SF30 AMD0002 to SPE60527Q0204_Signed.pdf

PDF 351 KB Posted

Attached to
Department of State (Erbil, Iraq)
Solicitation number
SPE605-27-Q-0204
Issued by

About this file

This document is Amendment 0002 to Request for Quote (RFQ) SPE605-27-Q-0204, issued by Defense Logistics Agency (DLA) Energy on November 12, 2026, with an effective date of November 4, 2026. The amendment extends the deadline for quote submission to November 18, 2026, at 11:00 AM EST and requires all offerors to acknowledge receipt of the amendment by submitting a signed copy of Standard Form 30 with their quotation. The amendment makes two substantive changes: it provides responses to 47 questions received from potential offerors and revises Attachment 3 (Letter of Commitment Instruction) by removing sentence 8, which previously required offerors to commence delivery within 48 hours of contract award, replacing it with language stating that awardees must be prepared to begin performance at the time of contract award, with flexibility for security clearance processing.

The underlying solicitation is a requirements-type contract for fuel supply to Erbil, Kurdistan Region, Iraq, requiring both Midgrade Unleaded Motor Gasoline (MUM) and Diesel Fuel (SFD) sourced directly from the Oil Products Distribution Center (OPDC). Estimated monthly requirements are 1,250 USG for MUM and 42,000 USG for SFD during the base year, with option year requirements of 415 USG and 20,830 USG respectively. Fuel must meet EN 228 and EN 590 specifications with maximum sulfur content of 10 mg/kg for diesel. All offerors must be registered in SAM.gov and registered and approved in JCCS as the prime contractor; subcontractors need not be registered in JCCS. Certificates of Analysis and Quality must be submitted directly by testing laboratories and must meet all solicitation requirements, with independent third-party laboratory testing preferred but not mandatory. The delivery terms are FOB Destination, with the seller retaining risk of loss until goods arrive at the buyer's designated location. Pricing is based on the reference price effective September 1, 2026, plus the offeror's all-inclusive differential for cost and profit.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

Augustus Patterson

Proceed to page no. 2 -5 for "Details."

Defense Logistics Agency - Energy 8725 John J Kingman Road, Suite 4950 Ft. Belvoir, VA 22060 Suttom Beshir - FEPDA 571-965-7789

SPE605-27-Q-0204

1.6 G

1 5

11/12/2026

11/04/2026

Amendment 0002 to RFQ

SPE605-27-Q-0204

This amendment is issued to make the following changes to the Solicitation:

1. Provide responses to the questions received.

2. Revise Attachment 3- Letter of Commitment Instruction by removing sentence 8.

All offerors are reminded to acknowledge receipt of this amendment, please submit a signed copy of the SF-30 with your quote. All quotes are due no later than November 18, 2026, 11:00 AM EST, Ft. Belvoir time. All other terms and conditions of the solicitation remain unchanged.

Question Answer

1 Economic Price Adjustment (EPA): We understand that price adjustments are based on OPDC's officially issued prices.

However, OPDC sometimes issues retroactive price adjustments up to two months after fuel delivery, resulting in additional costs to the contractor. Would DLA accept and reimburse such price increases when officially issued by OPDC after delivery, even if the adjustment is received approximately two months later?

Yes

2 MUM Certificate of Quality (COQ): Obtaining certification from an overseas independent laboratory may take approximately 7–10 working days. Would DLA accept an OPDC-issued COQ, or is independent laboratory certification mandatory?

DLA Energy will accept certificates from different sources. These certificates must meet all terms and conditions outlined in the solicitation.

3 Fuel Rejection and Non-Compliance: Once fuel is purchased, loaded, and dispatched from OPDC, returning it to the refinery is not feasible under its standard procedures. Could DLA clarify the required disposition of rejected fuel and the applicable contractor responsibilities if fuel fails inspection at the destination?

The Delivery Terms of this contract are FOB (Free on Board) Destination. This indicates that the seller retains ownership and the risk of loss of the goods during transit prior to acceptance by the buyer. Ownership and financial responsibility officially transfer to the buyer only when the goods safely arrive at the buyer's specified location. It is the responsibility of the vendor to ensure the fuel meets DLA Energy quality standards prior to delivery.

