SF30 SPE60425R0405 A0005.pdf
PDF 13 KB Posted
- Attached to
- PJM 2025 - Electricity Federal contract opportunity
- Solicitation number
- SPE60425R0405
- Issued by
- Defense Logistics Agency Energy
About this file
This document is an Amendment of Solicitation/Modification of Contract for a federal energy procurement solicitation. The amendment, issued by DLA Energy Installation Energy, makes several key modifications to the original solicitation SPE60425R0405:
For CLIN 0018 (Joint Base McGuire Dix Lakehurst), the amendment removes two accounts and corrects the usage amount on one account, resulting in a decrease of 2 total accounts (from 630 to 628) and a reduction of 1,308,882 kWh in total estimated quantity (from 5,622,435,134 kWh to 5,621,126,252 kWh). Additionally, the amendment corrects a previous change related to NIST, specifying a 23-month performance period from January 2026 to December 2027, noting manual infrastructure adjustments that have reduced average monthly electricity usage from 210,000 kWh to 141,000 kWh. The amendment updates Attachment I (Installation Data Sheet) and Attachment VII (Pricing Sheet) to reflect these changes.
View the file
Other files for this federal contract opportunity
Show all 50
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO.
See Block 14
4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
6. ISSUED BY CODE SPE604 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE FACILITY CODE
SPE60425R0405
X
2025 JUN 27
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX is extended, X is not extended.
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
12. ACCOUNTING AND APPROPRIATION DATA (If required)
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A NAME AND TITLE OF SIGNER (Type or print)
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
(a) By completing Items 8 and 15, and returning
DLA ENERGY
INSTALLATION ENERGY
8725 JOHN J. KINGMAN ROAD
FORT BELVOIR VA 22060
15C. DATE SIGNED 16C. DATE SIGNED
D. OTHER (Specify type of modification and authority)
2025 OCT 06
3. EFFECTIVE DATE
See Attached Continuation Sheet(s).
(X)
CHECK ONE
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
CONTINUED ON NEXT PAGE
PAGE 2 OF 3 PAGES
SPE60425R0405 - 0005
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
1. B1.08, Paragraph (c) Table 1 is hereby amended to reflect the following changes:
a. CLIN 0018 Joint Base McGuire Dix Lakehurst (JBMDL) is amended to remove two account.
b. CLIN 0018 Joint Base McGuire Dix Lakehurst (JBMDL) is amended to correct usage amount on one account.
c. As a result of the change outlined in Items 1a and 1b above, the Total Accounts for CLIN 0018 has decreased by 2, from 156 accounts to 154 accounts. The Total Estimated Quantity for CLIN 0018 has decreased by 1,308,882 kWh, from 92,732,964 kWh to 91,424,082 kWh.
d. As a result of the change outlined in Items 1a above, the Total Accounts solicited has decreased by 2 accounts, from 630 accounts to 628 accounts.
e. As a result of the change outlined in Items 1a and 1b above, the Total Estimated Quantity solicited has decreased by 1,308,882 kWh, from 5,622,435,134 kWh to 5,621,126,252 kWh.
2. The change detailed in Amendment 0004, Item 2b was incorrectly identified as applying to CLIN 0027 - Letterkenny Army Depot. This change is hereby corrected as follows:
a. 0035 - NIST is amended to read as follow:
"NIST is seeking for a 23-month period of performance from the meter read date occurring in the month of January 2026 to the meter read date occurring in the month of December 2027. Beginning March 7, 2025, manual infrastructure adjustments were implemented to enhance energy efficiency. These efforts have yielded a consistent decline in kWh consumption, with the average usage decreasing by approximately 39%, from 210,000 kWh to 141,000 kWh. This reduction is already reflected in Pepco’s billing statements."
SECTION D - LIST OF ATTACHMENTS
3. Attachment I - Installation Data Sheet PJM 2025 A0005 is hereby amended to:
a. Reflect the changes specified in Item 1 above.
4. Attachment VII – Pricing Sheet PJM 2025 A0005 is hereby amended as follow:
a. To include the changes specified in Item 1 above.
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 3 OF 3 PAGES
SPE60425R0405 - 0005
SECTION J - LIST OF ATTACHMENTS
List of Attachments
Description File Name ATTACH_IDS Attachment I - Installation
Data Sheet PJM 2025 A0005.xlsx
ATTACH_Pricing_Sheet Attachment VII - Pricing Sheet PJM 2025 A0005.
xlsx ATTACH_Continuation_Pa ges Continuation Pages
SPE60425R0405 A0005.
File details come from the government source that posted it. Updated .