SPECIAL_CONDITIONS_DEVCC_Chiller.docx

DOCX document 17 KB Posted

Attached to
Deland Courthouse CEP Upgrades and Efficiency Improvements
Solicitation number
25-B-144LL
Issued by
Volusia County, Florida

About this file

This is a Special Conditions document for Volusia County, Florida's DeLand Courthouse Chiller Plant Optimization project (ITB No. 25-B-144LL), outlining operational requirements and contractor expectations for the central energy plant upgrade. The project involves replacing existing dedicated chillers, pumps, and associated components with two new 500-ton water-cooled chillers using R-514A refrigerant, two primary and secondary chilled water pumps with variable frequency drives, and new piping integrated with the existing Alerton Controls building automation system. The pre-bid meeting is scheduled for July 24, 2025, at 1:00 pm, with bid responses due August 14, 2025, at 3:01 pm. The total contract time is 180 days, and the estimated construction cost is $950,000. Contractors must hold a valid Florida General, Building, or Mechanical Contractor license and comply with local business preferences and E-Verify requirements.

The special conditions emphasize that work must occur primarily during non-business hours (Monday-Friday after 5:00 pm) to avoid disrupting courthouse operations, as the facility must maintain full cooling capacity at all times. The building is secured and requires all contractors to be escorted and cleared through security, with access via the loading dock on the Rich Avenue side. The awarded contractor is responsible for all equipment demolition and removal with no materials retained by the County, and all tools must remain secured in public areas. Alerton Controls is the mandatory standard for system integration, and the County will include a TRANE extended warranty with equipment purchase. A 5% bid bond is required, along with comprehensive insurance coverage from Florida-licensed providers with minimum A.M. Best ratings of A- and Financial Category VIII or greater. The contractor and County project manager will coordinate dumpster and storage locations, and contractors may use building bathrooms during the project.

View the file

Other files

File Type Posted
Deland_Courthouse_CEP_Upgrades_and_Efficiency_Improvements_(Addendum_#6_Revision).pdf PDF
Electrical_Diagram.pdf PDF
Page_M201,_Key_Note_#9_Detail.pdf PDF
Exhibit_F,_Technical_Specifications_25-B-144LL.pdf PDF
Deland_Courthouse_CEP_Upgrades_and_Efficiency_Improvements_(Addendum_#1_Revision).pdf PDF
PRIME-SUB_FORM_for_Contractors.xls XLS spreadsheet
PRIME-SUB_FORM_for_Contractors.xls XLS spreadsheet
Sales_Tax_Exemption_Procedure_25-B-144LL.pdf PDF
Special_Conditions_25-B-144LL.pdf PDF
Basic_Insurance_Requirements_25-B-144LL.pdf PDF
Basic_Insurance_Requirements_25-B-144LL.pdf PDF
MASTER_Construction_Contract_25-B-144LL.pdf PDF
Bid_Documents_25-B-144LL.pdf PDF
Payment_and_Performance_Bond_25-B-144LL.pdf PDF
Sales_Tax_Exemption_Procedure_25-B-144LL.pdf PDF
Special_Conditions_25-B-144LL.pdf PDF
Bid_Documents_25-B-144LL.pdf PDF
Exhibit_E,_CEP_Upgrades_100%_Construction_Drawings.pdf PDF
MASTER_Construction_Contract_25-B-144LL.pdf PDF
Payment_and_Performance_Bond_25-B-144LL.pdf PDF
Exhibit_E,_CEP_Upgrades_100%_Construction_Drawings.pdf PDF
Volusia_County_Government_-_Deland_Courthouse_-_CEP_Upgrades_100%_Construction_Drawings_(5).pdf PDF
Volusia_County_Government_-_Deland_Courthouse_-_CEP_Upgrades_100%_Construction_Drawings_(5).pdf PDF
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls XLS spreadsheet
Pre-Bid_Meeting_Invitee_Listing.docx DOCX document
SPECIAL_CONDITIONS_DEVCC_Chiller.docx DOCX document
PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls XLS spreadsheet
Pre-Bid_Meeting_Invitee_Listing.docx DOCX document
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DELAND COURTHOUSE CHILLER PLANT OPTIMIZATION

SPECIAL CONDITIONS

1. You will be working in a Courthouse. Any excessive noise, debris, or construction activity that disrupts the functionality of the Courthouse will not be permitted. The contractor will be asked to stop work immediately and may continue after business hours.

2. Courthouse Business hours are Monday through Friday 8:00 am to 5:00 pm

3. The Courthouse is a secured building. All contractors must be escorted in and out of the building and may be required to go through security.

4. The awarded contractor shall be responsible for the demolition and removal of all equipment outlined in the scope of work. The County does not wish to retain any unused materials.

5. At no time during normal business hours shall the Courthouse be without full cooling capacity. Any arrangement and costs needed to maintain full cooling capacity shall be the responsibility of the awarded contractor.

6. Alerton Controls are the County Standard and basis of design for integration, no other controls shall be acceptable on this project.

7. The County wishes to include the TRANE extended warranty with the purchase of the new equipment.

8. The County project manager and the awarded contractor will determine locations for the contractor's dumpster and storage (if needed). Locations for any other construction items can be determined at this time.

9. All contractors will enter the courthouse via the loading dock on Rich Ave. side.

10. All tools must remain secured while working in public areas.

11. Building bathrooms may be used during this project.

File details come from the government source that posted it. Updated .