4 COA/COQ validity period - The solicitation refers to certificates issued within the previous three months, while another requirement specifies certificates issued within 30 days of submission. Please confirm the applicable validity period for the COA/COQ submitted with our quotation.

See Amendment 001 to this solicitation, which was posted on November 9, 2026.

5 Delivery commencement and security clearances: The scheduled delivery commencement date is December 1, 2026, while driver security vetting requires 60 days. Can the vetting process begin before contract award, or will a mobilization period be allowed after award to complete the required clearances before the first delivery?

If the awardee is unable to perform due to security clearance still being processed, an alternate method will be utilized to meet the customer's requirements. However, if it is determined later that the awardee is unable to perform, the U.S. Government reserves the right to take appropriate corrective actions.

6 Fuel pricing and monthly adjustments: Please clarify how the applicable Platts reference prices, the contractor’s fixed differential, and monthly OPDC fuel price changes will be used to calculate the payable delivery price. A worked example showing the initial price and a subsequent monthly adjustment would be appreciated.

As stated in the solicitation, the reference base price is the price of the fuel product effective on the base reference date (September 1, 2026). All offerors are required to use this price to build their bid price for each CLIN by adding a differential to the base price.

This differential is all-inclusive of the offeror's cost and profit. The calculation is as follows: Reference Price + Differential/Expenses = Total Offer Price. This calculation is included in Attachment 6 to this solicitation.

7 Official fuel allocation and purchase authorization: Upon contract award, will DLA, the U.S. Embassy’s Logistics Management Center (LMC), or another designated authority issue an official letter identifying Al-Taj United Company as the awarded supplier and authorizing or supporting the allocation and purchase of the contractual gasoline and diesel quantities from OPDC?

DLA Energy will provide the award documentation to the awardee.

8 Please confirm the issuing authority, when this letter would be provided, and whether our company must obtain any separate registration, purchasing authorization, or other approvals before purchasing the fuel.

The offeror is responsible for obtaining all necessary documents, authorizations, and approvals. The U.S. Embassy's Logistics Management Center (LMC) manages the administrative requirements required for performance in this region. See Attachment 1 - LMC - OPDC Process Instructions.

9 Regarding (Attachment 2 COA/COQ Submission Cover Page) on the first page it says we (Name of Offeror), we just to confirm that we are correct in putting our company's name in there and not the lab name. And also in the last page it says CUSTOMER NAME, is that should be DLA or the company's name?

The "Name of Offeror" is the name of the company that is submitted the quotation. It is not the name of the laboratory. The "Customer Name" is DLA Energy. It is not the name of the offeror or the laboratory.

10 We note that the Standard Form 1449 (SF1449) does not appear to be included in the subject solicitation package. Could the DLA kindly confirm whether the omission is intentional or whether it will be provided separately?

See Amendment 001 to this solicitation, which was posted on November 9, 2026.

11 We respectfully wish to bring to DLA's attention a minor typographical error in Attachment 2 where the closing date is stated as 2023 instead of 2026.

See Amendment 001 to this solicitation, which was posted on November 9, 2026.

12 In Section M, Sub factor 2, Paragraphs 1 and 2 specify certificates issued within 3 months of the RFQ Deadline, while Paragraph 6 specifies certificates within 30 days of submission. Please clarify.

See Amendment 001 to this solicitation, which was posted on November 9, 2026.

13 The available government laboratory conducts petroleum product testing in accordance with the testing procedures and standards enforced by the Kurdistan Regional Government’s Ministry of Natural Resources. Certain test methods may differ from the EN ISO methods referenced in EN 228 and EN 590. Will the MNR test methods be accepted?

It is up to the offeror to ensure that the test methods used are equivalent to the specification requirements. If it is known ahead of time that the test methods to be used are not covered by the specification, please submit an exception request. It is not mandatory, but it is highly recommended to use an independent third-party laboratory to ensure the test methods are equivalent to the specification requirements.

14 We would appreciate confirmation of whether DLA would consider locally recognized testing standards or alternative test methods for review and approval under the provisions of Attachment 4. (Quality Assurance Provisions)?

