISH TRICKLING FILTER PUMP 8.
TO A DEPTH OF 1’-0”ABOVE THE BOTTOM OF THE SUMP.
WITH NON-WOVEN GEOTEXTILE AND BACKFILL EACH SUMP WITH GRAVEL
2-INCH DIAMETER HOLES AT 18-INCHES ON CENTER. COVER BOTTOM SLAB
CORE DRILLING. TO PROVIDE DRAINAGE OF RAINWATER, CORE DRILL
PIPING AS REQUIRED TO EXPOSE BOTTOM OF THE EXISTING SUMP FOR
PRESSURE WASH INTERIOR. SELECTIVELY DEMOLISH EQUIPMENT AND
DECOMMISSION AND REMOVE FROM SERVICE. REMOVE RESIDUALS AND
ABANDON TRICKLING FILTER PUMP STATION (S-1) IN PLACE. 7.
CONSTRUCTION.
PERIMETER FENCE TO REMAIN, PROTECT FROM DAMAGE DURING 6.
GRAVEL TO A DEPTH OF 2’-0”ABOVE THE BOTTOM OF THE SUMP.
OVER FOOTPRINT OF EACH 2’-0”X 2’-0”SUMP. BACKFILL EACH SUMP WITH
DRAINS. FILL HOLES WITH GRAVEL AND PROVIDE NON-WOVEN GEOTEXTILE
ONE, 6-INCH DIAMETER HOLE IN EACH SUMP FOR A TOTAL OF FOUR
FOR CORE DRILLING. TO PROVIDE DRAINAGE OF RAINWATER, CORE DRILL
REQUIRED TO EXPOSE BOTTOM OF THE FOUR EXISTING CONCRETE SUMPS
SELECTIVELY DEMOLISH 8-INCH DIAMETER SLUDGE DRAW-OFF PIPING AS 5.
THE CONTRACT DOCUMENTS.
DISPOSE OF ALL SOLIDS AND LIQUIDS RESIDUALS IN ACCORDANCE WITH
SERVICE. REMOVE ALL RESIDUALS AND PRESSURE WASH INTERIOR.
ABANDON IMHOFF TANK IN PLACE. DECOMMISSION AND REMOVE FROM 4.
SAND FILTER BUILDING (B573) AND SAND FILTER PUMP STATION TO REMAIN.3.
PAD MOUNT ELECTRICAL TRANSFORMER. REFER TO DWG 0100-ES101.2.
STANDBY ELECTRICAL GENERATOR TO REMAIN.1.
6" DI
10" PVC
10" PVC
10" DI
10" DI
10" DI
10" DI
10" DI
6" DI
4" PVC
2" STEEL
FLUSHED WITH POTABLE WATER PRIOR TO CAPPING.
EXISTING PIPING THAT IS ABANDONED IN PLACE SHALL BE 14.
RESPONSIBLE TO CHARACTERIZING ALL WASTE STREAMS.
PROGRAM MANAGER. THE CONTRACTOR SHALL BE
EARLE ED SOLID AND HAZARDOUS WASTE MANAGEMENT
OFFICER. COORDINATE ALL DISPOSAL ACTIVITIES WITH NWS
EITHER OFF SITE OR AS DIRECTED BY THE CONTRACTING
OF THE WWTP. ALL MATERIALS MUST BE DISPOSED OF
SOLUTIONS, RESIDUAL WATER, ETC. TO THE FLOOR DRAINS
LIQUIDS, INCLUDING CHEMICALS, NEUTRALIZING
THE CONTRACTOR SHALL NOT DISCHARGE ANY WWTP 13.
RESPONSIBLE FOR CHARACTERIZING ALL WASTE STREAMS.
PROGRAM MANAGER. THE CONTRACTOR SHALL BE
NWS EARLE SOLD AND HAZARDOUS WASTE MANAGEMENT
REGULATIONS. COORDINATE ALL DISPOSAL ACTIVITIES WITH
AND FEDERAL SOLID AND HAZARDOUS WASTE
NWS EARLE ENVIRONMENTAL DIVISION (ED), LOCAL, STATE
WWTP SHALL BE DISPOSED OF IN ACCORDANCE WITH ALL
ALL CHEMICAL AND FILTER MEDIAL REMAINING AT THE 12.
COMMUNICATION STANDARD.