It is up to the offeror to ensure that the test methods used are equivalent to the specification requirements. If it is known ahead of time that the test methods to be used are not covered by the specification, please submit an exception request. It is not mandatory, but it is highly recommended to use an independent third-party laboratory to ensure the test methods are equivalent to the specification requirements.

15 Would DLA consider an arrangement technically acceptable in which the prime contractor remains fully responsible for contract performance (transportation, storage, handling, documentation and delivery) while a designated disclosed Iraqi fuel-supply affiliate obtains OPDC allocations, purchases fuel and coordinates the applicable tax-clearance and movement approvals in the affiliates name.

Such an arrangement is acceptable under the terms and conditions of this contract. However, the prime contractor is responsible for ensuring that the arrangement is acceptable and meets all the rules and regulations set forth under LMC, OPDC, and the Government of Iraq policies and procedures. The prime contractor also assumes all the risk if, for any reason, it is unable to perform.

Questions & Answers to SPE60527Q0204

16 We note that paragraph (a) requires diesel fuel to conform to the latest revision of EN 590, with a maximum sulfur content of 10 mg/kg. However, the subsequent location specific provisions address additional requirements for Kosovo and Afghanistan, without identifying a specific climate classification or seasonal grade for Northern Iraq (Kurdistan Region).

1. Should diesel fuel delivered to Erbil, Kurdistan Region, Iraq, comply with the latest revision of EN 590, subject only to the general modifications stated in paragraph (b), with the Kosovo-specific and Afghanistan-specific provisions excluded?

2. Does DLA Energy require a particular EN 590 climate class or seasonal grade for Erbil, or should the supplier determine the applicable grade based on local climatic conditions?

1. Yes, it should meet the requirements of EN 590.

2. Unless stated otherwise, the supplier shall determine the appropriate grade based on the local climate at the time of delivery.

17 Are there any additional testing requirements or characteristic limits applicable to diesel delivered to Erbil that are not expressly identified in Attachment 4?

Unless stated otherwise, the diesel delivered shall meet the requirements detailed in QAP C16.67-2.

18 Can an Iraq-based fuel trading company participate as a prime contractor? Yes. The Prime Contractor must meet all the requirements listed in the RFQ.

19 Can we participate through a partnership or subcontracting arrangement with an approved JCCS vendor? Yes. The Prime Contractor must be registered and approved in JCCS. Subcontractors are not required to be registered and approved in JCCS.

20 What are the exact SAM.gov and JCCS registration and approval requirements? The websites for SAM.gov and JCCS are https://www.sam.gov and https://www.jccs.gov/jccscoe, respectively. All offerors listed as the prime contractor must be registered in SAM, registered, and approved in JCCS. Use the guide and help features on these websites to learn more.

21 Can you provide guidance on the required fuel specifications, certificates of quality and supplier commitment letters? All offerors must read the requirements listed in the RFQ carefully and submit specific questions as it relates to the solicitation.

22 What is the correct procedure for submitting a quotation? This solicitation is being issued under RFO FAR 12.201 Solicitation Procedures. See the following website for additional details:

https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-12 23 Fuel sourcing through OPDC. Must both gasoline (MUM) and diesel (SFD) be purchased directly from OPDC, or may we use another supplier if OPDC approves the fuel source or shipment?

Yes. Both must be sourced directly from OPDC.

24 OPDC registration and approval. Must our company be registered with or approved by OPDC before submitting a quotation, or can the successful contractor complete this process after award? If approval is required with the quotation, which OPDC office should we contact, what documentation will DLA accept, and does DLA or the U.S. Embassy provide a referral letter?

All offerors must be registered and approved in JCCS. You are not required to be registered and approved to submit a quote.

However, an offeror must be registered and approved in JCCS in order to receive the award.

25 If OPDC supplies both fuels, can we use existing Certificates of Analysis or Quality that meet the RFQ specifications and fall within the required threemonth window, or is new testing required? Would DLA accept reports from OPDC’s own laboratory if it sends them directly to DLA, or must the reports come from an independent third-party lab?

For this solicitation, all COAs/COQs must be sent directly from the laboratory. All COAs/COQs must meet all requirements outlined in the solicitation. The use of an independent third party is not mandatory, but it is the preferred method to ensure all necessary tests are performed on the fuel sample.