OSHA SAFETY REQUIREMENTS, INCLUDING THE HAZARD
REQUIREMENTS FOR WORKERS AN INCORPORATE ALL
SAFETY PLAN SHALL INCLUDE SPECIFIC TRAINING
FOR THE CHEMICALS ENCOUNTERED IN THE WWTP. THE
FAMILIAR WITH ALL MATERIAL SAFETY DATA SHEETS (MSDS)
PERSONNEL. THE CONTRACTOR SHALL BE THOROUGHLY
PREVENT ANY UNSAFE EXPOSURES TO CONTRACTOR’S
DECONTAMINATED AS REQUIRED PRIOR TO DEMOLITION TO
WWTP. ALL CHEMICAL PIPING SHALL BE NEUTRALIZED OR
DECONTAMINATE, AND MAKE SAFE ALL PIPING AT THE
TECHNIQUES TO BE USED TO DRAIN, FLUSH, NEUTRALIZE,
A DETAILED SAFETY PLAN THAT DESCRIBES IN DETAIL THE
TREATMENT PROCESS. THE CONTRACTOR SHALL PREPARE
THE WWTP USES VARIOUS CHEMICALS DURING THE 11.
ANIL
ORAC HTRO
N
L A
NOISSEF
O
R P
REENIGN
E
GILES .A TTERR
AJ
V A
L F
A C
IL
IT
IE
S E
N G
IN
E E
R
IN
G C
O M
M A
N D M
ID
-A
T L
A N
T
IC
P U
B
R
P A
R T
M E
R L E
N
R L
L
C K
N E
W
J E
R S
S
T E
W A
T E
R T
R E
A T
M E
N T P
L A
P
A
IR
B
Y R
E P
L A
C E
M E
N T S
N A
V
A P
O
A T
R L E
C O
L
C K
N E
W
J E
R S
E
P A
R T
M E
V Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N A
V
C
IL
IT
G
IN
E E
R
M M
A N
D
DES DRW
S Y
M D
E S
C R
IP
T
IO
N D
A T E
A P
P R
DRAWFORM REVISION: 12 APRIL 2018
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
UNCLASSIFIED
U N
C L
A S
S
IF
IE
D
UNCLASSIFIED
ARLINGTON,VA 22201
SUITE 500
1100 N GLEBE ROAD,
APRIL 2020
AS
DM
O T D
A T
E
P L
O T T
IM
E
-A
P R -2
:3
F
IL
E N
A M
E
B L
D G
-1
-X
D .d g n
0100-XD102
NTS
NTS
SHEET KEYNOTES
GENERAL NOTES
D E
M O
L
IT
IO
N
SELECTIVE DEMOLITION - BUILDING 573 - LOWER PLAN
30'-0"
50'-4"
SELECTIVE DEMOLITION - BUILDING 573 - SECTION
NTS
34'-0"
L E
C T
IV
E D
E M
O L
IT
IO
N P
L A
N A
N D S
E C
T
IO
N
B L
D G
009 134
2'-3"
CONTROL PANEL
SAND FILTER
EXISTING RAPID
A2
A2
12795300
EXISTING.
ALL EQUIPMENT, PIPING, AND OBJECTS SHOWN ON THIS SHEET ARE 4.
STARTING THE WORK.
COMPLETE FACILITY CONFIGURATION; FIELD VERIFY PRIOR TO
PHOTOS ARE PROVIDED FOR CLARITY AND MAY NOT REFLECT 3.
ADDITIONAL INFORMATION.
DRAWINGS. REFER TO ATTACHED REFERENCE DRAWINGS FOR
PLAN AND SECTION SHOWN ARE EXCERPTS FROM REFERENCE 2.
VERIFIED.
ALL EXISTING DIMENSIONS ARE APPROXIMATE AND SHALL BE FIELD 1.
TO ENSURE THAT SAND FILTER REMAINS IN SERVICE AT ALL TIMES.
VALVE AND PIPING DEMOLITION AND REPLACEMENT AS REQUIRED
EXISTING ISOLATION VALVES. SEQUENCE AND COORDINATE CHECK
DUCTILE IRON RISER PIPING BETWEEN FLOOR FLANGE AND
INFLUENT CHECK VALVES (2) AND ASSOCIATED 6-INCH DIAMETER
DEMOLISH 6-INCH DIAMETER DUCTILE IRON RAPID SAND FILTER 4.
CONSTRUCTION.
RAPID SAND FILTER SYSTEM TO REMAIN. PROTECT DURING 3.
FILTER CONTROL PANEL.