26 If an independent third-party lab is required, may we select one ourselves? Are there specific accreditation requirements or a list of approved laboratories?

There is no list of approved independent third-party laboratories. The offeror can select a laboratory.

27 Could you confirm the minimum RON and MON values and the applicable seasonal EN 228 vapor-pressure class for MUM gasoline delivered in Erbil?

The RON and MON minimum values are 95 and 85 respectively; those values are represented in the EN 228 specification. We will not specify the class, but the vapor pressure shall be appropriate to the local climate in Erbil at the time of delivery.

28 What are the typical and minimum quantities per delivery for each fuel, and how much advance notice will the contractor receive for each delivery order?

This is a requirements type contract per RFO FAR 16.503. The estimated monthly requirement for MUM during the base year and option period is 1,250 and 415 USG, respectively, and the estimated monthly requirement for SFD for the base year and option year is 42,000 and 20,830 US Gallons, respectively.

29 Attachment 2 lists 18 November 2023, while the main RFQ lists 18 November 2026. Could you confirm that the lab certificates are due by 11:00 a.m. Eastern Time on 18 November 2026?

See Amendment 001 to this solicitation, which was posted on November 9, 2026.

30 Attachment 2 (COA/COQ cover page instructions) states a submission deadline of November 18, 2023. Please confirm the correct deadline is November 18, 2026 at 11:00 AM EST, and that the testing laboratory must email the certificates directly to DLA before that time.

See Amendment 001 to this solicitation, which was posted on November 9, 2026.

31 Please confirm whether the COA/COQ must be received by DLA before the closing time, or whether proof of the laboratory sending them before closing is sufficient.3

Yes. The COA/COQs must be received before the RFQ closes.

32 Section B states a monthly quantity for Diesel Fuel (SFD) but no monthly quantity for Gasoline (MUM), only the annual estimated quantities (15,000 USG base year and 5,000 USG option year). Please provide the estimated monthly quantity of MUM expected, and the typical delivery order size.

This is a requirements type contract per RFO FAR 16.503. The estimated monthly requirement for MUM during the base year and option period is 1,250 and 415 USG, respectively, and the estimated monthly requirement for SFD for the base year and option year is 42,000 and 20,830 US Gallons, respectively.

33 Is an offer submitted by a joint venture acceptable under this solicitation? If so, please confirm whether the joint venture itself must be registered in SAM.gov and registered and approved in JCCS as the prime vendor, or whether the SAM.gov and JCCS registration and approval of the managing joint venture partner satisfies those requirements. Please also confirm whether Letters of Commitment from joint venture partners are acceptable for supply, transportation, and storage.

The Prime vendor must be clearly identified. Only the Prime vendor must be registered in SAM and registered and approved in JCCS. Sub-contractors must be listed in SAM.

34 The reference price the award price fluctuates with Paragraph 2(c)(2) of Section B marks option (iii), the established price posted by the Oil Products Distribution Center, and we understand the OPDC posted price to be the one that applies.

Footnotes 2 and 3 to the Table then establish the base reference prices in column VI from Platts Oilgram FOB Med assessments. Please clarify which of the two governs, and which OPDC posting applies to a given delivery.

The reference price is only necessary to set a baseline to allow all offerors to submit a quote. The supplier notification process will be used during contract performance. The vendor will be required to submit the cost of the fuel received from OPDC to DLA Energy. The reference price and index will NOT be used to fluctuate fuel prices during performance.

35 Attachment 2 requires the certificates to be transmitted to DLA Energy directly by the testing laboratory. Please confirm that a commercial laboratory established in Iraq, independent of the offeror and with a record of testing undertaken for the Consulate's own requirements, satisfies this requirement.

All offerors are required to identify a laboratory that is willing to meet this requirement. No exceptions will be accepted.

36 Paragraph 8 of Attachment 3 requires offerors to commence delivery within 48 hours of award. Section B requires security background clearance for three vehicle operators before the first delivery and states that the clearance process takes 60 days, with vehicle data due five working days beforehand. Please confirm whether the 48 hour commitment runs from award or from completion of operator clearance and site access, and whether the Government will initiate operator clearance for the successful offeror immediately upon award.

The awardee must be prepared to begin performance at the time of contract award. Attachment 3 is revised to remove sentence 8.