WORK RESTRICTIONS WHILE REMOVING & REPLACING THE SAND
PANEL. SEE SPECIFICATION SECTION 01 14 00 PARA. 1.3 L. FOR
DEMOLITION FOR RECONNECTION TO REPLACEMENT CONTROL
WIRING TO REMAIN. DISCONNECT AND PROTECT DURING
DEMOLISH EXISTING RAPID SAND FILTER CONTROL PANEL. FIELD 2.
EFFLUENT PIPING TO REMAIN. PROTECT DURING CONSTRUCTION.
UV SYSTEM, CONTROL PANEL, EFFLUENT FLUME AND PLANT 1.
ANIL
ORAC HTRO
N
L A
NOISSEF
O
R P
REENIGN
E
GILES .A TTERR
AJ
V A
L F
A C
IL
IT
IE
S E
N G
IN
E E
R
IN
G C
O M
M A
N D M
ID
-A
T L
A N
T
IC
P U
B
R
P A
R T
M E
R L E
N
R L
L
C K
N E
W
J E
R S
S
T E
W A
T E
R T
R E
A T
M E
N T P
L A
P
A
IR
B
Y R
E P
L A
C E
M E
N T S
N A
V
A P
O
A T
R L E
C O
L
C K
N E
W
J E
R S
E
P A
R T
M E
V Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N A
V
C
IL
IT
G
IN
E E
R
M M
A N
D
DES DRW
S Y
M D
E S
C R
IP
T
IO
N D
A T E
A P
P R
DRAWFORM REVISION: 12 APRIL 2018
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
UNCLASSIFIED
U N
C L
A S
S
IF
IE
D
UNCLASSIFIED
ARLINGTON,VA 22201
SUITE 500
1100 N GLEBE ROAD,
APRIL 2020
AS
DM
O T D
A T
E
P L
O T T
IM
E
-A
P R -2
:3
F
IL
E N
A M
E
B L
D G
-1
-X
D .d g n
0100-XD103
NTS
NTS
SHEET KEYNOTES
GENERAL NOTES
D E
M O
L
IT
IO
SELECTIVE DEMOLITION - RAPID SAND FILTER PUMP STATION - SECTION
SELECTIVE DEMOLITION - RAPID SAND FILTER PUMP STATION - PLAN
S E
L E
C T
IV
E D
E M
O L
IT
IO
N P
L A
N A
N D S
E C
T
IO
N
R A
P
ID
S
A N
D F
IL
T E
R P
U M
P S
T A
T
IO
N
ROUND
91.00
95.75
100.17
010 134
A1
A1A1
12795301
ADDITIONAL RAPID SAND FILTER PUMP STATION INFORMATION.
DRAWINGS. REFER TO THE ATTACHED REFERENCE DRAWINGS FOR
PLAN SHOWN IS AN EXCERPT FROM THE ATTACHED REFERENCE 2.
APPROXIMATE AND SHALL BE FIELD VERIFIED.
ALL EXISTING DIMENSIONS ARE INDICATED AS +/-, ARE 1.
REMOVE AND REPLACE LEVEL INSTRUMENTATION.4.
CUT AND CAP/PLUG RESTRAINED PIPE (BASE BID). 3.
EXISTING DISCHARGE PIPING DURING DEMOLITION.
EXISTING PUMP STATION DISCHARGE PIPING TO REMAIN. PROTECT 2.
SAND FILTER PUMPS TO REMAIN. 1.
ANIL
ORAC HTRO
N
L A
NOISSEF
O
R P
REENIGN
E
GILES .A TTERR
AJ
V A
L F
A C
IL
IT
IE
S E
N G
IN
E E
R
IN
G C
O M
M A
N D M
ID
-A
T L
A N
T
IC
P U
B
R
P A
R T
M E
R L E
N
R L
L
C K
N E
W
J E
R S
S
T E
W A
T E
R T
R E
A T
M E
N T P
L A
P
A
IR
B
Y R
E P
L A
C E
M E
N T S
N A
V
A P
O
A T
R L E
C O
L
C K
N E
W
J E
R S
E
P A
R T
M E
V Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N A
V
C
IL
IT
G
IN
E E
R
M M
A N
D
DES DRW
S Y
M D
E S
C R
IP
T
IO
N D
A T E
A P
P R
DRAWFORM REVISION: 12 APRIL 2018
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
UNCLASSIFIED
U N
C L
A S
S
IF
IE
D
UNCLASSIFIED
ARLINGTON,VA 22201
SUITE 500
1100 N GLEBE ROAD,
APRIL 2020
AS
DM
O T D
A T
E
P L
O T T
IM
E
-A
P R -2
:3
F
IL
E N
A M
E
B L
D G
-1
-X
D .d g n
0100-XD801
NTS
D E
M O
L
IT
IO
M O
L
IT
IO
N
P
H O
T O
S
PHOTO
C1
NTS
PHOTO
NTS
PHOTO
NTS
PHOTO
NTS
PHOTO
NTS
PHOTO
NTS
PHOTO
NTS
PHOTO
NTS
PHOTO
NTS
PHOTO
NTS
PHOTO
NTS
PHOTO
A2 A3 A4
C2 C3 C4
B1 B2 B3 B4
A1
GENERAL NOTES
CONFIGURATION.
CONTRACTOR SHALL FIELD VERIFY FACILITY
REFLECT COMPLETE FACILITY CONFIGURATION
PHOTOS PROVIDED FOR CLARITY AND MAY NOT 1.
011 134
12795302
N
L A
NOISSEF
O
R P
REENIGN
E
GILES .A TTERR
AJ
V A
L F
A C
IL
IT
IE
S E
N G
IN
E E
R
IN
G C
O M
M A
N D M
ID
-A
T L
A N
T
IC
P U
B
R
P A
R T
M E
R L E
N
R L
L
C K
N E
W
J E
R S
S
T E
W A
T E
R T
R E
A T
M E
N T P
L A
P
A
IR
B
Y R
E P
L A
C E
M E
N T S
N A
V
A P
O
A T
R L E
C O
L
C K
N E
W
J E
R S
E
P A
R T
M E
V Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N A
V
C
IL
IT
G
IN
E E
R
M M
A N
D
DES DRW
S Y
M D
E S
C R
IP
T
IO
N D
A T E
A P
P R
DRAWFORM REVISION: 12 APRIL 2018
CHK
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
UNCLASSIFIED
U N
C L
A S
S
IF
IE
D
UNCLASSIFIED
ARLINGTON,VA 22201
SUITE 500
1100 N GLEBE ROAD,
APRIL 2020
AS
DM
O T D
A T
E
P L
O T T
IM
E
-A
P R -2
:3
F
IL
E N
A M
E
B L
D G
-1
-X
D .d g n
0100-XD802
NTS
D E
M O
L
IT
IO
M O
L
IT
IO
N
P
H O
T O
S
PHOTO
C1
NTS
PHOTO
NTS
PHOTO
NTS
PHOTO
NTS
PHOTO
NTS
PHOTO
NTS
PHOTO
NTS
PHOTO
NTS
PHOTO
NTS
PHOTO
NTS
PHOTO
NTS
PHOTO
A2 A3 A4
C2 C3 C4
B1 B2 B3 B4
A1
GENERAL NOTES
CONFIGURATION.
CONTRACTOR SHALL FIELD VERIFY FACILITY
REFLECT COMPLETE FACILITY CONFIGURATION.
PHOTOS PROVIDED FOR CLARITY AND MAY NOT 1.
012 134
12795303
N
L A
NOISSEF
O
R P
REENIGN
E
GILES .A TTERR
AJ
| DEMOLITION |
| 0100-XC101 - DEMOLITION CIVIL PLAN |
| 0100-XD101 - DEMOLITION OVERALL SITE PROCESS DEMOLITION PLAN |
| 0100-XD102 - DEMOLITION BLDG 573 SELECTIVE DEMOLITION PLAN AND SECTION |
| 0100-XD103 - DEMOLITION RAPID SAND FILTER PUMP STATION SELECTIVE DEMOLITION PLAN AND SECTION |
| 0100-XD801 - DEMOLITION DEMOLITION PHOTOS |
| 0100-XD802 - DEMOLITION DEMOLITION PHOTOS |
| 2020-04-03T11:42:29-0400 | |
| Jarrett Selig |
| 2020-04-03T11:42:58-0400 | |
| Jarrett Selig |
| 2020-04-03T11:42:58-0400 | |
| Jarrett Selig |
| 2020-04-03T11:42:58-0400 | |
| Jarrett Selig |
| 2020-04-03T11:43:08-0400 | |
| Jarrett Selig |
| 2020-04-03T11:43:09-0400 | |
| Jarrett Selig |
File details come from the government source that posted it. Updated .