37 JCCS timing. Special Administration Note 5 requires the prime to be registered and approved in JCCS. Is a quotation acceptable if the JCCS registration is submitted and pending approval at the quote deadline, provided approval is in place before award?

All quotations must be submitted before or on the due date. All timely quotes will be received and evaluated. The prime vendor must be registered and approved in JCCS before award.

38 Host nation business license. For a U.S. prime that will perform through a licensed Iraqi fuel supplier and transporter, may the Iraqi subcontractor's host nation license and tax documents satisfy items (c) to (e) of Note 5, or must the prime hold its own Iraqi license?

The prime vendor must be registered and approved in JCCS. All the required documentation must be applicable to the prime vendor.

39 OPDC sourcing. Note 6 requires fuel to be obtained through OPDC under the LMC/OPDC/PMNOC process. May a U.S.

prime meet this requirement through a licensed Iraqi subcontractor that holds the OPDC allocation, supported by a letter of commitment under Section M, Subfactor 3?

Yes. However, the prime contractor is responsible for ensuring that the subcontractor meets all the rules and regulations set forth under LMC, OPDC, and the Government of Iraq. The prime contractor assumes all risk if, for any reason, the subcontractor cannot perform.

40 Fuel source in the Kurdistan Region. For delivery in Erbil, is product from a KRG-licensed refinery or terminal acceptable if it meets specifications C16.67 and C16.69-2 and is supported by a current COA/COQ, or must all product originate through

OPDC?

Yes.

41 Driver clearance. The delivery notes state a 60-day security clearance for three vehicle operators. With deliveries beginning 1 December 2026, how will the Government handle the first deliveries if clearances are still in process?

If the awardee is unable to perform due to security clearance still being processed, an alternate method will be utilized to meet the customer's requirements. However, if it is determined later that the awardee is unable to perform, the U.S. Government reserves the right to take appropriate corrective actions.

42 Incumbent and history. Is there a current contract for this requirement, and if so, may you share the contract number? The solicitation was issued as a follow-on requirement for the Department of State (DOS) Erbil. The incumbent contracts were SPE605-26-D-9552 and SPE60526P9510, and the current contract is SPE60527P9652.

43 Qandel is registered in SAM.gov, holding an active DUNS and is actively completing its JCCS approval process. Could the Government confirm whether final JCCS approval must be obtained before quotation submission or whether an active registration pending final approval can still be considered?

All quotations must be submitted before or on the due date and time. All timely quotes will be received and evaluated. The prime vendor must be registered and approved in JCCS before award.

44 For Midgrade Unleaded Motor Gasoline (MUM), specification C16.69-2, could the Government confirm the exact gasoline grade required, including the minimum Research Octane Number (RON) and Motor Octane Number (MON)? Specifically, should the offered gasoline correspond to a particular octane grade commonly available in the Kurdistan Region of Iraq?

The RON and MON minimum values are 95 and 85 respectively; those values are represented in the EN 228 specification. The gasoline octane grade shall match the octane specified in the solicitation.

45 The solicitation references different validity periods for Certificates of Analysis/Quality, including 30 days, 90 days, and three months. Could the Government confirm the controlling validity period and whether it is measured from the sampling, testing, or certificate issuance date?

See Amendment 001 to this solicitation, which was posted on November 9, 2026.

46 Will the Government accept COA/COQ documentation based on samples collected from an identified fuel storage terminal or batch tank, provided the fuel meets all applicable specifications and refinery-origin traceability requirements? Additionally, may existing qualifying certificates be submitted directly by the issuing laboratory without requiring new testing?

Yes. The sample must meet the standards set forth in the solicitation.

47 Attachment 3 references the capability to commence deliveries within 48 hours of contract award, while the solicitation indicates that driver security clearances may require approximately 60 days. Could the Government clarify how these requirements are reconciled for newly awarded contractors?

If the awardee is unable to perform due to security clearance still being processed, an alternate method will be utilized to meet the customer's requirements. However, if it is determined later that the awardee is unable to perform, the U.S. Government reserves the right to take appropriate corrective actions.

2026-11-12T14:49:49-0500
PATTERSON.AUGUSTUS.JR.1047232046

File details come from the government source that posted it. Updated .